i Table of Contents Executive Summary E-1 1 Introduction 1.1 Project Overview 1.2 Project Proponent 1.3 Environment Effects Statement 1.4 Subject matter of the EES 1.5 Matters not addressed in the EES 1.6 Project Delivery 1.7 Project Approvals 1.8 Structure of the EES 2 Project Rationale and Benefits 2.1 Introduction 2.2 Previous Studies 2.3 Policy Context 2.4 Project Rationale 2.5 Project Benefits 2.6 Satisfying the Project Objectives 3 Legislative Framework and Approval Requirements 3.1 Introduction 3.2 Environment Effects Act 1978 3.3 Principal approvals 3.4 Secondary Approvals and Compliance 3.5 Major Transport Projects Facilitation Act 2009 4 EES Assessment Framework and Approach 4.1 Introduction 4.2 Draft EES Evaluation Objectives and Assessment Framework 4.3 Relevant Legislation and Policies 4.4 Approach to EES Specialist Studies 4.5 Environmental Risk Assessment 4.6 Scope of Specialist Studies MMRA | Environment Effects Statement

EES - Chapter 1 to 8 - Metro Tunnelmetrotunnel.vic.gov.au/.../word_doc/0019/51166/MMRP_…  · Web view4.2Draft EES Evaluation Objectives and Assessment Framework4–1. 4.3Relevant

Embed Size (px)

Citation preview

i

Table of ContentsExecutive Summary E-1

1 Introduction1.1 Project Overview1.2 Project Proponent1.3 Environment Effects Statement1.4 Subject matter of the EES1.5 Matters not addressed in the EES1.6 Project Delivery1.7 Project Approvals1.8 Structure of the EES

2 Project Rationale and Benefits2.1 Introduction2.2 Previous Studies2.3 Policy Context2.4 Project Rationale2.5 Project Benefits2.6 Satisfying the Project Objectives

3 Legislative Framework and Approval Requirements3.1 Introduction3.2 Environment Effects Act 19783.3 Principal approvals3.4 Secondary Approvals and Compliance3.5 Major Transport Projects Facilitation Act 2009

4 EES Assessment Framework and Approach4.1 Introduction4.2 Draft EES Evaluation Objectives and

Assessment Framework4.3 Relevant Legislation and Policies4.4 Approach to EES Specialist Studies4.5 Environmental Risk Assessment4.6 Scope of Specialist Studies

5 Project Development5.1 Introduction5.2 Project Options5.3 Design Refinements

6 Project Description6.1 Introduction

MMRA | Environment Effects Statement

ii

6.2 Design Requirements6.3 Project Schedule and Delivery6.4 Proposed Project Boundary6.5 Project Precincts and Components6.6 Construction Methodology6.7 Operation and Maintenance6.8 Waste, Spoil and Groundwater Management6.9 Property Acquisition6.10 Sustainability Principles and Approach6.11 Urban Design Strategy

7 Community and Stakeholder Engagement7.1 Introduction7.2 EES Scoping Requirements7.3 Engagement Principles and Goals7.4 Consultation Approach7.5 Stakeholders7.6 Overview of Engagement7.7 Response to Feedback7.8 Ongoing Community and Stakeholder Engagement

8 Transport8.1 Overview8.2 EES Objectives8.3 Legislation and Policy8.4 Methodology8.5 Existing Conditions8.6 Risk Assessment8.7 Impact Assessment8.8 Precinct 1: Tunnels8.9 Precinct 2: Western Portal (Kensington)8.10 Precinct 3: Arden Station8.11 Precinct 4: Parkville Station8.12 Precinct 5: CBD North Station8.13 Precinct 6: CBD South Station8.14 Precinct 7: Domain Station8.15 Precinct 8: Eastern Portal (South Yarra)8.16 Precinct 9: Western Turnback (West Footscray)8.17 Environmental Performance Requirements8.18 Conclusion

MMRA | Environment Effects Statement

iii

9 Land Use and Planning9.1 Overview9.2 EES Objectives9.3 Legislation and Policy9.4 Methodology9.5 Existing Conditions9.6 Planning Approval Mechanism9.7 Risk Assessment9.8 Impact Assessment9.9 Precinct 1: Tunnels9.10 Precinct 2: Western Portal (Kensington)9.11 Precinct 3: Arden Station9.12 Precinct 4: Parkville Station9.13 Precinct 5: CBD North Station9.14 Precinct 6: CBD South Station9.15 Precinct 7: Domain Station9.16 Precinct 8: Eastern Portal (South Yarra)9.17 Precinct 9: Western Turnback (West Footscray)9.18 Early Works9.19 Environmental Performance Requirements9.20 Conclusion

10 Social and Community10.1 Overview10.2 EES Objectives10.3 Legislation10.4 Methodology10.5 Existing Conditions10.6 Risk Assessment10.7 Impact Assessment10.8 Precinct 1: Tunnels10.9 Precinct 2: Western Portal (Kensington)10.10 Precinct 3: Arden Station10.11 Precinct 4: Parkville Station10.12 Precinct 5: CBD North Station10.13 Precinct 6: CBD South Station10.14 Precinct 7: Domain Station10.15 Precinct 8: Eastern Portal (South Yarra)10.16 Precinct 9: Western Turnback (West Footscray)10.17 Early Works10.18 Environmental Performance Requirements10.19 Conclusion

MMRA | Environment Effects Statement

iv

11 Business11.1 Overview11.2 EES Objective11.3 Legislation and Policy11.4 Methodology11.5 Existing Conditions11.6 Risk Assessment11.7 Impact Assessment - Summary11.8 Metropolitan Impact11.9 Early Works Impact11.10 Precinct 1: Tunnels11.11 Precinct 2: Western Portal (Kensington)11.12 Precinct 3: Arden Station11.13 Precinct 4: Parkville Station11.14 Precinct 5: CBD North Station11.15 Precinct 6: CBD South Station11.16 Precinct 7: Domain Station11.17 Precinct 8: Eastern Portal (South Yarra)11.18 Precinct 9: Western Turnback (West Footscray)11.19 Environmental Performance Requirements11.20 Conclusion

12 Air Quality12.1 Overview12.2 EES Objective12.3 Legislation and Policy12.4 Methodology12.5 Existing Conditions12.6 Risk Assessment12.7 Impact Assessment12.8 Precinct 1: Tunnels12.9 Precinct 2: Western Portal (Kensington)12.10 Precinct 3: Arden Station12.11 Precinct 4: Parkville Station12.12 Precincts 5 and 6: CBD North Station and

CBD South Station12.13 Precinct 7: Domain Station12.14 Precinct 8: Eastern Portal (South Yarra)12.15 Precinct 9: Western Turnback (West Footscray)12.16 Environmental Performance Requirements12.17 Conclusion

MMRA | Environment Effects Statement

v

13 Noise and Vibration13.1 Overview13.2 EES Objective13.3 Legislation and Policy13.4 Methodology13.5 Noise and Vibration Levels and Criteria13.6 Existing Conditions13.7 Risk Assessment13.8 Impact Assessment13.9 Precinct 1: Tunnels13.10 Precinct 2: Western Portal (Kensington)13.11 Precinct 3: Arden Station13.12 Precinct 4: Parkville Station13.13 Precinct 5: CBD North Station13.14 Precinct 6: CBD South Station13.15 Precinct 7: Domain Station13.16 Precinct 8: Eastern Portal (South Yarra)13.17 Precinct 9: Western Turnback (West Footscray)13.18 Environmental Performance Requirements13.19 Conclusion

14 Historical Cultural Heritage14.1 Overview14.2 EES Objectives14.3 Legislation and Policy14.4 Methodology14.5 Existing Conditions14.6 Risk Assessment14.7 Impact Assessment14.8 Precinct 1: Tunnels14.9 Precinct 2: Western Portal (Kensington)14.10 Precinct 3: Arden Station14.11 Precinct 4: Parkville Station14.12 Precinct 5: CBD North Station14.13 Precinct 6: CBD South Station14.14 Precinct 7: Domain Station14.15 Precinct 8: Eastern Portal (South Yarra)14.16 Precinct 9: Western Turnback (West Footscray)14.17 Early Works14.18 Environmental Performance Requirements14.19 Conclusion

MMRA | Environment Effects Statement

vi

15 Aboriginal Heritage15.1 Overview15.2 EES Objectives15.3 Legislation and Policy15.4 Methodology15.5 Existing Conditions15.6 Risk Assessment15.7 Impact Assessment15.8 Precinct 1: Tunnels15.9 Precinct 2: Western Portal (Kensington)15.10 Precinct 3: Arden Station15.11 Precinct 4: Parkville Station15.12 Precinct 5: CBD North Station15.13 Precinct 6: CBD South Station15.14 Precinct 7: Domain Station15.15 Precinct 8: Eastern Portal (South Yarra)15.16 Precinct 9: Western Turnback (West Footscray)15.17 Early Works15.18 Environmental Performance Requirements15.19 Conclusion

16 Landscape and Visual16.1 Overview16.2 EES Objectives16.3 Legislation and Policy16.4 Methodology16.5 Existing Conditions16.6 Risk Assessment16.7 Impact Assessment16.8 Precinct 1: Tunnels16.9 Precinct 2: Western Portal (Kensington)16.10 Precinct 3: Arden Station16.11 Precinct 4: Parkville Station16.12 Precinct 5: CBD North Station16.13 Precinct 6: CBD South Station16.14 Precinct 7: Domain Station16.15 Precinct 8: Eastern Portal (South Yarra)16.16 Precinct 9: Western Turnback (West Footscray)16.17 Environmental Performance Requirements16.18 Conclusion

MMRA | Environment Effects Statement

vii

17 Surface Water17.1 Overview17.2 EES Objectives17.3 Legislation and Policy17.4 Methodology17.5 Existing Conditions17.6 Risk Assessment17.7 Impact Assessment17.8 Precinct 1: Tunnels17.9 Precinct 2: Western Portal (Kensington)17.10 Precinct 3: Arden Station17.11 Precincts 4 and 5: Parkville Station and

CBD North Station17.12 Precinct 6: CBD South Station17.13 Precinct 7: Domain Station17.14 Precinct 8: Eastern Portal (South Yarra)17.15 Precinct 9: Western Turnback (West Footscray)17.16 Early Works17.17 Environmental Performance Requirements17.18 Conclusion

18 Groundwater18.1 Overview18.2 EES Objective18.3 Legislation and Policy18.4 Methodology18.5 Existing Conditions18.6 Risk Assessment18.7 Impact Assessment18.8 Precinct 1: Tunnels18.9 Precinct 2: Western Portal (Kensington)18.10 Precinct 3: Arden Station18.11 Precinct 4: Parkville Station18.12 Precinct 5: CBD North Station18.13 Precinct 6: CBD South Station18.14 Precinct 7: Domain Station18.15 Precinct 8: Eastern Portal (South Yarra)18.16 Precinct 9: Western Turnback (West Footscray)18.17 Early Works18.18 Environmental Performance Requirements18.19 Conclusion

MMRA | Environment Effects Statement

viii

19 Ground Movement and Land Stability19.1 Overview19.2 EES Objective19.3 Legislation and Policy19.4 Background19.5 Methodology19.6 Risk Assessment19.7 Evaluation Criteria19.8 Impact Assessment19.9 Precinct 1: Tunnels19.10 Precinct 2: Western Portal (Kensington)19.11 Precinct 3: Arden Station19.12 Precinct 4: Parkville Station19.13 Precinct 5: CBD North Station19.14 Precinct 6: CBD South Station19.15 Precinct 7: Domain Station19.16 Precinct 8: Eastern Portal (South Yarra)19.17 Precinct 9: Western Turnback (West Footscray)19.18 Environmental Performance Requirements19.19 Conclusion

20 Contaminated Land and Spoil Management20.1 Overview20.2 EES Objective20.3 Legislation and Policy20.4 Methodology20.5 Existing Conditions20.6 Risk Assessment20.7 Impact Assessment Overview20.8 Precinct 1: Tunnels20.9 Precinct 2: Western Portal (Kensington)20.10 Precinct 3: Arden Station20.11 Precinct 4: Parkville Station20.12 Precinct 5: CBD North Station20.13 Precincts 6 and 7: CBD South Station and

Domain Station20.14 Precinct 8: Eastern Portal (South Yarra)20.15 Precinct 9: Western Turnback (West Footscray)20.16 Early Works20.17 Environmental Performance Requirements20.18 Conclusion

MMRA | Environment Effects Statement

ix

21 Biodiversity21.1 Overview21.2 EES Objectives21.3 Legislation and Policy21.4 Methodology21.5 Existing Conditions21.6 Risk Assessment21.7 Impact Assessment21.8 Precinct 1: Tunnels21.9 Precinct 2: Western Portal (Kensington)21.10 Precinct 3: Arden Station21.11 Precinct 4: Parkville Station21.12 Precinct 5: CBD North Station21.13 Precinct 6: CBD South Station21.14 Precinct 7: Domain Station21.15 Precinct 8: Eastern Portal (South Yarra)21.16 Precinct 9: Western Turnback (West Footscray)21.17 Early Works21.18 Environmental Performance Requirements21.19 Conclusion

22 Greenhouse Gas22.1 Overview22.2 EES Objective22.3 Legislation and Policy22.4 Sustainability Performance Targets22.5 Methodology22.6 Risk Assessment22.7 Impact Assessment22.8 Environmental Performance Requirements22.9 Conclusion

MMRA | Environment Effects Statement

x

23 Environmental Management Framework23.1 Introduction23.2 Scoping Requirements and EMF Structure23.3 Governance Framework23.4 Roles and Responsibilities23.5 Risk and Impact Assessment23.6 Environmental Performance Requirements23.7 Environmental Management Documentation23.8 Evaluating Environmental Performance Outcomes23.9 Contingency Measures

24 Conclusion24.1 Overview24.2 Melbourne Metro Concept Design and Environmental

Performance Requirements24.3 Project Evaluation against the Scoping Requirements24.4 Transport Integration Act 201024.5 Next Steps24.6 Conclusion

Glossary and Abbreviations

MMRA | Environment Effects Statement

xi

Technical Appendecis

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report 1

Appendix D Transport

Appendix E Land Use and Planning 3

Appendix F Social and Community 4

Appendix G Business 4

Appendix H Air Quality 4

Appendix I Noise and Vibration 5 & 6

Appendix J Historical Cultural Heritage 7

Appendix K Aboriginal Heritage 8

Appendix L Landscape and Visual 8

Appendix M Urban Design Strategy 8

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

xii MMRA | Environment Effects Statement

Table of Contents

Volume 1Executive Summary

1 Introduction

2 Project Rationale and Benefits

3 Legislative Framework and Approval Requirements

4 EES Assessment Framework and Approach

5 Project Development

6 Project Description

7 Community and Stakeholder Engagement

8 Transport

9 Land Use and Planning

Volume 210 Social and Community

11 Business

12 Air Quality

13 Noise and Vibration

14 Historical Cultural Heritage

15 Aboriginal Heritage

16 Landscape and Visual

Volume 317 Surface water

18 Groundwater

19 Ground Movement and Land Stability

20 Contaminated Land and Spoil Management

21 Biodiversity

22 Greenhouse Gas

23 Environmental Management Framework

24 Conclusion

Glossary and abbreviations

MMRA | Environment Effects Statement

Table of Contents

Volume 1Executive Summary

1 Introduction

2 Project Rationale and Benefits

3 Legislative Framework and Approval Requirements

4 EES Assessment Framework and Approach

5 Project Development

6 Project Description

7 Community and Stakeholder Engagement

8 Transport

9 Land Use and Planning

Volume 210 Social and Community

11 Business

12 Air Quality

13 Noise and Vibration

14 Historical Cultural Heritage

15 Aboriginal Heritage

16 Landscape and Visual

Volume 317 Surface water

18 Groundwater

19 Ground Movement and Land Stability

20 Contaminated Land and Spoil Management

21 Biodiversity

22 Greenhouse Gas

23 Environmental Management Framework

24 Conclusion

Glossary and abbreviations

MMRA | Environment Effects Statement

Table of Contents

Volume 1Executive Summary

1 Introduction

2 Project Rationale and Benefits

3 Legislative Framework and Approval Requirements

4 EES Assessment Framework and Approach

5 Project Development

6 Project Description

7 Community and Stakeholder Engagement

8 Transport

9 Land Use and Planning

Volume 210 Social and Community

11 Business

12 Air Quality

13 Noise and Vibration

14 Historical Cultural Heritage

15 Aboriginal Heritage

16 Landscape and Visual

Volume 317 Surface water

18 Groundwater

19 Ground Movement and Land Stability

20 Contaminated Land and Spoil Management

21 Biodiversity

22 Greenhouse Gas

23 Environmental Management Framework

24 Conclusion

Glossary and abbreviations

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 1 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 2 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 3 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 4 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 5 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 6 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 7 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 8 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 9 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 10 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 11 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 12 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 13 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of ContentsTechnical Appendices – 14 of 14

Appendix A Planning Scheme Amendment and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Community and Stakeholder Feedback Summary Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: City of Melbourne, Port Phillip and Maribyrnong

Appendix S Arboriculture: City of Stonnington

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Principles and Approach

EES Map Book

MMRA | Environment Effects Statement

Table of Contents

Appendix A Planning Scheme and Associated Documentation

Appendix B Environmental Risk Assessment Report (Risk Register)

Appendix C Consultation and Engagement Report

Appendix D Transport

Appendix E Land Use and Planning

Appendix F Social and Community

Appendix G Business

Appendix H Air Quality

Appendix I Noise and Vibration

Appendix J Historical Cultural Heritage

Appendix K Aboriginal Heritage

Appendix L Landscape and Visual

Appendix M Urban Design Strategy

Appendix N Surface Water

Appendix O Groundwater

Appendix P Ground Movement and Land Stability

Appendix Q Contaminated Land and Spoil Management

Appendix R Arboriculture: John Patricks

Appendix S Arboriculture: Tree Dimensions

Appendix T Terrestrial Flora and Fauna

Appendix U Aquatic Ecology and River Health

Appendix V Greenhouse Gas

Appendix W Sustainability Assessment Report

EES Map Book

MMRA | Environment Effects Statement

Technical Appendices

1 of 24

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 1 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 2 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 3 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 4 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 5 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 6 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 7 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 8 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 9 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 10 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 11 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 12 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 13 OF 14

MELBOURNE METRO RAIL PROJECTENVIRONMENT EFFECTS STATEMENT

TECHNICAL APPENDICES 14 OF 14