DIRFT III PLANNING FOR THE FUTURE THE EXPANSION OF DAVENTRY INTERNATIONAL RAIL FREIGHT INTERCHANGE www.DIRFTIII.com DIRFT III Revised Document List Document 1.5E Marrons Shakespeares 13 December 2013

DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III

PLANNING FOR THE FUTURE

THE EXPANSION OF DAVENTRY INTERNATIONAL

RAIL FREIGHT INTERCHANGE

www.DIRFTIII.com

DIRFT III Revised Document ListDocument 1.5E

Marrons Shakespeares13 December 2013

Page 2: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14
Page 3: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

1

DIRFT III Document List Document 1.5E

Document/Plan Status/ Regulation Plan No.

Doc No. Date first submitted to PINS

Application Documents 1.Application Form Application Form

Reg 5(1) 1.1 22.02.13

Letter Accompanying Original Application

1.2 31.10.12

Letter Accompanying Resubmission

1.2A 22.02.13

Newspaper Notices Report (s48)

1.3 31.10.12

Site Notice Information

1.4 31.10.12

DIRFT III Document List

1.5 22.02.13

DIRFT III Revised Document List 1.5A 14.08.13

DIRFT III Revised Document List 1.5B 13.09.13

DIRFT III Revised Document List 1.5C 11.10.13

DIRFT III Revised Document List 1.5D 18.11.13

DIRFT III Revised Document List 1.5E 13.12.13

Applicant’s Original S.55 Checklist

1.6 22.10.12

DIRFT III Pre Acceptance Submission Update

1.7 22.02.13

2. Plans/ Drawings/ Sections Location Plan

Reg 5(2)(o) P001 Rev G

2.1

31.10.12

Overall Scheme Plan

Reg 5(2)(o) 11041/PD/54

2.1A

22.02.13

Ease of Reference Plans Bundle Reg 5 (2)(o) 2.1B 22.02.13

Main Site and Rail Land Plans

Reg 5(2)(i) and 5(2)(n)

Page 4: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

2

Main Site and Rail Land Plans – Key Plan Main Site and Rail Land Plans – Sheet 1 Main Site and Rail Land Plans – Sheet 2 Main Site and Rail Land Plans – Sheet 3

L020(Key) Rev E L020(SHEET 1) Rev E L020 (SHEET 2) Rev E L020 (SHEET 3) Rev E

2.2 2.2A 2.2B 2.2C

31.10.12 31.10.12 31.10.12 31.10.12

Main Site and Rail Works Plans Main Site and Rail Works Plans – Key Plan Main Site and Rail Works Plans – Sheet 1 Main Site and Rail Works Plans – Sheet 2 Main Site and Rail Works Plans – Sheet 3

Reg 5(2)(j) A058 (KEY) Rev C A058 (SHEET 1) Rev C A058 (SHEET 2) Rev C A058 (SHEET 3) Rev C

2.3 2.3A 2.3B 2.3C

31.10.12 31.10.12 31.10.12 31.10.12

Highway Mitigation Land and Works Plans (labelled as Highway Works Area Plans) Highway Mitigation Land and Works Plans – Key Plan Highway Mitigation Land and Works Plans – A5/A426 Highway Mitigation Land and Works Plans – M1 Junction 18 Highway Mitigation Land and Works Plans – A5/A428 Halfway House Highway Mitigation Land and Works Plans – Lilbourne Junction

Reg 5(2) (i) (j) and (n) 11041/PD/49 Rev A 110041/PD/23 Rev C 110041/PD/24 Rev C 110041/PD/25 Rev C 110040/PD/27 Rev C

2.4 2.4A 2.4B 2.4C 2.4D

22.02.13 22.02.13 22.02.13 22.02.13 Withdrawn 11.10.13 22.02.13

Page 5: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

3

Highway Mitigation Land and Works Plans – Catthorpe Junction Highway Mitigation Land and Works Plans – Clifton upon Dunsmore Highway Mitigation Land and Works Plans – Kilsby Highway Mitigation Land and Works Plans – A5 to A428 at Crick Highway Mitigation Land and Works Plans – DIRFT III to Hilmorton Highway Mitigation Land and Works Plans – DIRFT III to Hilmorton

110041/PD/28 Rev C 110041/PD/29 Rev C 110041/PD/30 Rev C 110041/PD/31 Rev C 110041/PD/32 Rev E 110041/PD/45 Rev C

2.4E 2.4F 2.4G 2.4H 2.4I 2.4J

22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13

Access and Rights of Way Plan

Reg 5(2)(k) 83538/D3-100 Rev H

2.5

31.10.12

Land Ownership Plans Land Ownership Plans

- Key Plan Land Ownership Plans Sheet 1 Land Ownership Plans Sheet 2 Land Ownership Plans Sheet 3

Reg 5(2)(o) L019 (KEY) Rev D L019 (SHEET 1) Rev C L019 (SHEET 2) Rev D L019 (SHEET 3) Rev C

2.6 2.6A 2.6B 2.6C

31.10.12 31.10.12 31.10.12 31.10.12

Main Site and Rail Corridor Framework Plans and Schedule

Reg 5(2)(o)

Page 6: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

4

of Parameters Main Site and Rail Corridor Framework - Key Plan Main Site and Rail Corridor Framework Sheet 1 Main Site and Rail Corridor Framework Sheet 2 Main Site and Rail Corridor Framework Sheet 3 Main Site and Rail Corridor Framework Schedule of Parameters

AO39 (KEY) Rev L AO39 (SHEET 1) Rev D AO39 (SHEET 2) Rev E AO39 (SHEET 3) Rev D

2.7 2.7A 2.7B 2.7C 2.7D

31.10.12 31.10.12 31.10.12 31.10.12 31.10.12

Illustrative Masterplan Illustrative Masterplan - Key Plan Illustrative Masterplan - Sheet 1 Illustrative Masterplan - Sheet 2 Illustrative Masterplan - Sheet 3

Reg 5(2)(o) FO14 (KEY) Rev D FO14 (SHEET 1) Rev A FO14 (SHEET 2) Rev B FO14 (SHEET 3) Rev A

2.8 2.8A 2.8B 2.8C

31.10.12 31.10.12 31.10.12 31.10.12

Ecology and Landscape Plans and Assessment

Reg 5(2)(l) In Chapter F and H of the ES

31.10.12

Heritage Plans and Assessment

Reg 5(2)(m) In Chapter G of the ES

31.10.12

Rail Background Information Plans

Reg 5(2)(o)

Page 7: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

5

• Existing Rail Layout • Rail Structures Key Plan Illustrative Rail Alignment –

Sheet 1

• Illustrative Rail Alignment – Sheet 2

• Illustrative Rail Alignment – Sheet 3

• Network Rail Maintenance Access

URS 47056898/SLD/03 Rev B URS 47056898/KEY/01 Rev B URS 47067076-SW-PW-0001 Rev A02 URS 47067076-SW-PW-0002 Rev A02 URS 47067076-SW-PW-0003 Rev A02 URS 47067076-ACC-001

2.9A 2.9B 2.9C 2.9D 2.9E 2.9F

31.10.12 31.10.12 18.07.13 18.07.13 (revised 18.11.13) 18.07.13 18.07.13

Rail Framework Plans

• Rail Framework Plan (Single Line Drawing) Sheet 1

• Rail Framework Plan (Single Line Drawing) Sheet 2

• Bridge A (Tunnel) (Replacement of existing tunnel to accommodate twin track

• Bridge over the A428 – in

the alternative:

(a) Bridge B (as permitted)

Reg 5(2)(o) URS 47056898/SLD/01 Rev C URS 47056898/SLD/02 Rev C URS D122659-SW-CV-DRG-1002 Rev E Bridge – URS

2.10A 2.10B 2.10C 2.10D

31.10.12 31.10.12 31.10.12 31.10.12

Page 8: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

6

with Bridge B1 (two single track bridges)*

(b) Bridge B Viaduct (as

permitted) with Bridge B1 Viaduct (two single track viaducts)

OR

(c) Bridge B2 (single bridge with double rail track)**

• Bridge D (over the A5)

• Bridge E (over the internal) estate road

*to be used if most eastern alignment of rail track is used **to be used if rail track is on any alignment other than the most eastern

D122659-SW-CV-DRG-1004 Rev D Viaduct - URS D122659-SW-CV-DRG-1003 Rev D URS 47056898-SW-CV-DRG-1005 Rev A URS D122659-SW-CV-DRG-1000 Rev G URS D122659-SW-CV-DRG-1001 Rev E

2.10E 2.10F 2.10G 2.10H

Withdrawn 11.10.13 31.10.12 Withdrawn 11.10.13 31.10.12 31.10.12 31.10.12

Rail Embankments • Rail embankment through

DIRFT II and III in the alternative:

(a) Eastern Embankment Option*

(b) Alternative Embankment Alignment Option **

*to be used if most eastern alignment of rail track is used **to be used if rail track is on any alignment other than the most eastern

Reg 5(2)(o) URS D122659-SW-PW-GEO1 Rev F URS D122659-SW-PW-GE02 Rev C

2.10I 2.10J

31.10.12 Withdrawn 11.10.13 31.10.12

Page 9: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

7

Minor Watercourse Bridges and Flow Control Structure • West Footbridge and

Maintenance Access • Bridleway Bridge and

Maintenance Access • Clifton Brook Tributary

Storage Scheme Flow Control Structure

• Clifton Brook Realignment

Access Bridge, General Arrangement

Bridleway Bridges over Rail on Main Site

• Bridleway Details Plan and Longitudinal Section

• Bridleway Details Cross Sections

• Bridleway Bridge West

General Arrangement

• Bridleway Bridge Central General Arrangement

• Bridleway Bridge East general Arrangement

Reg 5(2)(o) PBA 2.11A Rev C PBA 2.11B Rev C PBA 2.11C Rev C PBA 2.11D Rev C 60051619/100 P4 60051619/101 P4 60051619/103 P4 60051619/104 P4 60051619/105 P4

2.11A 2.11B 2.11C 2.11D 2.11E 2.11F 2.11G 2.11H 2.11I

31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12

Flood Alleviation Works

• Long Dole Culvert A5/125.20 Replacement, General Arrangement

Reg 5(2)(o) PBA 2.11J Rev A

2.11J

31.10.12

Page 10: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

8

• Danes Way Culvert

Replacement, General Arrangement

PBA 2.11K Rev A

2.11K

31.10.12

Railway Bridging Structures over Clifton Brook

• Western Alignment

• Eastern Alignment

Reg 5(2)(o) PBA 2.11L Rev A PBA 2.11M Rev A

2.11L 2.11M

31.10.12 Withdrawn 11.10.13 31.10.12

Lilbourne Meadows Lilbourne Ridge Proposed Contours and Sections

Reg 5(2)(o) AECOM – 600519/CIV/PD/016 Rev. P3

2.12

31.10.12

Highway Works Framework Plans • General Arrangement Plan

o Key Plan

o Gibbet Roundabout

o M1 J18

o A5/A428 (Halfway

House)

o Lilbourne Junction

o Catthorpe Junction

110041/PD/42 Rev B 110041/PD/08 Rev D 110041/PD/09 Rev D 110041/PD/10 Rev D 110041/PD/12 Rev D 110041/PD/13 Rev C

2.13 2.13A 2.13B 2.13C 2.13D 2.13E

22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13

Page 11: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

9

o A5/A428 (Parklands)

110041/PD/53 Rev A

2.13F

22.02.13

Highway Works Illustrative Plans • Indicative Scheme Drawings

o Clifton upon Dunsmore Indicative Traffic Calming Scheme

o Kilsby Indicative Traffic Calming Scheme

o A5 to A428 at Crick Ped/Cycle Improvement Scheme.

o DRIFT III to Hillmorton Ped/Cycle Improvement Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated]

o Key Plan

110041/PD/14 Rev C to 17 Rev C (overview plan and 3 sheets) 110041/PD/18.1 to 18.5 Rev C and 18.6 Rev D and 18.7 Rev C (7 sheets) 110041/PD/19 Rev C to 21 Rev C ( 3 sheets) 110041/PD/22 Rev C 110041/PD/43 Rev B

2.13G 2.13H 2.13I 2.13J 2.13K

22.02.13 22.02.13 22.02.13 22.02.13 22.02.13

Site Access Plans • Southern Access to DIRFT III • Northern Access to DIRFT III

Reg 5(2)(o) 110041/PD/44 Rev A 110041/PD/06A Rev B

2.14A 2.14B

31.10.12 31.10.12

Page 12: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

10

Phasing Plan Phasing Plan – Key plan Phasing Plan – Sheet 1 Phasing Plan – Sheet 2 Phasing Plan – Sheet 3

Reg 5(2)(o) A049 Rev D A049 (SHEET 1) Rev B A049 (SHEET 2) Rev B A049 (SHEET 3) Rev B

2.15 2.15A 2.15B 2.15C

31.10.12 31.10.12 31.10.12 31.10.12

3.Draft Development Order and associated plans Draft Proposed Development Consent Order (including requirements) (February 2013)

Reg 5(2)(b) 3.1 22.02.13

Revised Development Consent Order (including requirements) (August 2013)

3.1A 14.08.13

Revised Development Consent Order (including requirements) (October 2013)

3.1B 11.10.13

Revised Development Consent Order (including requirements) (November 2013) (tracked)

3.1C(i) 18.11.13

Revised Development Consent Order (including requirements) (November 2013) (clean)

3.1C(ii) 18.11.13

Revised Final Draft Development Consent Order (including requirements) (December 2013) (tracked)

3.1D(i) 13.12.13

Revised Final Draft Development Consent Order (including requirements) (December 2013)

3.1D(ii) 13.12.13

Page 13: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

11

(clean) Explanatory Memorandum to Draft Development Consent Order (February 2013)

Reg 5(2)(c) 3.2 22.02.13

Revised Explanatory Memorandum to Draft Development Consent Order (October 2013)

3.2A 11.10.13

Revised Explanatory Memorandum to Draft Development Consent Order (November 2013)

3.2B 18.11.13

Revised Explanatory Memorandum to Final Draft Development Consent Order (December 2013)

3.2C 13.12.13

Table of Revisions Made to the Development Consent Order (August 2013)

3.3 14.08.13

Revised Table of Revisions Made to the Development Consent Order (October 2013)

3.3A 11.10.13

Revised Table of Revisions Made to the Development Consent Order (November 2013)

3.3B 18.11.13

Revised Table of Revisions Made to the Final Draft Development Consent Order (December 2013)

3.3C 13.12.13

4. Compulsory Acquisition Information Statement of Reasons

Reg 5(2)(h) 4.1 22.02.13

Funding Statement

Reg 5(2)(h) 4.2 31.10.12

Book of Reference

Reg 5(2)(d) 4.3 22.02.13

5. Reports/Statements Consultation Report

S.37 Planning Act 2008 5.1 31.10.12

Page 14: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

12

Consultation Report Update

S.37 Planning Act 2008 5.1A 22.02.13

Section 79(1) of Environmental Protection Act 1990 Statement (re statutory nuisance)

Reg 5(2)(f)

5.2 31.10.12

Regulation 48 European Site Statement Reg 5(2)(g))

Reg5(2)(g)

5.3 31.10.12

6. Environmental Impact Assessment & Habitat Regulations Information Environmental Statement (With replacement chapters B & C)

Reg 5(2)(a) FRA Reg 5(2)(e) Heritage Assessment Reg (m) Nature Conservation Reg (l)

6.1 22.02.13

ES Technical Appendices (With replacement appendices C1 & D1)

Reg 5(2)(a) 6.2 22.02.13

ES Non-Technical Summary

Reg 5(2)(a) 6.3 22.02.13

ES Scoping Opinion Reg 5(2)(a)

6.4 31.10.12

7. Other Documents Summary of Proposals Document

Reg 5(2)(q) 7.1

31.10.12

Update on Proposals Document

Reg 5(2)(q) 7.2 31.10.12

Planning Statement

Reg 5(2)(q) 7.3 22.02.13

Need Report

Reg 5(2)(q) 7.4 31.10.12

Assessment of Sites for Rail Freight Development Potential

Reg 5(2)(q) 7.5 31.10.12

Design and Access Statement (including Design Guide and sustainability of buildings)

Reg 5(2)(q) 7.6 31.10.12

Sustainability Report

Reg 5(2)(q) 7.7 31.10.12

Rail Operations Report

Reg 5(2)(q) 7.8 31.10.12

Summary of Draft Development Reg 5(2)(q) 7.9A 22.02.13

Page 15: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

13

Consent Obligation – February 2013 Draft Development Consent Obligation – Draft February 2013

Reg 5(2)(q) 7.9B 22.02.13

Revised Draft Development Consent Obligation – Draft August 2013

7.9C 14.08.13

Revised Draft Development Consent Obligation – Draft October 2013

7.9D 11.10.13

Revised Draft Development Consent Obligation – Draft November 2013 (tracked)

7.9E(i) 18.11.13

Revised Draft Development Consent Obligation – Draft November 2013 (clean)

7.9E(ii) 18.11.13

Engrossment Development Consent Obligation – December 2013

7.9F 13.12.13

Additional Information relating to Provision for European Protected Species

Reg 5(2)(q) 7.10 31.10.12

Dirft III – Route Map of Mitigation Controls

Reg 5(2)(q) 7.11 18.07.13

8. Statements of Common Ground and Correspondence M1 Works (Highways Agency)

Reg 5 (2)(q) 8.1 31.10.12

Archaeology/ Heritage (English Heritage)

Reg 5 (2)(q) 8.2A (EH) 8.2B (NCC)

31.10.12

Correspondence from Network Rail

Reg 5 (2)(q) 8.3 31.10.12

Planning (Daventry District Council)

Reg 5(2)(q) 8.4 31.10.12

Flood Risk (Environment Agency) Reg 5(2)(q) 8. 5 31.10.12

Page 16: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

14

Bridge A (Highways Agency)

Reg 5 (2)(q) 8.6A 31.10.12

Bridge D (Highways Agency)

Reg 5 (2)(q) 8.6B 31.10.12

New Rail Bridges over A428 (Northamptonshire County Council)

Reg 5 (2)(q) 8.7 22.02.13

Draft EPS Mitigation Licence Application – Letter of Comfort between Natural England and Aviva Investors with regard to Brown Long Eared Bats

Reg 5 (2)(q) 8.8 22.02.13

Flood Management, Drainage and River Diversion Works (Highways Agency)

Reg 5 (2)(q) 8.9 18.07.13

Rail (Network Rail) 8.10 14.08.13

Ecology (Natural England)

8.11 14.08.13

Highways (Northamptonshire County Council and Warwickshire County Council) – (superceded)

8.12 14.08.13

Replacement Highways (Northamptonshire County Council and Warwickshire County Council)

8.12A 11.10.13

Highways (Highways Agency) – (superceded)

8.13 14.08.13

Replacement Highways (Highways Agency)

8.13A 11.10.13

Air Quality (Daventry District Council and Rugby Borough Council)

8.14 14.08.13

Noise (Daventry District Council and Rugby Borough Council)

8.15 14.08.13

Ecology (Northants Wildlife Trust) 8.16 14.08.13

Page 17: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

15

Ecology (Environment Agency)

8.17 14.08.13

Correspondence from Natural England

8.18 11.10.13

9. Applicants written responses submitted to PINS Applicants Written Responses to the First Questions of the Examining Authority

9.1A 14.08.13

Appendices to Applicants Written Responses to the First Questions of the Examining Authority

9.1B 14.08.13

Applicant’s response to:- 1. Written Representations of

Interested Parties received by the Examining Authority for 14 August 2013 deadline.

2. Interested Parties Responses to the Examining Authorities First Written Questions.

3. Local Impact Reports received by the Examining Authority for 14 August 2013 deadline.

9.1C 13.09.13

Applicant’s Response to Request for Further Information under Rule 17 Received 3 September 2013

9.1D 27.09.13

Applicant’s Written Responses to the Further Questions of the Examining Authority

9.1E 11.10.13

Applicant’s Appendices to Written Responses to the Further Questions of the Examining Authority

9.1F 11.10.13

Applicant’s Response to Request for Further Information under Rule 17 Received 29 October

9.1G 18.11.13

Page 18: DIRFT III PLANNING FOR THE FUTURE... · Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated] o Key Plan 110041/PD/14

DIRFT III Document List Marrons Shakespeares

13 December 2013

16

2013 Applicant’s Appendices to Response to Request for Further Information under Rule 17 Received 29 October 2013

9.1H 18.11.13

Additional Justification for Articles 5(2), Article 8(3) and (4).

9.1I 18.11.13

Applicant’s Response to Request for Further Information under Rule 17 Received 8 November 2013

9.1J 18.11.13

10. Additional Documents submitted Letter from NLP on behalf of the Applicants to the Health and Safety Executive dated 14 August 2013

10.1 14.08.13

Letter from NLP on behalf of the Applicants to Public Health England dated 14 August 2013

10.2 14.08.13

Letter to NLP on behalf of the Applicants from North Warwickshire Borough Council dated 16 July 2013

10.3 14.08.13

Statement of Intent – M1 Boundary Slopes

10.4 11.10.13