Dunsfold Airport Ltd
Dunsfold Park
Dunsfold Park
Preliminary Transport Assessment
Figures, Appendix A and Appendix D
November 2014
i
VOLUME 1 - TEXT
Contents
EXECUTIVE SUMMARY ...........................................................................................................
SUMMARY AND CONCLUSIONS ........................................................................................... III
Strategic Transport Assessment ................................................................................. iii
Scope of Report ........................................................................................................ iv
The Proposals ........................................................................................................... iv
The Sustainable Transport Strategy ........................................................................... iv
The Assessment Process ............................................................................................. v
Highway Enhancements ............................................................................................ vi
The Results of the Assessments ................................................................................. vi
Summary of Findings ................................................................................................ vii
What Has Changed since the Appeal Decision .......................................................... viii
Next Steps ................................................................................................................ ix
1 INTRODUCTION .......................................................................................................... 1
Background ................................................................................................................ 1
Report Scope and Structure ........................................................................................ 1
2 DEVELOPMENT PROPOSALS ....................................................................................... 3
Development Quantum .............................................................................................. 3
Access Strategy .......................................................................................................... 4
3 TRIP GENERATION ...................................................................................................... 6
2008 Planning Application Trip Generation Summary .................................................. 6
Updated Trip Generation ............................................................................................ 8
Residential Trip Generation .............................................................................. 8
Employment Trip Generation .......................................................................... 11
Hotel Trip Generation ..................................................................................... 13
Education Trip Generation .............................................................................. 15
Internal Trips .................................................................................................. 16
Summary ................................................................................................................. 17
4 TRIP DISTRIBUTION AND ASSIGNMENT ..................................................................... 21
2008 Planning Application Trip Distribution Summary ............................................... 21
Updated Trip Distribution ......................................................................................... 21
Residential Trip Distribution............................................................................ 21
Employment Trip Distribution ......................................................................... 22
Education Trip Distribution ............................................................................. 23
5 SUSTAINABLE TRANSPORT OPPORTUNITIES .............................................................. 24
ii
2008 Planning Application Sustainable Transport Strategy ........................................ 24
Changes since 2008 .................................................................................................. 25
Proposed Sustainable Transport Opportunities ................................................ 26
Mixed Use Scheme ......................................................................................... 26
Walking and Cycling ........................................................................................ 26
Bus Services .................................................................................................... 27
Access to Rail .................................................................................................. 29
Car Club and Car Share Schemes ..................................................................... 29
Community Vehicles ....................................................................................... 29
Smart Technology ........................................................................................... 29
Site Wide Travel Plan ...................................................................................... 29
6 POTENTIAL HIGHWAY ENHANCEMENT MEASURES .................................................... 32
2008 Planning Application Highway Mitigation ......................................................... 32
Current Highway Mitigation Opportunities ............................................................... 33
A281/Kings Road and A281/Broadford Road, Shalford ..................................... 33
A281/Station Road, Bramley ........................................................................... 34
A281/Barrihurst Road ..................................................................................... 35
A281/Elmbridge Road ..................................................................................... 35
A281/Site Access ............................................................................................ 35
Alfold Crossways ............................................................................................ 36
7 PRELIMINARY RESIDUAL TRAFFIC EFFECTS ................................................................ 37
2014 Base ................................................................................................................ 37
2031 Reference Case ................................................................................................ 38
Modelling Scenarios ................................................................................................. 38
Potential Residual Effects ......................................................................................... 41
1,800 Houses at Dunsfold Park ........................................................................ 41
2,600 Houses at Dunsfold Park ........................................................................ 42
3,400 Houses at Dunsfold Park ........................................................................ 44
Summary ................................................................................................................. 46
8 SUMMARY OF CHANGES SINCE THE APPEAL DECISION .............................................. 47
Location ................................................................................................................... 47
Congestion on the A281 ........................................................................................... 48
Traffic Growth .......................................................................................................... 49
Traffic Effects of Dunsfold Park ................................................................................. 50
Mitigation Strategy .................................................................................................. 51
Summary ................................................................................................................. 51
9 NEXT STEPS .............................................................................................................. 53
iii
VOLUME 2 – FIGURES AND APPENDICES
Figures
Figure 5.1 - Downs Link Bus Option 1
Figure 5.2 - Downs Link Bus Option 2
Figure 5.3 - Downs Link Bus Option 3
Figure 5.4 - Downs Link Bus Option 4
Figure 7.1 - A281 Corridor Model Network Area
Figure 8.1 - 2031 Do Minimum Average Junction Delay for the AM Weekday Peak Period
Appendices
Appendix A - A281 Site Access (Drawing Number 110047_A_09)
Appendix B - TRICS Output
Appendix C - 2008 Planning Application Highway Improvement Proposals
Appendix D - Current Highway Enhancement Opportunities
Appendix E - 2014 Traffic Data Collection Summary
Appendix F - Summary of Paramics Results
FIGURES
DRAWING REFERENCE: SCALES: DATE: CHECKED: DRAWN: REVISION: NTS .
Network Building, 97 Tottenham Court Road, London W1T 4TP Tel: 020 7580 7373 Email: [email protected] www.vectos.co.uk
Figure 5.1
Dunsfold Park Dunsfold Airport Ltd
Bus Route Option 1
L.K 14/10/14
Cranleigh
Bramley
Shalford
Downs Link (Length: 9.66 km)
Existing Road
New Road
New Access
Site
D.B
DRAWING REFERENCE:SCALES:DATE:CHECKED:DRAWN:REVISION:NTS
.
Network Building, 97 Tottenham Court Road, London W1T 4TP
Tel: 020 7580 7373 Email: [email protected] www.vectos.co.uk
Figure 5.2
Dunsfold Park Dunsfold Airport Ltd
Bus Route Option 2
L.K 14/10/14
Cranleigh
Bramley
Shalford
Downs Link
(Length: 9.66 km)
Existing Road
New Road
New Access
Site
D.B
DRAWING REFERENCE: SCALES: DATE: CHECKED: DRAWN: REVISION: NTS .
Network Building, 97 Tottenham Court Road, London W1T 4TP Tel: 020 7580 7373 Email: [email protected] www.vectos.co.uk
Figure 5.3
Dunsfold Park Dunsfold Airport Ltd
Bus Route Option 3
L.K 14/10/14
Cranleigh
Bramley
Shalford
Downs Link (Length: 11.27 km)
Existing Road
New Road
New Access
Site
D.B
DRAWING REFERENCE: SCALES: DATE: CHECKED: DRAWN: REVISION: NTS .
Network Building, 97 Tottenham Court Road, London W1T 4TP Tel: 020 7580 7373 Email: [email protected] www.vectos.co.uk
Figure 5.4
Dunsfold Park Dunsfold Airport Ltd
Bus Route Option 4
L.K 14/11/14
Cranleigh
Bramley
Shalford
Downs Link (Length: 2.41 km)
Existing Road
New Access
Site
D.B
APPENDIX A
A281 Site Access
APPENDIX D
Current Highway Enhancement Opportunities
A281 Horsham Road
A281 Horsham Road
Snowde
nham
Lane
Station
Roa
d
Snowdenham Lane closed off totraffic entering at Iron Lane junction(0.85km to the southwest)
110047/A/4 .DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
Iron Lane
Snow
denh
am L
ane
Snow
denh
am L
ane
110047/A/7 .DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
A281 Horsham Road
A281 Horsham Road
Snowde
nham
Lane
Station
Roa
d
Snowdenham Lane closed off totraffic entering at Iron Lane junction(0.85km to the southwest)
No right turn fromA281 (south) to
Station Road
110047/A/5 .DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
DETAILSREV. DRAWN CHECKED REV.DATE DETAILS DRAWN CHECKED DATE Notes:
DRAWN:
DRAWING TITLE:
PROJECT:
SCALES:DATE:CHECKED: DRAWING NUMBER:
CLIENT:
REVISION:
Ordnance Survey © Crown copyright .All rights reserved. Licence No. 100052073.
2013
A281 Horsham Road
A281 Horsham Road
Snowde
nham
Lane
Station
Roa
d
Snowdenham Lane closed off totraffic entering at Iron Lane junction(0.85km to the southwest)
Station Road - no rightturn at traffic lights
110047/A/6 .DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
A281
A281
Barrihurst Lane
110047/A/2 ADRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
Ordnance Survey © Crown copyright 2012All rights reserved. Licence No. 100052073