Enexis energy storage webinar - CEDEC · elektriciteit van de 310 kWp aan zonnepanelen moet worden opgeslagen in ... Microsoft PowerPoint - Enexis energy storage webinar.pptx Author:

Embed Size (px)

Citation preview

1

2

3

4

5

6

7

Load MS/LS transformer, without SSU

This is not an extreme situation, not at all. Minus 50 kW in very common.

8

These targets are general targets, not specially smart storage targets.

1-2. With SSU we can postpone the classical expansion of the network.

3. An average MV failure takes about 2 hours. SSU’s dimensions are based on this figure. In 75% of the failures, it will do.

9

10

Peak reduction: so peak loads of transformers have been decreased andexpansion of the network can be postponed.

11

Peak reduction: so peak loads of transformers have been decreased andexpansion of the network can be postponed.