32
© 2016 Electric Power Research Institute, Inc. All rights reserved. Distribution Advisory Meeting September 2016 Hollywood, FL Distribution Systems Practices PS180I

Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

© 2016 Electric Power Research Institute, Inc. All rights reserved.

Distribution Advisory Meeting

September 2016

Hollywood, FL

Distribution Systems

Practices

PS180I

Page 2: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

2© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Systems PracticesStrategic Alignment

Grid Modernization

Safety

Reliability

Knowledge & Practices

Asset Management

Capacity and Efficiency

DistributionSystemFutureState

Page 3: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

3© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution System Practices

Project Description

This project set focuses on

– Identifying,

– Documenting, and

– Sharing Practices

By identifying better

methods, utilities can

improve

– Efficiency

– Reliability

– Safety

Page 4: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

4© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Practices ResearchFocus Areas

Underground Systems Overhead Systems

Page 5: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

5© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Underground Systems

Focus Area - Network Systems

Prevalent design

in US for urban

centers

Redundancy

Higher Cost

High Reliability

Source: Con Edison

2016 Focus

Page 6: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

6© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Underground Systems

Network Systems

Challenges

– Aging infrastructure

– Serves high visibility customers

– For most utilities, represents

small % of overall infrastructure

– Limited employees with subject

knowledge / knowledge loss

– In some cases, high reliability

has resulted in limited

maintenance

– Environmental issues

– Increasing failures, often

“spectacular”

2016 Focus

Page 7: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

7© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Overhead SystemsFocus Area – Distribution Automation Specialists

DA prevalent and growing

Managing these devices is

challenging

– Rapid change in technology

– Continued need for compatibility

and integration

Managing requires coordination of

resources with varied skill sets

Need to identify, document and share

practices

2016 Focus

Page 8: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

8© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Approach

Practices Identification

Coordination with Other

Research

Sharing of Information

Page 9: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

9© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Practices Research - Identification

The Immersion - Interviews

Page 10: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

10© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Practices Research - Identification

The Immersion – field work

Page 11: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

11© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Practices Research - Identification

The Immersion - technology

Page 12: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

12© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Urban Underground Practices

Page 13: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

13© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Duke Energy (Florida)

Network Revitalization

Florida Primary and Secondary

Network Improvement Plan

– Develop long term strategic plan

– Succession planning for craft

– Design engineering expertise

– Address asset replacement and

maintenance backlog

– Improve network modeling

– Review work methods, processes and

procedures

Infrastructure Refurbishment

Page 14: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

14© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Southern California Edison

Network Revitalization

Formation of LBNOG

– Matrixed / key stakeholders

– Effective project management

System Hardening

– Civil Focus

– Protector replacements

– Secondary cable replacement

– Manhole retention system

Remote Monitoring

– Tie with DMS

– Piloting secondary monitoring

Page 15: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

15© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Automation Practices

Alabama Power Duke Energy

Page 16: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

16© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Automation Specialists

Alabama Power“Managing requires coordination of resources with varied skill sets”

Multiple Resources

– Real Time Systems

– Distribution Engineering Services

– Distribution Support

– P&C Field Services

– IT Field Operations

Single Point of Contact (SPOC)

– QB

Defined Processes

– Ex: Switched Cap Bank Test Procedure

– Ex: Maintenance ticket from device alarm

Role definition

“We’re looking for opportunities to improve our organizational structure”

Page 17: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

17© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Automation Specialists

Duke Energy

“Managing these devices is challenging”

Multiple Jurisdictions

Multiple Systems

Various applications, multiple stages of deployment

Strategic Direction

– Short and long term

– Standards

Job Aides

– Ex: Volt Regulator Control Provisioning

“…target of having 80% of customers on a self healing network”

Page 18: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

18© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

New Interest Group

Scope

– distribution automation devices

– controls

– devices which enable communications

Focus

– Strategy / Planning

– Training and Resourcing

– Design and Provisioning

– Install, testing, commissioning

– Inspect, maintain, replace

– Mfg / DMS supplies / Interoperability

– Troubleshoot

– Security

– DER

Who?

– Automation designers / engineers

– Controls engineers and technicians

– Device installers and troubleshooters

– Communications technicians

Page 19: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

19© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Identification of PracticesSurveys

Tri-annual Urban Underground

Network Survey

Ad hoc surveys

– Manhole Event Research and

Practices Review

Page 20: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

20© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Coordination with Other Research

Ex: Arc Flash Testing

Page 21: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

21© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Coordination with Other Research

Ex: Manhole Events

Page 22: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

22© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Coordination with Other Research

Ex: Forensic Analysis

Solid Dielectric Vacuum Switch

– Teardown and analysis

– Aging

Submerge (salt solution)

Load Cycling

Periodic switch operations

Post aging forensics

– Analyze for suitability in service environment

– Design improvement opportunities

Page 23: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

23© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Coordination with Other Research

Ex: Other

Project 180.004

Technology Innovation

Project 180.003

Page 24: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

24© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Sharing of PracticesPractice Repository

Page 25: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

25© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Sharing of PracticesTraining & Videos

Spring 2016 – SCE

Fall 2016 – PEPCO

– UI

Page 26: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

26© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Systems PracticesInterest Group

North American

Dense Urban Utility

Working Group

(NADUUWG)

– Open to all

Participation

NDA

Fall 2016 – Chicago

– Commonwealth

Edison – Host

– Nov 15 – 17, 2016

Page 27: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

27© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Systems Practices

2016 Activities

• Practices Immersions

• UG

• Duke Energy Florida

• Southern California Edison

• OH

• Alabama Power

• Duke Energy

• Manhole Event Research and Practices Review

• Data Repository Update (UG)

• UG Network Training Session (3)

• Video Training

• Interest Group (NADUUWG)

Page 28: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

28© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Knowledge CaptureBronze Book Update – 2016 Edition

Includes:

• System Protection Chapter (6)

• Overvoltage Protection (Tom Short)

• Overcurrent Protection (Steve Cress)

• Protection philosophy and objectives

• Overcurrent protection components

• Application to various system components

• Coordination of protective devices

• Transformer protection

• Protection of systems with DG

• Addressed Errata

Will be issued through PS180J

Page 29: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

29© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Systems Practices

(P180.019 & P180.020)

• Overall research objective

Identify, document and share leading industry practices

• What are we doing in 2016?

Identifying and documenting leading industry functional practices in urban underground systems.

Investigating issues and practices for distribution automation device management including activities such as designing, provisioning, installing and commissioning, testing, maintaining, operating and troubleshooting.

• Why is it valuable?

Participants can compare and validate their current practices for

managing systems against those of peer companies to identify

optimum approaches for application at their company. By identifying

better methods, utilities can improve efficiency, reliability, and safety.

Page 30: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

30© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Systems Practices (Secondary Networks)

(P180.019)

• Deliverables

Technical Update Reports:

1. Underground Practices – Duke Energy Florida (3002007997)

2. Underground Practices – Southern California Edison (2017)

3. Practices Repository (3002007998)

• Completion Date

December 2016

• Project Life

Report Report Report

2016 Project Tasks

Completed

In Process

Upcoming

Project Plans & Scope

Immersion - Duke

Practices Repository

Webcast/Report(s)

Immersion – SCE

2015 2016 2017

Page 31: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

31© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Distribution Systems Practices (Distribution Automation)

(P180.020)

• Deliverables

Trial Immersions:

1. Distribution Automation Specialists – Alabama Power

2. Distribution Automation Specialists – Duke Energy

Workshop / IG

• Completion Date

December 2016

• Project Life

Immersion Report Report

2016 Project Tasks

Completed

In Process

Upcoming

Project Plans & Scope

Immersion

Workshop / IG Meeting

Webcast(s)

Immersion

2016 2017 2018

Page 32: Distribution Systems Practices PS180I · December 2016 • Project Life Report Report Report 2016 Project Tasks Completed In Process Upcoming Project Plans & Scope Immersion - Duke

32© 2016 Electric Power Research Institute, Inc. All rights reserved.© 2015 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity