Draft Mobility Design Toolbox(a living document)
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 1
Introduction• This Mobility Design Toolbox was created as a reference for the River Street
Reconstruction project. More information about the project, and a similar Streetscape Design Toolbox document can be found on the River Street Reconstruction web page, http://cambridgema.gov/riverstreet
• This toolbox is a reference for the types of design treatments that could be considered to address transportation opportunities and challenges on River Street. It is not intended to propose specific design solutions.
• It is intended to be a work in progress, or a living document, that can be refined throughout the River Street Reconstruction design process.
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 2
http://cambridgema.gov/riverstreet
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 3
"Mobility" Includes People Using All Modes:People walking, biking, taking public transit, driving, etc.
Sidewalks
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 4
Crosswalks Refuge Islands
Pedestrian Facilities (1/2)
Curb Extensions Raised Side Street Crossing
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 5
Pedestrian Facilities (2/2)
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 6
Uncontrolled
Pedestrian Hybrid Beacon/HAWK
Rapid Flashing Beacon
Signalized
Pedestrian CrossingsCurb Ramps and Detectable Warning Strips
Crosswalk Illumination
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 7
Wayfinding SignageAudible Pushbuttons and Signals
Pedestrian Operations and Flow
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 8
Parking BufferMarked Buffer Planters Plastic Flexposts
Bicycle Facilities: Separated Bicycle Lane (Street Level)
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide
Raised-Buffered w/Parking Concrete BufferRaised–No Parking
Raised Mountable Curb
Bicycle Facilities: Separated Cycle Tracks - Raised
9
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide
Signal ControlProtected Intersections
Bicycle Facilities - Intersection Treatments
10
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 11
Bike Signals Wayfinding SignagePavement Markings Bicycle Detection
Bicycle Operations and Flow
Bike Rack Bike Share Stations
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 12
Secure Bike Parking
Bicycle AmenitiesOn-Street Bike
Corral
Bus Only Lane Transit Signals/Bus Queue Jump
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 13
Roslindale Bus Lane
Bus Priority
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 14
Involves extending the green time at an
intersection or calling the green time early
for the approach that a bus is traveling on.
This may or may not involve a dedicated
lane or queue jump.
1. On-board technology requests signal priority.
2. In addition, in ground technology like loop detectors can detect when buses approach a signal.
3. The request is received and processed by traffic equipment or through a centrally controlled system
Transit Signal Priority
New Britain-Hartford Busway (CT) MBTA Silver Line
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 15
Examples of Enhanced Bus Service
Designated Stop Locations Accommodations for Waiting Passengers
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 16
Transit Stops (1/2)
Floating Bus Stop
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 17
Curbside Pull-Out Bus Stop
Transit Stops (2/2)
Detectable Warning Panels Level & Clear Boarding Area
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 18
Kneeling Buses/Ramps
Transit Accessibility
Bus Stop Sign Wayfinding/Route Signage
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 19
Transit Stop Signage
Real Time Information Bike Racks/Bike Parking
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 20
Transit Amenities
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 21
Nearside
Farside(after left turn)
Midblock
90 – 100’
60 – 80’(100 – 120’)
100 – 120’
Minimum – Standard Bus Stop Length*
*Based on 40’ Bus in a Parking Lane Source: MBTA Bus Stop Design Guidelines
Placement
Source: SEPTA Bus Stop Design Guidelines
Bus Stop Length Requirements
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 22
Clear ZoneLanding Area
Bus Stop Accessibility
Source: MBTA Bus Stop Planning and Design Guidelines
(Clear zone needed to deploy ramp)
Optimized/Coordinated Signal Timings Lane Use Markings and Signage
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 23
Traffic Flow/Operations
Traffic Calming
DRAFT 7/10/19 Working Group #5, July 17, 2019 – Slide
Pinch Point
Chicane
Pedestrian Crossing Island
Raised Side-Street Crossing
Signal Progression
Constrained Sight Lines
On-Street Parking
Street Trees(Signals timed to match the target speed)
Before After
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 25
Skewed intersections create safety hazards for pedestrians Creating T intersections can calm traffic
Complex Intersections
Before After
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 26
Five-way intersections also lengthen crossings and confuse drivers
Separating the legs can create a safer condition
Complex Intersections
Curb Cut Locations, Width
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 27
Barriers
Access Management
Parking Accommodations/Vehicle Storage
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 28
EV Charging Stations
Private Vehicle Curbside Amenities
Emerging Mobility Options and Technologies Need to be Considered
Ride Hailing Micromobiilty
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 29
Connected & Autonomous Vehicles
Note: electric scooters are not legal until state legislation is passed
• Other tools you think should be included?
• What have you liked/disliked about the toolbox elements that were presented?
• What challenges or unintended side effects do you see by utilizing these toolbox elements?
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 30
PLACEHOLDER IMAGE
Discussion
THANK [email protected]
DRAFT 7.10.19 River Street Reconstruction Mobility Toolbox – Slide 31
Slide Number 1Introduction"Mobility" Includes People Using All Modes:�People walking, biking, taking public transit, driving, etc.Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Traffic CalmingSlide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31