2
 82 DAFTAR PUSTAKA [1] Asiyanto, Construction Project Cost Management  (Jakarta:Pradnya Paramita,2003) [2] Afrizal Nursin (1999) Perencanaan, Penjadwalan, dan Pengendalian Proyek Konstruksi. (Politeknik Negeri Jakarta Depok 1999) [3] A. Elias (1999), Construction planning and scheduling CCE 5035,class Notes September 1999. [4] Beecher, J(1995) Integrated Resource Planning Fundamental.  AWWA  Journal  v87(6) [5] Brian J Dreger, Project Management: Effective Schedulling (New York:Van Wastrand,1992). [6] Daniel W. Halpin and Ronald W Woodhead, Construction Management (1998) John Wiley and sons, Inc. [7] Donald S Barrie, Boy C Paulson Jr, “  Manajemen Konstruksi Profesional ”, (Jakarta: Erlangga, 1990). [8] Edi Nugroho,  Dasar-dasar manajemen proyek konstruksi (Depok, FTUI 2001) [9] Greenberg V. and Harshbarger S. (1993). “  Least cost selection of energy conserva tion measures for regulated gas utilities”.  Energy Economic . July 93 [10] Harris, Robert B., Precedence And Arrow Networking Techniques For Construction (New York :John Wiley & Sons, 1978) [11] Holsapple, C.W. (Ed), Handbook of Knowledge Management, Springer- Verlag, Heidelberg, 2002 [12] Humpreys, KK,  Jelen’s Cost and Optimization Engineering  (Singapore :Mc-Graw-Hill). [13] Imam Soeharto,  Manajemen Proyek-dari konseptual sampai operasional , (Jakarta:Erlangga, 1995) [14] Kunal Sinha, Ogilvy & Mather India (2004). “Knowledge, Entertainment,  Networking”. Journal of Knowledge Management Practice, May 2004 Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008

Digital 123077 R210802 Tinjauan Optimalisasi Bibliografi

Embed Size (px)

Citation preview

 

  82

DAFTAR PUSTAKA

[1]  Asiyanto, Construction Project Cost Management   (Jakarta:Pradnya

Paramita,2003)

[2]  Afrizal Nursin (1999) Perencanaan, Penjadwalan, dan Pengendalian

Proyek Konstruksi. (Politeknik Negeri Jakarta Depok 1999)

[3]  A. Elias (1999), Construction planning and scheduling  CCE 5035,class

Notes September 1999.

[4]  Beecher, J(1995) Integrated Resource Planning Fundamental.  AWWA

 Journal v87(6)

[5]  Brian J Dreger, Project Management: Effective Schedulling  (New

York:Van Wastrand,1992).

[6]  Daniel W. Halpin and Ronald W Woodhead, Construction Management

(1998) John Wiley and sons, Inc.

[7]  Donald S Barrie, Boy C Paulson Jr, “ Manajemen Konstruksi Profesional”,

(Jakarta: Erlangga, 1990).

[8]  Edi Nugroho,  Dasar-dasar manajemen proyek konstruksi  (Depok, FTUI

2001)

[9]  Greenberg V. and Harshbarger S. (1993). “ Least cost selection of energy

conservation measures for regulated gas utilities”. Energy Economic. July

93

[10]  Harris, Robert B., Precedence And Arrow Networking Techniques For

Construction (New York :John Wiley & Sons, 1978)

[11]  Holsapple, C.W. (Ed), Handbook of Knowledge Management, Springer-

Verlag, Heidelberg, 2002

[12]  Humpreys, KK,  Jelen’s Cost and Optimization Engineering  (Singapore

:Mc-Graw-Hill).

[13]  Imam Soeharto,  Manajemen Proyek-dari konseptual sampai operasional,

(Jakarta:Erlangga, 1995)

[14]  Kunal Sinha, Ogilvy & Mather India (2004). “Knowledge, Entertainment,

 Networking”. Journal of Knowledge Management Practice, May 2004

Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008

 

  83

[15]  Kyunghwan Kim and Jesus M de la Garza (2005), “Evaluation of the

Resource-Constrained Critical Path Method Algorithms”  ASCE Journal

May 2005.

[16]  Leroy J Isidore and W. Edward Back (2001). “Probabilistic Optimal Cost

Scheduling” ASCE Journal Vol 127, No.6 November/Desember 2001.

[17]  Makarand Hastak, Daniel W Halpin and Jorge Vanegas (1996). “New

Paradigm for Project Cost Control Strategy and Planning. Journal of

Construction Engineering and Management . September 1996

[18]  Roberta Russell and Bernard W. Taylor, III (2006). operation

management-5th

 edition. Project management. John Willey and Son inc.

[19]  Shtub, A., Globerson, S., Band, J.f., Project Management: Enrg, Tech, and

 Imple.(New Jersey: Prentice Hall, 1994)

[20]  Simon Fane and Stuart White (2007),” Levelised cost, a general formula

 for calculation of unit cost in integrated resource planning”

[21]  Stepehen Grey , Practical Risk Asessment for Project Management  

(Chichester: John Willey and Sons Ltd, 1995)

[22]  Suhail, S., and Neale, R (1994).” CPM/LOB: New methodology to

integrate CPM and line of balance.” J. Constr. Eng. Manage., 1994

[23]  Terry Sugijanti (1999), “Penjadualan Proyek dengan PERT-CPM”  Jurnal

Teknik Sipil “Sipil Soepra”1999, Volume 1. No.2

[24] Yin R. K., Case Study Research, Design and Method (Sage Publication,. 

1994)

[25]  Yusuf Latief, Perencanaan dan Penjadualan Proyek Konstruksi(Depok

FTUI, 2001).

Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008