Citation preview
a) Number of 230kV breakers/substation
b) Number of 500kV breakers/substation
Number of 500kV breakers/ switching station
2
4
2400
960
600
840
4
4619
CALCULATION OF HVDC LINE COSTS
1) Rated Voltage
2
end, Step-Down transformer at the receiving end)
2) HVDC line capability
1620 MW/line. But
power to be transmitted has been proposed as 3200 MW. This means
that we need 2 Bipolar HVDC lines to transmit the available power.
MVA rating of 230kV/500kV Transformer 4000
Number of HVAC Lines required
HVAC LINE REQUIREMENTS CALCULATION
The rated voltage of the HVDC line is proposed as 450kV. Since the sending and receiving
filters & transformers, one at each end of the line. (Step-Up transformer at the sending
end voltage is 230kV, we require converter stations with
The line capability of one HVDC line has been given as
HVDC
Number of Converter Stations 2
HVAC
Series Reactance XL ( per km) 0.35
Shunt Susceptance BL (S per km) 5*10^-6
5000 (Lambda)
Number of Bipolar HVDC lines required
Number of Grounding Electrodes
Reactive Power Requirement (MVAR)
2
2
2
12
Number of Transformer Substations
Power Factor
a) AC System Supply (MVAR)
b) Shunt Capacitors (MVAR)
c) Shunt Filters (MVAR)
HVDC LINE REQUIREMENTS CALCULATION
HVDC Transmission Voltage (kV)
HVAC Transmission Voltage (kV)
450
500
Current (IL)-Amps
1000Surge Impedance Loading/HVAC line (MW)
HVDC Line Capability (MW) 1620
Sending End Voltage(kV)
Receiving End Voltage(kV)
Total Power to be transmitted (MW)
Distance to be Studied (km)
230
230
3200
0-1200
0.8
3) Grounding Electrodes
2 Bipolar HVDC lines, 4 grounding electrodes are
required.
4) Reactive Power Requirement
The reactive power requirement (Qdc) is obtained as 2400 MW and is
shared among the following according to the given ratios.
Ratio
AC System Supply 0.4
0.25
Shunt Filters 0.35
5) Cost of HVDC line components
$100,000
$15,000
$400,000
$6,000
$15,000
a) Bi-polar HVDC line cost (per km)
b) HVDC Converter Station including filters and Transformers (per MW)
c) Earth Electrode (each line)
d) Capacitors for Reactive Power (per MVAR)
e) System Reactive Power (per MVAR)
Each Bipolar HVDC line requires 2 nos. of grounding electrodes, one at each end. Thus, for
Shunt Capacitors
0 $0
Length of the line (km) Bi-polar HVDC line cost ($)
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
$16,000,000
$18,000,000
$20,000,000
$22,000,000
$24,000,000
$26,000,000
$28,000,000
$30,000,000
$32,000,000
$34,000,000
$36,000,000
$38,000,000
$40,000,000
$42,000,000
$44,000,000
$46,000,000
$48,000,000
$50,000,000
$70,000,000
$72,000,000
$74,000,000
$76,000,000
$78,000,000
$80,000,000
$82,000,000
$84,000,000
$86,000,000
$52,000,000
$54,000,000
$56,000,000
$58,000,000
$60,000,000
$62,000,000
$64,000,000
$66,000,000
$68,000,000
10
20
30
40
50
60
70
80
90
190
200
210
220
230
240
250
260
270
100
110
120
130
140
150
160
170
180
370
380
390
400
410
420
430
280
290
300
310
320
330
340
350
360
520
530
540
550
560
570
460
470
480
490
500
510
$92,000,000
$94,000,000
$96,000,000
$98,000,000
$100,000,000
$102,000,000
700
710
720
730
740
750
640
650
660
670
680
690
580
590
600
610
620
630
850
860
870
760
770
780
790
800
810
$104,000,000
$106,000,000
$108,000,000
$110,000,000
$112,000,000
$114,000,000
880
890
900
910
920
930
820
830
840
$140,000,000
$142,000,000
$144,000,000
$146,000,000
$148,000,000
$150,000,000
$128,000,000
$130,000,000
$132,000,000
$134,000,000
$136,000,000
$138,000,000
$116,000,000
$118,000,000
$120,000,000
$122,000,000
$124,000,000
$126,000,000
$182,000,000
$184,000,000
$186,000,000
$164,000,000
$166,000,000
$168,000,000
$170,000,000
$172,000,000
$174,000,000
$176,000,000
$178,000,000
$180,000,000
$152,000,000
$154,000,000
$156,000,000
$158,000,000
$160,000,000
$162,000,000
$88,000,000
$90,000,000
440
450
960
1120
1130
1140
1060
1070
1080
1090
1100
1110
1180
1190
1200
1150
1160
1170
970
980
990
1000
1010
1020
1030
1040
1050
940
950
$200,000,000
$202,000,000
$204,000,000
$206,000,000
$208,000,000
$210,000,000
$188,000,000
$190,000,000
$192,000,000
$194,000,000
$196,000,000
$198,000,000
$230,000,000
$232,000,000
$234,000,000
$212,000,000
$214,000,000
$216,000,000
$218,000,000
$220,000,000
$222,000,000
$224,000,000
$226,000,000
$228,000,000
$236,000,000
$238,000,000
$240,000,000
Since the sending and receiving end voltages have to be maintained at 230
kV, we require a fixed number of 2 TRANSFORMER SUBSTATIONS,
one at the sending end (to step-up the voltage) and the other at the receiving end (to step
down the voltage. Each Transformer Substation consists of two 230 kV & two 500kV CBs.
Each Transformer Substation has 2 230 kV Circuit Breakers &
2 500 kV Circuit Breakers.
The Surge Impedance Loading of one line has been given as 1000 MW. However,
the Power to be transmitted along line has been proposed as 3200 MW. Thus, to
transmit the power, we need a min. of 4 HVAC lines.
According to the requirement, we require ONE SWITCHING SUBSTATION for every 200km.
Thus, the number of Switching Substations will vary depending on the length of the line.
In addition, nos. of 500kV breakers in each switching station is given as 12
The line current is determined to be 4619 A. The value of is also
given as 5000 km. Now we calculate the series compensation as
follows.
where,
The Shunt reactive compensation can be calculated using the following formula.
$150,000
$2,000
$200,000
$500,000
$7,000
$4,000
CALCULATION OF HVAC LINE COSTS
1) HVAC Line Rated Voltage & Transformer Substations
2) HVAC line Loading
3) Switching Substations
4) Series Compensation of 500kV line
3) Shunt Reactive Compensation
4) Cost of HVAC line components
a) 3-phase 500kV line (per km)
b) 230kV/500kV Transformer (per MVA)
c) 230kV circuit breaker (each)
d) 500kV circuit breaker (each)
e) 500kV series compensation (per MVAr)
f) 500kV shunt compensation (per MVAr)
=
= ()
= .
= * *
*
3-phase HVAC line costLength of the line (km)
0 $0
320
330
340
350
360
370
380
390
400
410
420
430
440
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
250
260
270
280
290
300
310
$60,000,000
$66,000,000
$72,000,000
$78,000,000
$84,000,000
$90,000,000
$96,000,000
$102,000,000
$108,000,000
$6,000,000
$12,000,000
$18,000,000
$24,000,000
$30,000,000
$36,000,000
$42,000,000
$48,000,000
$54,000,000
$168,000,000
$174,000,000
$180,000,000
$186,000,000
$192,000,000
$198,000,000
$204,000,000
$210,000,000
$216,000,000
$114,000,000
$120,000,000
$126,000,000
$132,000,000
$138,000,000
$144,000,000
$150,000,000
$156,000,000
$162,000,000
$222,000,000
$228,000,000
$234,000,000
$240,000,000
$246,000,000
$252,000,000
$258,000,000
$264,000,000
920
910
900
890
880
870
940
$312,000,000
$306,000,000
$300,000,000
$294,000,000
670
660
650
640
630
740
730
720
710
700
690
840
830
820
810
450
680
570
580
590
600
610
620
510
520
530
540
550
560
460
470
480
490
500
$318,000,000
$324,000,000
$330,000,000
$336,000,000
930
850
860
750
760
770
780
790
800
$342,000,000
$348,000,000
$354,000,000
$360,000,000
$366,000,000
$372,000,000
$276,000,000
$282,000,000
$288,000,000
$450,000,000
$456,000,000
$462,000,000
$468,000,000
$474,000,000
$480,000,000
$414,000,000
$420,000,000
$426,000,000
$432,000,000
$438,000,000
$444,000,000
$378,000,000
$384,000,000
$390,000,000
$396,000,000
$402,000,000
$408,000,000
$558,000,000
$564,000,000
$522,000,000
$528,000,000
$534,000,000
$540,000,000
$546,000,000
$552,000,000
$486,000,000
$492,000,000
$498,000,000
$504,000,000
$510,000,000
$516,000,000
$270,000,000
Length (km) HVAC LINE COST HVDC LINE COST
0 $18,800,000 $114,800,000
10 $24,840,000 $116,800,000
20 $30,880,000 $118,800,000
30 $36,920,000 $120,800,000
40 $42,960,000 $122,800,000
50 $49,000,000 $124,800,000
60 $55,040,000 $126,800,000
70 $61,080,000 $128,800,000
80 $67,120,000 $130,800,000
90 $73,160,000 $132,800,000
100 $79,200,000 $134,800,000
110 $85,240,000 $136,800,000
120 $91,280,000 $138,800,000
130 $97,320,000 $140,800,000
140 $103,360,000 $142,800,000
150 $109,400,000 $144,800,000
160 $115,440,000 $146,800,000
170 $121,480,000 $148,800,000
180 $127,520,000 $150,800,000
190 $133,560,000 $152,800,000
980
970
960
950
1200
1190
1180
1170
$720,000,000
$714,000,000
$708,000,000
$702,000,000
$624,000,000
$618,000,000
$612,000,000
$606,000,000
$600,000,000
$594,000,000
$660,000,000
$654,000,000
$648,000,000
$642,000,000
$636,000,000
$630,000,000
$696,000,000
$690,000,000
$684,000,000
$678,000,000
$672,000,000
$666,000,0001110
1120
1130
1140
1150
1160
1050
1060
1070
1080
1090
1100
990
1000
1010
1020
1030
1040
$570,000,000
$576,000,000
$582,000,000
$588,000,000
200 $145,600,000 $154,800,000
210 $151,640,000 $156,800,000
220 $157,680,000 $158,800,000
230 $163,720,000 $160,800,000
240 $169,760,000 $162,800,000
250 $175,800,000 $164,800,000
260 $181,840,000 $166,800,000
270 $187,880,000 $168,800,000
280 $193,920,000 $170,800,000
290 $199,960,000 $172,800,000
300 $206,000,000 $174,800,000
310 $212,040,000 $176,800,000
320 $218,080,000 $178,800,000
330 $224,120,000 $180,800,000
340 $230,160,000 $182,800,000
350 $236,200,000 $184,800,000
360 $242,240,000 $186,800,000
370 $248,280,000 $188,800,000
380 $254,320,000 $190,800,000
390 $260,360,000 $192,800,000
400 $272,400,000 $194,800,000
410 $278,440,000 $196,800,000
420 $284,480,000 $198,800,000
430 $290,520,000 $200,800,000
440 $296,560,000 $202,800,000
450 $302,931,579 $204,800,000
460 $309,437,390 $206,800,000
470 $315,941,747 $208,800,000
480 $322,444,638 $210,800,000
490 $328,946,048 $212,800,000
500 $335,445,961 $214,800,000
510 $341,944,361 $216,800,000
520 $348,441,234 $218,800,000
530 $354,936,561 $220,800,000
540 $361,430,328 $222,800,000
550 $367,922,515 $224,800,000
560 $374,413,105 $226,800,000
570 $380,902,081 $228,800,000
580 $387,389,422 $230,800,000
590 $393,875,109 $232,800,000
600 $406,359,123 $234,800,000
610 $412,841,443 $236,800,000
620 $419,322,047 $238,800,000
630 $425,800,915 $240,800,000
640 $432,278,024 $242,800,000
650 $438,753,350 $244,800,000
660 $445,226,872 $246,800,000
670 $451,698,564 $248,800,000
680 $458,168,402 $250,800,000
690 $464,636,360 $252,800,000
700 $471,102,412 $254,800,000
710 $477,566,533 $256,800,000
720 $484,028,693 $258,800,000
730 $490,488,865 $260,800,000
740 $496,947,019 $262,800,000
750 $503,403,127 $264,800,000
760 $509,857,157 $266,800,000
770 $516,309,079 $268,800,000
780 $522,758,859 $270,800,000
790 $529,206,465 $272,800,000
800 $541,651,863 $274,800,000
810 $548,095,017 $276,800,000
820 $554,535,893 $278,800,000
830 $560,974,453 $280,800,000
840 $567,410,659 $282,800,000
850 $573,844,473 $284,800,000
860 $580,275,855 $286,800,000
870 $586,704,763 $288,800,000
880 $593,131,156 $290,800,000
890 $599,554,990 $292,800,000
900 $605,976,221 $294,800,000
910 $612,394,803 $296,800,000
920 $618,810,690 $298,800,000
930 $625,223,833 $300,800,000
940 $631,634,182 $302,800,000
950 $638,041,687 $304,800,000
960 $644,446,295 $306,800,000
970 $650,847,952 $308,800,000
980 $657,246,604 $310,800,000
990 $663,642,192 $312,800,000
1000 $676,034,659 $314,800,000
1010 $682,423,943 $316,800,000
1020 $688,809,984 $318,800,000
1030 $695,192,717 $320,800,000
1040 $701,572,077 $322,800,000
1050 $707,947,996 $324,800,000
1060 $714,320,404 $326,800,000
1070 $720,689,230 $328,800,000
1080 $727,054,400 $330,800,000
1090 $733,415,839 $332,800,000
1100 $739,773,467 $334,800,000
1110 $746,127,205 $336,800,000
1120 $752,476,970 $338,800,000
1130 $758,822,675 $340,800,000
1140 $765,164,233 $342,800,000
1150 $771,501,552 $344,800,000
1160 $777,834,540 $346,800,000
1170 $784,163,099 $348,800,000
1180 $790,487,129 $350,800,000
1190 $796,806,528 $352,800,000
$0
$100,000,000
$200,000,000
$300,000,000
$400,000,000
$500,000,000
$600,000,000
$700,000,000
$800,000,000
$900,000,000
0
1200 $809,121,191 $354,800,000
The rated voltage of the HVDC line is proposed as 450kV. Since the sending and receiving
filters & transformers, one at each end of the line. (Step-Up transformer at the sending
converter stations with
HVDC Converter
Station including
filters and
Transformers ($)
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
Earth Electrodes Cost ($)Cost of Capacitors for Reactive Power
($)
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$96,000,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$800,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
$3,600,000
TRANSFORMER SUBSTATIONS,
Transformer Cost 230kV C.B 500kV C.B Number (rad.)
$16,000,000 $800,000 $2,000,000 0 0.000
$16,000,000 $800,000 $2,000,000 0 0.013
$16,000,000 $800,000 $2,000,000 0 0.025
$16,000,000 $800,000 $2,000,000 0 0.038
$16,000,000 $800,000 $2,000,000 0 0.050
$16,000,000 $800,000 $2,000,000 0 0.063
$16,000,000 $800,000 $2,000,000 0 0.075
$16,000,000 $800,000 $2,000,000 0 0.088
$16,000,000 $800,000 $2,000,000 0 0.100
$16,000,000 $800,000 $2,000,000 0 0.113
$16,000,000 $800,000 $2,000,000 0 0.126
$16,000,000 $800,000 $2,000,000 0 0.138
$16,000,000 $800,000 $2,000,000 0 0.151
$16,000,000 $800,000 $2,000,000 0 0.163
$16,000,000 $800,000 $2,000,000 0 0.176
$16,000,000 $800,000 $2,000,000 0 0.188
$16,000,000 $800,000 $2,000,000 0 0.201
$16,000,000 $800,000 $2,000,000 0 0.214
$16,000,000 $800,000 $2,000,000 0 0.226
$16,000,000 $800,000 $2,000,000 0 0.239
$16,000,000 $800,000 $2,000,000 1 0.251
$16,000,000 $800,000 $2,000,000 1 0.264
$16,000,000 $800,000 $2,000,000 1 0.276
$16,000,000 $800,000 $2,000,000 1 0.289
$16,000,000 $800,000 $2,000,000 1 0.301
$16,000,000 $800,000 $2,000,000 1 0.314
$16,000,000 $800,000 $2,000,000 1 0.327
$16,000,000 $800,000 $2,000,000 1 0.339
$16,000,000 $800,000 $2,000,000 1 0.352
$16,000,000 $800,000 $2,000,000 1 0.364
$16,000,000 $800,000 $2,000,000 1 0.377
$16,000,000 $800,000 $2,000,000 1 0.389
$16,000,000 $800,000 $2,000,000 1 0.402
$16,000,000 $800,000 $2,000,000 1 0.414
$16,000,000 $800,000 $2,000,000 1 0.427
$16,000,000 $800,000 $2,000,000 1 0.440
$16,000,000 $800,000 $2,000,000 1 0.452
$16,000,000 $800,000 $2,000,000 1 0.465
$16,000,000 $800,000 $2,000,000 1 0.477
$16,000,000 $800,000 $2,000,000 1 0.490
$16,000,000 $800,000 $2,000,000 2 0.502
$16,000,000 $800,000 $2,000,000 2 0.515
$16,000,000 $800,000 $2,000,000 2 0.528
$16,000,000 $800,000 $2,000,000 2 0.540
$16,000,000 $800,000 $2,000,000 2 0.553
500 kV Series CompensationSwitching Stations
$6,000,000
$6,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
$6,000,000
Transformer Station with Transformers and
Circuit Breakers
Cost ($)
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$6,000,000
$0
$0
$0
$16,000,000 $800,000 $2,000,000 2 0.565
$16,000,000 $800,000 $2,000,000 2 0.578
$16,000,000 $800,000 $2,000,000 2 0.590
$16,000,000 $800,000 $2,000,000 2 0.603
$16,000,000 $800,000 $2,000,000 2 0.615
$16,000,000 $800,000 $2,000,000 2 0.628
$16,000,000 $800,000 $2,000,000 2 0.641
$16,000,000 $800,000 $2,000,000 2 0.653
$16,000,000 $800,000 $2,000,000 2 0.666
$16,000,000 $800,000 $2,000,000 2 0.678
$16,000,000 $800,000 $2,000,000 2 0.691
$16,000,000 $800,000 $2,000,000 2 0.703
$16,000,000 $800,000 $2,000,000 2 0.716
$16,000,000 $800,000 $2,000,000 2 0.728
$16,000,000 $800,000 $2,000,000 2 0.741
$16,000,000 $800,000 $2,000,000 3 0.754
$16,000,000 $800,000 $2,000,000 3 0.766
$16,000,000 $800,000 $2,000,000 3 0.779
$16,000,000 $800,000 $2,000,000 3 0.791
$16,000,000 $800,000 $2,000,000 3 0.804
$16,000,000 $800,000 $2,000,000 3 0.816
$16,000,000 $800,000 $2,000,000 3 0.829
$16,000,000 $800,000 $2,000,000 3 0.842
$16,000,000 $800,000 $2,000,000 3 0.854
$16,000,000 $800,000 $2,000,000 3 0.867
$16,000,000 $800,000 $2,000,000 3 0.879
$16,000,000 $800,000 $2,000,000 3 0.892
$16,000,000 $800,000 $2,000,000 3 0.904
$16,000,000 $800,000 $2,000,000 3 0.917
$16,000,000 $800,000 $2,000,000 3 0.929
$16,000,000 $800,000 $2,000,000 3 0.942
$16,000,000 $800,000 $2,000,000 3 0.955
$16,000,000 $800,000 $2,000,000 3 0.967
$16,000,000 $800,000 $2,000,000 3 0.980
$16,000,000 $800,000 $2,000,000 3 0.992
$16,000,000 $800,000 $2,000,000 4 1.005
$16,000,000 $800,000 $2,000,000 4 1.017
$16,000,000 $800,000 $2,000,000 4 1.030
$16,000,000 $800,000 $2,000,000 4 1.042
$16,000,000 $800,000 $2,000,000 4 1.055
$16,000,000 $800,000 $2,000,000 4 1.068
$16,000,000 $800,000 $2,000,000 4 1.080
$16,000,000 $800,000 $2,000,000 4 1.093
$16,000,000 $800,000 $2,000,000 4 1.105
$16,000,000 $800,000 $2,000,000 4 1.118
$16,000,000 $800,000 $2,000,000 4 1.130
$16,000,000 $800,000 $2,000,000 4 1.143
$16,000,000 $800,000 $2,000,000 4 1.156
$16,000,000 $800,000 $2,000,000 4 1.168
$16,000,000 $800,000 $2,000,000 4 1.181
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$12,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$18,000,000
$16,000,000 $800,000 $2,000,000 4 1.193
$16,000,000 $800,000 $2,000,000 4 1.206
$16,000,000 $800,000 $2,000,000 4 1.218
$16,000,000 $800,000 $2,000,000 4 1.231
$16,000,000 $800,000 $2,000,000 4 1.243
$16,000,000 $800,000 $2,000,000 5 1.256
$16,000,000 $800,000 $2,000,000 5 1.269
$16,000,000 $800,000 $2,000,000 5 1.281
$16,000,000 $800,000 $2,000,000 5 1.294
$16,000,000 $800,000 $2,000,000 5 1.306
$16,000,000 $800,000 $2,000,000 5 1.319
$16,000,000 $800,000 $2,000,000 5 1.331
$16,000,000 $800,000 $2,000,000 5 1.344
$16,000,000 $800,000 $2,000,000 5 1.356
$16,000,000 $800,000 $2,000,000 5 1.369
$16,000,000 $800,000 $2,000,000 5 1.382
$16,000,000 $800,000 $2,000,000 5 1.394
$16,000,000 $800,000 $2,000,000 5 1.407
$16,000,000 $800,000 $2,000,000 5 1.419
$16,000,000 $800,000 $2,000,000 5 1.432
$16,000,000 $800,000 $2,000,000 5 1.444
$16,000,000 $800,000 $2,000,000 5 1.457
$16,000,000 $800,000 $2,000,000 5 1.470
$16,000,000 $800,000 $2,000,000 5 1.482
$16,000,000 $800,000 $2,000,000 5 1.495
$16,000,000 $800,000 $2,000,000 6 1.507
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$36,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$24,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
$30,000,000
200 400 600 800 1000
COST V/S LENGHT (KM)
HVAC LINE COST HVDC LINE COST
Total Cost ($)
$182,800,000
$184,800,000
$186,800,000
$188,800,000
$190,800,000
$192,800,000
$194,800,000
$196,800,000
$198,800,000
$200,800,000
$148,800,000
$150,800,000
$152,800,000
$154,800,000
$156,800,000
$158,800,000
$160,800,000
$162,800,000
$164,800,000
$166,800,000
$168,800,000
$170,800,000
$172,800,000
$174,800,000
$176,800,000
$178,800,000
$180,800,000
$114,800,000
$116,800,000
$118,800,000
$120,800,000
$122,800,000
$124,800,000
$126,800,000
$128,800,000
$130,800,000
$132,800,000
$134,800,000
$136,800,000
$138,800,000
$140,800,000
$142,800,000
$144,800,000
$146,800,000
Cost of System Reactive Power ($)
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$284,800,000
$286,800,000
$288,800,000
$290,800,000
$292,800,000
$294,800,000
$296,800,000
$298,800,000
$300,800,000
$250,800,000
$252,800,000
$254,800,000
$256,800,000
$258,800,000
$260,800,000
$262,800,000
$264,800,000
$266,800,000
$268,800,000
$270,800,000
$272,800,000
$274,800,000
$276,800,000
$278,800,000
$280,800,000
$282,800,000
$216,800,000
$218,800,000
$220,800,000
$222,800,000
$224,800,000
$226,800,000
$228,800,000
$230,800,000
$232,800,000
$234,800,000
$236,800,000
$238,800,000
$240,800,000
$242,800,000
$244,800,000
$246,800,000
$248,800,000
$202,800,000
$204,800,000
$206,800,000
$208,800,000
$210,800,000
$212,800,000
$214,800,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$352,800,000
$354,800,000
$318,800,000
$320,800,000
$322,800,000
$324,800,000
$326,800,000
$328,800,000
$330,800,000
$332,800,000
$334,800,000
$336,800,000
$338,800,000
$340,800,000
$342,800,000
$344,800,000
$346,800,000
$348,800,000
$350,800,000
$302,800,000
$304,800,000
$306,800,000
$308,800,000
$310,800,000
$312,800,000
$314,800,000
$316,800,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
$14,400,000
(deg.) Comp. Cost ($)
0.000 ND $0
0.720 -41.040 $0
1.440 -20.022 $0
2.160 -13.016 $0
2.880 -9.514 $0
3.600 -7.413 $0
4.320 -6.013 $0
5.040 -5.013 $0
5.760 -4.264 $0
6.480 -3.681 $0
7.200 -3.215 $0
7.920 -2.834 $0
8.640 -2.517 $0
9.360 -2.248 $0
10.080 -2.018 $0
10.800 -1.819 $0
11.520 -1.645 $0
12.240 -1.492 $0
12.960 -1.356 $0
13.680 -1.234 $0
14.400 -1.124 $0
15.120 -1.025 $0
15.840 -0.935 $0
16.560 -0.853 $0
17.280 -0.778 $0
18.000 -0.710 $0
18.720 -0.646 $0
19.440 -0.587 $0
20.160 -0.533 $0
20.880 -0.482 $0
21.600 -0.435 $0
22.320 -0.391 $0
23.040 -0.350 $0
23.760 -0.311 $0
24.480 -0.275 $0
25.200 -0.241 $0
25.920 -0.209 $0
26.640 -0.178 $0
27.360 -0.149 $0
28.080 -0.122 $0
28.800 -0.097 $0
29.520 -0.072 $0
30.240 -0.049 $0
30.960 -0.027 $0
31.680 -0.006 $0
500kV Shunt Compensation
420
430
440
500 kV Series Compensation
MVAR
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
250
260
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
MVAR
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
270
280
290
300
310
320
330
340
350
360
370
380
390
400
410
32.400 0.014 $331,579
33.120 0.033 $797,390
33.840 0.051 $1,261,747
34.560 0.069 $1,724,638
35.280 0.085 $2,186,048
36.000 0.101 $2,645,961
36.720 0.116 $3,104,361
37.440 0.131 $3,561,234
38.160 0.145 $4,016,561
38.880 0.158 $4,470,328
39.600 0.171 $4,922,515
40.320 0.184 $5,373,105
41.040 0.195 $5,822,081
41.760 0.207 $6,269,422
42.480 0.218 $6,715,109
43.200 0.228 $7,159,123
43.920 0.238 $7,601,443
44.640 0.248 $8,042,047
45.360 0.258 $8,480,915
46.080 0.267 $8,918,024
46.800 0.275 $9,353,350
47.520 0.284 $9,786,872
48.240 0.292 $10,218,564
48.960 0.300 $10,648,402
49.680 0.307 $11,076,360
50.400 0.314 $11,502,412
51.120 0.321 $11,926,533
51.840 0.328 $12,348,693
52.560 0.335 $12,768,865
53.280 0.341 $13,187,019
54.000 0.347 $13,603,127
54.720 0.353 $14,017,157
55.440 0.359 $14,429,079
56.160 0.364 $14,838,859
56.880 0.369 $15,246,465
57.600 0.374 $15,651,863
58.320 0.379 $16,055,017
59.040 0.384 $16,455,893
59.760 0.389 $16,854,453
60.480 0.393 $17,250,659
61.200 0.397 $17,644,473
61.920 0.401 $18,035,855
62.640 0.405 $18,424,763
63.360 0.409 $18,811,156
64.080 0.413 $19,194,990
64.800 0.416 $19,576,221
65.520 0.420 $19,954,803
66.240 0.423 $20,330,690
66.960 0.426 $20,703,833
67.680 0.429 $21,074,182
860
870
880
890
900
910
920
930
940
600
610
620
630
640
650
660
670
680
690
700
710
720
730
740
750
760
450
460
470
480
490
500
510
520
530
540
550
560
570
580
2851
2904
2958
3011
246
312
378
443
509
574
639
703
768
832
896
959
1023
1086
1149
1212
1274
1460
1521
1582
1643
1704
1764
1824
1884
1943
2002
2061
2120
2178
2236
2294
1336
1398
47
114
180
2351
2408
2464
2521
2577
2632
2687
2742
2797
590
770
780
790
800
810
820
830
840
850
68.400 0.432 $21,441,687
69.120 0.435 $21,806,295
69.840 0.437 $22,167,952
70.560 0.440 $22,526,604
71.280 0.442 $22,882,192
72.000 0.445 $23,234,659
72.720 0.447 $23,583,943
73.440 0.449 $23,929,984
74.160 0.451 $24,272,717
74.880 0.453 $24,612,077
75.600 0.455 $24,947,996
76.320 0.456 $25,280,404
77.040 0.458 $25,609,230
77.760 0.459 $25,934,400
78.480 0.461 $26,255,839
79.200 0.462 $26,573,467
79.920 0.463 $26,887,205
80.640 0.465 $27,196,970
81.360 0.466 $27,502,675
82.080 0.467 $27,804,233
82.800 0.468 $28,101,552
83.520 0.468 $28,394,540
84.240 0.469 $28,683,099
84.960 0.470 $28,967,129
85.680 0.470 $29,246,528
86.400 0.471 $29,521,191
1090
1100
1110
1120
1130
1140
1150
1160
1170
1180
1190
1200
950
960
970
980
990
1000
1010
1020
4138
4178
4217
3063
3115
3167
3218
3269
3319
3369
3419
3468
3516
3564
3611
3658
1030
1040
1050
1060
1070
10803705
3751
3796
3841
3885
3929
3972
4015
4056
4098
1200 1400
Cost ($)
$0
$40,000
$80,000
$120,000
$160,000
$200,000
$240,000
$280,000
$320,000
$360,000
$400,000
$440,000
$480,000
$520,000
$560,000
$600,000
$640,000
$680,000
$720,000
$760,000
$800,000
$840,000
$880,000
$920,000
$960,000
$1,000,000
$1,040,000
$1,080,000
$1,120,000
$1,160,000
$1,200,000
$1,240,000
$1,280,000
$1,320,000
$1,360,000
$1,400,000
$1,440,000
$1,480,000
$1,520,000
$1,560,000
$1,600,000
$1,640,000
$1,680,000
$1,720,000
$1,760,000
Total Cost
$242,240,000
$248,280,000
$254,320,000
$260,360,000
$272,400,000
$278,440,000
$284,480,000
$290,520,000
$296,560,000
$133,560,000
$145,600,000
$151,640,000
$157,680,000
$163,720,000
$169,760,000
$175,800,000
$181,840,000
$187,880,000
$193,920,000
$199,960,000
$206,000,000
$212,040,000
$218,080,000
$224,120,000
$230,160,000
$236,200,000
500kV Shunt Compensation
$18,800,000
$24,840,000
$30,880,000
$36,920,000
$42,960,000
$49,000,000
$55,040,000
$61,080,000
$67,120,000
$73,160,000
$79,200,000
$85,240,000
$91,280,000
$97,320,000
$103,360,000
$109,400,000
$115,440,000
$121,480,000
$127,520,000
$1,800,000
$1,840,000
$1,880,000
$1,920,000
$1,960,000
$2,000,000
$2,040,000
$2,080,000
$2,120,000
$2,160,000
$2,200,000
$2,240,000
$2,280,000
$2,320,000
$2,360,000
$2,400,000
$2,440,000
$2,480,000
$2,520,000
$2,560,000
$2,600,000
$2,640,000
$2,680,000
$2,720,000
$2,760,000
$2,800,000
$2,840,000
$2,880,000
$2,920,000
$2,960,000
$3,000,000
$3,040,000
$3,080,000
$3,120,000
$3,160,000
$3,200,000
$3,240,000
$3,280,000
$3,320,000
$3,360,000
$3,400,000
$3,440,000
$3,480,000
$3,520,000
$3,560,000
$3,600,000
$3,640,000
$3,680,000
$3,720,000
$3,760,000
$586,704,763
$593,131,156
$599,554,990
$605,976,221
$612,394,803
$618,810,690
$625,223,833
$631,634,182
$471,102,412
$477,566,533
$484,028,693
$490,488,865
$496,947,019
$503,403,127
$509,857,157
$516,309,079
$522,758,859
$529,206,465
$541,651,863
$548,095,017
$554,535,893
$560,974,453
$567,410,659
$573,844,473
$580,275,855
$354,936,561
$361,430,328
$367,922,515
$374,413,105
$380,902,081
$387,389,422
$393,875,109
$406,359,123
$412,841,443
$419,322,047
$425,800,915
$432,278,024
$438,753,350
$445,226,872
$451,698,564
$458,168,402
$464,636,360
$302,931,579
$309,437,390
$315,941,747
$322,444,638
$328,946,048
$335,445,961
$341,944,361
$348,441,234
$3,800,000
$3,840,000
$3,880,000
$3,920,000
$3,960,000
$4,000,000
$4,040,000
$4,080,000
$4,120,000
$4,160,000
$4,200,000
$4,240,000
$4,280,000
$4,320,000
$4,360,000
$4,400,000
$4,440,000
$4,480,000
$4,520,000
$4,560,000
$4,600,000
$4,640,000
$4,680,000
$4,720,000
$4,760,000
$4,800,000
$701,572,077
$707,947,996
$714,320,404
$720,689,230
$727,054,400
$733,415,839
$739,773,467
$746,127,205
$752,476,970
$758,822,675
$765,164,233
$771,501,552
$777,834,540
$784,163,099
$790,487,129
$796,806,528
$809,121,191
$638,041,687
$644,446,295
$650,847,952
$657,246,604
$663,642,192
$676,034,659
$682,423,943
$688,809,984
$695,192,717