19
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Embed Size (px)

Citation preview

Page 1: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM

GERMANY WORKSHOP16/ 12/2010 Dr. Zeynep Yöntem General Director

Ekodenge Engineering & Consultancy

Page 2: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

EPESUS PROJECT AIMS

To design decision support tool in order to develop waste and energy management

To serve Small and Medium Enterprises (SMEs) within an industrial park or any communication network,

To improve their environmental requirements, managing their resource usage and waste management

To improve their energy efficiency. To deliver a set of guidelines and best practices to the

industrialists by the help of a software tool. To provide guidance for waste minimisation and reuse,

energy saving potential and optimization for the industrial establishments of an EIP through utilisation symbiotic relations.

Page 3: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

WORK PACKAGES

WP 1 – PROJECT MANAGEMENTWP 2 – DEFINITION OF WASTE MANAGEMENT PARAMETERSWP 3 - DEFINITION OF ENERGY EFFICIENCY METHODOLOGYWP 4 – INFORMATION SYSTEM DEVELOPMENTWP 5 – CASE STUDIES WITHIN INDUSTRIAL PARKS

WP - 6 PREPARATION OF TRAINING MATERIALS AND THE TRAINING PROGRAMMEWP 7 – DISSEMINATION AND EXPLOITATION

Page 4: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Feedback

EPESUS INFORMATION SYSTEMManagement

Support ModuleIndustrial

Establishment Support Module

CASE STUDIES

DISSEMINATION

WP3

WP4

WP6

WP7

WP1 MANAGEMENT

WP7 DISSEMINATION

WP2

WASTE

MANAGEMENT

ENERGY

EFFICIENCY

TRAININGWP5

Work Programme Diagram

Page 5: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Industrial Sectors textile processing plants, smitheries and foundries, large combustion plants, building industry polymer plants. We need processes input output data for calculation of

waste composition and quantities. We used the pre-defined processes from the library or

individually specified processes for calculation System boundary and data gathering report that also includes

identification of the standard process flow module specifications

Page 6: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Progress of work plan in the period

EPESUS project has completed its 15 months at the end of November 2010.

PR 1 has been delivered for the first eight months. PR 1 has been aimed at developing the dissemination activities of the project and also establishment of the project technical baseline.

The second eight months of the project has been focused more on the development of the technical workloads.

Page 7: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Progress of work plan in the period

Progress on work package 2 Activities of the work package 2 aimed at development of a detailed

exemplary study in order to orient the partner. Each sectoral study should be synchronized in the same line. For this reason, the first delivery of the WP2 includes standard flow diagrams for one sector. The other sectoral studies are expected to be developed in the same procedure.

The exemplary study is carried out on the polymer sector. The PVC production data is compiled in LCA vision. These documents are presented in the annex x of technical documents. “Basic Definition of Standard Process Flow Module Specifications” document includes datasheets relevant with the PVC production phases.

The sectors are shared between the relevant partners. The partners’ contribution includes the sectoral studies under their responsibility. The partner’s contribution.documents will include the system boundaries of the sectors mentioned in the EPESUS project.

Basic definition of standard process flow module specifications

Page 8: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Work Package 2 Activities

Progresson work package 2 Position

System boundary and data gathering report that also includes identification of the standard process flow module specifications

Done

Evaluation report of sample process input/output flow values of industrial processes for the 5 sectors

February 2011

Guideline on recovery system for each category of hazardous waste, supply chain management system

August 2011

Guideline on transfer and disposal options August 2011

Page 9: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Work Package 3 Activities

Progresson work package 3 Delivered (yes/no)

Assessment report on energy efficiency tools and methodologies for buildings after the workshop in UK

no

Calculation methodology for energy efficiency in industrial operations

yes

Calculation methodology for energy efficiency in Buildings yes

Guide for environmental friendly techniques yes

Page 10: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Work Package 4 Activities

Progresson work package 4 Delivered (yes/no)

Analysis meeting evaluation report Done

Software Requirements Specification (SRS) document Done

Pilot Version of EPESUS Information SystemInformation System

August 2011

Test reports December 2011

Revised Software Requirement Specification Report February 2012

Final Version of EPESUS June 2012

Page 11: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Work Package 5 Activities

Progresson work package 5 Delivered (yes/no)

Bug-feature tracking system October 2011

Case Studies Within Industrial Parks June 2011

Business plan November 2012

Page 12: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Work Package 6 Activities

Progress on work package 6Preparation of the handbook as a user guide and case study report of the EPESUS system.

October 2011

Preparation of the handbook as a software based training and user support module

October 2011

Preparation of Design strategies for Eco-Industrial Parks October 2011

Preparation of Management plan of EIPs October 2011

Preparation of Financial issues of EIPs October 2011Preparation of Sustainability of EIPs October 2011

Preparation of Waste strategies of EIPs October 2011Preparation of Energy strategies of EIPs October 2011

Preparation of training programme and its application October 2011

Page 13: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Work Package 7 Activities

Progresson work package 7 Delivered (yes/no)

Dissemination and project web site Yes

Exploitation plan On going

Page 14: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Progress of work plan in the period

Progress on Work Package I against initial objectives: Position

Communication regarding project activities

Contribution of subcontractors, stakeholder for preparation of reports

Management of the project web site Open

Management of the technical management board

Management meetings

Page 15: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Progress of work plan in the period

Progress regarding performance indicators(Improved environmental performance, Better use of natural resources Economic performance / market replication)

Performance indicators aim to define medium term improvements expected on environmental and economic parameters on the covered sectors/processes. Short term improvements cannot be measured until the system is deployed, tested and the users are trained.

The indicators of short term objectives can be in monitored by monitoring a relational gradual approach to the below mentioned mid term goals, starting from the deployment and use of the EPESUS system at the test sites in WP 4 and 5 and after the wider application of the EPESUS IS starting in month 28.

Page 16: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Progress regarding market uptake and exploitation

EPESUS exploitation plan asserts details on how the project results will be exploited, especially for the primary and secondary users of the project activities.

It aims to set up the successful exploitation of the results both during the project lifetime and in particular after the project has been concluded.

Progress of work plan in the period

Page 17: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Work plan for the next periodEvaluation report of sample process input/output flow values of industrial processes for the 5 sectors

February 2011

RMPM in Sofia January 2011

Guideline on transfer and disposal options August 2011

Pilot Version of EPESUS Information SystemInformation System

August 2011

Case Studies Within Industrial Parks June 2011

Guideline on recovery system for each category of hazardous waste, supply chain management system

August 2011

Page 18: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Neceseary Document From Partner

Original signed Partnership Agreement Original signed Confidentiality Agreement Original signed timesheets (From March 2010

to November 2010) Payroll for each month Flight Ticket for Kick-off Meeting Boarding Pass of Kick-off Meeting Hotel Invoice for Kick-off Meeting Meeting room rental invoice Other invoices

Page 19: ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

Thank You..