Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
DIVISIONAL I.T. CENTRE
VARANASI
Organizational Setup
Sr.EDPM
Sr. Engineer (IT)
04/04
Jr. Engineer(IT)
09/06
Other Office staff, Group (C&D)
06/06
D.R.M.
A.D.R.M.
•Divisional E.D.P./I.T. Centre was established in year1988-89 under 2nd Phase of divisionalcomputerization.
•Wipro Mini S-386 Computer System withCOBOL/UNIX (as console/server) along with fourdumb terminals were installed for programming &processing.
•Installation, Commissioning, Customization &maintenance were looked after by M/s WiproInfoTech Ltd.
•This nine years old Wipro system wasdeclared obsolete by M/s Wipro in 1995-96 &could not be replaced in time for want ofapproval of competent authority & ultimatelycrashed in nov-1997.
•.
•The Wipro system was replaced by HP Servers (UNIX /COBOL) & intelligent terminals (Windows / FoxPro) in 1998. This System/ application is continuing since 1998.
Hardware-
HP/IBM PC Based Servers - 03
Intelligent terminal/PC Systems - 13
Line Matrix Printers - 03
Laser jet/inkjet -04
Operating Systems - - UNIX
- Windows
Languages /Packages- - COBOL
- FoxPro
- M.S. office
Following UNIX/ COBOL application packagesare being run at Divisional I.T. Centre-
•PMIS• Payroll
• PPO
• LEAVE
• PF
•FMIS
To Provide
•PMIS (Payroll, PPO & Leave) related information to Account and
Personnel departments-
such as-
•Edit List to Bill clerks. (For this purpose, Besides Bill clerks of
DRM Office complex, About 32 Bill Clerks/ Office staff come
at least 4 times to IT centre/BSB from open line for receiving,
checking, handing over & taking over edit list/ , enclosures,
Pay-slip etc. This may be reduced by taking data in soft copy
from field staff.
• Pay slips to employees indicating PAN,
PF Balance & Leave Balance etc.
• Summary of debits & credits.
• Recovery statements
•FMIS related Statements
Such as-
• Edit list of CO7 entries to Accounts
• Cash Book statement
• Suspense Register
• Monthly & progressive Demand wise/PUwise & Department wise /PU wiseRevenue
• Expenditure statement.
• Revenue Allocation data for submissionto H/Q in softcopy.
•PF related Statements-
Such as-
Edit list.
PF slips to employees ( yearly).
PMIS (Payroll - Pay slip Printing)-
•Trip-I (Office & Supervisory Staff ) - -22nd of the Month.
•Trip-II (Artizen of Mech./Elec dept.) -Last day of the Month.
•Trip-R (Running Staff) -1st day of the Month.
•Trip-III(Engineering & Signal staff) -8th of the Month.
•Trip-IV (Operating & Commercial staff) -9th of the Month.
•PPO
• Normal case -15th day of the Month.
• Abnormal -16th day of the Month.
•PF
• PF Slip -31st July of each year.
• Monthly Ledger -Open Path.
•FMIS
GKP-Data -4th day of the day.
RAR -5th day of the Month.
Cash-Book -6th day of the Month.
Suspense Register - 6th day of the Month.
Demand/Dept wise expenditure statement-
- 5th day of the Month.
•Centralized Photocopying through outsourcing.
• AMC of aprox. 100 P.C. systems & peripherals of the
DRM office at the cost of aprox. Rs2,65,000/- per
annum.
•Procurement of PCs under DRM’s Power & Laptops .
•Technical Vetting of I.T. procurements &
installations.
•In house Computer Training of employees.
•Payment to 44% employees through
Bank. Data containing details of
Employees account numbers & Payable
amount & bank codes in soft copy are
being sent to bank for payment through
CBS.
• Payment of salary in Division through
CBS.
• Renewal of the two years
Comprehensive Contract for
Centralized Photo Copy Machines for
all departments in DRM office ( April -
2010 to March– 2012).
•
•Three Years Comprehensive Maintenance
Contract for PC systems of the DRM office
( Feb- 2009 - jan-2012).
•Pay Fixation and payment of remaining60% arrears to employees has beencompleted.
• Dispensing with the existing system checking/
rechecking of PMIS(Payroll) outputs by the staff of
fields units by taking data in soft copy as per following
schedule-
Trip-1 18th ( Same Month)
Trip-2 & Trip-R 23rd (Same Month)
Trip-3 4th (Next Month)
Trip-4 6th (Next Month)
• Implementation ofIPAS (PRIME- AFRES)is under considerationof the Railway Board.
•The I.T. centre is in dilapated condition. Leakage
of water, lots of crack in wall mounted wooden
panels, false ceiling is also requires immediate
repair /replacement. Hence complete renovation of
IT centre & attached conference hall is required.
THANKS