Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
Public Charging Infrastructureas a servicefor sustainable mobility
CIVITAS Workshop
Rotterdam
17 June 2016
PhD Àngel López Rodríguez
eMobility Program Manager
Barcelona City Council
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
Urban Mobility
Urban mobility is a complex issue that directly affects all citizens
“Urban mobility systems are composed of multiple elements with strong interactions. Thus, use adaptation over prediction, regulate interactions to avoid friction, use sensors to recover real time information, develop adaptive algorithms to exploit that information, and deploy agents to act on the urban environment” (Carlos Gershenson)
2
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
"The air pollution produced by mobility causes more deaths than traffic accidents" (WHO 2014)
Challenges due to Urban Mobility
3
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
Vehicles with new electric powertrains will not solve Urban Mobility, as they only reduce some unwanted side effects of dirty technologies
EV’s not THE Solution
4
“If you plan cities for cars and traffic, you get cars and traffic.If you plan for people and places, you get people and places. (Fred Kent)”
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
The SUMPs
A Sustainable Urban Mobility Plan fosters a balanced development of all relevant transport modes, while encouraging a shift towards more sustainable modes.
The plan puts forward an integrated set of technical, infrastructure, policy-based, and soft measures to improve performance and cost-effectiveness with regard to the declared goal and specific objectives. (EC 2013)
5
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
SUMPs need EV
A Sustainable Urban Mobility Plan fosters a balanced development of all relevant transport modes, while encouraging a shift towards more sustainable modes.
The plan puts forward an integrated set of technical, infrastructure, policy-based, and soft measures to improve performance and cost-effectiveness with regard to the declared goal and specific objectives. (EC 2013)
6
Award for the best technology available
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV could break SUMP rules?
7
when they are parked, ICE vehicles are also zero emissions, why discriminate?
i.e. free parking in public spaces or allowing bus lane use for private EV are not sustainable policies.
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV could break SUMP rules? NO
8
The electric vehicles promotion should not break the rules, we must adapt the rules temporarily retaining the principles of the SUMP.
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV new Challenges: Charging Infrastructure
9
EV technology changes the way that energy is supplied.
All we have heard two tricky promises: •Electricity distribution grid is the most widespread energy network so recharging EV will be done easily anywhere… •Cars are parked 90% of the day so there is always enough time for charging…
… for now, autonomy and charging network remain the key barriers for drivers of an EV
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
SUMPs must incorporate EV
Sustainable Urban Mobility Plan must incorporate EV advantages but also must solve the new challenges.
How to deploy EV charging infrastructure will be crucial to promote EV in a compatible way with other mobility policies.
As in all other transport systems analysis, it is necessary to differentiate types of vehicles and users cases.
10
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure
11
Kinds of charging infrastructure according to needs:
Residential Charge:Charging at home, overnight, private sphere
Opportunity Charge:“Meanwhile” charging, associated to another main activity, at work, leisure, shopping, restaurant, hospital, Park&Ride… private/public activity
Emergency Charge: Battery exceptionally exhausted, needed to get back home or just to enlarge autonomy once (one of the main fears of a novice EVdriver). Public Service. Also RACC Road Assistance.
OnRoute Charge:Long planned trip, charging in route to enlarge autonomy
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. Residential
12
EV must charge where it park, rather than the reverse
i.e. “Residential Charging is a major barrier…” NO! Off-Street Residential Parking IS the Challenge
Charging at Home (low power, 15km/h):•your own private garage•loan private garage•granted public garage (*)•paid place on-street (reserved 22h-08h)(*)
(*) public administration involved
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. Residential
13
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. Opportunity
14
EV must charge where it park, rather than the reverse.Rules may force agents to install charging points in its facilities. (low-semi 15-50km/h)
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. Emergency
15
EV should quick charge when needed.“RemoveFears” for privates, essential for professionals.(Quick/Fast 100-200km/h)
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. Emergency
16
EV should quick charge when needed.“RemoveFears” for privates, essential for professionals.(Quick/Fast 100-200km/h) limited to 30’
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. Emergency
17
EV should quick charge when needed.One QC at < 6 min
17
Criteria: Land Coverage1 QC station/6’20Km/h -> 2Km60Km/h -> 6km
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. Emergency
18
EV should quick charge when needed.One QC at < 6 min
18
Criteria: Land Coverage1 QC station/6’20Km/h -> 2Km60Km/h -> 6km
Criteria: DemandNumber of stands per station<-> users demand
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
19
EV Charging Infrastructure. Emergency
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
20
EV Charging Infrastructure. Emergency
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. PHEV’s hogging
21
Plug-in EV could use Opportunity and Emergency Chargers but there is the risk of hogging infrastructure while they aren’t in a critical situation.PHEV and EV without quick charger capabilities will be banned on QC Emergency Chargers
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. eMoto
22
EV motorbike should charge when needed. On-street.(30-50 km/h)
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. OnRoute
23
EV should quick charge when On Route. National Corridors.Essential for professionals and long trips. “electrostation”(Fast/Super 200-300km/30min)
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. OnRoute
24
EV should quick charge when On Route. National Corridors.
24
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
EV Charging Infrastructure. OnRoute
25
EV should quick charge when On Route. National Corridors.
25
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
• 26 Residential services in public garages overnight
• 154 Opportunity services in public garages off-street
• 16 Opportunity services for taxis/delivery in public space on-street
• 54+129 Opportunity services for eMoto in public off-street/on-street
• 17 QC Emergency services in public space on-street
26
EV Charging Infrastructure. BCN Public Network
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures
• Actual regulation of Spanish electricity market obliges us to have an independentconnection to the grid for each ChargeStation.
• Fixed Cost per connection=80€/kw/year (+ consumption of energy)
• Total OPEX QC (50kw)(2015): 14.000€/charger
• High usage 6-8 charges/day/charger on average
• Costs 5-6€/100km charged (CAPEX excluded) on average
• In the actual context NO bussines model is possible.
CONCLUSION: Investment, management and operational cost of the Public Charging Network must be assumed by the local mobility authority as needed Services to achieve SUMP objectives.
27
EV Charging Infrastructure. Bussines Model
Ecologia Urbana
Gerència Adjunta de Mobilitat i Infraestructures