E.Kistenev, Forward Upgrade Meeting 08/18/04 Forward (Nose Cone) Calorimeter: Update 2.5 mm

E.Kistenev, Forward Upgrade Meeting 08/18/04 Forward (Nose Cone) Calorimeter: Update 2.5 mm

Embed Size (px)

Citation preview

E.Kistenev, Forward Upgrade Meeting 08/18/04

Forward (Nose Cone) Calorimeter: Update

2.5 mm

E.Kistenev, Forward Upgrade Meeting 08/18/04

Physics

• A-dependence of the partonic structure functions at small x

+ jets / isolated lepton pairs / lepton pairs + jets

• A-dependence of pt-broadening (black body limit)

0’s• Spin dependence of the gluon

structure function (via W production)– lepton-isolation, total yield in e-

channel

E.Kistenev, Forward Upgrade Meeting 08/18/04

- reasonable resolution for e/m showers – the only measurement which can be precise given all PHENIX Forward constrains;

- e/ and charged/neutral hadron separation;

- /0 identifier;

- jet recognition, good space vector, reasonable 4-vector jet measurements;

- combined muon tracking starting close to production vertex;

- e//jet triggers;

NCC MUST have superior pattern recognition capabilities

fine laterally and longitudinally segmented sampling calorimeter !!!

given real estate constrains ->W+Si

Spec’s ….

E.Kistenev, Forward Upgrade Meeting 08/18/04

Cost of curiosity

E.Kistenev, Forward Upgrade Meeting 08/18/04

Concept in general & Cost (no cont.)

Item Quantity Cost

W 1.8 t 200k

Si (calorimeter) 14 m2 1000k

Cables 5184 100k

Readout units 384 100k

Preamps (16 ch) 3904 300k

Receivers 52 50k

Digitization & pipeline

8704 490k

Si (strips) 1.15 m2 130k

/0 ident. SVX4 readout

48 100k

Total today ~2.5 m

E.Kistenev, Forward Upgrade Meeting 08/18/04

Cost saving options

Further cost/benefits analysis may result in ~10% total cost reduction:

(1) increasing thickness of the W plates (to 3mm) and Si layers (to ~500mkm) will reduce the total amount of Si in calorimeter;

(2) (2) increasing the pad size to ~2x2 cm2 will reduce the number of channels but ….. will make pattern recognition even bigger a challenge.

Biggest cost items are (1) Si, (2) Preamps and (3) Digital readout.

We are currently trying to clarify answers to two questions:

-Do we really have the collaborator who can do the preamp development at no cost to PHENIX – item (2);

-Is there really out there the digital readout for ~10k channels available for free - item (3).

E.Kistenev, Forward Upgrade Meeting 08/18/04

Item Total “Confirmed”cost

Probablecost

W 1.8 t 200k

Si (calorimeter):Silicon wafers Sensors production and testing

14 m260003904 (good sensors)

912k132k780k

Si (g-p0 identifier):Silicon wafersSensors production and testing

1.15 m2600320

109k13 k96k

Flex cables (sensor PCB interconnect) 3904 100k

Readout units and cablesPCB140 contacts cables

384768

97k39k58k

Preamps 16 or 32 ch ( ~2$/ch in production) without R&D and chip design

40000ch 300k

SVX4 and service electronics:SVX4Service electronics (could be used electronics from Fermilab - ?)Fastbus crate

5041

50k + ???=100k18k32k??????

Digitization&pipeline, 12 bit ADC 8704 360k (30% cont)

EDIA on digital processing 250k (30% cont)

Trigger ???

Global contingency 400k (20%)

Total known ~2.5 m > 0.3m

E.Kistenev, Forward Upgrade Meeting 08/18/04

R&D 2004-2006US ( BNL ++)• Conceptual mechanical design (BNL/Dubna);• Conceptual system design (BNL/Nevis/Trieste);• Prototype mechanical design (UCR/BNL/Dubna);• Component testing and prototype construction (UCR/BNL/MSU);• Full readout for prototype testing (BNL/MSU);• Test beam setup (at BNL/IHEP/KEK ?);• Packaging concepts (BNL/MSU)

MSU• Pad Sensors• Readout units & cables• Receiver boards

Prague• Strip sensors, SVX4 learning curve in - electronics engineer from Prague must first to go to ORNL

(October/November probably !!!!!) then  to Japan (Atsushi) to help with sensor/SVX4 testing in Japan;

Trieste • Preamps

Dubna• Mechanics

E.Kistenev, Forward Upgrade Meeting 08/18/04

Getting through the development stage

Prototype Sensors MSU / Trieste(strips) Early 2005 Sizes mismatch

Prototype readout ~on shelf (MSU) Mid 2005 $10k, DAQ, cables/connectors

Prototype mechanics BNL, UCR, Dubna ? $10k

Mechanical design BNL, Dubna+industry 2005 $30k

Packaging concept & prototype

BNL, MSU, Trieste 2005 Analog summing untested

$30k

Preamps & receivers Trieste , MSU 2006 $30k

Dig. readout design & prototyping

BNL, Nevis, Trieste 2006 $250 k

SVX4 learning curve & readout design for strip layers

Prague, Trieste 2006

Construction 2007-2008 ~2 m

Coordination of this project is probably the biggest challenge.

Both R&D and production are supposedly mostly in Europe, in difference to the central tracker project we have NO strong OUT-of-US group able to serve the center of gravity for this project. If no one else is

interested – this will be a role BNL must play

…. with no control over project money – will it work?

E.Kistenev, Forward Upgrade Meeting 08/18/04

How to integrate NCC into PHENIX

E.Kistenev, Forward Upgrade Meeting 08/18/04

receiver digitizerDelay/

event buffers

receiver digitizerDelay/

event buffers

Trigger Sum

To DCM

L1 trigger board

Readout method:

Digitize signal as early as possible

Generate trigger sum output (2X2) from the ADC output

Total channel count:Calorimeter 2060+2060+35840 identifier 8240

NCC readout concept (Chi)

E.Kistenev, Forward Upgrade Meeting 08/18/04

Possible implementation

DCM

Readout unit

Rec

eive

r

Max 256x10 inputs

Readout unit

Si Sensor

Flex cable

256 analog lines

Pre

ampl

ifie

rs

10 units maximum

Trigger processor

Digitizer &

FPGA based

pipeline

E.Kistenev, Forward Upgrade Meeting 08/18/04

PHENIX Grand Central

E.Kistenev, Forward Upgrade Meeting 08/18/04

Terminal buildings ….

NCC

Receivers

E.Kistenev, Forward Upgrade Meeting 08/18/04

Real estate sharing

Digitizer Boards

NCC readout location on

the surface of magnet pole

Central tracking communication lines

E.Kistenev, Forward Upgrade Meeting 08/18/04

The end

E.Kistenev, Forward Upgrade Meeting 08/18/04

Urgent

Technical progress on• Skeleton support structure allowing staged implementation of

the new PHENIX central detectors;• Design of NCC Mechanics (in collaboration with potential

manufacturers);• Component analysis of the NCC readout.

Managerial support for• NCC needs equal standing with all other components of the

new PHENIX Central;– R&D funds for 2005;

• Help from BZ to cement the Collaboration.

E.Kistenev, Forward Upgrade Meeting 08/18/04

What’s going on now….

• MSU – ready to work …

• Trieste – possibly one person working part time on preamps for NCC in 2005;

• Prague (Institute of Physics + Charles University) – planning to apply for funding under umbrella of US-Czech

Cooperation (dead line – September)

• Dubna – will probably help with mechanical design & construction

• Iowa– will work on trigger

• BNL / UCR / Nevis– everything else and more to come …..

E.Kistenev, Forward Upgrade Meeting 08/18/04

SPS TestBeam Data:p & e-

200 GeV/c

Ultimate e - h separation

10GeV p-

10GeV e-

M.Boezio, INFN, Trieste, PAMELA

E.Kistenev, Forward Upgrade Meeting 08/18/04

Partonic structure functions

E.Kistenev, Forward Upgrade Meeting 08/18/04

Reaching into saturation region

-pairs

pp, 100+100

pp, 250+100