ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM
GERMANY WORKSHOP16/ 12/2010 Dr. Zeynep Yöntem General Director
Ekodenge Engineering & Consultancy
EPESUS PROJECT AIMS
To design decision support tool in order to develop waste and energy management
To serve Small and Medium Enterprises (SMEs) within an industrial park or any communication network,
To improve their environmental requirements, managing their resource usage and waste management
To improve their energy efficiency. To deliver a set of guidelines and best practices to the
industrialists by the help of a software tool. To provide guidance for waste minimisation and reuse,
energy saving potential and optimization for the industrial establishments of an EIP through utilisation symbiotic relations.
WORK PACKAGES
WP 1 – PROJECT MANAGEMENTWP 2 – DEFINITION OF WASTE MANAGEMENT PARAMETERSWP 3 - DEFINITION OF ENERGY EFFICIENCY METHODOLOGYWP 4 – INFORMATION SYSTEM DEVELOPMENTWP 5 – CASE STUDIES WITHIN INDUSTRIAL PARKS
WP - 6 PREPARATION OF TRAINING MATERIALS AND THE TRAINING PROGRAMMEWP 7 – DISSEMINATION AND EXPLOITATION
Feedback
EPESUS INFORMATION SYSTEMManagement
Support ModuleIndustrial
Establishment Support Module
CASE STUDIES
DISSEMINATION
WP3
WP4
WP6
WP7
WP1 MANAGEMENT
WP7 DISSEMINATION
WP2
WASTE
MANAGEMENT
ENERGY
EFFICIENCY
TRAININGWP5
Work Programme Diagram
Industrial Sectors textile processing plants, smitheries and foundries, large combustion plants, building industry polymer plants. We need processes input output data for calculation of
waste composition and quantities. We used the pre-defined processes from the library or
individually specified processes for calculation System boundary and data gathering report that also includes
identification of the standard process flow module specifications
Progress of work plan in the period
EPESUS project has completed its 15 months at the end of November 2010.
PR 1 has been delivered for the first eight months. PR 1 has been aimed at developing the dissemination activities of the project and also establishment of the project technical baseline.
The second eight months of the project has been focused more on the development of the technical workloads.
Progress of work plan in the period
Progress on work package 2 Activities of the work package 2 aimed at development of a detailed
exemplary study in order to orient the partner. Each sectoral study should be synchronized in the same line. For this reason, the first delivery of the WP2 includes standard flow diagrams for one sector. The other sectoral studies are expected to be developed in the same procedure.
The exemplary study is carried out on the polymer sector. The PVC production data is compiled in LCA vision. These documents are presented in the annex x of technical documents. “Basic Definition of Standard Process Flow Module Specifications” document includes datasheets relevant with the PVC production phases.
The sectors are shared between the relevant partners. The partners’ contribution includes the sectoral studies under their responsibility. The partner’s contribution.documents will include the system boundaries of the sectors mentioned in the EPESUS project.
Basic definition of standard process flow module specifications
Work Package 2 Activities
Progresson work package 2 Position
System boundary and data gathering report that also includes identification of the standard process flow module specifications
Done
Evaluation report of sample process input/output flow values of industrial processes for the 5 sectors
February 2011
Guideline on recovery system for each category of hazardous waste, supply chain management system
August 2011
Guideline on transfer and disposal options August 2011
Work Package 3 Activities
Progresson work package 3 Delivered (yes/no)
Assessment report on energy efficiency tools and methodologies for buildings after the workshop in UK
no
Calculation methodology for energy efficiency in industrial operations
yes
Calculation methodology for energy efficiency in Buildings yes
Guide for environmental friendly techniques yes
Work Package 4 Activities
Progresson work package 4 Delivered (yes/no)
Analysis meeting evaluation report Done
Software Requirements Specification (SRS) document Done
Pilot Version of EPESUS Information SystemInformation System
August 2011
Test reports December 2011
Revised Software Requirement Specification Report February 2012
Final Version of EPESUS June 2012
Work Package 5 Activities
Progresson work package 5 Delivered (yes/no)
Bug-feature tracking system October 2011
Case Studies Within Industrial Parks June 2011
Business plan November 2012
Work Package 6 Activities
Progress on work package 6Preparation of the handbook as a user guide and case study report of the EPESUS system.
October 2011
Preparation of the handbook as a software based training and user support module
October 2011
Preparation of Design strategies for Eco-Industrial Parks October 2011
Preparation of Management plan of EIPs October 2011
Preparation of Financial issues of EIPs October 2011Preparation of Sustainability of EIPs October 2011
Preparation of Waste strategies of EIPs October 2011Preparation of Energy strategies of EIPs October 2011
Preparation of training programme and its application October 2011
Work Package 7 Activities
Progresson work package 7 Delivered (yes/no)
Dissemination and project web site Yes
Exploitation plan On going
Progress of work plan in the period
Progress on Work Package I against initial objectives: Position
Communication regarding project activities
Contribution of subcontractors, stakeholder for preparation of reports
Management of the project web site Open
Management of the technical management board
Management meetings
Progress of work plan in the period
Progress regarding performance indicators(Improved environmental performance, Better use of natural resources Economic performance / market replication)
Performance indicators aim to define medium term improvements expected on environmental and economic parameters on the covered sectors/processes. Short term improvements cannot be measured until the system is deployed, tested and the users are trained.
The indicators of short term objectives can be in monitored by monitoring a relational gradual approach to the below mentioned mid term goals, starting from the deployment and use of the EPESUS system at the test sites in WP 4 and 5 and after the wider application of the EPESUS IS starting in month 28.
Progress regarding market uptake and exploitation
EPESUS exploitation plan asserts details on how the project results will be exploited, especially for the primary and secondary users of the project activities.
It aims to set up the successful exploitation of the results both during the project lifetime and in particular after the project has been concluded.
Progress of work plan in the period
Work plan for the next periodEvaluation report of sample process input/output flow values of industrial processes for the 5 sectors
February 2011
RMPM in Sofia January 2011
Guideline on transfer and disposal options August 2011
Pilot Version of EPESUS Information SystemInformation System
August 2011
Case Studies Within Industrial Parks June 2011
Guideline on recovery system for each category of hazardous waste, supply chain management system
August 2011
Neceseary Document From Partner
Original signed Partnership Agreement Original signed Confidentiality Agreement Original signed timesheets (From March 2010
to November 2010) Payroll for each month Flight Ticket for Kick-off Meeting Boarding Pass of Kick-off Meeting Hotel Invoice for Kick-off Meeting Meeting room rental invoice Other invoices