1 F PHASE: SCALE: SHEET NUMBER AIR FORCE CIVIL ENGINEER CENTER 2 3 4 5 6 7 8 9 E D C B A NOT FOR CONSTRUCTION NOTIONAL MASSING DATE: AS INDICATED C-1 COVER SHEET RPA GENERAL MAINTENANCE HANGAR, CONUS DYNAMIC PROTOTYPE DEVELOPMENT FINAL OCTOBER 2018 AIR FORCE CIVIL ENGINEER CENTER DYNAMIC PROTOTYPE DEVELOPMENT RPA GENERAL MAINTENANCE HANGAR FINAL OCTOBER 2018 DRAWING LIST NUMBER NAME C-1 COVER SHEET A-1 MODULES A-2 MODULES A-3 MODULES A-4 MODULES A-5 MODULES A-6 MODULES A-7 PROOF OF CONCEPT 1 ( POC 1) A-8 PROOF OF CONCEPT 2 ( POC 2) 1. USE THESE DOCUMENTS IN CONJUCTION WITH THE DESIGN CRITERIA, SUPPLEMENTAL RFP AND PROGRAMING SHEET. GENERAL NOTES

Dynamic Prototype Development RPA General Maintenance

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

NOTIONAL MASSING

DATE

:

AS I

NDIC

ATED

C-1

CO

VER

SH

EET

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

AIR FORCE CIVIL ENGINEER CENTERDYNAMIC PROTOTYPE DEVELOPMENTRPA GENERAL MAINTENANCE HANGAR

FINAL OCTOBER 2018

DRAWING LISTNUMBER NAME

C-1 COVER SHEETA-1 MODULESA-2 MODULESA-3 MODULESA-4 MODULESA-5 MODULESA-6 MODULESA-7 PROOF OF CONCEPT 1 ( POC 1)A-8 PROOF OF CONCEPT 2 ( POC 2)

1. USE THESE DOCUMENTS IN CONJUCTION WITH THE DESIGN CRITERIA, SUPPLEMENTAL RFP AND PROGRAMING SHEET.

GENERAL NOTES

A

TRAN

SITI

ON

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-1

MO

DU

LES

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

MODULE A:HANGAR BAY (HORIZONTAL SLIDING DOORS)

32' 16' 0 32'

MODULE NET AREA: 58,025 SF *NOTE : DAYLIGHTING PER UFC 1-200-02

A HANGAR BAY

A

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-2

MO

DU

LES

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

MODULE A:HANGAR BAY (UPWARD ACTING DOORS)

MODULE NET AREA: 54,360 SF *NOTE : DAYLIGHTING PER UFC 1-200-02

32' 16' 0 32'

A HANGAR BAY

LAYDOWN AREA200 SF

LAYDOWN AREA300 SF

B3

B2

B1

B7 B6 B5

B4

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-3

MO

DU

LES

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

MODULE B:TOOLS, PARTS & SUPPORT0 8' 16' 32'

SCALE:1/16"=1'

B1 SUPPLY OFFICE

MODULE NET AREA: 5,835 SF

*NOTE : DAYLIGHTING PER UFC 1-200-02

B2 SUPPLY (TNB/FOM)B3 TRANSACTIONB4 SUPPORT (TOOL CRIB)B5 SUPPORT OFFICEB6 HAZMATB7 STORAGE

C2

C3

C1

D1

D2

D3

D4

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-4

MO

DU

LES

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

MODULE NET AREA: 5,290 SF *NOTE : DAYLIGHTING PER UFC 1-200-02

MODULE C:READY ROOM

C1 READY ROOM

C2 UNISEX LOCKER ROOM

C3 BREAK ROOM

MODULE D:RPA TECHNICAL SUPPORT

D1 WEAPONS

D2 AVIONICS

D3 AC SECTION

D4 TRAINING

MODULE NET AREA: 2,250 SF

*NOTE : DAYLIGHTING PER UFC 1-200-02

0 8' 16' 32'

SCALE:1/16"=1'

0 8' 16' 32'

SCALE:1/16"=1'

E2

E3

E1

E4

F

G2

G1

G3

G5G4

G6

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-5

MO

DU

LES

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

MODULE E:RPA ADMINISTRATION SUPPORT

E1 OIC / AOIC / CHIEF

E2 SUPERVISOR OFFICE

E3 CONFERENCE

E4 CIVILIAN SUPPORT

MODULE NET AREA: 1,875 SF *NOTE : DAYLIGHTING PER UFC 1-200-02

0 8' 16' 32'

SCALE:1/16"=1'

MODULE F:SQUADRON CONFERENCE

F SQUADRON CONFERENCE

MODULE NET AREA: 715 SF *NOTE : DAYLIGHTING PER UFC 1-200-02

0 8' 16' 32'

SCALE:1/16"=1'

0 8' 16' 32'

SCALE:1/16"=1'

MODULE G:TOILET /SHOWER /LOCKER

G1 ADMINISTRATION MEN'S TOILET

G2 ADMINISTRATION WOMEN'S TOILET

G3 ADMINISTRATION JANITOR

G4 GENERAL MEN'S TOILET / SHOWER/ LOCKER

G5 GENERAL WOMEN'S TOILET/ SHOWER/ LOCKER

G6 GENERAL JANITOR

MODULE NET AREA: 2,185 SF

H5

H4

H3

H2

H1

CORRIDOR

I2

I1

I4I3

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-6

MO

DU

LES

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

MODULE H:AIRCRAFT MAINTENANCE SUPPORT

MODULE I:BUILDING SUPPORT

H1 ENGINE REPAIR SHOP

H2 SATCOM SHOP

H3 BATTERY SHOP

H4 MANAGEMENT OFFICE

H5 UNISEX TOILET

MODULE NET AREA: 2,205 SF

*BUILDING SUPPORT AREAS ARE ESTIMATES ONLY. ACTUAL SIZE IS DEPENDENT ON REQUIREMENTS FOR CLIMATE ZONE, LOCATION, SYSTEMS, ETC.

I1 TELECOMMUNICATIONSI2 ELECTRICALI3 MECHANICALI4 FIRE PUMP

MODULE NET AREA: 4,265 SF *NOTE : DAYLIGHTING PER UFC 1-200-02

0 8' 16' 32'

SCALE:1/16"=1'

0 8' 16' 32'

SCALE:1/16"=1'

AREA IS NOT INCLUDED IN POC NET SQUARE FOOTAGE TOTAL

AVIONICS

AC SECTION

TRAINING

ENTRY

WEAPONS

CIVILIAN SUPPORT

CONFERENCE

SUPOFFICECONF

OIC/AOIC/ CHIEF

MECH

STOR

CORRIDOR

HAZMAT

SUPPLYTNB/FOM

TRANSACTION

FIRE PUMP

SUPPORT(TOOL CRIB)

SUPPORT OFFICE

20

6' - 0

"

MODULE LEGEND

A - HANGAR BAY

B - TOOL & PARTS SUPPORT

C - READY ROOM

D - RPA TECHINICAL SUPPORT

E - RPA ADMINISTRATION SUPPORT

F - SQUADRON CONFERENCE

G - TOILET/ SHOWER / LOCKER

H - AIRCRAFT MAINTENANCE SUPPORT

J - BUILDING SUPPORT

CIRCULATION

COMM

ELEC

40' - 0" 83' - 0"

TRAN

SITI

ON

SUPPLY

WOMEN'SJAN

MEN'S

MEN'S

JANWOMEN'S

UNISEXLOCKER

ROOMBREAK ROOM

READY ROOM

ENGINE REPAIRSHOP

SATCOM SHOP

BATTERY SHOP

MANAGEMENTOFFICE

TOIL

32' - 0" 32' - 0" 185' - 0"185' - 0"

12

6' - 0

"16

' - 0"

16

' - 0

"

557' - 0"

158'

- 0"HANGAR BAY

HANGAR BAY

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-7

PRO

OF

OF

CO

NC

EPT

1 ( P

OC

1)

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

PROOF OF CONCEPT 148' 24' 0 48'

1. THIS PROOF OF CONCEPT LAYOUT ILLUSTRATES ONE POSSIBLE SCENARIO OF ARRANGEMENT OF INDIVIDUAL MODULES AND IS NOT INTENDED TO BE A FINAL SOLUTION WHICH WILL BE DETERMINED PER PROJECT SPECIFICS.

2. (*) DIMENSIONS HAVE BEEN PROVIDED FOR REFERENCE ONLY. FINAL SPACE AREAS, CONFIGURATIONS, LAYOUTS, AND SIZES SHALL BE BY THE DESIGN BUILDER IN COMPLIANCE WITH FACILITIES CRITERIA, DESIGN BUILD GUIDE, SUPPLEMENTAL RFP AND AUTHORIZED PROGRAMMING SHEET.

NET SQ FOOTAGE: 80,440 SF

BULLPEN

CORRIDOR

SUPPLYTNB/FOM SUPPORT

(TOOL CRIB)

TRANSACTIONSUPPLY

UNISEXLOCKER

ROOMBREAK ROOM

CONF.

CIVILIANS

OIC/AOIC/CHIEF

SUPOFFICE

TRAINING

ENTRY

WEAPONSAVIONICSAC SECTION

COMM

ELEC MECHFIRE PUMP

BATTERYSHOP

SATCOMSHOP

178' - 0" 378' - 0" 28' - 0"

HAZMAT

108' - 0" 70' - 0"

583' - 0"

HANGEROFFICE

TOIL.

SUPPORT OFFICE

MODULE LEGEND

A - HANGAR BAY

B - TOOL & PARTS SUPPORT

C - READY ROOM

D - RPA TECHINICAL SUPPORT

E - RPA ADMINISTRATION SUPPORT

F - SQUADRON CONFERENCE

G - TOILET/ SHOWER / LOCKER

H - AIRCRAFT MAINTENANCE SUPPORT

J - BUILDING SUPPORT

CIRCULATION

TRAN

SITI

ON

STORAGE

WOMEN'SMEN'SJAN

ENGINEREPAIR SHOP

CORRIDOR

122'

- 0"

126'

- 0"

156'

- 0"

HANGAR BAY HANGAR BAY

1

F

PHAS

E:

SCAL

E:

SHEET NUMBER

AIR

FO

RC

ECI

VIL

ENG

INEE

R

CENT

ER

2 3 4 5 6 7 8 9

E

D

C

B

A

NOT FOR CONSTRUCTION

DATE

:

AS I

NDIC

ATED

A-8

PRO

OF

OF

CO

NC

EPT

2 (

POC

2)

RPA

GEN

ERAL

MAI

NTE

NAN

CE

HAN

GAR

,C

ON

US

DYNA

MIC

PRO

TOTY

PE D

EVEL

OPM

ENT

FIN

AL

OC

TOBE

R 2

018

PROOF OF CONCEPT 248' 24' 0 48'

1. THIS PROOF OF CONCEPT LAYOUT ILLUSTRATES ONE POSSIBLE SCENARIO OF ARRANGEMENT OF INDIVIDUAL MODULES AND IS NOT INTENDED TO BE A FINAL SOLUTION WHICH WILL BE DETERMINED PER PROJECT SPECIFICS.

2. (*) DIMENSIONS HAVE BEEN PROVIDED FOR REFERENCE ONLY. FINAL SPACE AREAS, CONFIGURATIONS, LAYOUTS, AND SIZES SHALL BE BY THE DESIGN BUILDER IN COMPLIANCE WITH FACILITIES CRITERIA, DESIGN BUILD GUIDE, SUPPLEMENTAL RFP AND AUTHORIZED PROGRAMMING SHEET.

NET SQ FOOTAGE: 77,145 SF