Distribution List – 1
1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045
2. Chief Engineer (SP & PA) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. FAX : 011-26102045
3. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafir Marg, New Delhi – 110 001 Fax No. 011-2371 6674.
4. Chief Executive Officer POSOCO B-9, Qutab Institutional Area Katwaria Sarai, New Delhi – 110 0016
5. The Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore – 560 009. Fax No. 080-22259343
6. The Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri (E), Mumbai – 400 093.
7. Director (Grid Transmission and Management) Transmission Corp. of Telangana Ltd. Vidyut Soudha, Khairatabad Hyderabad – 500 082. FAX : 040-2332 1751
8. Director (Transmission) Transmission Corp. of Andhra Pradesh Ltd. Vidyut Soudha Hyderabad – 500 082. FAX : 040-6666 5137
9. Director (TANTRANSCO) Tamil Nadu electricity Board (TNEB) 6th Floor, Eastern Wing, 800 Anna Salai, Chennai – 600 002. Fax No. 044-2851 6362
10. Member (Transmission) Karnataka State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore 560 009. Fax No. 080-2222 8367
11. Member (Transmission) Kerala State Electricity Board Vidyuthi Bhawanam, Pattom, P.B. No. 1028 Thiruvananthapuram – 695 004. Fax No. 0471-2444 738
12. Superintending Engineer –I First Floor, Electricity Department Gingy Salai Puducherry – 605 001. Fax No. 0413-2334 277/2331 556
13. Director (Operation), MSETCL 4th Floor, "Prakashganga'' Plot No. C- 19, E-Block Bandra - Kurla Complex, Bandra (East), Mumbai – 400 051
14. The Executive Engineer (Projects) Chief Engineer (Transmission) Nuclear Power Corpn. of India Ltd, 12th Floor, North Wing, VS Bhawan Anushaktinagar, Mumbai-400 094
15. Managing Director Chhattisgarh State Transmission Co. Ltd. Dangania, Raipur – 492 013
16. Chairman & Managing Director MPPTCL, Block No.3 Shakti Bhawan, Rampur, Jabalpur – 482 008
17. Managing Director Gujarat Energy Transmission Corp. Ltd. Sardar Patel Vidyut Bhawan, Race Course, Vadodra -390 007
18. The Executive Engineer UT of Daman & Diu Administration. OIDC Corporate Office, Plot No. 35 Somnath, Daman, Pin 396 210
19. The Executive Engineer (Projects) Electricity Department UT of Dadra & Nagar Havelli, Post Naroli-396 235, Silvassa
20. The Chief Engineer Electricity Department The Government of Goa, Panaji
21. Director (Engineering) OPTCL Jan path, Bhubaneshwar-751022
22. Member Secretary ERPC 14, Golf Club Road, Tollygunge Kolkata-700033
23. Director (System Operation) WBSETCL Vidyut Bhavan, 5th Floor Block-D, Bidhannagar Sector-II, Kolkata-700091
24. Director (System) Damodar Valley Corporation DVC Towers, VIP Road, Kolkata-700054
25. Managing Director Jharkhand Urja Sancharan Nigam Limited (JUSNL) Engineering Building, HEC, Dhurwa, Ranchi -834004
Distribution List – 2
1. Sh. Atanu Ghosh Chowdhury Vice President Bharat Aluminium Company Ltd. Balco Nagar, Korba - 495 450 Chhattisgarh Email: [email protected]; [email protected]; [email protected]
Tel: 98931 22359
2. Vikas Saksena President-Engineering
Jindal Power Limited 4th Floor, Jindal Centre Plot No.2 , Tower – B, Sector-32, Gurgaon, Haryana- 122001 Tel : +91 124 6612337 Mob : + 91 9971200857 Email : [email protected]
3. Shri Amit Jain, Director, Jindal India Thermal Power Ltd. Plot-12, Sector B-1, Local Shopping Complex Vasant Kunj, New Delhi – 110 070 Mobile : 09810062441 Email : [email protected]
4. Shri Anand Mohan Misra Associate Vice President Head – Business Development Jhabua Power Limited Avantha Power & Infrastructure Ltd., 6th & 7th Floor, Vatika City Point M.G.Road, Gurgaon – 122002 M : 09810553164 Ph : 0124-4392011 Email : [email protected]
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 1 of 8
Agenda for processing of Long Term Access applications received during December’2014 as per CERC orders dated 16.02.2015 & 03.07.2015 and MTOA applications received during June, 2015
1.0 In pursuance with the CERC orders dated 16.02.2015 and 03.07.2015 a
meeting was convened on 06.08.2015 for processing of LTA/MTOA application
received during the period from Jan’14 to Dec’14. The LTA applications
received up to Nov’14 and MTOA applications received up to Dec’14 were
discussed and agreed during the meeting. For processing the Dec’14 LTA
applications import capability of Kerala was required to be assessed, as entire
Dec’14 LTA applicants were seeking transfer of power to Kerala. As this
processing of Dec’14 LTA applications may have impact on Jun’15 MTOA
applications, it was agreed in the meeting that same may be processed through
separate meeting after carrying out joint study with Kerala. Under present
agenda the LTA applications received in Dec’14 and MTOA applications
received in Jun ’15 are being processed.
2.0 Applications for Dec’14: Five (5) nos. LTA applications for transfer of
726.75MW of power from NEW grid to Kerala in SR were received in Dec’14.
Details of the applications are tabulated below
Sl. No. Applicant
App. date
LTA/ MTOA
Quantum Injection
Point Drawl Start Date End Date
1. Bharat Aluminium Company Limited
Dec-14 LTA 95 BALCO, Chhattisgarh
KSEB 01.10.2017 30.09.2040
2. Jindal Power Ltd.
Dec-14 LTA 190 Tamnar, Chhattisgarh
KSEB 01.12.2016 30.11.2040
3. Jindal Power Ltd.
Dec-14 LTA 142.5 Tamnar, Chhattisgarh
KSEB 01.10.2017 30.09.2040
4. Jindal India Thermal Power
Dec-14 LTA 95 Angul, Odisha
KSEB 01.10.2017 30.09.2040
5. Jhabua Power Limited
Dec-14 LTA 204.25 Jabalpur Pool, Madhya Pradesh
KSEB 01.12.2016 30.12.2040
For transfer of power to Kerala it should be seen that capacity is available for (i)
Power transfer from NEW GRID to SR and (ii) Power transfer to Kerala within
SR.
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 2 of 8
3.0 Power transfer from NEW Grid to SR. From 1st Jun’16 ATC of 542 MW
would be available for transfer of power from NEW GRID to SR due to expiry of
MTOA (KSK, NETL & Shree Cements), details at Annexure-I.
4.0 LTA applications for total quantum of 727 MW cannot be granted from 1st
Jun’16 onwards as the ATC is less than the full LTA quantum.
Further MTOA of the order of 300 MW are expiring in Feb/May’17. However, as
mentioned earlier LTA from NEW grid to SR grid on target region basis has
been granted which can only be released against MTOA, so that these LTA
applicants as and when firm up their beneficiaries, can be granted LTA.
Therefore, LTA to Dec’14 applicants can only be granted with the enhancement
of ATC through system augmentation.
5.0 During the meeting held on 06.08.2015, constituents enquired about the
enhancement of ATC with the commissioning of Angul-Srikakulam-Vemagiri
765 kV D/C line. Accordingly, studies have been carried out which indicates
that with commissioning of Angul-Srikakulam-Vemagiri 765 kV D/C line and
commissioning of Kudgi Generation, ATC would remain almost same due to
capacity constraints beyond Vemagiri and reduction in ATC on Narendra-
Kolhapur line due to Kudgi generation injection. ATC will enhance with the
commissioning of system strengthening schemes viz “Constraints in 400kV bay
extensions at Vemagiri” and/or “Wardha-Nizamabad-Maheshwaram 765kV D/c
link” which are expected by Jun’18. Therefore, notional LTA to Dec’14
applicants can be granted from Jul’18 with the commissioning of system as
indicated above.
Power transfer to Kerala within SR: Presently the import capability of Kerala
is of the order of 1800MW. With the commissioning of Mysore-Kozhikode
400kV D/c line, maximum import capability of Kerala is expected to be about
2500MW (without considering transformer contingency (N-1) at Kozhikode
substation). However, the transformers at Kozhikode substation are getting
heavily loaded. Hence augmentation of transformation capacity at Kozhikode by
2x500MVA is proposed for the grant of notional LTA. It is recommended Kerala
should also expedite completion of Edamon – Cochin 400 kV (Quad) D/C line to
meet its growing power demand.
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 3 of 8
In view of above, notional LTA to Dec’14 applications can be granted with effect
from Jul’18 subject to following
Commissioning of System strengthening schemes viz “Constraints in
400kV bay extensions at Vemagiri” and/or “Wardha-Nizamabad-
Maheshwaram 765kV D/c link”.
Augmentation of transformation capacity at Kozhikode by 2x500MVA
subject to the approval in the Standing Committee Meeting of SR.
MTOA Applications received in the month of June, 2015
6.0 Total 9 Nos. of MTOA applications have been received in the month of June,
2015 for transfer of Power from NEW Grid to SR Grid and 1 No. application for
transfer of power within SR Grid from Karnataka to Telangana. The details of
the same are given below.
Sl. No.
Applicant (Injection and drawl) Quantum (MW)
Date of Application
Start date of MTOA
End date of MTOA
1. Adhunik Power and Natural Resources (Adhunik Power and Natural Resources Ltd, Jharkhand to TANGEDCO, Tamil Nadu)
100 30.06.2015 01.12.2015 30.11.2018
2. BESCOM (DVC Kolkata , Jharkhand to BESCOM, Karnatka)
139 30.06.2015 01.06.2016 31.05.2017
3. BESCOM (DVC Kolkata , West Bengal to BESCOM, Karnatka)
111 30.06.2015 01.06.2016 31.05.2017
4. KSEB Ltd (Mejia TPS (U# 7&8), Eastern Region to KSEB Ltd, Kerala)
93.5 23.06.2015 01.12.2015 30.11.2018
5. Jindal Power Ltd (Jindal Power Ltd, Western Region to KSEB Ltd, Kerala)
190 29.06.2015 01.06.2016 31.05.2019
6. KSEB Ltd (Maithon Power Ltd, Eastern Region to KSEB Ltd, Kerala)
140.5 30.06.2015 01.06.2016 31.05.2019
7. KSK Mahanadi Power Company Ltd (KSK Mahandi Power Company Ltd, Chhattisgarh to APEPDCL & APSPDCL, AP)
400 30.06.2015 16.06.2016 15.06.2019
8. Jindal Power Ltd (Jindal Power Ltd, Western Region to TANGEDCO, Tamil Nadu)
140.5 29.06.2015 01.12.2015 31.08.2017
9. Shree Cement Ltd (IPP, Rajasthan to TSSPDCL, Telangana)
50 30.06.2015 01.12.2015 26.05.2016
10. JSW Power Trading Company Ltd (JSW Energy Ltd, karnataka to TSSPDCL, Telangana)
150 30.06.2015 01.12.2015 26.05.2016
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 4 of 8
7.0 Sl. No. 1 to 4 of the above applications have the same PPA as their earlier
LTA/MTOA applications.
Sl.No.
Applicant (Injection and drawl) Quantum (MW)
Earlier Application
Notional LTA granted from
1. Adhunik Power and Natural Resources (Adhunik Power and Natural Resources Ltd, Jharkhand to TANGEDCO, Tamil Nadu)
100 LTA – Jan’14 1st April’15
2. BESCOM (DVC Kolkata , Jharkhand to BESCOM, Karnatka)
139 LTA – Mar’14 1st Dec’15
3. BESCOM (DVC Kolkata , West Bengal to BESCOM, Karnatka)
111 LTA – Mar’14 1st Dec’15
4. KSEB Ltd (Mejia TPS (U# 7&8), Eastern Region to KSEB Ltd, Kerala)
93.5 LTA – Apr’14 1st April’15
These applications have already been considered for notional grant of
LTA/MTOA as indicated above and their priority for operationalization shall be
higher than the MTOA applications in June, 2015. Therefore, these are not
considered in the present Agenda.
8.0 Out of the balance, 3 applications (Sl. No 5 to 7), have equal priorities (duration
36 months) and higher than that of the applications at Sl. No. 8 & 9. Sl. No. 5 &
6 sought power transfer to Kerala while Sl. No. 7 sought power transfer to
Andhra Pradesh. As proposed earlier, LTA of Dec’14 applications can be
granted only with the enhancement of Capacity between NEW grid and SR
expected by Jun’18, the balance ATC of 542 MW (available from Jun’16) as
well as 92.25 MW (getting available after reduction of LTA quantum by Kerala
in Apr’14 LTA application) can be considered for grant of MTOA for these
applications on pro rata basis as given below. The available transfer capability
to Kerala is given at Annexure-II. From the Annexure-II it is seen that the
proposed MTOA of 287 MW to Kerala can be accommodated from Jun’16.
Sl. No.
Applicant (Injection and drawl)
Req. Quantum
(MW)
Start date of MTOA
End date of MTOA
Grant (MW)
1. Jindal Power Ltd (Jindal Power Ltd, Western Region to KSEB Ltd, Kerala)
190 01.06.2016 31.05.2019 165*
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 5 of 8
2. KSEB Ltd (Maithon Power Ltd, Eastern Region to KSEB Ltd, Kerala)
140.5 01.06.2016 31.05.2019 122
3. KSK Mahanadi Power Company Ltd (KSK Mahandi Power Company Ltd, Chhattisgarh to APEPDCL & APSPDCL, AP)
400 16.06.2016 15.06.2019 347
Total 730.5 634
*Jindal Power Ltd. has applied for LTA of 190 MW in Dec’14 and also applied for
MTOA of 190 MW in Jun’15 and enclosed same PPA in both the applications.
Jindal Power Ltd. need to relinquish MTOA rights & pay the applicable
relinquishment charges in line with the CERC regulations as and when the LTA for
the application made in Dec’14 is operationalised.
9.0 Presently the import capability of Kerala is of the order of 1800MW. With the
commissioning of Mysore-Kozhikode 400kV D/c line, maximum import capability
of Kerala is expected to be about 2500MW (without considering transformer
contingency (N-1) at Kozhikode substation). However, as per the discussions with
Kerala on 06.08.2015, Kerala has informed that they would rearrange their loads
& 220 kV network to meet their import requirement. Accordingly studies were
carried out considering modifications proposed by Kerala and import capability
has been re-assessed as 2750 MW without considering transformer contingency
(N-1) at Kozhikode substation. The expected LTA/MTOA and CGS allocations for
Kerala by Jun’16 is about 2508MW (including Jun’15 MTOA of 287MW) against
the capability of 2615 MW (2750WM-135MW TRM) (details given at Annexure-II).
10.0 Further, here it may be mentioned that Kozhikode would be a radially
connected load and transformer outage at Kozhikode shall not have any major
impact on the grid, however there may be load curtailment in Kerala, for which
KSEB has agreed. Kerala should ensure to limit their drawl through load
shedding & to ensure healthy operation of transformers in case of any
contingency.
11.0 Application at Sl.No.8, have higher priority (duration 21 months) than that of the
application at Sl. 9, is seeking transfer of 140.5 MW power from Jindal Power
Ltd, Western Region to TANGEDCO, Tamil Nadu from 01.12.2015 to
31.08.2017. As ATC of 92.25 MW (which was created by reduction of LTA
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 6 of 8
quantum of KSEB) is available from Jan’16 to May’16, it is proposed to grant
MTOA to Jindal Power Ltd for 92.25 MW from Jan’16 to May’16 as given below.
Sl. No.
Applicant (Injection and drawl)
Req. Quantum
(MW)
Start date of MTOA
End date of MTOA
Grant (MW)
1. Jindal Power Ltd (Jindal Power Ltd, Western Region to TANGEDCO, Tamil Nadu)
140.5 01.01.2016 31.05.2016 92.25
12.0 Application at Sl.No 9 is seeking transfer of 50 MW power from Shree Cement
Ltd, Rajasthan to TSSPDCL, Telangana from 01.12.2015 to 26.05.2016. As
ATC is not available during this period, application is proposed to be closed.
13.0 Applications at Sl.No.10 is seeking transfer of 150 MW power from JSW Energy
Ltd, Karnataka to TSSPDCL, Telangana from 01.12.2015 to 26.05.2016. This
power transfer is within S1 area of Southern Region. The MTOA to JSW Energy
Ltd, Karnataka for transfer of 150 MW of power to TSSPDCL, Telangana from
01.12.2015 to 26.05.2016 may be granted.
14.0 Simulation Studies has been carried out for Jun’16 time frame with considering
the generations & transmission lines expected to be commissioned by June’16.
The details of the load flow studies along with results for the above MTOA
applications are enclosed at Exhibit-I.
15.0 Conclusion:
1. In view of above, notional LTA to Dec’14 applications can be granted with effect
from Jul’18 subject to following
Commissioning of System strengthening schemes viz “Constraints in 400kV
bay extensions at Vemagiri” and/or “Wardha-Nizamabad-Maheshwaram
765kV D/c link”.
Augmentation of transformation capacity at Kozhikode by 2x500MVA subject
to the approval in the Standing Committee Meeting of SR
2. MTOA may be granted with the existing/under construction transmission system
to the applications received in the Jun’15 for transfer of power from NEW to SR
and within SR as indicated above.
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 7 of 8
Kerala should ensure to limit their drawl through load shedding & to ensure
healthy operation of transformers in case of any contingency.
Further the applicants are liable to pay relinquishment charges as per the
directions of Hon’ble CERC, wherever applicable and are also subject to the
establishment of necessary payment security mechanism.
Agenda for Dec’14 LTA & Jun’15 MTOA applications
Page 8 of 8
Annexure-I
Total ATC envisaged between NEW grid and SR grid
Post Grant of LTA &
MTOA to Nov’14 applications
Total LTA (including GoI allocation to SR beneficiaries) 4781
Talcher Firm Share to SR beneficiaries 1773
DVC Allocation 33
Solar Allocation 85
BALCO (1200 MW) 100
Jindal Power Ltd. (2400 MW) 400
KSK Mahanadi Power Co. Ltd (3600 MW) 500
DB Power Ltd. (500 MW) 208
Ind-Bharat (Utkal) Power Ltd. 500
GMR EMCO Energy Ltd. ** 150
BALCO 100
Dhariwal Power 100
KSEB (from Maithon Power) 140.5
Adhinik Power & natural Resources 100
BESCOM 450
KSEB(from West Bengal) 141.5
Total MTOA Granted 484.7
PTC India Ltd (01.03.2015 to 28.02.2017) 100
SAIL - VISP (01.08.2014 to 31.07.2017) 4.55
SAIL - VISP (01.08.2014 to 31.07.2017) 13.65
NTPC Vidyut Vyapar Nigam Ltd (01.08.2014 to 28.02.2017) 297
Facor Power Ltd (01.08.2014 to 30.09.2016) 10
Jindal Power Ltd 59.5
Grand Total LTA/MTOA Granted 5265.7
Total ATC between NEW grid and SR 5900
Transmission Margin available 634.3
Power Transfer Capability to Kerala - considering Dec'14 LTA applications
Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17
TTC2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750
ATC2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615 2615
Allocation2221 2508 2508 2546 2546 2546 2546 2546 2546 2186 2186 2186 2186 2186 2186 2224
LTA 1824 1824 1824 1862 1862 1862 1862 1862 1862 1899 1899 1899 1899 1899 1899 1937
MTOA397 397 397 397 397 397 397 397 397 0 0 0 0 0 0 0
Jun'15 MTOA0 287 287 287 287 287 287 287 287 287 287 287 287 287 287 287
Margin 394 107 107 69 69 69 69 69 69 429 429 429 429 429 429 391
Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19
TTC 2750 2750 2750 2750 2750 2750 2750 2750 2750 3000 3000 3000 3000 3000 3000 3000
ATC 2615 2615 2615 2615 2615 2615 2615 2615 2615 2865 2865 2865 2865 2865 2865 2865
Allocation 2224 2224 2224 2224 2224 2224 2224 2224 2224 2786 2786 2786 2786 2786 2786 2786
LTA 1937 1937 1937 1937 1937 1937 1937 1937 1937 2664 2664 2664 2664 2664 2664 2664
MTOA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Jun'15 MTOA 287 287 287 287 287 287 287 287 287 122 122 122 122 122 122 122
Margin 391 391 391 391 391 391 391 391 391 79 79 79 79 79 79 79
Annexure-II
Exhibit-I-Base case
FROM ------AT ZONE BUSES------- TO -NET INTERCHANGE-
GENE- FROM IND TO IND TO TO BUS GNE BUS TO LINE FROM TO TO TIE TO TIES
X-- ZONE --X RATION GENERATN MOTORS LOAD SHUNT DEVICES SHUNT CHARGING LOSSES LINES + LOADS
50 7144.6 0.0 0.0 6059.4 0.0 0.0 0.0 0.0 119.3 965.9 965.9
ANDHRA -694.9 0.0 0.0 1991.6 585.4 0.0 3366.7 9473.2 1167.4 1667.1 1667.1
51 5385.6 0.0 0.0 6270.5 0.0 0.0 0.0 0.0 125.4 -1010.3 -1010.3
TELANGANA -452.7 0.0 0.0 2061.0 -838.4 0.0 736.4 3607.2 1724.8 -529.2 -529.2
52 6736.4 0.0 0.0 8837.6 0.0 0.0 0.0 0.0 354.9 -2456.1 -2456.1
KARNATKA -1068.4 0.0 0.0 2904.8 -737.7 0.0 1579.2 6823.8 4114.4 -2105.3 -2105.3
53 1687.4 0.0 0.0 3753.5 0.0 0.0 0.0 0.0 154.9 -2221.0 -2221.0
KERALA 514.1 0.0 0.0 1237.3 -548.6 0.0 0.0 1205.8 969.3 61.9 61.9
54 12429.4 0.0 0.0 13107.8 0.0 0.0 0.0 0.0 275.7 -954.1 -967.1
TAMILNAD 1509.0 0.0 0.0 4330.2 177.1 0.0 1139.7 7240.2 3143.9 -41.7 -45.9
57 29.1 0.0 0.0 356.2 0.0 0.0 0.0 0.0 1.5 -328.5 -315.6
PONDY 19.0 0.0 0.0 117.1 -23.8 0.0 0.0 11.6 61.5 -124.2 -119.9
COLUMN 33412.5 0.0 0.0 38385.0 0.0 0.0 0.0 0.0 1031.6 -6004.0 -6004.0
TOTALS -173.8 0.0 0.0 12642.0 -1385.9 0.0 6822.0 28361.7 11181.3 -1071.4 -1071.4
FROM AREA 5 SOUTH
TO AREA 3 WEST
X---- FROM AREA BUS ----X X----- TO AREA BUS -----X
BUS# X-- NAME --X BASKV BUS# X-- NAME --X BASKV CKT MW MVAR
514009 CHAND-SR 400.00 374007 BHADRAWATI 400.00* 2DC -502.4 -204.8 TWO TRM DC "11"
514009 CHAND-SR 400.00* 374007 BHADRAWATI 400.00 2DC -497.0 246.0 TWO TRM DC "12"
522031 AMBD 220.00 342002 PONDA2 220.00* 2 15.5 -27.9
522031 AMBD 220.00* 342006 XELDEM 220.00 2 21.9 -39.2
524015 NARENDR-NEW 400.00* 374050 KOLHAPURPG 400.00 1 -92.7 -81.7
524015 NARENDR-NEW 400.00* 374050 KOLHAPURPG 400.00 2 -92.7 -81.7
528003 RAIC800 765.00 378040 SHOLAPUR 765.00* 1 -1099.3 -191.4
528003 RAIC800 765.00 378040 SHOLAPUR 765.00* 2 -1099.3 -191.4
TOTAL FROM AREA 5 TO AREA 3 -3346.1 -572.0
TO AREA 4 EAST
X---- FROM AREA BUS ----X X----- TO AREA BUS -----X
BUS# X-- NAME --X BASKV BUS# X-- NAME --X BASKV CKT MW MVAR
524011 KOLAR 400.00 424019 TALCHER 400.00* 2DC -1004.8 -421.8 TWO TRM DC "10"
514010 GAZU-SR 400.00* 424099 GAZ-ER 400.00 2DC -320.3 172.1 TWO TRM DC "13"
514010 GAZU-SR 400.00* 424099 GAZ-ER 400.00 2DC -320.3 172.1 TWO TRM DC "14"
524011 KOLAR 400.00 424019 TALCHER 400.00* 2DC -1004.8 -421.8 TWO TRM DC "9"
TOTAL FROM AREA 5 TO AREA 4 -2650.1 -499.4
-------- --------
TOTAL FROM AREA 5 SOUTH -5996.3 -1071.4
400
MDRA
398
54
5
-54
2
12
49
7
-28
93
-12
4
0
18
9
-27
-24
1
-92
18
00
-21
1
TIRUNEL4
ARSUR4 398
SALEM 398
-15
2
12
15
2
-45 1
93
-59
-19
1
-12
METTUR4
38
8
-28
-38
4
-35
10
HOSUR4 396
SMNH 393
NYVL 400
16
5
-58
14
1
-40
KOLAR
BIDADI
26
9
41
11
3
-29
-11
3
19
-44
0
44
3
18
NELMANG4 394
10
-31
3
402
MYSORE4 399
HIRY4
TALAGUP4 404
84
-24
10
8
-97
-10
7
22
-41
0
29
41
5
-26
12
7
-24
-32
9
-14
33
1
-17
-94
-79
UDUPI400 400
-42
1
31
42
8
-65
10
39
-11
8
405
-453
26
-74
404
RAIC-NEW 401
406
403
31
0
-47
-50
3
56
50
6
-99
-37
6
-50
38
3
-45
-24
2
30
15
8
-11
1
-15
7
-15
15
7
-12
6
-16
2
400
DAVAN4 401
45
2
-36
-44
6
17
-16
7
-42
16
8
30
KAIGA 400
NAREND-4
TORNGL4 400
MNRB
-13
8
-7
13
8
-53
3
-21
-3 -63
-32
9
14
-46
-9
-14
8
29
14
8
-83
-11
4 8
79
3
-63
84
4
-11
1
400
-54
-36
24
-11
2
-24
10
5
-21
1
31
72
4
-28
3
402
-32
7
36
0
-21
0
HOODI4
-38
3
-17
9
38
4
16
2
405
10
5
17
76
-29
HYDR 396
-21
6
23
-274
21
27
8
-91
22
5
-57
-22
2
27
-33
-10
6
33
8
-36
-33
4
21
58
-10
8
-58
-13
22
96
13
CHAND-SR 400
GAJWEL4 399
MALKARM4 396
399
-48
9
67
49
7
-78
-40
4
10
40
8
-25
34
7
-31
-40
-55
-27
-12
0 -50
0
62
22
34
4
-20
11
8
48
2
83
409
-34
4
-67
NELLORE4 404
CHITOR 410
MADR 407
ALMATI4 401
407
-32
6
22
32
8
-12
3
-14
5
-22
14
5 7
20
-1713
2
-13
-13
1
-55
-23
3
-0
-37
5
15
0
37
5
-15
3
60 6
32
-78
400
402
-34
8
65
34
8
-76
-15
9
2
15
9
-54
-31
8
66
32
0
-12
0
-75
33
5
13
37
-39
1
397
11
77
-75
69
9
-53
3
400
-29
411
12
1
-83
11
2
-83
-11
1
69
-6 -6
6 -65
NEYEXTN4
400
205
-21
377
-131
TRIC
29
9
-77
-23
6
-58
KARAIK 415
-37
-17
5
19
8
-11
7
TUTI-OA 402
-44
3
98
400
400
-40
9
20
1
38
1
-20
9
11
6
-11
26
5
-12
85
25
-22
1
VIJW 400
12
8
-69
-8
-32
GAZW 400
405
VIJTP-IV
400
-22
8
9
98
-35
42
5
-19
9
0 0
400
SIMHD-II 400
VIZPOOL 400
-64
1
-27
-21
0
8
21
0
-14
-218
35
21
8
-41
0 -37
1
24
4
-36
-24
2
9 -24
6
65
24
8
-91
18
1
-66
-34
85
7
-95
SIMHADRI 400
-19
9
17
20
0
-31
20
0
-31
-19
9
17
52 -5
85
0
-13
0
GAZU-SR
400
-11
23
11
-50
-40
-27
41
5
-34
R
HYDR-AP4 395
KOTH-VI
17
8
-34
-17
6
-62
20
7
-36
-20
7
5
-28
23
41
5
-73
R
400
-18
5
-65
18
6
-12
38
8
-97
72
0
-16
7
VIJ-AP
20
16
-20
-67
4
93
-11
1
-90
11
2
-12
16
5
-62
-16
3
-10
CHENN-EX 400
-11
3
50
11
3
-65
38
4
-96
-38
2
86
99
3
-32
3
MENAK-OA
LANCO-OA
44
4
-55
-18
7
UDMP
31
4
-22
RSTP
KURL-NEW
54
HASSAN4
397
VEMAGIR4
WARN4
21
8
KAKTIA-G
400
CUDP
-58
27
393
400
-74
43
-4
394
398
393
24
6
20
-24
5
-56
-39 3
39
-24
41
16
-41-3
2
SSLBPH4
PUGALUR4
89
2
-74
-74
-33
4
7
NEY_IIEX
32
3
-14
0
MALEKTT
-543
BELLARY
399
MAHABUB4
21
0
-3
-93
-72
403
-16
4
400
-24
7L
PONDY4
KURNOOL4
400
SVCHTRM
33
9
-48
2
KRISH-AP 400
NELLORE-AP 404
-17
8
-36
1
17
1
-28
2
55
28
5
-12
5
1
64
7
-30
2L
11
5
48
-11
5
-48
11
5
48
-11
5
-48
36
2
TIRUVLM
SIMHP-OA
MADHUGI4
-28
406
404
RAIC
-26
-63
-21
7
12
6
NSAG
CEPL
400
-130
1558
-147R
545
-93
-13
-16
34
6
-95
44
5
399
400
400
YELAHNKA
21
4
-13
0
KHAM
-17
8
NEL-POOL
KUDAN4
40
3
25
-40
3
-12
GOOT
-21
0
-11
3
TUTICORN
-12
7
-24
12
8
-68
-13
8
-16
400
ILFS
406172
-110-172
59
407
-172
27
172
-59
-11
-27
172
NAGAPTNM4
TPCIL 400
13
5
-14
2
-13
5
12
71
35
-14
2
-13
5
12
7
27
0
-28
3
-171
VTPS
-36
0
-10
6
36
3
-43
-36
0
-10
6
36
3
-43
-7
-35
6
KOZIKODE4 401
16
9
-77
-16
8
-23
16
9
-77
-16
8
-23
NARENDR-NEW 417
-92
-17
89
2
47
KOLHAPURPG 414
-92
-47
92
-98
ELAPULY4 398
-36
7
14
36
9
-38
COCHIN4 398
TRICHUR4A 397
18
9
-31
-18
8
-11
61
-43
-61
-14
TRIVNDRM4 389
-30
3
-75
30
6
22
MADKTHRA4A 397
25
4
10
8
403
41
8
20
7
-10
6-2
06
4
DHARMPR 397
11
8
-83
-11
7
38
11
8
-83
-11
7
38
-11
7
0
11
7
-38
-11
7
0
11
7
-38
24
9
53
18
8
41
23
2
48
14
9
35
59
1
25
8
20
1
50
14
8
51
70
95
38
92 6
-11
0
27
11
7
52
19
9
23
16
0
31
94 2
-10
6
2
23
7
90
82
13
28
8
10
9
14
4 1
36
-31
34
4
93
18
2
20
11
0
62
32
24
9
36
37
0
68
27
6
61
-25
1
54
59 3
19
7
64
12
5
37
10
7
39
72
35
23
1
68
12
5
19
21
8
66
-22
8
-50
86
45
12
9
64
13
9
-11
5
16
3
59
30
6
-18
8
-49
7
-49
7
-32
0
-32
0
31
3
12
4-9
32
-93
2
-20
8
-24
12
4
19
2
69
24
6
84
13
0
30
34
6
12
233
-21
6
-38
22
8
74
-22
8
-50
-36
32
36
-31
-59
-1
-19
7
-47
-86
-41
-23
1
-44
-53
12
4
19
-21
8
-45
-10
7
-34
-12
5
-18
-16
0
-20
11
0
-22
-92
-3
-95
-34
-26
7
-39
-31
3
-96
10
6 2
-19
9
-7
-23
7
-74
-20
1
-39
-24
9
-27
-14
8
-17
-14
8
-17
24
-14
8
-41
23
5
81
-19
2
TALCHER
18
5
32
-18
5
-18
21
8
66-1
24
-13
-11
7
-46
-72
-33
-14
4
7
-28
8
-85
28
8
10
9
12
5
37
-12
5
-30
68
19
6
Bus - Voltage(kV)Branch - MW/MvarEquipment - MW/Mvar
kV: <=110.000 <=132.000 <=220.000 <=230.000 <=400.000 <=765.000 >765.000
-17
7
-11
17
8
17
-11
17
8
17
-17
7
-61
-12
61
-61
-12
61
14
-85
-33
85
36
-85
-33
85
-85
85
36
-33
14
-20
1
-32
20
2
50
-20
1
-32
36
-16
8
-12
16
8
23
-16
8
-12
16
8
23
26
7
SYSTEM STUDIES FOR GRANT OF MTOA TO JUNE15 APPLICATIONS
-24
6
-66
24
6
84
-13
0
-25
13
0
30
87
34
79
31
-79
-26
13
5
25
-13
5
-13
12
39
-42
7
KURL800
771RAIC800
783
TIRUVLM 784
-40
3
-15
1
40
4
-20
2
SHOLAPUR 778
11
06
10
3
-11
01
9
NELL-POL 782
-4 -18
0
4
-15
8
-30
6
25
0
-37
0
-1
20
8
43
-24
9
-7
18
8
41
-23
2
-26
-27
6
-26
-18
2 -7
-233
-10-1
10
-56
-16
3
-48
25
1
-24
-14
9
-26
-20
8
-24
-18
8
-26
-22
7
10
22
7
10
-22
7
10
22
7
10
1
Exhibit-I a- Base case
400
MDRA
397
54
9
-54
7 -2
50
1
-14
73
-12
6
-4
17
9
-25
-24
5
-99
18
00
-16
4
TIRUNEL4
ARSUR4 397
SALEM 397
-17
5
8
17
5
-39 2
27
-56
-22
6
-10
METTUR4
41
0
-20
-40
6
-65
10
HOSUR4 396
SMNH 392
NYVL 400
19
0
-57
13
3
-34
KOLAR
BIDADI
26
5
53
14
0
-36
-14
0
27
-46
2
46
4
26
NELMANG4 393
5
-34
0
400
MYSORE4 398
HIRY4
TALAGUP4 403
82
-24
12
2
-92
-12
1
18
-45
9
41
46
5
-24
13
3
-22
-34
3
-19
34
5
-11
-10
2
-80
UDUPI400 400
-42
5
25
43
2
-57
10
39
-10
2
404
-462
22
-73
403
RAIC-NEW 400
405
403
28
9
-47
-57
3
61
57
7
-88
-38
1
-48
38
8
-44
-23
1
30
13
9
-10
6
-13
9
-22
14
5
-17
8
-15
0
400
DAVAN4 401
48
9
-25
-48
2
17
-19
4
-45
19
5
36
KAIGA 400
NAREND-4
TORNGL4 400
MNRB
-15
1
-11
15
1
-48
21
-22
-21
-62
-35
1
14
-39
-12
-13
6
22
13
6
-77
-22
1
18
94
3
-66
84
4
-80
400
-87
-33
1 -40
-1 34
-20
1
28
72
4
-12
6
402
-40
5
36
0
-18
9
HOODI4
-35
9
-19
8
36
0
18
0
405
59
22
48
-22
HYDR 396
-19
4
19
-270
19
27
3
-90
21
4
-57
-21
2
24
-47
-10
7
33
4
-33
-33
0
17
23
-10
3
-23
-20
22
96
43
CHAND-SR 400
GAJWEL4 398
MALKARM4 396
399
-48
9
67
49
7
-78
-40
6
6
40
8
-21
35
3
-30
-27
-57
-39
-12
0 -50
0
64
21
32
7
-22
10
4
57
6
30
409
-33
6
-64
NELLORE4 403
CHITOR 409
MADR 407
ALMATI4 401
406
-33
1
19
33
3
-11
9
-12
9
-26
12
9
11
29
-2214
7
-16
-14
6
-51
-24
1
1
-44
6
15
3
44
7
-15
5
69 -0
22
-75
400
402
-34
5
63
34
6
-74
-16
0
0
16
0
-53
-32
0
62
32
3
-11
5
-57
32
6
13
37
-37
8
397
16
94
-79
69
9
-51
4
400
-28
410
12
8
-80
12
0
-80
-11
9
68
11 -8
-11
-63
NEYEXTN4
400
198
-21
377
-129
TRIC
31
2
-75
-22
3
-59
KARAIK 414
-30
-17
4
19
0
-11
6
TUTI-OA 402
-43
9
93
400
400
-40
9
18
9
38
1
-19
7
11
6
-11
26
5
-11
65
25
-20
9
VIJW 400
10
9
-68
-6
-33
GAZW 400
405
VIJTP-IV
400
-21
8
7
11
7
-36
42
5
-19
6
0 0
400
SIMHD-II 400
VIZPOOL 400
-64
1
-27
-21
4
3
21
4 -9
-216
34
21
6
-41
0 -37
1
24
0
-35
-23
8
7 -24
1
64
24
3
-91
17
2
-66
-36
85
7
-83
SIMHADRI 400
-20
0
15
20
0
-29
20
0
-29
-20
0
15
51 -5
85
0
-12
0
GAZU-SR
400
-9 26
9 -53
-35
-32
41
5
-19
R
HYDR-AP4 394
KOTH-VI
17
2
-31
-17
1
-65
20
7
-35
-20
7
3
-29
21
41
5
-69
R
400
-19
7
-67
19
8
-8
32
8
-84
72
0
-14
6
VIJ-AP
2
17
-2 -68
2
93
-11
0
-92
11
1
-10
15
2
-61
-15
1
-12
CHENN-EX 400
-11
2
48
11
2
-63
38
5
-93
-38
3
82
99
3
-31
2
MENAK-OA
LANCO-OA
44
4
-51
-17
7
UDMP
34
1
-15
RSTP
KURL-NEW
55
HASSAN4
396
VEMAGIR4
WARN4
21
6
KAKTIA-G
400
CUDP
-79
43
392
400
-10
0
53
-2
393
397
392
25
6
18
-25
5
-53
-61
17
61
-38
45
9
-45-2
5
SSLBPH4
PUGALUR4
89
2
-70
-71
-35
3
12
NEY_IIEX
31
5
-13
2
MALEKTT
-563
BELLARY
399
MAHABUB4
27
0
-10
-93
-70
402
-18
9
400
-21
4L
PONDY4
KURNOOL4
400
SVCHTRM
35
7
-57
6
KRISH-AP 400
NELLORE-AP 403
-16
9
-35
7
16
2
-28
6
52
28
9
-12
1
1
64
7
-29
0L
13
7
49
-13
7
-49
13
7
49
-13
7
-49
35
8
TIRUVLM
SIMHP-OA
MADHUGI4
-33
405
403
RAIC
-11
-2
-21
5
17
8
NSAG
CEPL
400
-125
1558
-143R
542
-88
-16
-16
34
2
-92
44
1
399
400
400
YELAHNKA
20
1
-12
8
KHAM
-17
0
NEL-POOL
KUDAN4
45
8
11
-45
8 6
GOOT
-27
0
-97
TUTICORN
-10
8
-28
11
0
-68
-12
0
-20
400
ILFS
406179
-108-178
59
407
-178
26
178
-59
-11
-26
178
NAGAPTNM4
TPCIL 400
13
5
-13
4
-13
5
11
91
35
-13
4
-13
5
11
9
27
0
-26
7
-177
VTPS
-38
3
-97
38
6
-44
-38
3
-97
38
6
-44
-11
4
-31
8
KOZIKODE4 399
19
7
-71
-19
5
-24
19
7
-71
-19
5
-24
NARENDR-NEW 416
-13
2
-16
91
32
41
KOLHAPURPG 413
-13
2
-41
13
2
-10
1
ELAPULY4 395
-41
2
4
41
5
-21
COCHIN4 396
TRICHUR4A 395
21
8
-30
-21
8
-10
79
-50
-79
-5
TRIVNDRM4 386
-32
3
-85
32
6
37
MADKTHRA4A 395
27
7
12
0
402
43
2
21
6
-10
7-2
15
6
DHARMPR 396
14
1
-84
-14
0
42
14
1
-84
-14
0
42
-14
0
5
14
0
-42
-14
0
5
14
0
-42
25
5
56
19
0
36
23
1
46
15
4
33
58
3
26
0
20
0
51
14
9
51
72
90
38
88 6
-11
8
25
13
7
53
21
1
23
17
3
30
99 2
-10
8
2
24
6
88
81
13
28
6
11
2
15
5 3
28
-29
35
1
97
18
3
20
10
9
60
32
25
0
35
37
0
68
27
7
61
-25
6
55
71 3
20
8
70
13
3
41
11
0
41
78
37
23
6
71
13
1
21
22
1
69
-23
4
-52
95
46
14
1
68
14
1
-11
6
16
4
59
30
5
-18
8
-49
7
-49
7
-32
0
-32
0
30
6
12
9-9
32
-93
2
-21
4
-23
12
6
20
8
72
24
7
84
12
5
30
36
6
13
235
-22
1
-40
23
4
77
-23
4
-52
-28
30
28
-29
-71
-1
-20
8
-51
-95
-42
-23
6
-46
-53
12
6
21
-22
1
-47
-11
0
-35
-13
1
-19
-17
3
-18
11
8
-19
-88
-3
-90
-34
-26
8
-41
-30
6
-10
2
10
8 2
-21
1
-5
-24
6
-71
-20
0
-40
-25
5
-29
-16
5
-19
-16
5
-19
26
-14
9
-40
23
6
80
-20
8
TALCHER
20
1
33
-20
1
-17
22
1
69-1
26
-14
-13
7
-44
-78
-34
-15
5
6
-28
6
-88
28
6
11
2
13
3
41
-13
3
-33
66
20
0
Bus - Voltage(kV)Branch - MW/MvarEquipment - MW/Mvar
kV: <=110.000 <=132.000 <=220.000 <=230.000 <=400.000 <=765.000 >765.000
-19
3
-18
19
4
26
-18
19
4
26
-19
3
-79
-3
79
-79
-3
79 5
-92
-36
92
40
-92
-36
92
-92
92
40
-36
5
-21
4
-35
21
5
57
-21
4
-35
40
-19
4
-8
19
5
24
-19
4
-8
19
5
24
26
8
SYSTEM STUDIES FOR GRANT OF MTOA TO JUNE15 APPLICATIONS
-24
7
-66
24
7
84
-12
5
-26
12
5
30
87
34
79
31
-79
-26
13
8
26
-13
8
-14
15
79
-44
1
KURL800
766RAIC800
780
TIRUVLM 782
-45
8
-13
7
45
9
-20
7
SHOLAPUR 772
13
73
11
0
-13
66
70
NELL-POL 780
-57
-16
1
57
-17
5
-30
5
24
9
-37
0
-1
21
4
43
-25
0
-6
19
0
36
-23
1
-23
-27
7
-25
-18
3 -6
-235
-9-1
09
-54
-16
4
-47
25
6
-24
-15
4
-23
-21
4
-23
-19
0
-21
-22
8
10
22
8
11
-22
8
10
22
8
11
1
Exhibit-Ib- with Jun'15 MTOA