25
DIII-D Research Structure http://fusion.gat.com/exp/2005/forum.html

DIII-D Research Structure

Embed Size (px)

Citation preview

Page 1: DIII-D Research Structure

DIII-D Research Structure

http://fusion.gat.com/exp/2005/forum.html

Page 2: DIII-D Research Structure
Page 3: DIII-D Research Structure

Recent Highlights

Page 4: DIII-D Research Structure

Hybrid Regime

Page 5: DIII-D Research Structure

Sawteeth induced transients

Page 6: DIII-D Research Structure

EXAMPLESubmission No. 606: R. Nazikian

Title:   4/3 and 3/2 NTM redistribution of beam driven current in Hybrid plasmas

Background: The extrapolation of the Hybrid regime to a reactor depends critically on the physics of the 3/2, 4/3 NTM and its interaction with the plasma current. The mechanism for current redistribution has not yet been resolved.

Approach: ref # 122884: a. Reproduce Hybrid regime with co-beams. b. Swap co for counter source rapidly keeping total power constant. c. Identify modulation in q(0) due to change in beam driven current. d. Modulate total power rapidly looking for prompt heat loss on the divertor

or boundary region. e. Add 60 MHz FWs early in discharge to heat beam ions on axis using 3rd

or 4th harmonic: need ~ 4 slowing down times before onset of NTMs. f. Identify change in tail ion signal at the time of crossing of the onset of

NTMs using the new D_alpha detector.

Page 7: DIII-D Research Structure

RWMs

Page 8: DIII-D Research Structure
Page 9: DIII-D Research Structure
Page 10: DIII-D Research Structure

Ideas for RWM Physics?

Page 11: DIII-D Research Structure

NTMs

Page 12: DIII-D Research Structure
Page 13: DIII-D Research Structure

Ideas for NTMs- co/counter beams

-modulated ECH

-other?

Page 14: DIII-D Research Structure

Disruption Mitigation

Page 15: DIII-D Research Structure
Page 16: DIII-D Research Structure
Page 17: DIII-D Research Structure

Ideas for RWM Physics?

Page 18: DIII-D Research Structure

ELMs

Page 19: DIII-D Research Structure
Page 20: DIII-D Research Structure
Page 21: DIII-D Research Structure
Page 22: DIII-D Research Structure

Ideas for ELMs?

Page 23: DIII-D Research Structure
Page 24: DIII-D Research Structure

2005 ROF Process

• Solicitation of proposals: submit via WEB by Nov. 14– Sooner the better for getting on the agenda

• Get your proposals in even if you are not going to attend

• Forum Nov. 15-17– Plenary morning session: NSTX contributions overview– Parallel sessions, multiple meeting rooms for remote participation

http://fusion.gat.com/exp/2005/forum.html

Page 25: DIII-D Research Structure

Discussion