E.Kistenev, Forward Upgrade Meeting 08/18/04
Physics
• A-dependence of the partonic structure functions at small x
+ jets / isolated lepton pairs / lepton pairs + jets
• A-dependence of pt-broadening (black body limit)
0’s• Spin dependence of the gluon
structure function (via W production)– lepton-isolation, total yield in e-
channel
E.Kistenev, Forward Upgrade Meeting 08/18/04
- reasonable resolution for e/m showers – the only measurement which can be precise given all PHENIX Forward constrains;
- e/ and charged/neutral hadron separation;
- /0 identifier;
- jet recognition, good space vector, reasonable 4-vector jet measurements;
- combined muon tracking starting close to production vertex;
- e//jet triggers;
NCC MUST have superior pattern recognition capabilities
fine laterally and longitudinally segmented sampling calorimeter !!!
given real estate constrains ->W+Si
Spec’s ….
E.Kistenev, Forward Upgrade Meeting 08/18/04
Concept in general & Cost (no cont.)
Item Quantity Cost
W 1.8 t 200k
Si (calorimeter) 14 m2 1000k
Cables 5184 100k
Readout units 384 100k
Preamps (16 ch) 3904 300k
Receivers 52 50k
Digitization & pipeline
8704 490k
Si (strips) 1.15 m2 130k
/0 ident. SVX4 readout
48 100k
Total today ~2.5 m
E.Kistenev, Forward Upgrade Meeting 08/18/04
Cost saving options
Further cost/benefits analysis may result in ~10% total cost reduction:
(1) increasing thickness of the W plates (to 3mm) and Si layers (to ~500mkm) will reduce the total amount of Si in calorimeter;
(2) (2) increasing the pad size to ~2x2 cm2 will reduce the number of channels but ….. will make pattern recognition even bigger a challenge.
Biggest cost items are (1) Si, (2) Preamps and (3) Digital readout.
We are currently trying to clarify answers to two questions:
-Do we really have the collaborator who can do the preamp development at no cost to PHENIX – item (2);
-Is there really out there the digital readout for ~10k channels available for free - item (3).
E.Kistenev, Forward Upgrade Meeting 08/18/04
Item Total “Confirmed”cost
Probablecost
W 1.8 t 200k
Si (calorimeter):Silicon wafers Sensors production and testing
14 m260003904 (good sensors)
912k132k780k
Si (g-p0 identifier):Silicon wafersSensors production and testing
1.15 m2600320
109k13 k96k
Flex cables (sensor PCB interconnect) 3904 100k
Readout units and cablesPCB140 contacts cables
384768
97k39k58k
Preamps 16 or 32 ch ( ~2$/ch in production) without R&D and chip design
40000ch 300k
SVX4 and service electronics:SVX4Service electronics (could be used electronics from Fermilab - ?)Fastbus crate
5041
50k + ???=100k18k32k??????
Digitization&pipeline, 12 bit ADC 8704 360k (30% cont)
EDIA on digital processing 250k (30% cont)
Trigger ???
Global contingency 400k (20%)
Total known ~2.5 m > 0.3m
E.Kistenev, Forward Upgrade Meeting 08/18/04
R&D 2004-2006US ( BNL ++)• Conceptual mechanical design (BNL/Dubna);• Conceptual system design (BNL/Nevis/Trieste);• Prototype mechanical design (UCR/BNL/Dubna);• Component testing and prototype construction (UCR/BNL/MSU);• Full readout for prototype testing (BNL/MSU);• Test beam setup (at BNL/IHEP/KEK ?);• Packaging concepts (BNL/MSU)
MSU• Pad Sensors• Readout units & cables• Receiver boards
Prague• Strip sensors, SVX4 learning curve in - electronics engineer from Prague must first to go to ORNL
(October/November probably !!!!!) then to Japan (Atsushi) to help with sensor/SVX4 testing in Japan;
Trieste • Preamps
Dubna• Mechanics
E.Kistenev, Forward Upgrade Meeting 08/18/04
Getting through the development stage
Prototype Sensors MSU / Trieste(strips) Early 2005 Sizes mismatch
Prototype readout ~on shelf (MSU) Mid 2005 $10k, DAQ, cables/connectors
Prototype mechanics BNL, UCR, Dubna ? $10k
Mechanical design BNL, Dubna+industry 2005 $30k
Packaging concept & prototype
BNL, MSU, Trieste 2005 Analog summing untested
$30k
Preamps & receivers Trieste , MSU 2006 $30k
Dig. readout design & prototyping
BNL, Nevis, Trieste 2006 $250 k
SVX4 learning curve & readout design for strip layers
Prague, Trieste 2006
Construction 2007-2008 ~2 m
Coordination of this project is probably the biggest challenge.
Both R&D and production are supposedly mostly in Europe, in difference to the central tracker project we have NO strong OUT-of-US group able to serve the center of gravity for this project. If no one else is
interested – this will be a role BNL must play
…. with no control over project money – will it work?
E.Kistenev, Forward Upgrade Meeting 08/18/04
receiver digitizerDelay/
event buffers
receiver digitizerDelay/
event buffers
Trigger Sum
To DCM
L1 trigger board
Readout method:
Digitize signal as early as possible
Generate trigger sum output (2X2) from the ADC output
Total channel count:Calorimeter 2060+2060+35840 identifier 8240
NCC readout concept (Chi)
E.Kistenev, Forward Upgrade Meeting 08/18/04
Possible implementation
DCM
Readout unit
Rec
eive
r
Max 256x10 inputs
Readout unit
Si Sensor
Flex cable
256 analog lines
Pre
ampl
ifie
rs
10 units maximum
Trigger processor
Digitizer &
FPGA based
pipeline
E.Kistenev, Forward Upgrade Meeting 08/18/04
Real estate sharing
Digitizer Boards
NCC readout location on
the surface of magnet pole
Central tracking communication lines
E.Kistenev, Forward Upgrade Meeting 08/18/04
Urgent
Technical progress on• Skeleton support structure allowing staged implementation of
the new PHENIX central detectors;• Design of NCC Mechanics (in collaboration with potential
manufacturers);• Component analysis of the NCC readout.
Managerial support for• NCC needs equal standing with all other components of the
new PHENIX Central;– R&D funds for 2005;
• Help from BZ to cement the Collaboration.
E.Kistenev, Forward Upgrade Meeting 08/18/04
What’s going on now….
• MSU – ready to work …
• Trieste – possibly one person working part time on preamps for NCC in 2005;
• Prague (Institute of Physics + Charles University) – planning to apply for funding under umbrella of US-Czech
Cooperation (dead line – September)
• Dubna – will probably help with mechanical design & construction
• Iowa– will work on trigger
• BNL / UCR / Nevis– everything else and more to come …..
E.Kistenev, Forward Upgrade Meeting 08/18/04
SPS TestBeam Data:p & e-
200 GeV/c
Ultimate e - h separation
10GeV p-
10GeV e-
M.Boezio, INFN, Trieste, PAMELA