42
1 MoH – Docs # 294491 Roger Simmenes Roger Simmenes EVP EVP Operations Operations North North Sea Sea NFBL 2007 Vinterkonferansen 2007

DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

Embed Size (px)

Citation preview

Page 1: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

1MoH – Docs # 294491

Roger SimmenesRoger SimmenesEVP EVP OperationsOperations North North SeaSea

NFBL 2007Vinterkonferansen 2007

Page 2: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

2MoH – Docs # 294491

Kort om Odfjell Drilling

Nye driftsformer – video

Ny 6 generasjonsrigg

Nye regimer - markedsituasjon

NFBL 2007Vinterkonferansen 2007

Page 3: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

3MoH – Docs # 294491

Odfjell DrillingBergen

Operations from Bergen

• Deepsea Delta, Norsk Hydro • Deepsea Trym, Norsk Hydro • Grane, Norsk Hydro • Visund, Statoil • Heidrun, Statoil

• Snorre*A&B

Page 4: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

4MoH – Docs # 294491

Odfjell Drilling Stavanger

Operations fromStavanger

• Ekofisk 2/4 K • Ekofisk 2/4 X • Eldfisk 2/7 A • Eldfisk 2/7 B • Deepsea Bergen• Sleipner A*

Page 5: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

5MoH – Docs # 294491

Odfjell DrillingAberdeen

Operations from Aberdeen

• Claymore Talisman • Clyde Talisman • Tartan Talisman • Piper B Talisman • Halley Talisman • Beatrice A Talisman • Beatrice B Talisman • Saltire Talisman • Fulmar Talisman• Auk Talisman

Page 6: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

6MoH – Docs # 294491

ODFJELL DRILLING

MOBILE UNITS PLATFORM DRILLING WELL SERVICES TECHNOLOGY DEEPSEA RIG

Integrated drilling- and well service supplier

Privately owned

Focus on growth strategy

Highly recognised drilling contractor

More than 30 years of international experience

Turnover of NOK 3.0 billion

Financially strong

Approx. 2,500 employees

Page 7: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

7MoH – Docs # 294491

Deepsea Bergen (1983)

ODFJELL DRILLINGMOBILE UNITS

Deepsea Delta(1981)

Deepsea Trym(1976)

Turnover: MNOK 1.128Employees: 400

Page 8: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

8MoH – Docs # 294491

Visund

Hydro

•Grane

ODFJELL DRILLINGPLATFORM DRILLING

Statoil

•Sleipner

•Visund

•Snorre A

•Snorre B

•Heidrun

ConocoPhillips

•Ekofisk 2/4 X

•Ekofisk 2/4 K

•Eldfisk 2/7 A

•Eldfisk 2/7 B

Talisman

•Claymore

•Clyde

•Saltire

•Piper

•Tartan

•Beatrice A and B

•Auk

•Fulmar

Turnover: MNOK 1.239Employees: 1115

Page 9: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

9MoH – Docs # 294491

CORPORATE MANAGEMENT

KETIL LENNING CEO

KETIL LENNING CEO

QHSEBUSINESS SUPPORT

QHSEBUSINESS SUPPORT

Janike A. MyreExec. Vice President

Janike A. MyreExec. Vice President

FINANCE &BUSINESS CONTROL

FINANCE &BUSINESS CONTROL

Atle SæbøExec. Vice President

Atle SæbøExec. Vice President

OPERATIONSNORTH SEA

OPERATIONSNORTH SEA

Roger SimmenesExec. Vice President

Roger SimmenesExec. Vice President

ODTODT

Bjørnar IversenExec. Vice President

Bjørnar IversenExec. Vice President

BUSINESS DEVELOPMENT

BUSINESS DEVELOPMENT

Erik AskvikExec. Vice President

Erik AskvikExec. Vice President

OWSOWS

Øyvind C. RohnExec. Vice President

Øyvind C. RohnExec. Vice President

DSRDSR

Ernst HestnesProject Manager

Ernst HestnesProject Manager

Page 10: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

10MoH – Docs # 294491

EX. VP OPERATIONS NORTH SEA

Eldar SætreRoger Simmenes

RIG MANAGERDEEPSEA BERGEN

Eldar SætreRune Mesel

RIG MANAGERDEEPSEA DELTA

Eldar SætreKjetil Gjersdal

RIG MANAGERDEEPSEA TRYM

Eldar SætreFrode Losnedal

OPERATIONS BERGEN

Eldar SætreKjetil Forland

OPERATIONS STAVANGER

Eldar SætrePer Jarle Tjessem

OPERATIONS UK

Eldar SætreArve Grasdal

Eldar SætreOPERATION SUPPORT

Eldar SætreMorten Haukebø

FINANCIAL MANAGER

Eldar SætreKent Omenås

OPERATION NORTH SEAManagement team

Page 11: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

11MoH – Docs # 294491

NFBL 2007Vinterkonferansen 2007

Kort om Odfjell Drilling

Nye driftsformer – video

Ny 6 generasjonsrigg

Nye regimer - markedsituasjon

Page 12: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

12MoH – Docs # 294491

E-drift & mulitifunksjoner:Ny drillerstol ?

Page 13: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

13MoH – Docs # 294491

Kort om Odfjell Drilling

Nye driftsformer – video

Ny 6 generasjonsrigg

Nye regimer - markedsituasjon

NFBL 2007Vinterkonferansen 2007

Page 14: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

14MoH – Docs # 294491

Designed for the most environmentally sensitive areas

Ultra deepwater

Harsh environment

Prepared for full winterisation

Full production drilling and completion capability

Optimised drilling efficiency with dual capability

Largest deck area and deckload >7500MT

High water depth flexibility with DP and mooring systems

DESIGNED TO THE HIGHEST ENVIRONMENTAL AND SAFETY STANDARDS

Ny 6 generasjonsriggDeepsea Rig

Page 15: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

15MoH – Docs # 294491

• Enclosed Pipedeck

• Enclosed BOP handling area

• Enclosed anchor winches

• Enclosed lifeboat stations

• Enclosed ROV platform

• Partly enclosed derrick

• Heavy tool store on drillfloor

- 20o C Design temperature

• Shelter deck below drillfloor

• Enclosed x- mas tree area

Implemented in basic design

Optional, not implemented in basic design

VIEW

Ny 6 generasjonsriggWinterisation

Page 16: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

16MoH – Docs # 294491

25 %Total efficiency improvement

6,6 %6. Efficiency improvements due to dual drill tower

2,0 %5. Dual drawworks c/w active heave compensation

5,2 %4. Build up/ break down of stands on non-critical timeline

1,5 %3. Efficiency improvement due to triple casing stands

4,8 %2. Efficiency improvements due to quadruple drillpipe stands

5,0 %1. Reduction in waiting on weather (WOW)

Estimated efficiency improvement Deepsea Rig concept,compared to 4th generation semi, nominal water depth.

>25 % !

HOURS

EFF

ICIE

NC

Y

Ny 6 generasjonsriggEfficiency improvement

Page 17: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

17MoH – Docs # 294491

Ny 6 generasjonsriggDSME

Page 18: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

18MoH – Docs # 294491

Kort om Odfjell Drilling

Nye driftsformer – video

Ny 6 generasjonsrigg

Nye regimer - markedsituasjon

NFBL 2007Vinterkonferansen 2007

Page 19: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

19MoH – Docs # 294491

Nye regimerMarkedsituasjon

Source: DNB Markets

Contract lead time averaging 2.5 - 3 years

0

0.5

1

1.5

2

2.5

3

May

-01

Aug-0

1

Nov-

01

Feb-0

2

May

-02

Aug-0

2

Nov-

02

Feb-0

3

May

-03

Aug-0

3

Nov-

03

Feb-0

4

May

-04

Aug-0

4

Nov-

04

Feb-0

5

May

-05

Aug-0

5

Nov-

05

Feb-0

6

May

-06

Aug-0

6

lead

-tim

e (

years

)

Page 20: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

20MoH – Docs # 294491

Current world fleet running at near 100% capacity utilisation

Contract rates, length and lead time growth

Existing rigs on average booked to mid-2009 and beyond

More than 35 new deepwater floaters by 2010E including current order book

Supply deficit by 2010E

Deep Water and Harsh Environment

Source: Odfjell Drilling

0

20

40

60

80

100

120

140

160

180

Current Fleet 2010

New orders

Potential demand 2010

Potential new orders/options

Rig supply vs demand

Deficit 30-40 units

0

20

40

60

80

100

120

140

160

180

Current Fleet 2010

New orders

Potential demand 2010

Potential new orders/options

Rig supply vs demand

Deficit 30-40 units

Nye regimerMarkedsituasjon

Page 21: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

21MoH – Docs # 294491

Arctic areas holds more than75bn boe

25% of the worldsundiscovered reserves

Includes Norway/Barents,Russia and Canada

Nye regimerMarkedsituasjon – nye områder

THE MARKETARCTIC – THE NEXT FRONTIER

Page 22: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

22MoH – Docs # 294491

Worldwide Floater DemandTrend demand scenarios, 1994 - 2012

0

50

100

150

200

250

300

1Q94 1Q95 1Q96 1Q97 1Q98 1Q99 1Q00 1Q01 1Q02 1Q03 1Q04 1Q05 1Q06 1Q07 1Q08 1Q09 1Q10 1Q11 1Q12

Rig

s

Effective Supply Total Supply High-CaseLow-Case Mid-Case

Nye regimerMarkedsituasjon – rigg tilgjengelighet

Page 23: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

23MoH – Docs # 294491

Kort om Odfjell Drilling

Nye driftsformer – video

Ny 6 generasjonsrigg

Nye regimer – samhandlingsformer & IO

NFBL 2007Vinterkonferansen 2007

Page 24: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

24MoH – Docs # 294491

SeriellBeslutninger tas basertpå historiske data

Nye regimerIntegrerte Operasjoner (IO)

Tradisjonell arbeidsform

SeriellSeriell

Avhengig av fysisk lokalisering

Reaktiv

Arbeidsform for (IO)

Parallell

Uavhengig av fysisk lokalisering

Beslutninger tas basertpå sanntidsdata

Proaktiv

Page 25: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

25MoH – Docs # 294491

Nye regimerDagens arbeidsform

Dedikerte arbeidsoppgaver

Administrasjon /møter/rapportering + + +

Page 26: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

26MoH – Docs # 294491

Nye regimerMorgendagens arbeidsform

Dedikerte arbeidsoppgaver

Administrasjon /møter/rapportering + + +

Page 27: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

27MoH – Docs # 294491

Safety manager1 day

Nurse1 day

Radio operator1 day

OperationsMobile units

Operations manager

Ass. Tool pusher1 day/night

Subsea engineer1 day

Driller1 day/night

Ass. driller1 day/night

Derrickman1 day/night

Roughneck/BVO4 night/day

Tool pusher1 day

Electrician1 day/night

Storekeeper1 day

Welder1

day

Techn.assistant1 night

Machineroomoperator1 day/nightHydraulics

1 nightMechanic

1 day

Technical manager1 day

Control room operator1 day/night

Crane operator/Supervisor1 day/night

Rigger/DVO3 day/night

Ass. Crane operator/DVO1 day/night

Stability supervisor1 night

Operator HSD(Head Safety

Delegate)

ISMDesignated

personPlatform manager1 day

Company doctor

Nye regimerEffektivisering av arbeidsformene

Page 28: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

28MoH – Docs # 294491

Nye regimerEffektivisering av arbeidsformene

Dagens organisering om bord har vært prinsipielt uendret siste 30 år +

Page 29: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

29MoH – Docs # 294491

Nye regimerEffektivisering av arbeidsformene

Kan noen av de administrative stillingene & oppgavene effektivisere / flyttes onshore?

Page 30: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

30MoH – Docs # 294491

E-drift som konsept

Vår 2003

Høst 2003

Vinter 2004

Vinter 2005

2006 2007

Rigmanager taes i bruk i Odfjell

Online med COP, videkonf/realtime

Første granskning fra land /OSC 02.08.05

Bestemmelse om å utvikle RigManager og PhoDoc

PhoDoc 1.0 for DSB og DST

PhoDoc i bruk på 2/4-XAugust

Nye regimerMilepæler Odfjell Drilling - IO

Snorre IO pilotprosjekt

Page 31: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

31MoH – Docs # 294491

• 2. august 2005 inntraff en hendelse på Ekofisk. En granskningsgruppe ble raskt etablert og det ble besluttet å gjennomfør granskningen fra OSC

• I etterkant har vi gjennomført flere nivå 2 granskninger med samme metodikk.

Resultat:

• Granskningsgruppen anbefaler en slik løsning for fremtidige granskningerder hendelse og omstendighetermuliggjør dette.

• Erstattet 4 dagers offshore tur for 4 personer.

Eksempel på granskninger vha. OSC

Nye regimerNye samhandlingsformer - Erfaringer

Page 32: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

32MoH – Docs # 294491

Nye regimerNye samhandlingsformer - Erfaringer

Eksempel på myndighetstilsyn vha. OSC

Page 33: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

33MoH – Docs # 294491

Nye regimerNye samhandlingsformer - Erfaringer

” Erfaringene med å utnytte tekniske hjelpemidler som videokonferanse og arbeid på dokumenter på felles nettflater under tilsynet, var svært positive.”

* Ptil - 21.12.2006 – journal 06/1428

Page 34: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

34MoH – Docs # 294491

Planleggingsfase01.01- 01.03

•Samhandling / OSC•Prosesser•Operasjonelle analyser•Kommunikasjon•Ansvar•Opplæring

•Effektivisering av operasjoner•Endret arbeidsmetodikk

Driftsfase01.03- 01.09

Evalueringsfase01.09- 01.10

•Beste praksis for samhandling•Anbefaling om implementering

Eksempel på daglig oppfølging vha. OSC

Nye regimerNye samhandlingsformer - Erfaringer

Page 35: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

35MoH – Docs # 294491

Nye regimerModne innretninger & ny teknologi

Page 36: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

36MoH – Docs # 294491

Muligheter i samhandlingsrom:

Videokonferanser, enklereReal time dataCCTV bilderTelefon og UHF samband med rigg Bruk av VisiwearNettmøter

Nye regimerNye samhandlingsformer - OSC

Page 37: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

37MoH – Docs # 294491

• Visninger av ”views”o Escape routeso Fire protect / detecto Area classificationo Crane loadlimitso Osv

• Overoversiktlige CAD tegninger• Bilder, video, 3D demonstasjoner fra ulike steder på riggen

Nye regimerNye samhandlingsverktøy – PhoDoc

Page 38: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

38MoH – Docs # 294491

Odfjell have developed a system for online KPI follow up.This system give us the possibility to real time KPI follow up in the following areas:

•Drilling•Maintenance•QHSE•Logistic•Personnel•Cost control

Nye regimerNye samhandlingsverktøy – QPR

Page 39: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

39MoH – Docs # 294491

Drilling TimelineEstimate

Supplies / LogisticEquipment Critical

maintenance

Contract

QHSE / Synergy

ProjectsModifications

New equipment

PersonnelPersonnel plan

Cabin plan

After Action report

Best PracticeTechnical Limit

Regulations / Deck loadEnvironment / Weather

Other conditions (Cranes. etc.)

Drilling Time logActuals

Operations proceduresTOP / PROC

Nye regimerNye samhandlingsverktøy – RigManager

Page 40: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

40MoH – Docs # 294491

Nye regimerIkke ta for lett på utfordringene …

Page 41: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

41MoH – Docs # 294491

Nye regimerUtfordringer knyttet til IO

Dagens kontraktregime er ikke tilstrekkelig oppdatert til å reflektere /premiere aktører som benytter ny teknologi.

Bransjeforståelsen av dagens petroleumsregelverk må samkjøres bedre for å reflektere nye samhandlingsformer.

Den enkelte ansatte innen petroleumsnæringen må erkjenne at endringene kommer, og delta i å gjøre de best mulig for næringen.

Integrerte Operasjoner (IO) prosessen handler ikke bareom teknologi, men også om endrede arbeidsformer.

Page 42: DOCS-294491-v2-INNLEGG FOR ROGER TIL NFBL 2007 ...nflb.no/wp-content/uploads/2007_Odfjell_Drilling.pdf · NFBL 2007 Vinterkonferansen 2007. 2 MoH ... Storekeeper 1 day Welde 1 r day

42MoH – Docs # 294491

Til sluttTakk for oppmerksomheten

Spørsmål ?Spørsmål ?

Roger SimmenesRoger SimmenesEVP EVP OperationsOperations North North SeaSea