51
Dugway West Interceptor Relief Sewer (DWIRS) April 4, 2013

Dwirs community impact pres 4 4-13-v3

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Dwirs community impact pres 4 4-13-v3

Dugway West Interceptor Relief Sewer (DWIRS) April 4, 2013

Page 2: Dwirs community impact pres 4 4-13-v3

Agenda

• Project Location and Alignment• Easements, Constraints, and

Construction Sequencing• Community Benefits and

Restoration• Project Clean Lake and CSO

Benefits once completed

2

Page 3: Dwirs community impact pres 4 4-13-v3

About us

• Created by Court Order in 1972• Servicing all or part of 62

member communities• 1 million customers• 90+ billion gallons wastewater

treated each year

3

Page 4: Dwirs community impact pres 4 4-13-v3

What We Do

• Three wastewater treatment plants• Interceptor sewer operation,

maintenance• Combined Sewer Overflow control• Regional Stormwater Management

4

Page 5: Dwirs community impact pres 4 4-13-v3

Combined Sewer System

WWTP

Regulator

Industrial Wastewater

Street CatchBasins

Domestic Wastewat

er

Flow to WWTP

Combined Sewer

Lake Erie

Combined Sewer

Overflow

Dry weather outlet (DWO)

Storm Water Outlet (SWO)

Page 6: Dwirs community impact pres 4 4-13-v3

How they work:Regulating structures allow excess stormwater to overflow

Side-spill weirSide-spill weir

Overflow pipeOverflow pipe

6

Page 7: Dwirs community impact pres 4 4-13-v3

Combined Sewer Overflow (CSO)

Page 8: Dwirs community impact pres 4 4-13-v3

8

Netting facility, floatable debris from combined sewer overflow 2010

Page 9: Dwirs community impact pres 4 4-13-v3

9

Page 10: Dwirs community impact pres 4 4-13-v3

10

Page 11: Dwirs community impact pres 4 4-13-v3

Project background

• Control CSO overflows• Consolidate existing regulators• Provide relief for up to a 5-year, 6-

hour storm event• Convey flow to current interceptor,

future tunnel• Prepare for future 17’ Doan Valley

Tunnel

11

Page 12: Dwirs community impact pres 4 4-13-v3

By the numbers

•11,000 feet3’ to 6’ sewers in tunnel

•2,700 feet15” to 7’ sewers in open-cut

• Plus structures, regulators, and modifications

Page 13: Dwirs community impact pres 4 4-13-v3

DWIRS location related to Dugway West Brook and Dugway West Culvert

Existing local sewer system

Existing CSO Regulators

Proximity to Dugway East Brook and Dugway Storage Tunnel

Proximity to Easterly Interceptor on the North End

Proximity to Doan Valley Tunnel on the South End

DWIRS Location

13

Page 14: Dwirs community impact pres 4 4-13-v3

Open Streams, Brooks ORIGINAL

Doan Brook/ CulvertDoan Brook/ Culvert

Dugway West Brook /Culvert

Dugway West Brook /Culvert

Nine Mile Creek/Culvert

Nine Mile Creek/Culvert

Dugway East Brook/Culvert

Dugway East Brook/Culvert

Page 15: Dwirs community impact pres 4 4-13-v3

Open Streams, Buried Culverts CURRENT

Doan Brook/ CulvertDoan Brook/ Culvert

Dugway West Brook /Culvert

Dugway West Brook /Culvert

Nine Mile Creek/Culvert

Nine Mile Creek/Culvert

Dugway East Brook/Culvert

Dugway East Brook/Culvert

Page 16: Dwirs community impact pres 4 4-13-v3

Bidding, Construction Schedule

1. DWIRS Project Bidding May 2013

2. Construction Start Sept. 2013

3. Substantial Completion May 2016 (32 months)

4. Final Completion Sept. 2016(36 Months)16

Page 17: Dwirs community impact pres 4 4-13-v3

Easements, property acquisition• Ongoing discussions• Negotiations: TranSystems• Land Bank acquisitions, demolition:

NEORSD• 8 properties to be demolished• Demolition work will occur in the

first 5 months

17

Page 18: Dwirs community impact pres 4 4-13-v3

Project Constraints

• Focus: Northern half, then southern– Utility relocation by other agencies

may occur anywhere along alignment

• Limit active shafts, work sites• Restore work zones shortly after

completion

18

Page 19: Dwirs community impact pres 4 4-13-v3

Project Constraints

• Coordinate with schools to maintain access to all driveways

• Limit haul routes• Complete work within St. Clair

within 12 months

19

Page 20: Dwirs community impact pres 4 4-13-v3

Project Constraints

• Complete Durant sewer in final 12 months

• Demolish eight structures within first five months

• Work hours: 7 a.m. – 7 p.m.Monday – Saturday per the City

20

Page 21: Dwirs community impact pres 4 4-13-v3

Mainline A-Open Cut Mainline B-Tunnel St. Clair Ave East

Mainline C-Tunnel

Estimated Work Durations

21

Page 22: Dwirs community impact pres 4 4-13-v3

22

Page 23: Dwirs community impact pres 4 4-13-v3

23

Page 24: Dwirs community impact pres 4 4-13-v3

24

Page 25: Dwirs community impact pres 4 4-13-v3

25

Page 26: Dwirs community impact pres 4 4-13-v3

26

Page 27: Dwirs community impact pres 4 4-13-v3

27

Page 28: Dwirs community impact pres 4 4-13-v3

28

Page 29: Dwirs community impact pres 4 4-13-v3

29

Page 30: Dwirs community impact pres 4 4-13-v3

30

Page 31: Dwirs community impact pres 4 4-13-v3

31

Page 32: Dwirs community impact pres 4 4-13-v3

32

Page 33: Dwirs community impact pres 4 4-13-v3

33

Page 34: Dwirs community impact pres 4 4-13-v3

34

Page 35: Dwirs community impact pres 4 4-13-v3

35

Page 36: Dwirs community impact pres 4 4-13-v3

36

Page 37: Dwirs community impact pres 4 4-13-v3

Provisions and monitoring• Inspections: Contractors will

video and photograph structures’ exterior

• Markers: Contractor will install Geotechnical instrumentation and survey markers on structures

• Vibration monitoring

37

Page 38: Dwirs community impact pres 4 4-13-v3

Provisions and monitoring• Surface settlement monitoring

over tunnel• Post-construction inspection• Restoration as needed

38

Page 39: Dwirs community impact pres 4 4-13-v3

Community benefits, restoration

• Aspects of restoration are open to community input

• Final Roadway restoration will include new pavement

39

Page 40: Dwirs community impact pres 4 4-13-v3

Community benefits, restoration

• Additional demolition will be considered

• Additional community benefits will be considered as opportunities are presented

40

Page 41: Dwirs community impact pres 4 4-13-v3

What is Project Clean Lake?• Consent decree with EPA• $3 billion 25-year program to

address water quality issues caused by sewage overflows (CSOs)

41

Page 42: Dwirs community impact pres 4 4-13-v3

What is Project Clean Lake?• 772 communities have similar

mandates

Page 43: Dwirs community impact pres 4 4-13-v3

What is Project Clean Lake?• Reduce combined sewer overflow

volume

0123456789

10

1972 TODAY 2035

Billions

of gallons

43

Page 44: Dwirs community impact pres 4 4-13-v3

44

Page 45: Dwirs community impact pres 4 4-13-v3

7 tunnels to control CSO• 21 total miles• 17’ to 24’ diameters• 100’ to 200’ underground• Three Deep Tunnel Pump Stations• Drop Structures, Near Surface

Sewers and Structures

45

Page 46: Dwirs community impact pres 4 4-13-v3

46

Page 47: Dwirs community impact pres 4 4-13-v3

Other CSO Project Coordination DST Overlap (DST)

DST-4 Forest Hills Park DST-5 St. Clair/E 109th DST-7 Lakeview and Ada DST-8 Lakeview and

Superior East 140th Relief Sewer

(E140) Doan Valley Tunnel (DVT)

Lakeview and Ada Superior Ave

Shoreline Storage Tunnel

(SST) Forest Hills Park Mining

Site

SSTSST

E140E140

DWIRSDWIRS

DSTDST

DVTDVT 47

Page 48: Dwirs community impact pres 4 4-13-v3

AERIAL ALIGNMENT

DEIRS PROPOSED ALIGNMENT

48

Page 49: Dwirs community impact pres 4 4-13-v3

CSO Reduction Benefits

Project TitleYear of

Completion

AnnualCSO capture

Dugway East Relief Sewer (DEIRS) 2012 85 Million Gallons

Euclid Creek Storage Tunnel (ECT) 2015 344 Million Gallons

Dugway West Relief Sewer (DWIRS) 2016 110 Million Gallons

Dugway Storage Tunnel/E 140th (DST/E140)

2020 411 Million Gallons

Doan Valley Tunnel (DVT) 2021 348 Million Gallons

Shoreline Storage Tunnel (SST) 2027 502 Million Gallons

Total CSO Capture

1,800 Million Gallons

Page 50: Dwirs community impact pres 4 4-13-v3

What’s the benefit?

• Improve water quality– Clean beaches, recreation– Protecting clean-water resource– Improve our regional image– Neighborhood revitalization

• Regional economic impact– Job creation– Tax Revenue

Page 51: Dwirs community impact pres 4 4-13-v3

3900 Euclid Avenue | Cleveland, OH 44115 | (216) 881-6600 | neorsd.org

LEARN MORE.dugwaytunnel.blogspot.comneorsd.org/cleanlake

ASK [email protected]

TWEET US.@neorsd