ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot water generator system was installed to recover energy from a solid waste incinerator in an Arctic work camp. The heat recovery system was to provide heat for the incinerator, the domestic water and sewage treatment buildings, and other associated camp facilities. Excess heat was to be rejected to a cooling pond. A study was con- ducted to utilize excess heat for power generation using steam and Organic Rankine Cycles alternatives. Arctic conditions present special problems for design and con- struction. Some of the design considerations are described as wel l as experience during startup. NOMENCLATURE MBtu/hr = Millions of Btu/hr = 1.055 gJ/h TPD - Tons Per Day = 907 kg per day NFS = Non-Frost Susceptible INTRODUCTION A 100 TPD (90,700 kg/day) solid waste incinerator was installed at the central incinerator facility of Prudhoe Bay, Alaska in 1980 to replace two previously installed incinerators. The combustion gas to hot water heat exchangers on both of the older incinerators were leaking after 2� years of operation and the duct work was badly corroded. Finned heat transfer surfaces were eroded. The incinerators suffered from continual overheating due to a buildup of solid calcium carbonate on the water side. These problems were causing excessively high operation and maintenance costs. 135 The new incinerator was intal led with a gas to hot water heat exchanger system to match the previous in- cinerator heat recovery system. This paper describes the incinerator, the heat recovery system and the proposed system addition to the incinerator facility. BACKGROUND Prudhoe Bay is the northern terminus of the Alaska Crude Oil Pipeline and is the center of oi l activity in northern Alaska. Oil production, exploration and support activities are carried out by short term imported crews. The population of approximately 3500 persons lives in a construction camp environment on one to three week rotations. Solid wastes are generated from the camps and related kitchens, drill rig sites and support shops in the area. Prudhoe Bay is located in the North Slope Borough which governs all land north of the Brooks Range in Alaska. The seat of government is located in Barrow, Alaska. The Borough requires all solid waste generated in the Prudhoe Bay area to b e processed at the Borough's central incineration plant. Privately operated incinerators built prior to the enactment of the law are allowed to continue operation. Prudhoe Bay is located just above 70 0 N latitude, in an area of continuous permafrost. The permafrost ex- tends from the surface to depths as great as 2000 ft (610 m). There is an active surface layer on the perma- frost which thaws and refreezes every year. The active layer extends to a depth of 4-6 ft· ( l.2-l.8 m) during the short summer from late June to early September. ese conditions present special construction problems not found in more temperate climates.

Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR

PAUL E. OLIVER Van Gulik & Associates, Inc.

Lake Oswego, Oregon

ABSTRACT

A hot water generator system was installed to recover energy from a solid waste incinerator in an Arctic work camp. The heat recovery system was to provide heat for the incinerator, the domestic water and sewage treatment buildings, and other associated camp facilities. Excess heat was to be rejected to a cooling pond. A study was con­ducted to utilize excess heat for power generation using steam and Organic Rankine Cycles alternatives. Arctic conditions present special problems for design and con­struction. Some of the design considerations are described as well as experience during startup.

NOMENCLATURE

MBtu/hr = Millions of Btu/hr = 1.055 gJ/h TPD - Tons Per Day = 907 kg per day NFS = Non-Frost Susceptible

INTRODUCTION

A 100 TPD (90,700 kg/day) solid waste incinerator was installed at the central incinerator facility of Prudhoe Bay, Alaska in 1980 to replace two previously installed incinerators. The combustion gas to hot water heat exchangers on both of the older incinerators were leaking after 2� years of operation and the duct work was badly corroded. Finned heat transfer surfaces were eroded. The incinerators suffered from continual overheating due to a buildup of solid calcium carbonate on the water side. These problems were causing excessively high operation and maintenance costs.

135

The new incinerator was intalled with a gas to hot water heat exchanger system to match the previous in­cinerator heat recovery system. This paper describes the incinerator, the heat recovery system and the proposed system addition to the incinerator facility.

BACKGROUND

Prudhoe Bay is the northern terminus of the Alaska Crude Oil Pipeline and is the center of oil activity in northern Alaska. Oil production, exploration and support activities are carried out by short term imported crews. The population of approximately 3500 persons lives in a construction camp environment on one to three week rotations. Solid wastes are generated from the camps and related kitchens, drill rig sites and support shops in the area.

Prudhoe Bay is located in the North Slope Borough which governs all land north of the Brooks Range in Alaska. The seat of government is located in Barrow, Alaska. The Borough requires all solid waste generated in the Prudhoe Bay area to be processed at the Borough's central incineration plant. Privately operated incinerators built prior to the enactment of the law are allowed to continue operation.

Prudhoe Bay is located just above 700N latitude, in an area of continuous permafrost. The permafrost ex­tends from the surface to depths as great as 2000 ft (610 m). There is an active surface layer on the perma­frost which thaws and refreezes every year. The active layer extends to a depth of 4-6 ft· ( l .2- l .8 m) during the short summer from late June to early September. These conditions present special construction problems not found in more temperate climates.

Page 2: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

,

nt .. "au 10 • •• •• • • •• · -

-2'" f) .. .. .. 1 • ..

.. _-

IXHAU IT .T.CIt ,

OUt;,. " ACIt .. 0 o· ,

• .. .. .. 1 • • • •

• • • • "tCIAC.'

'1,400 C 4'0' '-I

••

SOA .. ",,,

, , ,

I ' • • 'u(:,"e.O"1 400' , • • • V\ D AlII OUUleM

D " .. UII .. AUt

) • • • • • • • •

'III MAX.

',000 " H

I,O.'AN

·'.'OO C

"'0' , - ,

-, lioii III ... X.

10,000 " .

I' •

:o!= CONVICTION " AOI ."

: •

� "uue"

r- IIIIUII. 'UMMll'C,)

1,400·' ' .. . .. , . . . . . ' 4Y.IOO-I,.700 .... H •

\

''''''''12

1-I-\

OIL IU'"".,UIU

2 .• - •.•• to· " Hlit

20-10 Q"H MOO.

• • , . I MIlINO C ... " .. '.III • le'''e.O''1

'.000-10.700 '''N I 10.700-111,100 .. ," \ • • • I • • . . , QLYCOL • �------------------------- -- --,

• • . . . --,. \ WTIII/QLYCOL 1'4' •• '" .••• 0·', "00-4'0 (I" .. . 110 1""0 'c--------' \ I

· ... x.. 1------- ____ I ' . Ml,I.CHANO'" 1 .1 I -: : QL'ICOL' ".eOfU'TION

TIC SS,A 0 (-:"��. �"�"L�/�I : : �UT

12.'0' """ ....... I r \ �

III#.O'ATION I.CTlON

"" 0,,'1" 0" 10110'''"111

.--... ---�-----""lfl AUII,OIL IUIUIIA •

: I: I _.

'u"",. r", . I

,Utll ,.".'U,

.'0 0 .. .. � : Tev CW JI • • " 2 " 'N

• • c;. HT , II1.1l0TlON .. .... � .. I . NT ,llICH"HOl[l1 - I '"0M .1 • • lev "" 0"" 1011 I I ... . ' ... HI( • lIS 30.,0' . ,"" ..... 1I.

I C w • I:--'�:r--' : 0 ."....... ..JI •• t::>I<: ________ _

HEAT RECOVERY­REJECTION

"""" 1 'UIL

'.000-1.'00 .. ," al·I.'" we

'0-40.10' I/"JII

INCINERATOR

• U" D '0l1li '''11110. "T. 'OU"CI O.l'

FIG.l INCINERATOR W/HOT WATER HEAT RECOVERY FOR BLDG. HEAT

Temperatures experienced in the Prudhoe Bay area range from -55°F (-48°C) in the winter to +75°F (24°C) in the summer. There are approximately 20,000 heating degree days per year. Although it is located on the Beau­fort Sea of the Arctic Ocean, the area is essentially an arctic desert receiving less than 6 in. of precipitation each year. The precipitation occurs as fine granular snow which in winter is driven by strong winds across the arctic plains, creating white-out conditions which impact daily opera­tions.

The site imposes severe conditions on buildings and on solid waste facilities. Landfill operation is not feasible because the long periods of low temperatures prevents bacterial decomposition. The frozen condition of the earth makes it difficult to excavate and drainage of the contourless terrain is difficult. Only inert materials such as ash, glass and metals are permitted to be landfilled.

DESCRIPTION OF S ITE CONDITIONS

In 1980 the Borough purchased a new 100 TPD (90, 700 kg/day) starved combustion, solid waste incinerator capable of 40 MBtu/hr (42 gJ/h) energy input. The in­cinerator design included a batch type, ram feeder and vibrating furnace floors. A gas to hot water heat exchange system capable of 30 MBtu/hr (32 gJ/h) absorption was selected to match the existing incinerator heat recovery system. (Fig. 1). Subsequently, a turnkey design/construct

contract was let for the completion of all work, including the building, system installation and startup.

The starved 'combustion achieves low particulate emis­sions by sub stoichiometrically burning the solid waste in a chamber to drive off the volatile components of the fueL Combustion of resulting smoke and vapors is completed in a second chamber at a controlled temperature to insure complete oxidization. Ideally the process would result in complete burning of the fixed carbon in the first chamber, leaving only ash at the end of the vibratory grates.

The heat of incineration is recovered by a radiation furnace section and a convection section downstream of the secondary combustion zone. The radiation section is a

. water wall chamber surrounding the substoichiometric

136

combustion process designed to absorb 10 MBtu/hr (11 gJ/h). The convection section consists of approximately 15 rows of bare and 7 rows of finned tubes. This section was designed to absorb 18 MBtu/hr (19 gJ/h) at a gas inlet temperature of 1400°F (760°C) which is controlled by reCirculating the exhaust gas. The hot gas recirculation is used to lower ash temperature below the softening point to prevent buildup in the convection tubes. Gas recircula­tion accomplishes this goal without loss of efficiency or increase in exist gas mass flow that would occur if cold air is used for cooling. The outlet gas temperature was held to 400°F (204°C) to minimize condensation of corrosion products at the cold end of the heat exchanger.

The building that encloses the incinerator covers 16,600 ft2 (1680 m2) and has a 48 ft (14.6 m) eave height. The

Page 3: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

r---. : 0 "JW�Ol"COL

( ) tH.rICH. �.'AHSIO'" TAHIl : I . I I 6 I I ,--------- -'--___ J �� ___ ----r I I I ,-I I I I I I I I I

�----H-,--n I ---�-------I I I I '9 I I l) I I � I I I I I I I I I I I STAHOIY : C1_J C): '- - IOllUI - "1 I I I I I I

I I I I I STANDIY : h

- .O .... f.. .J � (OLD)

I L I

- " I ___ ,_J. I I I I I I I

C): I I I

I I I � �

10LO)

OLe HEW

'LANT PLANT

--- - -.. I ,- ----I I I G) I I I I I I I

- " I I I I I I I I I I I I I I I I I I I I I I I I

� H10.

HIW -

, GLY COL "f.EXCH.

I

I

UNIT

"fA (NIEW)

flC'A ... SIOH TAHII.

� H

<!

c: '"U

I HE W)

FIG.2 GLYCOL HEATING SYSTEM

building is constructed adjacent to the previously existing 16,000 square foot (1720 m2) incinerator building and shares a common wall. The existing unloading and shread­ding facility was retained and a fuel conveyor from the shredder to the new incinerator was installed. The build­ing and incinerator were constructed on a refrigerated slab on grade. The only penetration below grade is by the ash scoop hopper.

Incinerator combustion air is delivered to the building through an air handling unit which preheats the arctic air to acceptable room temperature. The waste heat is re­covered in a high pressure hot water heating system which is used to heat glycol for building heating. Excess heat is rejected to a pond located approximately 1000 ft (328 m) from the facility. The heat exchange to the glycol loop was designed for 12 MBtu/hr (12 gJ/h) to heat existing facilities, the new incinerator building and future expan­sion of the North Slope Borough facility. All heat for the incinerator building and the adjacent camp is provided by the glycol heating system. The glycol heating system is shown in Fig. 2.

During the course of the construction it was determined that the amount of energy actually required for building heating was only 25 percent to 30 percent of heat avail­able from the incinerator. A study was performed to evaluate alternatives for generating electric power using the excess energy. Later sections describe the eXisting hot water heat system and the alternatives studied for produc­tion of power from the existing facility and from a second 100 TPD (90,700 kg/day) incinerator planned to meet the projected solid waste loads.

137

CONSTRUCTION OF FACILITY

The primary guideline for facility design in permafrost regions is to prevent thawing of the ground below the normal active layer by eliminating heat flow into the earth. Most structures are built on piling about 4-6 ft (1.2-1.8 m) above the ground. This allows air to circulate under the building to assure refreezing of the ground during winter and removal of heat absorbed during the summer.

Where it is necessary to construct a slab on grade the design must prevent flow of heat into the ground on a continuous basis. The design used at this facility was a refrigerated slab as shown in Fig. 3. This design consists of providing a non-frost susceptible (NFS) gravel base over the tundra which is then covered with sand to a depth of 6 in. (15.2 cm). Refrigeration coils are embedded in the sand which is covered with rigid urethane foam insulation, a layer of gravel and a reinforced concrete floor. For addi­tional safety, the major load points are supported on wood piles. The piles are placed in holes drilled in the ground and back fIlled with a dirt slurry. The slurry freezes back against the pile to provide the necessary load carrying capability.

ANALYSIS OF WASTE MATERIAL

A study was performed to determine the fuel charac­teristics of the waste and project the future solid waste volume that could be expected based on the growing oil development activity at Prudhoe. The author served as the process design consultant to evaluate methods for power

Page 4: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

TABLE 1 ANALYSIS OF WASTE SAMPLES

Dry Basis Sample

No. Moisture

% Ash

% HHV

BTU/lb C %

1 25.6 21.9 6,540 .3 36.2 5.8 36.1 2 32.2 21.3 7,300 3 51.8 14.9 9,210 4 47.5 12.0 8,810 · 6 46.2 7.4 33.8 5 47.0 12.3 9,990 .5 50.7 7.3 29.2 6 51.6 10.2 9,160 • 1 48.5 7.5 33.7 7 31.5 10.7 8,140 · 2 47.3 6.3 35.5

Average 41.0 14.6 8,450 .3 45.2 6.8 33.1

generation. The study was further motivated by high elec­trical costs of 20 to 25¢ per kW·h and the high electrical energy demands of the plant to operate the shredders, the incinerator and auxiliary equipment.

The solid waste comes from three sources; drill rigs, shops and camp waste. Representative samples were taken from each of the sites. The samples were analyzed for moisture content, ash and heat value. A ultimate analysis of selected samples was made to determine the carbon, hydrogen, and oxygen contents for combustion analysis. A summary of the results of these analyses is shown in Table 1. The ash content of the waste is lower than typical municipal solid wastes which generally produce between 25 percent to 30 percent residual ash. A major constituent of the waste from the drill rigs was solid wood; however, drilling mud and gypsum wallboard were observed in the

• mix.

Moisture content varied considerably within the sample. Samples were taken in January, a period when winds deposit snow in the bins holding the solid waste. It is ex­pected that the moisture would actually be lower in the summer or when there is little or no wind.

The existing plant design required shredded solid waste that was injected into the incinerator through a ram feed or stuffer tube. The solid waste from the camps is shredded to 0.5 to 2 in. (1.3 to 5.1 cm) size in a Heil shredder. Loads from the rigs or shops which contain large pieces are first reduced in a Saturn low speed shredder and then further reduced in the Heil shredder. The fuel is then con­veyed to a compactor. Two compactors are required for each incinerator. The one compactor is filled while the other is used to feed incinerator. All the shredded fuel is

compacted and then conveyed to the incinerator. This process ultimately caused serious combustion problems in the new incinerator.

The fuel delivery system for the new incinerator was configured to use the shredded fuel. A feed system con­veyed the shredded fuel to two compactors. Fuel is fed out of one compactor to the incinerator fuel hopper where it is pushed into the combustion chamber on a timed cycle. The shredded, compacted fuel would burn on the top surface, but the heat and air required to initiate combustion could not reach the interior of the pile. As a result combustion was inconsistent, heat release fluc­tuated violently and much of the material reached the end of the vibrating grates largely unburned.

138

The water walls surrounding the combustion chamber also adversely affected combustion and volatilization of the fuel by reducing temperatures in the chamber, further complicating the incinerator operation. The incinerator did not pass the Alaska Department of Environmental Conservation standards' major modifications to the fuel system, which are now being installed along with other modifications to meet compliance with the emission standard.

DESCRIPTION OF THE HEAT RECOVERY SYSTEM

The primary purpose of the incinerator is to process solid waste as it is received and secondarily to provide heat to the building facility through a high temperature hot water system as shown in Fig. 3. The incinerator is the only device supplying heat, although backup auxiliary oil fired glycol heaters are installed (Fig. 4). The main design

Page 5: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

• • �

- . ".. � D" ... �: . . . .. . ' � ""

.. . ,

: � 'I. �. ;::.'� " " . ,. " ' , ", . • !." .;JJ .. .. .

'. . • .I - -- ' -, . ' ./.

'" CONCRETE SLAB

14- NFS GRAVEL

•• INSULATION WI

. . · . .. . . 1 ;:- · · . • · · . . �: .. : . .

�.':._ .

. . .. .. . . ;' •. : : ...

... . <,,":.�.�.'.'.:.'.: .- SAND MATERIAL WI

• ' . • .. ; .£ '. ' .. '. . :. .... REFRIGERATION COILa

aUIGRADE MATERIAL

FIG.3 TYPICAL FOUNDATION FOR

PERMAFROST AREAS

problem was control of the hot water temperature, as the combustion rate changed due to the change in fuel feed rate or fuel heat value.

The incinerator output capacity of 30 MBtu/hr (32 gJ/h) was much higher than the potential heat demand of 8-10 MBtu/hr (8.4 - 10.5 gJ /h), requiring a portion of the . heat to be rejected to a cooling pond. Water is circulated through the convection and radiation section at a constant rate with the exist temperature controlled to 350°F (177°C) while the inlet temperature varies from 210°F (99°C) and up depending on heat absorption. The hot water flows either to the glycol heat exchanger or the heat rejection heat exchanger. There is a controlled bypass loop which is used to maintain constant flow through heat transfer surfaces exposed to high temperatures gases to prevent steam formation.

Glycol in the system is circulated through the glycol heat exchange at a constant flow. Its temperature is con­trolled to 200°F (93°C) by modulating the hot water flow so that the glycol has first calion any heat produced in the incinerator. The demand on the glycol heater could vary from 0 to 12 MBtu/hr (13 gJ/h). The remaining hot water flows either through the heat rejection heat ex­changer or the bypass line controlled by the boiler water exist temperature controller. Valves TCV2 and TCV2A receive the same signal from the boiler TIC but act oppo­site to each other. As the hot water temperature rises the heat rejection valve opens to provide more cooling while the bypass valve closes. As the hot water temperature drops the reverse occurs. This control is particularly critical because the heat flux within the incinerator could change at a rapid rate, causing temperature changes as high as 200°F (93°C) per hour. This condition occurs during startup when the auxiliary oil boiler in the incinerator is turned on and off, adding or removing up to 14 MBtu/hr (15 gJ/h) instantaneous heat change. A low cost digital 3 mode controller with an automatic/manual position with bumpless shift betweetl. positions was installed. This con­troller could maintain the outlet temperature ot within several degrees of the setpoint temperature.

,

MAKE-UP EXPANSION TANK PUMP

WATER TREATMENT

, , ,

,

- -

OUT .J..- - - .,

200' f H) � '-' TIC

GLYCOL HTR. �

IN I ...,

C/W 'T'_ - -lTic 120· F � ... r�

HT .REJ ECT.EXCH. I I �

C/W LV : I T1C

�)- ___________ J 310· F ,

- - - - - - - - I , ,

RADIATION CONVECTION

INCINERATOR � - --- - - --- ---- �

30 M.TU(OUTPUTl

/

FIG.4 INCINERATOR HEAT RECOVERY

(AS INSTALLED)

HT.W TR. PU",

GPM CIRC. 4'0

( .. I N. )

The cooling water for heat rejection came from a pond adjacent to the plant. The pond was filled by the Saga­vanuktok River and was deep enough to sustain a 6 ft (2.0 m) insulating cover of ice without freezing solid. This source of water provided all cooling, process and drinking water for the NSB facility. The cooling water was pumped to the building through a lOin. (254 mm) supply and 8 in. (203 mm) return line. The cooling water flow was con­trolled by the outlet temperature of the cooling water. This arrangement was selected to insure that cooling water would continuously flow through the heat exchanger and not be heated above its boiling point.

Operational control of the incinerator and all asso­ciated equipment, including the fuel conveyors, ash removal and heat recovery, system was performed by a programmable logic controller (PLC). This unit main­tained control of the fuel feed rate, the operation of auxiliary burners, the ash handling, all alarms and safety trips. The PLC was provided by the incinerator manufac­turer who worked closely with the mechanical and elec­trical engineers and contractors to integrate all the neces­sary control logic normally provided by relay devices.

POTENTIAL HEAT RECOVERY FOR

POWER GENERATION

During the design/installation of the incinerator a ,

study was performed to project future solid waste deliveries

139

Page 6: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

OIN. TU".,NI

1100 It W

Q / C, ..

CONDo

1"'''0. C,"

DU ....

� ..... -J---'.0 .. IIQ I 'ATUIUTID

ITI"" CONDENSAT' I .. U., .. ). DE"'''ATO'' ) /'TI"" 'E"""ATO"\ , ".10/22'- , 'uC

S •• - ,. I.

I

I{- OYCOL EXCH j..-.:::-:; I I t

TIC <;:> 0-----...:

I 310'"0

I 411' , OUT

I "UX.) I I

101LE" CI"C. 'U .. ,

). } �C

• I

. . .000 .... /200 H'

I . . .. . I I --l Ir :

,

""DI"TION I I CONV ECTION I : L .. _ ! � CINE � � �

. . • • J � O ... TU(OUT'UT)

'OILE"

'(10 'u .. ,

FIG.5 RETROFIT STEAM/POWER GENERATION

U'

and to evaluate methods for further recovering energy to generate electrical power. This study, based on analysis of current deliveries and historical data, and interviews of the oil field operators (Sohio and Arco) and service con· tractors suggested that growth of camp and drilling activi· ties would continue for the next several years. Deliveries were projected to reach 90,700 kg/day) by the end of the year· when the incinerator would have been in operation for only one year. During the time more than 65 percent of the heat produced would be rejected to the cooling pond while the Borough would consume close to $1 million a year in electrical power for operation of the incinerator and the camp.

Potential power generation methods from the new incinerator were evaluated to maximize energy recovery with a system that was simple to operate and maintain and would have a minimum operational risk in an arctic environment.

Three methods of power production were evaluated: (a) steam; (b) high temperature organic rankine cycle; and (c) low temperature organic rankine cycle. Three methods were considered for producing steam

within the existing incinerator;

.. -->Ii After the study, oil prices dropped followed by a leveling off of activity as well as refuse. A second incinerator has not been

installed at this time.

• •

I • ,

I • ,

f-�UP"N.T"NK

--

• •

I. I OLY.HTA. r •

OUT TIC I

O.A.C. POWEA ,,,CK"OE -- .. (V" "OR"TOA

'''EHEATER

-- - . . -

FAEON AI14

2�O- ,.

-----, • •

I • •

I • ;-o.�. • o· , • I

I HT.WTR.

CIRC ... U .. .. /""' •

.60 OPW

(WIH.) I --2'0-" (MIN.) -- . ---• •

CONVECTION: I • ,

""DI"TlON I , ,

..I INCINERATOR -- -- .. 30 "ITU(OUTpUT)

. . -I • ,

I , •

I • ,

L ..

, ,

I OE N. P- TUR"INE • 800 KW •

I F"E ED

PUM .. 133- F • •

CONDENSER I , •

715- F • ( ) CON •.

pO M" • • . . -- .

. -- -

C/W PUMP ) 32-50' ,.

POND 0 0 o 0

FIG. 6 LOW-TEMP ORGANIC RANKINE CYCLE

ADDITION TO EXISTING INCINERATOR

0

(a) replace the hot water convection section with a steam boiler section and modify the existing radiation section to be compatible with steam production;

(b) provide a high volume, hot water circulation system with an external steam separator to operate within the pressure and temperature limits of the existing hot water equipment; and

(c) duct hot incinerator gases to an external steam generator.

The first approach was rejected because of the high cost to replace the convection section and the extensive delays and loss of operation of the incinerator during the construction.

In the second approach, shown in Pig. 5, water is circulated through the boiler at a pressure of 350 psig (2410 kPa) and heated to 415°p (213°C), approximately 15°p (g0C) below the saturation temperature. Water is expanded from the hot water generator into a steam separator maintained at 150 psig (1030 kPa). A portion of the water flashes to steam while the remainder is reo circulated to the hot water generator. Saturated steam is delivered to a condensing turbine capable of producing a maximum of 1500 kW under summar conditions when heat demand for the buildings is at a minimum. Average power generation is estimated at 1000 kW. Glycol heating would be achieved by taking water off the steam drum to the glycol heater and returning it to the deaerator. The major disadvantages of this design is the difficulty in con· trolling pressures, temperatures and levels throughout the

140

Page 7: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

OUWII' / ITACK \

IIIAOIATiON

10MITU

AI501llll'TION

�;

CONOENIATE II'UW,

CON OENSEIII

'.00' "

. -- - - - -, I , , , I 210· "

, , MEOENlRATOR

140' F

IllIECllilCUlATiON OAlll -400' ,

IllIECIIilC. 'ON

, '00' " CONVECTION

------- - -U1.100ll'PH 1 100' , "\

r- - - - ' 626' FI �A�OIRIZIEM ,

, ...i C 1'",0 WI Z IE III

S2S I II' 51A - - -�- --,

! ,S'" f , ,

TURelNE

OEN.

w

'- - - - _ . - - - - - - - - - - - - - - -

1.0. 'ON

FIG.7 HIGH-TEMP ORGANIC RANKINE CYCLE

ADDITION TO EXISTING INCINERATOR

loop and the high parasitic horsepower required by the recirculating pump,

At the time of the study the Organic Rankine Cycle (ORC) was an emerging technology that appeared to offer some advantages over the steam cycle for low to medium temperature waste heat. High and low temperature ORC designs were evaluated. The low temperature organic rankine cycle (LT-ORC) is shown in Fig. 6. Several manu­facturers offer designs using refrigerants as the working fluid for low temperature waste hot streams 200-350°F (93-177°C), The design is suitable for geothermal heat or recovery of low temperature steam for process plants, The system analyzed is designed by Mechanical Technology Inc, of Latham, New York, The advantage of the low temperature system is that hot water, already available, from the incinerator could be used as the heat source for the freon and required minimal piping changes to the in­cinerator's hot water system,

Hot water is circulated to the evaporator and then to the preheater (economizer) and back to the hot water generator. The refrigerant is circulated from the condenser by a condensate pump to the vaporizer feed pump then to the preheater and evaporator. The evaporator pressure is set at approximately 75 psig (kPa) for R114 and the saturation temperature set at approximately 240°F (116°C). The vapor passes to a turbine which drives both the generator and the feed pump. The turbine, generator and feed pump is enclosed in a hermetic housing and is capable of producing ap�oximately 900 kW. The refri­gerant exhaust from the turbine is condensed at 75°F (24°C) by pond cooling water.

The high temperature organic rankine cycle (HT-ORC) shown in Fig. 7, uses combustion gases from the incinera­tor as a source of heat. The HT-ORC designed by Sund­strand Corp utilizes toluene as a drive medium. The hot gases are taken off the incinerator prior to the convection

section at a blended temperature of 1100°F (593°C) and brought to the vaporizer. The vaporizer consists of the boiler and economizer sections. The toluene is evapo­rated at a temperature of 550° (288°C) and at a pressure of approximately 300 psig (2070 kPa). Careful control of the hot gases and the toluene temperature is required to prevent degradation of the toluene above 550°F (288°C). The vaporized toluene powers the turbine which drives a generator and a feed pump similar to the freon system except the generators are air cooled and hot hermetical­ly enclosed, After passing through the turbine, the toluene is a superheated vapor at a temperature of 379°F (193°C). A regenerative heat exchanger reduces the exhaust tem­perature by preheating the feed liqUid. An air cooled • condenser is used to prevent toluene contamination of the water supply and is effective because of the high condens­ing temperature of the toluene. The toluene condensate is then pumped through the feed pump to the regenerator section and the vaporizer.

A comparison of the advantages and disadvantages of the three systems evaluated is presented in Table 2. The primary advantages of the ORC in the arctic environment is its relative simplicity, and lack of freezeup potential. The high temperature system provides efficiencies close to that of steam but with the risk of using toluene, a flam­mable, toxic medium.

141

INCINERATOR OPERATION - STATUS OF

POWER GENERATOR MODIFICATIONS

The incinerator was initially fired in August 1981 utilizing the shredded solid waste. Difficulties with the conveyor system prevented consistent operation of the incinerator. The compactor discharge system prevented the uniform release of fuel and required extensive modi­fications. During that time it was determined that the vibrating floors would not move the shredded waste through the furnace at a proper rate. Modifications to the system required increased air compressor capacity to significantly increase the vibration frequency.

Problems were experienced in maintaining constant boiler water temperature because of rapid changes in heat flux during combustion experienced during the startup process. The original 3 mode analog controller was subsequently replaced with a 3 mode digital controller with an automatic/manual position. The automatic/ manual position allowed setting the controller more quickly and also provided the operator with greater flexibility in reducing the potential for overheating of the hot water.

'After modification of the fuel feed system the incinera­tor could not sustain a consistent burning rate because the shredded fuel compacted on the grates and prevented

Page 8: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

- ""'­ N

TA

BL

E 2

No

rt

h S

lo

pe

B

or

ou

gh

In

ci

ne

ra

to

r

CHA

RA

CTE

RIS

TICS

O

F V

AR

IO

US

PO

WE

R

GE

NE

RA

TI

ON

M

ET

HO

OS

Sy

st

em

Fe

at

ure

s

Hi

gh

Pr

es

sur

e

St

ea

m

Hi

gh

T

em

pe

ra

tu

re

O

rg

an

ic

Ra

nk

in

e

Cy

cl

e

Lo

w

Te

mp

er

at

ur

e

Or

ga

ni

c R

an

ki

ne

C

yc

le

1.

11a

nuf

act

ur

er

s

Ma

ny

co

mp

on

en

t

ma

nu

fa

ct

ur

er

s,

no

sy

ste

m

Su

nd

st

ra

nd

*

MTI

, O

rm

at

, E

co

1a

ir

e

ma

nuf

ac

tur

er

or

a

ss

em

bl

er

.

2.

Wo

rki

ng

Fl

ui

d

Wa

te

r

To

lu

en

e

Fre

on

R

l1

3

or

R

l1

4

Fre

ez

in

v Po

i n

t

320

F _

13

90F

_13

70

F -

3.

Op

er

at

in

g

Ma

ny

w

as

te

h

ea

t

st

ea

m

sy

st

em

i

ns

ta

ll

ed

A

pp

ro

xi

ma

te

ly

6

sy

st

em

s

op

er

at

in

g

in

U

.S.

�ys

te

ms

h

av

e

no

u

ni

ts

i

ns

ta

ll

ed

i

n

Ex

pe

ri

en

ce

b

ut

fe

w

wit

h

po

we

r g

en

er

at

io

n.

Non

e u

ti

li

ty

a

nd

in

du

st

ri

al

s

it

es

.

fi

el

d.

Dev

el

op

me

nt

al

e

xp

ei

re

nc

e

on

ly

. c

urr

en

tl

y

op

er

at

in

g

wi

th

m

un

ic

ip

al

Orm

at

h

as

o

ne

o

r

mo

re

i

ns

ta

ll

ed

a

t

wa

st

e

as

f

ue

l.

in

du

st

ri

al

s

it

es

.

4.

He

a t

Tr

an

s f

er

Di

re

ct

s

te

am

pr

od

uc

ti

on

b

y

ho

t

Dir

ec

t v

ap

or

pr

od

uc

ti

on

by

h

ot

H

ot

g

as

es

h

ea

t w

at

er

, o

il

, o

r

ge

ne

ra

te

Pa

th

co

mb

us

ti

on

g

as

es

. c

om

bu

st

io

n

ga

se

s.

st

ea

m,

wh

ic

h

th

en

v

ap

or

iz

es

o

rg

an

ic

f

lu

id

. T

hi

s

ad

dit

io

na

l i

nt

er

me

di

at

e

he

at

tr

an

sf

er

l

oo

p

re

qu

ir

ed

t

o

pr

ev

en

t

lo

ca

li

zed

d

ec

om

po

si

ti

on

o

f

or

ga

ni

c f

lui

d.

.

5.

Com

pl

exi

ty

M

uch

s

ys

te

m

sup

po

rt

e

qu

ip

me

nt

, s

uch

as

N

o

sy

st

em

s

up

po

rt

e

qu

ip

me

nt

r

eq

ui

re

d,

Int

er

me

di

at

e

he

at

tr

an

sf

er

l

oo

p

re

qu

ir

ed

, w

at

er

tr

ea

tm

en

t

sy

st

em

, b

oi

le

r

b1

0wd

own

o

th

er

t

ha

n f

ir

e

pr

ot

ec

ti

on

s

ys

te

m

an

d

no

t

ne

ce

ss

ar

y

on

s

te

am

o

r H

ig

h

Tem

per

a t

ure

s

ys

te

rn,

et

c.

S

uch

s

ys

te

ms

a

re

h

ig

h

al

ar

m

sy

st

em

s.

T

he

se

a

re

l

ow

m

ai

nt

e-

OR

C

sy

s t

ern

.

Ma

in

te

na

nc

e

an

d

op

er

at

or

m

ai

nt

en

an

ce

a

nd

o

pe

ra

to

r

in

te

ns

iv

e.

na

nc

e

an

d

re

qu

ir

e

no

o

pe

ra

to

r

re

qu

ir

em

en

ts

e

xp

ec

te

d h

ig

he

r

th

an

H

ig

h

at

te

nd

a n

ce

. T

em

pe

ra

tu

re

O

RC

, l

ow

er

t

he

n

st

ea

m s

ys

te

m.

6.

Op

er

at

in

g

Es

ti

mat

ed

1

-1/

2

ad

di

ti

on

al

o

pe

ra

to

r

Ex

pe

ct

n

o

ad

di

ti

on

al

o

pe

ra

to

r p

os

it

io

ns

E

xp

ec

t

no

a

dd

it

io

n

op

er

at

or

p

os

it

io

ns

Pe

rso

nn

e 1

p

os

it

io

ns

r

eq

ui

re

d t

o

ma

in

ta

in

a

nd

r

eq

ui

re

d

to

m

ai

nt

ai

n

an

d

op

er

at

e

OR

C

re

qu

ir

ed

t

o

ma

in

ta

in

an

d

op

er

at

e

OR

C

Re

qui

rem

en

ts

o

pe

ra

te

s

te

am

p

ow

er

s

ys

te

m.

po

we

r

sy

st

em

.

po

we

r

sy

st

em

.

7.

Exp

ec

te

d

An

ti

ci

pa

te

h

ig

h

ma

in

te

na

nc

e

ty

pi

ca

l o

f

An

ti

ci

pa

te

l

ow

m

ai

nt

en

an

ce

o

f

po

we

r

An

ti

ci

pa

te

l

ow

ma

in

te

na

nc

e.

M

a i

nt

ena

nce

a

s

te

am

s

ys

te

m.

W

il

l

in

cl

ud

e

bo

il

er

mo

du

le

. S

om

e

ga

s

si

de

m

ai

nt

en

an

ce

o

f

Re

qu i

re

me

nt

s m

ai

nt

en

an

ce

, w

at

er

tr

ea

tm

en

t

ma

in

-f

lu

id

v

ap

or

iz

er

e

xp

ec

te

d.

t

en

an

ce

, t

urb

in

e

ma

in

te

na

nc

�,

pu

mp

m

ai

nt

en

an

ce

, s

te

am

li

ne

m

ai

:it

en

an

ce

, c

on

de

ns

or

m

ai

nt

en

an

ce

, e

tc

.

8.

Cy

cl

e

Eff

ic

ie

nc

y

22

%

21

%

15%

---

.

*O

rma

t

ha

s a

t

pr

es

en

t

on

e

st

an

da

rd

s

iz

e,

300

KW

s

ys

te

m.

T

hr

ee

c

om

pl

et

e

sy

st

em

s,

in

cl

ud

in

g

ge

ne

ra

to

rs

a

re

r

�q

ui

re

d

to

us

e

al

l

he

at

in

th

e

ho

t

wat

er

s

ys

tem

. Ec

o1a

ir

e

is

de

ve

lo

pi

ng

s

ta

nd

ar

d

si

ze

s

@ 5

00

&

10

00

KW

. T

hey

h

av

e

he

at

t

ra

ns

fe

r

de

si

gn

a

nd

m

an

uf

ac

tu

ri

ng

ca

pa

bi

li

ty

b

ut

n

o

tu

rb

in

e

or

sy

st

em

p

ac

ka

gi

ng

a

nd

co

nt

ro

l

ex

pe

ri

enc

e.

MTI

off

er

s

on

ly

a

n

in

duc

ti

on

ge

ne

ra

to

r

de

si

gn

wh

ic

h i

s n

ot s

ui

ta

bl

e

fo

r

st

an

d

al

on

e

ope

ra

ti

on

o

r i

n

a

sma

ll

p

ow

er

g

en

er

at

io

n

sy

st

em

.

Page 9: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

.......

.j::.

w

Sy

st

em

Fe

at

ur

es

9.

Wo

rki

ng

F

1 u

i d

T

ox

ic

it

y

Wo

rki

ng

F

lu

id

F

i a

mma

bi

1 i

ty

10.

Wa

te

r T

re

at

me

nt

11

.

Co

ol

in

g

wa

te

r

12

.

Sl

ow

do

Wil

13.

P

ac

kag

e

Sy

st

em

o

r C

om

po

ne

nt

S

ys

te

m

14

. V

ap

or

De

te

ct

or

S

ys

te

m

15

.

Fi

re

S

up

pr

es

si

on

S

ys

te

m

16

. H

ig

h T

em

pe

ra

tu

re

G

as

Du

ct

wo

rk

17.

Su

i1

di

ng

R

eq

ui

rem

en

ts

18.

So

ot

b1

0w

in

g

,

CH

AR

ACT

ER

IST

ICS

O

F V

AR

IO

US

PO

WE

R

GE

NE

RA

TI

ON

M

ET

HO

DS

Hi

gh

P

re

ss

ur

e

St

ea

m

Hi

gh

T

em

pe

ra

tu

re

O

rg

an

ic

Ra

nki

ne

Cy

cl

e

Low

T

em

pe

ra

tu

re

Or

ga

ni

c

Ra

nki

ne

C

yc

le

No

t

to

xi

c

Mo

de

ra

te

ly

t

ox

ic

, a

bo

ve

2

00

pp

m

in

ai

r

Rl

13

Mo

de

ra

te

ly

t

ox

ic

R

1l

4

Nc,

t

to

xi

c

flon

-f

l a

mma

b 1

e

NF

PA

Cl

as

s

3

Fl

amm

ab

il

it

y

Ra

ti

ng

N

on

-f

l a

rrma b

1 e

E

xp

lo

si

ve

b

et

we

en

1.

3 a

nd

7%

b

y v

ol

um

e

in

a

ir

.

Req

ui

re

d

fo

r

bo

il

er

a

nd

m

ake

up

w

at

er

. N

on

e

re

qu

ir

ed

. N

on

e.

re

qu

ir

ed

. C

on

ti

nu

ou

s

wa

te

r

tr

ea

tm

en

t

co

st

wi

ll

b

e

in

cu

rr

ed

.

Re

qu

ir

ed

. E

st

im

at

ed

2

35

0 g

pm

Ai

r-

co

ol

ed

r

oo

f

mo

un

te

d

co

nd

en

so

rs

. W

at

er

c

oo

li

ng

r

eq

ui

re

d,

es

ti

ma

te

d

18

00

No

co

ol

in

g

wa

te

r r

eq

ui

re

d.

No

h

Jza

rd

g

pm

.

Co

nt

am

in

at

io

n

of

c

po

1i

ng

p

on

d

by

po

te

nt

ia

l f

or

co

nt

am

in

at

ion

o

f

co

ol

in

g

or

ga

ni

c

flu

id

p

os

si

bl

e.

po

nd

b

y

or

ga

ni

c

fl

ui

d

ex

is

ts

. A

ir

-c

oo

le

d

co

nd

en

so

r

no

t p

ra

ct

ic

al

du

e

to

h

ig

h

eq

ui

pm

en

t

co

st

, a

nd

la

rg

e

gr

ou

nd

m

ou

nt

ed

i

ns

ta

ll

at

io

n .

.

Sl

ow

do

wn

r

eq

ui

re

d.

M

ak

e-

up

w

at

er

m

ust

N

on

e

re

qu

ir

ed

. Fl

ui

d

sy

st

em

s

ea

le

d.

No

ne

r

eq

ui

re

d.

Fl

ui

d

sy

st

em

se

al

ed

. b

e

tr

ea

te

d.

Sl

ow

do

wn

wa

te

r

mu

st

b

e

.

di

sp

os

ed

o

f.

In

di

vi

du

al

c

om

po

ne

nt

s f

ro

m

va

ri

ou

s

Co

mp

le

te

, p

re

-p

ac

kag

ed

v

ap

or

iz

er

a

nd

C

om

pl

et

e,

pr

e-

pa

cka

ge

d

sy

st

em

f

ro

m

on

e

ma

nu

fa

ct

ur

er

s,

as

se

mb

le

d

to

c

om

pl

et

e

po

we

r

mo

du

le

f

ro

m

on

e

ma

nu

fa

ct

ur

er

. m

an

uf

ac

tu

re

r.

in

st

al

la

ti

on

. S

ys

te

m

de

si

gn

b

y

ar

ch

it

ec

t/

en

gi

ne

er

r

eq

ui

re

d.

Ilon

e

re

qu

ir

ed

. Al

ar

m

an

d

sh

ut

do

wn

p

ro

vi

de

d

at

7

5%

o

f

Pe

rs

on

ne

l a

la

rm

s

ys

te

m i

s r

ec

omm

en

de

d.

lo

we

r

ex

pl

os

iv

e

li

mi

t.

P

er

so

nn

el

ala

rm

s

ys

te

m

is

a

ls

o

re

co

mme

nd

ed

.

Non

e

re

qu

ir

e.

Re

qu

ir

ed

o

n a

ll

t

ol

ue

ne

e

qu

ip

me

nt

. N

on

e

re

qu

ir

ed

. M

an

uf

ac

tu

re

r

re

co

mme

nd

s

a

CO� sy

st

em

. H

al

on

w

il

l

be

co

ns

id

er

ed

a

s

os

si

b1

e

a l

te

rn

a t

i v

e.

Re

qu

ir

ed

. A

pp

ro

xi

ma

te

ly

10

0' ,

R

eq

ui

re

d.

Ap

pr

ox

im

at

el

y 1

00

',

co

ns

tr

uc

te

d

No

ne

re

qu

ir

ed

.

Re

qu

ir

e

ho

t w

at

er

, h

ot

c

on

st

ru

ct

ed

o

f

hi

gh

a

ll

oy

s

te

el

o

r

of

h

ig

h

al

lo

y

st

ee

l

or

r

ef

ra

ct

or

y

li

ne

d

oi

l

or

s

te

am

in

te

rm

ed

ia

te

h

ea

t

tr

an

sf

er

r

ef

ra

ct

or

y

li

ne

d

ca

rb

on

s

te

el

.

ca

rb

on

s

te

el

.

lo

op

t

o

pr

ot

ec

t

th

e f

re

on

.

No

n

ew

b

ui

ld

in

g

re

qu

ir

ed

. E

qu

ip

me

nt

Ne

w

bu

il

di

ng

r

eq

ui

re

d

fo

r

va

po

ri

ze

r.

No

n

ew

b

ui

ld

in

g

re

qu

ir

ed

.

Eq

ui

pm

en

t

lo

ca

te

d

in

a

re

a

oc

cu

pi

ed

b

y

or

ig

in

al

P

ow

er

m

od

ul

e

lo

ca

te

d

in

a

re

a

oc

cu

pi

ed

b

y

lo

ca

te

d

in

a

re

a

oc

cu

pi

ed

by

o

ri

gi

na

l

in

ci

ne

ra

to

rs

.

, o

ri

gi

na

l

in

ci

ne

ra

to

r.

P

ow

er

m

od

ul

e a

re

a

in

c i

ne

ra

to

rs

.

I . m

us

t

be

i

so

la

te

d f

ro

m

re

ma

in

de

r

of

I

bu

il

di

ng

. , I

St

ea

m

so

ot

b1

0w

in

g

re

qu

ir

ed

.

Pn

eu

ma

ti

c

so

ot

b1

0w

in

g

re

qu

ir

ed

. P

ne

um

at

ic

s

oo

tb

1o

wi

ng

r

eq

ui

re

d,

ins

ta

ll

ed

o

n

ex

is

ti

ng

h

ot

w

at

er

g

en

er

at

or

.

Page 10: Energy Recovery from a 100 TPD Solid Waste …...ENERGY RECOVERY FROM A 100 TPD SOLID WASTE INCINERATOR PAUL E. OLIVER Van Gulik & Associates, Inc. Lake Oswego, Oregon ABSTRACT A hot

rapid combustion from occurring. The vibratory grates were unable to tumble the fuel and expose the unburned material to the combustion process. The welded water wall radiation chambers surrounding the furnace floors also prevented sufficient heat retention in the combus­tion chamber to assure completion of the combustion process within the confines or the furnace section. Modi­fication is presently underway to eliminate the high speed shredder and bypass the compactors for normal feed directly to the ram feed hopper. This modification will eliminate compacting of the fuel and allow hot gases to reach the material so combustion can proceed more rapidly.

CONCLUSION

The major influence of arctic conditions on the incine­rator installation was the need to elevate the incinerator above the building slab to minimize below-grade pits in the refrigerated slab. The only part of the system below the slab was the ash hopper pit. Normally the top of the ram feeder would have been at slab level to allow solid waste dumped on the floor to be pushed into the feeder by a bobcat loader. This type of furnace floor does not require processing or shredding of the fuel prior to input into the incinerator. Eliminating the processing will reduce the bulk density of the fuel significantly and improve the combustion properties of the fuel.

144

Another cause of combustion problems was the welded water wall radiation section, the shredded, compacted fuel and the low temperature of the combustion air. The water walls and cold combustion air keep furnace temperatures low while the shredded fuel increases the time required for combustion.

Power generation is a feasible alternative for a solid waste incinerator in an arctic region because of the high cost of electrical power in the region. ORC offers ad­vantages over conventional steam power generation be­cause of its simplicity, and its freedom from freezeup. The technology is not widespread as yet and remains to be proven in a variety of applications such as recovery from diesel engine exhaust and jacket water heat, geothermal source and industrial waste heat streams.

Once the combustion problems are resolved, it is ex­pected that power generation will be incorporated to reduce the high electrical cost at the incinerator facility.

ACKNOWLEDGMENTS

The author is indebted to Coffman-White Engineers, Inc. who were general consultants to the North Slope

Borough; Dr. Kenneth Hartz, Washington State Univer-sity, who directed the analysis of solid waste volumes and characteristics ; and Charles Gunderson who performed many of the analyses required during this project. I also express my gratitude to Myron Igtanloc, Director of Services Area 10 for authorizing publication of this paper.