  • DEVELOPMENT APPLICATION Serviced Apartments - Lot 4 (829) South Western Highway, Byford

    Prepared for

    CONSOLIDATED UT PTY. LTD 10 August 2020

  • URBIS STAFF RESPONSIBLE FOR THIS REPORT WERE:

    Director Ray Haeren Consultant Declan Creighan Project Code PA1584 Report Number Rev2Final

    All information supplied to Urbis in order to conduct this research has been treated in the strictest confidence. It shall only be used in this context and shall not be made available to third parties without client authorisation. Confidential information has been stored securely and data provided by respondents, as well as their identity, has been treated in the strictest confidence and all assurance given to respondents have been and shall be fulfilled. © Urbis Pty Ltd 50 105 256 228 All Rights Reserved. No material may be reproduced without prior permission. You must read the important disclaimer appearing within the body of this report. urbis.com.au

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    CONTENTS

    1. Overview ............................................................................................................................................ 1 1.1. Introduction .......................................................................................................................... 1 1.2. Site location and Lot Particulars .......................................................................................... 1 1.3. Previous Planning Approval on Subject Site ....................................................................... 4

    2. Proposed Development .................................................................................................................... 5 2.1. Land use and configuration ................................................................................................. 6 2.2. Vehicle access and Car Parking .......................................................................................... 9

    3. Planning Framework Assessment .................................................................................................10 3.1. State Planning Assessment ...............................................................................................10 3.2. Local Planning Framework ................................................................................................12

    3.2.1. Land Use Permissibility ......................................................................................12 3.2.1.1. LPS2 ...................................................................................................................12 3.2.1.2. DLPS3 ................................................................................................................12 3.2.1.3. Byford Town Centre Local Structure Plan (BTCSP) ..........................................13 3.2.2. Byford Town Centre Built Form Guidelines ........................................................15

    Conclusion ......................................................................................................................................................18

    Disclaimer ........................................................................................................................................................19

    Appendix A Certificate of Title Appendix B Development Plans FIGURES Figure 1 – Regional Context Map ...................................................................................................................... 1 Figure 2 – Aerial Plan ........................................................................................................................................ 2 Figure 3 – Landgate Extract .............................................................................................................................. 3 Figure 4 – Site Plan Extract from Previous Dome Development Application .................................................... 4 Figure 5 – Overall Site Plan ............................................................................................................................... 6 Figure 6 – MRS Extract ................................................................................................................................... 11 Figure 7 – Bushfire Prone Areas ..................................................................................................................... 11 Figure 8 – LPS Extract ..................................................................................................................................... 17 Figure 9 – BTCSP Map Extract ....................................................................................................................... 17

    TABLES Table 1 – Lot Particulars .................................................................................................................................... 3 Table 2 – Key State Planning Documents ....................................................................................................... 10 Table 3 – BTCSP Assessment ........................................................................................................................ 13 Table 4 – Relevant Design Guidelines ............................................................................................................ 15

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL OVERVIEW 1

    1. OVERVIEW 1.1. INTRODUCTION Urbis, on behalf of Consolidated Ut Pty Ltd is pleased to submit this development application to the Shire of Serpentine Jarrahdale (the Shire). This application is seeking development approval for ‘serviced apartments’. The proposed serviced apartments will be located on Lot 4 (829) South Western Highway, Byford (subject site).

    The serviced apartments will have a strong short stay tourist accommodation focus as there is a fantastic opportunity to improve tourist accommodation offerings within the Byford Town Centre. Improving the tourist offering will further help diversify and establish the Byford Town centre. The proposal seeks to develop the serviced apartments on the northern portion of the subject site (currently used as an at grade carpark). This report sets out the proposed scope of the development and outlines its compliance with the local and state government planning framework.

    1.2. SITE LOCATION AND LOT PARTICULARS The subject site is located within the suburb of Byford. It is approximately 32.5km south-east of the Perth CBD and is approximately 8.3km south of the Armadale Town Centre. It has frontage to South Western Highway to the east, Pitman Way to the south and George Street to the west. The surrounding land uses are a mix of town centre, mixed use and highway commercial.

    Figure 1 – Regional Context Map

  • 2 OVERVIEW URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    The site currently has a Dome café and associated car parking present. This application relates specifically to the northern portion of the site that encompasses the car park, which presently interfaces with a blank concrete panel wall from the adjoining service commercial units. Refer to Figure 2 for the Aerial Plan.

    Figure 2 – Aerial Plan

    Source: Nearmap

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL OVERVIEW 3

    A summary of the lot particulars is provided at Table 1 below. Refer to Figure 3 for a cadastral plan

    Table 1 – Lot Particulars

    Element Description

    Address 829 South Western Highway, Byford

    Lot 4

    Deposit Plan 38031

    Volume/Folio 1918/585

    Area 2,934 sq.m.

    Proprietor Consolidated Ut Pty. Ltd.

    Figure 3 – Landgate Extract

    Source: Landgate 2020

  • 4 OVERVIEW URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    1.3. PREVIOUS PLANNING APPROVAL ON SUBJECT SITE As noted above, the subject site has an existing approval for a Dome café (P00778/01). This approval was granted on 7 October 2016. At the time of lodgement for the original Dome development application, the future development of a short stay accommodation facility was envisioned on the northern portion of the subject site. Short stay tourist accommodation facilities are becoming an increasingly common component of the Dome café development model. Examples of Dome Katanning (Shire of Katanning) and Dome Northam (Shire of Northam) highlight where Dome cafes have a short stay accommodation component.

    Due to a range of factors, deferral of the short stay tourist accommodation premises on the subject site was considered appropriate with full intention to seek development approval at a later date. The maturity of the Byford Town Centre and intensification of surrounding land uses was perceived as an important predecessor for incorporation of the short stay accommodation facility on the subject site. The basis for this development application has therefore been envisioned for a number of years.

    Refer Figure 4 for an extract of the site layout from the original Dome development application in 2016 which highlights the future desire to develop the northern portion of the subject site.

    Figure 4 – Site Plan Extract from Previous Dome Development Application

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL PROPOSED DEVELOPMENT 5

    2. PROPOSED DEVELOPMENT The proposed development sees a three-storey serviced apartment complex with a total of 14 units. The proposed development is limited to the northern portion of the site and does not impact the existing Dome café.

    The proposed development has a strong focus on improving the tourist offering in the Byford Town Centre. There is significant opportunity to further develop tourist facilities within the locality. Provision of high quality, architecturally designed tourist accommodation facilities will have a range of benefits in improving the Town Centre. There will likely be a range of benefits to surrounding businesses and opportunities for further land use diversification as a result.

    This proposal adds to the surrounding land use diversity, helping to create a more vibrant and attractive district centre. The design offers an improvement to the existing urban form, breaking up the wall mass of the neighbouring property and improving the vitality and passive surveillance of the area.

    The Byford town centre is an important district centre in Perth’s south-east and the proposal strongly contributes to further establishing this centre. Byford has been identified as an important outer metropolitan area that requires major rail infrastructure investment. The proposed METRONET expansion of the Armadale line to Byford highlights the importance of servicing this important area with appropriate infrastructure. The growing population and the demand for increasingly diverse land uses is becoming evident and there are no short stay accommodation options currently within the Town Centre.

    This proposal seeks to capitalise on the site’s strategic importance. It also demonstrates the confidence that landowners have in investing in the town centre as well as the recognition of the importance of a well-designed urban form.

  • 6 PROPOSED DEVELOPMENT URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    2.1. LAND USE AND CONFIGURATION As noted above, the proposal sees a three-storey development with a total of 14 fully self-contained units. Associated car parking will be located on the ground floor under the serviced apartments. The development incorporates a total GFA of approximately 631.89 sq.m and incorporates ground floor, first floor and second floor components. Refer to Appendix B for the full development plans.

    Figure 5 – Overall Site Plan

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL PROPOSED DEVELOPMENT 7

    Ground Floor

    Ground floor development sees the removal of some of the northern car parking bays from the existing car park. This will be replaced with the following components:

    A lobby of approximately 33.4 sq.m in area.

    Storage space of approximately 10.2 sq.m in area.

    A total of 14 car parking bays retained beneath the first and second floor components of the development.

    First Floor

    First floor development incorporates units 1-7, housekeeping space, a corridor, lobby and lift facilities as well as staircase access at both the western and eastern ends of the corridor. The total GFA of the first floor is approximately 294.44 sq.m. Unit specifications are as follows:

    Units 1-6:

    ‒ Internal space of approximately 20.62 sq.m.

    ‒ Private kitchenette and bathroom facilities.

    ‒ Outdoor balcony area of approximately 5.06 sq.m.

    Unit 7:

    ‒ Internal space of approximately 21.61 sq.m.

    ‒ Private kitchenette and bathroom facilities.

    ‒ Outdoor balcony area of approximately 5.27 sq.m.

    Second Floor

    Second floor development incorporates units 8-14, housekeeping space, corridor, lobby and lift facilities as well as staircase access at both the western and eastern ends of the corridor. The total GFA of the second floor is approximately 293.81 sq.m. Unit specifications are as follows:

    Units 8-13:

    ‒ Internal space of approximately 27.22 sq.m.

    ‒ Private bathroom and kitchenette facilities.

    ‒ Outdoor balcony area of approximately 5.06 sq.m.

    Unit 14:

    ‒ Internal space of approximately 28.21 sq.m.

    ‒ Private bathroom and kitchenette facilities.

    ‒ Outdoor balcony area of approximately 5.27 sq.m.

    Design Approach

    The design is contemporary, with use of timber detailing in provision of shade whilst maintaining good overlooking to the carpark and creek line. Simple lines and colour palette are considered appropriate in the setting and complement the natural and build environment.

    The configuration and placement of the units, both enable an improved northern interface (replacing the current blank wall) whilst improving the amenity and security of the area through the increased passive surveillance through generous windows overlooking the area.

    Some preliminary renders are included below to show the design and interface proposed.

  • 8 PROPOSED DEVELOPMENT URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL PROPOSED DEVELOPMENT 9

    2.2. VEHICLE ACCESS AND CAR PARKING The existing vehicle access will be maintained, with access being limited to a single crossover via George Street. There is no direct vehicle access from South Western Highway as part of this application.

    As mentioned above, the proposed development will be co-located on the same site as the existing Dome cafe. The proposal seeks to remove a total of 4 parking bays to incorporate the ground floor components of the serviced apartments. This will see net onsite parking bays reduced from 35 to 31. There is an additional 8 ‘shared car parking bays’ located on the immediately adjacent George Street and Pitman Way. Inclusive of both on site and shared car parking bays, there is a total of 39 car parking bays.

    The peak requirement for parking associated with the serviced apartments will be in the evening, whilst the Dome café and surrounding commercial uses peak requirement is during the day. The carpark has low night usage based on this and the proposed development will enable better use of the existing site whilst also improving the security of the bays.

    The vehicle movement associated with a serviced apartment development of the scale is nominal and the functioning of both the carpark and the access is not considered to be affected. In the context of the broader town centre any impacts from either traffic or parking are considered minimal.

  • 10 PLANNING FRAMEWORK ASSESSMENT URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    3. PLANNING FRAMEWORK ASSESSMENT 3.1. STATE PLANNING ASSESSMENT This section outlines the key elements of the state planning framework that are relevant to this application.

    Table 2 – Key State Planning Documents

    Document Relevant Provisions/Objectives Compliance

    Metropolitan Region Scheme (MRS)

    The MRS is a high-level statutory land use plan over the metropolitan region.

    The subject site is zoned ‘urban’ under the MRS (refer Figure 6).

    Serviced apartments are a typical ‘urban’ land use.

    State Planning Policy 3.7 Planning in Bushfire Prone Areas (SPP 3.7)

    SPP3.7 outlines the requirements and guidelines for development in bushfire prone areas.

    The subject site is identified as a bushfire prone area (refer Figure 7). The following key objectives apply to the site:

    The preservation of life and the management of bushfire impact are paramount.

    Avoid any increase in the threat of bushfire to people, property and infrastructure. The preservation of life and the management of bushfire impact are paramount.

    Reduce vulnerability to bushfire through the identification and consideration of bushfire risks in decision-making at all stages of the planning and development process.

    The proposed development does not significantly increase the bushfire danger of the site.

    However, it is requested that should the Shire feel bushfire considerations be required as part of this application that they be conditioned accordingly.

    State Planning Policy 4.2 – Activity Centres for Perth and Peel (SPP 4.2)

    SPP 4.2 establishes the activity centre hierarchy and function for centres throughout the Perth and Peel region.

    The subject site is located within the Byford ‘District Centre’. District centres are to provide a diverse range of retail, commercial and residential options.

    Serviced apartments are consistent with the desired form and function of a district centre.

    The proposal contributes towards the desired diversity of land uses within the district centre.

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL PLANNING FRAMEWORK ASSESSMENT 11

    Figure 6 – MRS Extract

    Source: DPLH

    Figure 7 – Bushfire Prone Areas

  • 12 PLANNING FRAMEWORK ASSESSMENT URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    3.2. LOCAL PLANNING FRAMEWORK This section outlines the key elements of the local planning framework that are relevant to this application. The current Local Planning Scheme No. 2 (LPS2) will be a key document in the assessment of this development. It is also noted that the Shire have recently prepared and advertised draft Local Planning Scheme No. 3 (DLPS3). Whilst DLPS3 has not yet been formally gazetted, it will be a due regard document in the assessment of this application. The below sections outline the land use permissibility considerations and the relevant local instruments.

    3.2.1. Land Use Permissibility 3.2.1.1. LPS2 Under LPS2 the subject site is zoned ‘urban development’ – refer to Figure 8.

    Serviced apartments are not a listed use in the LPS2 zoning table. However, land use permissibility within the urban development zone is typically not specified within the zoning table of LPS2. Instead, section 5.19 (noted above) of LPS2 identifies a broad set of objectives that development within the urban development zone should comply with.

    The use and built form of the proposed development is consistent with the zone because:

    The use is commercial in nature and offers a service for the local and broader community that contributes to the diversification of town centre land uses.

    The use offers improved urban built form outcome from the car park currently on the site.

    The proposed development will see compatible development with the surrounding land uses which will offer suitable activity and employment opportunities in the town centre.

    There are no nearby noise sensitive or other vulnerable uses nearby that would be unduly impacted by the proposal.

    Additionally, section 5.19 of LPS2 requires any development within the urban development zone to be preceded by a structure plan. The below section highlights the proposals consistency with the applicable Byford Town Centre Local Structure Plan (BTCSP).

    3.2.1.2. DLPS3 Although DLPS3 is only a ‘due regard’ document for this application, the draft Scheme provides guidance on how ‘serviced apartments’ will be dealt with in the future planning framework. The DLPS3 identifies the site within a ‘District Centre’ zoning. DLPS3 defines serviced apartments as:

    means a group of units or apartments providing -

    (a) self-contained short-stay accommodation for guests; and

    (b) any associated reception or recreational facilities.

    Serviced apartments are noted as a ‘D’ use in DLPS3 meaning that the land use is capable of obtaining approval.

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL PLANNING FRAMEWORK ASSESSMENT 13

    3.2.1.3. Byford Town Centre Local Structure Plan (BTCSP) The subject site is located within the BTCSP area. Specifically, the site is within the ‘town centre – retail core’ classification. Refer to Figure 9 – BTCSP map extract.

    The proposals compliance with the BTCSP is outlined in the below table.

    Table 3 – BTCSP Assessment

    Relevant Provisions Comment Compliance

    Zoning Classification Intent

    The Retail Core area will be the priority area for retail and commercial development. Complimentary residential development, in the form of mixed-use development, is encouraged to assist with surveillance and after-hours activation.

    The proposed serviced apartment development is consistent with the desired intent of the town centre – retail core classification.

    The proposal incorporates commercial development that is highly compatible with the surrounding uses and allows for mixed use development on the site (adding to the existing Dome café).

    The proposal also assists with the surveillance and after-hours activation. The provision of accommodation in the town centre offers opportunity for the community to stay overnight, encouraging activation beyond the normal hours of retail operations.

    Preferred Land Uses

    Retail Shops; Restaurants and Cafes; Leisure and Entertainment; Commercial Offices; Civic and Community use including a town square; Child Care Facilities, Consulting Rooms and Medical Suites; Residential Developments; Open Space.

    Serviced apartments are not specifically noted as a preferred use. However, the land use is suitable as it is highly consistent and compatible with many of the preferred uses such as retail, restaurant, café, entertainment etc.

    The serviced apartments can support the listed preferred land uses and will contribute to the activation of the town centre.

    District centres usually have a diverse range of land uses. The provision of accommodation within the town centre is consistent with the diverse nature of a district centre.

    Specific Provisions: Lot 4 South Western Highway

    All lot specific provisions identified in the BTCSP were satisfied as part of the development approval relating

  • 14 PLANNING FRAMEWORK ASSESSMENT URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    Relevant Provisions Comment Compliance

    i. An Urban Water Management Plan will be required to be submitted with the application and must ensure peak flow rates and floodplain storage are maintained consistent with the Byford Town Centre Local Water Management Strategy.

    ii. Setbacks of 10 metres from the north and south of the existing creek line are required from any development which will affect water flow.

    iii. Restrict access to and from South Western Highway in accordance with Main Roads Western Australia Access Strategy for this section of South Western Highway.

    iv. A plan which identifies and protects and significant vegetation worthy of retention, particularly in proximity to the creekline, to the satisfaction of the local government.

    v. Any drainage on the site as required by the local government.

    the Dome which is currently located on the site (P00778/01).

    This application for development approval only applies to the very northern portion of the site and maintains all Urban Water Management, setback, access, vegetation protection and drainage practices that were granted as part of the previous planning approval.

    Should the Shire require specific information relating to any lot specific requirements, it is requested that this be dealt with through an appropriate condition of approval.

    Parking

    The parking requirement is 1 bay per 20 sq.m GLA.

    The new proposed development increases the net site GFA to 1,104 sq.m. This means there is a 55-car parking bay requirement.

    The total number of parking bays proposed on the site is 31. There are also an additional 8 shared street parking bays located on the adjacent George Street and Pitman Way.

    The total number of on site and street parking bays is 39. This represents a shortfall of 16 parking bays.

    This represents a variation of 16 parking bays. However, this is considered acceptable due to the reciprocal arrangements, evening peak and availability of shared parking arrangements throughout the Town Centre.

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL PLANNING FRAMEWORK ASSESSMENT 15

    Relevant Provisions Comment Compliance

    Although a parking bay shortfall, there is ample shared parking availability in the Town Centre close to the subject site. Additionally, the site offers activation of the town centre outside of peak demand meaning parking demand will likely be stagnated.

    3.2.2. Byford Town Centre Built Form Guidelines Design guidelines applicable to the subject site are outlined in the Shire’s local planning policies (LPPs). Under the relevant LPPs, the subject site is located within the ‘town centre east precinct’. The below table provides a summary of the preferred design outcomes applicable to the subject site.

    Table 4 – Relevant Design Guidelines

    Relevant Provisions Comment

    LPP 3.8 – Byford Town Centre Built Form Guidelines

    Land Use

    Preferred land uses include: retail; office; café; civic facilities; showrooms and; residential.

    Serviced apartments are not specifically noted as a preferred use. However, the land use is suitable as it is highly consistent and compatible with many of the preferred uses.

    Building Height

    The preferred building height is 1 – 2 storeys.

    The proposed development comprises three- storeys.

    Whilst it is noted that this is one storey above the preferred, the third storey component is considered acceptable in the context of the town centre.

    The three-storey proposal does not adversely impact either of the adjacent buildings and adds to the diversity of built form present within the town centre.

    The elevation of the first and second floors allows retention of the majority of the parking bays which would otherwise be lost.

    A three-storey development with retention of most of the car parking is an improved urban outcome as opposed to a two-storey development that significantly reduces parking.

    Setbacks The proposed development is built right up to the eastern lot boundary abutting South Western Highway. This achieves a ‘village style atmosphere’.

  • 16 PLANNING FRAMEWORK ASSESSMENT URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    Relevant Provisions Comment

    The maximum setback from South Western Highway is 3.0m to achieve a village style atmosphere.

    Building Orientation

    Active Ground floor uses shall be provided to address South Western Highway, George Street and the POS corridor.

    The existing Dome development on the site already addresses George Street and Pitman Way with active ground floor uses.

    This proposal does not propose active uses at ground level to address South Western Highway. However, this is considered acceptable as retaining car parking on the ground floor is integral to the function of the site.

    This proposal also offers an improvement in the built form through a vertically articulated, architecturally designed building that significantly improves the built form of the northern portion of the site – currently just an open car park.

    Parking and Site Access

    a. Shared on-street parking on George Street to be provided and shared between different uses.

    b. Off-street parking shall be placed in between developments to encourage shared parking and accessibility.

    c. Any parking facilities in the rail reserve will be subject to PTA approval.

    d. No vehicle access to or from South Western Highway will be permitted.

    a. There are currently shared parking bays on both George Street to the west of the site and Pitman Way to the south of the site.

    b. Off street parking located on Pitman Way is situated between the subject site and the development south of Pitman Way.

    c. There are no proposed parking facilities in the rail reserve requiring approval.

    d. There is no proposed vehicle access to or from South Western Highway as part of this development.

    View Corridors

    Development within the Town Centre East Precinct must respond and maintain key view corridors.

    View corridors shall have a minimum width of 15.0m and may traverse through parking areas.

    N/A – the subject site is not located within any of the identified view corridors.

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL PLANNING FRAMEWORK ASSESSMENT 17

    Figure 8 – LPS Extract

    Source: DPLH

    Figure 9 – BTCSP Map Extract

  • 18 PLANNING FRAMEWORK ASSESSMENT URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    CONCLUSION The proposed serviced apartment development is consistent with the relevant state and local planning framework and will contribute to the diversity of land uses within the Byford District Centre. The three-storey development will provide a suitably visually interesting building that improves the built form of the site and the local area.

    It is respectfully requested that the Shire approve the proposed development with fair and reasonable conditions.

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL DISCLAIMER 19

    DISCLAIMER This report is dated 10 August 2020 and incorporates information and events up to that date only and excludes any information arising, or event occurring, after that date which may affect the validity of Urbis Pty Ltd opinion in this report. Urbis prepared this report on the instructions, and for the benefit only, of CONSOLIDATED UT PTY. LTD for the purpose of Development Application and not for any other purpose or use. To the extent permitted by applicable law, Urbis expressly disclaims all liability, whether direct or indirect, to the Instructing Party which relies or purports to rely on this report for any purpose other than the Purpose, and to any other person which relies or purports to rely on this report for any purpose whatsoever (including the Purpose).

    In preparing this report, Urbis was required to make judgements which may be affected by unforeseen future events, the likelihood and effects of which are not capable of precise assessment.

    All surveys, forecasts, projections and recommendations contained in or associated with this report are made in good faith and on the basis of information supplied to Urbis at the date of this report, and upon which Urbis relied. Achievement of the projections and budgets set out in this report will depend, among other things, on the actions of others over which Urbis has no control.

    In preparing this report, Urbis may rely on or refer to documents in a language other than English, which Urbis may arrange to be translated. Urbis is not responsible for the accuracy or completeness of such translations and disclaims any liability for any statement or opinion made in this report being inaccurate or incomplete arising from such translations.

    Whilst Urbis has made all reasonable inquiries it believes necessary in preparing this report, it is not responsible for determining the completeness or accuracy of information provided to it. Urbis (including its officers and personnel) is not liable for any errors or omissions, including in information provided by the Instructing Party or another person or upon which Urbis relies, provided that such errors or omissions are not made by Urbis recklessly or in bad faith.

    This report has been prepared with due care and diligence by Urbis and the statements and opinions given by Urbis in this report are given in good faith and in the reasonable belief that they are correct and not misleading, subject to the limitations above.

  • 20 CERTIFICATE OF TITLE URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL

    APPENDIX A CERTIFICATE OF TITLE

  • URBIS DEVELOPMENT APPLICATION - SERVICED APARTMENTS FINAL DEVELOPMENT PLANS 21

    APPENDIX B DEVELOPMENT PLANS

  • SOUT

    H W

    ESTE

    RN H

    IGHW

    AYGEO

    RGE

    ST

    PITMAN WAY

    BOARDWALK BO

    ARDW

    ALK

    CREEK

    GRASSEDAREA

    EXISTINGDOME CAFE

    55.0

    55.0

    56.0

    56.0

    56.0

    56.0

    56.0

    56.0

    56.0

    66 D38031

    3 D38031

    42934m²

    88°21'

    86°41

    '35"

    135°0

    '5"

    137°28'37"

    137°28'38"

    135°0

    '5"

    64.

    37

    63.

    57 8.53

    45.56

    8.53

    27.72

    Gully

    TelstraManhole

    Gully

    Gully

    Gully

    SideEntry

    Pit

    Gully

    SewerManhole

    Bridg

    e

    55.78

    56.51

    56.60

    56.51

    56.46

    56.75

    56.7556.7456

    .71

    56.69

    56.32

    56.65

    55.19

    55.21

    55.27

    55.23

    55.28

    55.46

    55.51

    55.49

    55.52

    55.58

    55.62

    55.56

    55.59

    56.48 56

    .47 56.59

    56.56

    56.75

    56.69

    56.64

    56.48

    56.02

    55.97

    55.93

    55.94

    56.54

    56.29

    56.34

    56.16

    56.25

    55.62

    55.72

    55.86

    55.92

    55.84

    55.71

    55.52

    55.42

    55.57

    55.62

    55.66

    55.44

    56.45

    55.26

    55.87

    55.40

    55.53

    56.49

    55.15

    56.28

    55.55

    55.31

    55.63

    56.35

    55.12

    56.53

    55.39

    55.20

    55.58

    56.04

    55.25

    55.72

    55.12

    55.95

    55.84

    55.83

    55.26

    56.19

    55.62

    55.23

    55.58

    55.44

    56.61

    55.10

    56.02

    55.32

    55.60

    56.47

    55.13

    56.28

    55.45

    55.29

    55.61

    56.30

    55.17

    56.20

    55.46

    55.13

    55.65

    56.13

    55.68

    55.05

    56.00

    55.74

    55.78

    55.28

    56.08

    55.67

    55.23

    55.44

    55.52

    56.49

    55.11

    56.07

    55.68

    55.40

    55.65

    56.34

    55.10

    56.35

    55.41

    55.18

    55.43

    56.18

    55.22

    56.46

    55.59

    55.17

    55.86

    55.83

    55.86

    54.96

    56.26

    55.70

    55.21

    55.41

    55.5055.5055.5855.60 5

    5.62

    55.61

    55.59

    55.58

    56.3556.4956

    .52 56.63

    56.65

    56.64

    56.53

    56.47

    56.37

    56.6856

    .8056.7956

    .78

    56.7756

    .7456

    .7456.69

    56.62

    56.64

    56.65

    56.67

    56.68

    56.38

    56.3856.38

    56.48

    56.48

    56.5756.56

    55.12

    55.15

    55.17

    55.19

    55.21

    56.03

    55.85

    55.82

    55.83

    55.90

    55.92

    55.92

    55.96

    55.97

    54.99

    55.12

    54.97

    54.94

    54.93

    55.07

    54.94

    54.94

    54.92

    55.03

    54.94

    54.95

    55.0955

    .5956.01

    56.31

    56.35

    56.18

    55.34

    55.33 55

    .37

    55.38

    55.36

    55.36

    56.50

    56.59

    56.61

    55.5355

    .55

    55.55

    55.53

    55.98

    55.97

    56.07

    56.07

    56.25

    56.23

    56.46

    56.46

    56.45

    55.59

    56.75

    56.75

    56.57

    56.39

    56.51

    56.74

    56.76

    57.08

    56.67

    55.50

    55.23

    55.33

    55.93

    55.63

    TBMBYF17A

    SSMRL = 56.666

    TBM9501

    D/spike InBitumen

    RL =55.503

    EXISTING CARPARKASPHALT

    EXISTING CARPARK & KERBING TO BE REMOVED TO EXTENT SHOWN DASHED.

    EXISTING DRAIN TO BE REMOVED.

    BDAWA Inc. Member

    1 : 2

    00 @

    A1

    PRO

    POSE

    D D

    EVEL

    OPM

    ENT

    For S

    teph

    en W

    hite

    829

    Sout

    h W

    este

    rn H

    wy,

    BYF

    OR

    D W

    A 61

    22

    0735

    SK01

    Shee

    t 1Ju

    ly 2

    020

    M.S

    ibum

    N

    Scale 1 : 200

    SITE DEMOLITION PLAN

  • SOUT

    H W

    ESTE

    RN H

    IGHW

    AYGEO

    RGE

    ST

    PITMAN WAY

    BOARDWALK BO

    ARDW

    ALK

    CREEK

    GRASSEDAREA

    EXISTINGDOME CAFE

    55.0

    55.0

    56.0

    56.0

    56.0

    56.0

    56.0

    56.0

    56.0

    66 D38031

    3 D38031

    42934m²

    88°21'

    86°41

    '35"

    135°0

    '5"

    137°28'37"

    137°28'38"

    135°0

    '5"

    64.

    37

    63.

    57 8.53

    45.56

    8.53

    27.72

    Gully

    TelstraManhole

    Gully

    Gully

    Gully

    SideEntry

    Pit

    Gully

    SewerManhole

    Bridg

    e

    55.78

    56.51

    56.60

    56.51

    56.46

    56.75

    56.7556.7456

    .71

    56.69

    56.32

    56.65

    55.19

    55.21

    55.27

    55.23

    55.28

    55.46

    55.51

    55.49

    55.52

    55.58

    55.62

    55.56

    55.59

    56.48 56

    .47 56.59

    56.56

    56.75

    56.69

    56.64

    56.48

    56.02

    55.97

    55.93

    55.94

    56.54

    56.29

    56.34

    56.16

    56.25

    55.62

    55.72

    55.86

    55.92

    55.84

    55.71

    55.52

    55.42

    55.57

    55.62

    55.66

    55.44

    56.45

    55.26

    55.87

    55.40

    55.53

    56.49

    55.15

    56.28

    55.55

    55.31

    55.63

    56.35

    55.12

    56.53

    55.39

    55.20

    55.58

    56.04

    55.25

    55.72

    55.12

    55.95

    55.84

    55.83

    55.26

    56.19

    55.62

    55.23

    55.58

    55.44

    56.61

    55.10

    56.02

    55.32

    55.60

    56.47

    55.13

    56.28

    55.45

    55.29

    55.61

    56.30

    55.17

    56.20

    55.46

    55.13

    55.65

    56.13

    55.68

    55.05

    56.00

    55.74

    55.78

    55.28

    56.08

    55.67

    55.23

    55.44

    55.52

    56.49

    55.11

    56.07

    55.68

    55.40

    55.65

    56.34

    55.10

    56.35

    55.41

    55.18

    55.43

    56.18

    55.22

    56.46

    55.59

    55.17

    55.86

    55.83

    55.86

    54.96

    56.26

    55.70

    55.21

    55.41

    55.5055.5055.5855.60 5

    5.62

    55.61

    55.59

    55.58

    56.3556.4956

    .52 56.63

    56.65

    56.64

    56.53

    56.47

    56.37

    56.6856

    .8056.7956

    .78

    56.7756

    .7456

    .7456.69

    56.62

    56.64

    56.65

    56.67

    56.68

    56.38

    56.3856.38

    56.48

    56.48

    56.5756.56

    55.12

    55.15

    55.17

    55.19

    55.21

    56.03

    55.85

    55.82

    55.83

    55.90

    55.92

    55.92

    55.96

    55.97

    54.99

    55.12

    54.97

    54.94

    54.93

    55.07

    54.94

    54.94

    54.92

    55.03

    54.94

    54.95

    55.0955

    .5956.01

    56.31

    56.35

    56.18

    55.34

    55.33 55

    .37

    55.38

    55.36

    55.36

    56.50

    56.59

    56.61

    55.5355

    .55

    55.55

    55.53

    55.98

    55.97

    56.07

    56.07

    56.25

    56.23

    56.46

    56.46

    56.45

    55.59

    56.75

    56.75

    56.57

    56.39

    56.51

    56.74

    56.76

    57.08

    56.67

    55.50

    55.23

    55.33

    55.93

    55.63

    TBMBYF17A

    SSMRL = 56.666

    TBM9501

    D/spike InBitumen

    RL =55.503

    1 2 3 4 5 6 7 8

    1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

    300

    SE

    TOU

    T

    O/A

    8400

    CA

    RP

    AR

    K

    1278

    7

    394 SETOUT

    O/A

    44260 900 SETOUT

    300

    SE

    TOU

    T29

    00

    CA

    RB

    AYS

    5400

    NE

    W A

    ISLE

    WID

    TH

    7487

    EXI

    ST I

    NG

    CA

    RB

    AY

    S

    5400

    PROPOSED ACCOMMODATION UNITS OVER

    STORE 10.2m²

    LOBBY 33.4m²

    EXISTING CARPARKASPHALT

    BDAWA Inc. Member

    1 : 2

    00 @

    A1

    PRO

    POSE

    D D

    EVEL

    OPM

    ENT

    For S

    teph

    en W

    hite

    829

    Sout

    h W

    este

    rn H

    wy,

    BYF

    OR

    D W

    A 61

    22

    0735

    SK01

    Shee

    t 2Ju

    ly 2

    020

    M.S

    ibum

    Scale 1 : 200

    OVERALL SITE PLAN

    AREAS (GFA)LAND USE AREA

    CORRIDORS 120.24 m²HOUSE KEEPING 25.78 m²LOBBY 59.91 m²STORE 10.22 m²UNITS 415.75 m²TOTAL 631.89 m²

    OVERALL GFALEVEL AREA

    Ground Floor 43.65 m²First Floor 294.44 m²Second Floor 293.81 m²TOTAL 631.89 m²

    N

  • 56.0

    3 D 38031

    42934m²

    88°21'

    86°41

    '35"

    45.56

    TelstraManhole

    SewerManhole

    55.19

    55.21

    55.27

    55.23

    56.02

    55.97

    55.93

    55.94

    7155

    .52

    55.26

    55.15

    55.12

    55.25

    55.23

    55.13

    55.175

    5.23

    55.10

    55.22

    55.21

    55.41

    55.12

    55.15

    55.17

    55.19

    55.21

    56.03

    55.85

    55.82

    54.99

    55.12

    54.97

    54.94

    55.07

    54.94

    54.94

    55.03

    54.94

    55.23

    UP

    UP

    1 2 3 4 5 6 7 8

    23.96 m²

    ENTRYLOBBYLIFT

    8.13 m²STORE

    1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

    LOBBY O/A

    5042

    UNDERCOVER CARPARK O/A

    36383

    STORE O/A

    2835

    44260

    5210 5150 5150 5150 5150 5150 5150 5150 3000

    UNDERCOVER CARPARKNEW ASPHALT

    EXISTING CARPARKASPHALT

    SELECTING PAVING.

    HATCHED AREA DENOTES CARBAY DESIGN ENVELOPE TO AS2890.1.

    NEW CARBAYS 2400 WIDE x 5400 DEEP.

    300

    BETWEEN COLS.

    4850 TYP. 300

    BDAWA Inc. Member

    1 : 1

    00 @

    A1

    PRO

    POSE

    D D

    EVEL

    OPM

    ENT

    For S

    teph

    en W

    hite

    829

    Sout

    h W

    este

    rn H

    wy,

    BYF

    OR

    D W

    A 61

    22

    0735

    SK01

    Shee

    t 3Ju

    ly 2

    020

    M.S

    ibum

    N

    Scale 1 : 100

    GROUND FLOOR PLAN

  • UP

    UP

    UP

    1 2 3 4 5 6 7 8

    DN

    LIFT

    20.62 m²UNIT 1

    20.62 m²UNIT 2

    20.62 m²UNIT 3

    20.62 m²UNIT 4

    20.62 m²UNIT 5

    20.62 m²UNIT 6

    21.61 m²UNIT 7

    49.22 m²CORRIDOR

    11.96 m²LOBBY

    11.58 m²HOUSE KEEPING

    5.27 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    O/A

    44260

    150

    LIFT

    2300 240

    LOBBY

    2410 220

    UNIT 8

    4930 220

    UNIT 9

    4930 220

    UNIT 10

    4930 220

    UNIT 11

    5040 0

    UNIT 12

    5040 220

    UNIT 13

    5040 0

    UNIT 14

    5225 240

    EXT. STAIRS

    2535 150

    8400

    240

    STA

    IRS

    3000

    240

    LIFT

    2000

    240

    HO

    US

    E K

    EE

    PIN

    G

    2304

    7630

    0

    3300

    EX

    T. S

    TAIR

    S

    4950

    150

    240

    CO

    RR

    .

    1650

    92

    UN

    ITS

    5326

    92

    BA

    LC.

    1000

    1000

    92

    BE

    D

    3450

    76

    BA

    TH

    2250

    92

    CO

    RR

    .

    1200

    240

    5210 5150 5150 5150 5150 5150 5150 5150 3000

    1 2 3 4 5 6 7 8

    27.22 m²UNIT 8

    27.22 m²UNIT 9

    27.22 m²UNIT 10

    27.22 m²UNIT 11

    27.22 m²UNIT 12

    27.22 m²UNIT 13

    28.21 m²UNIT 14

    49.22 m²CORRIDOR

    11.34 m²LOBBY

    11.58 m²HOUSE KEEPING

    5.27 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    5.06 m²BALCONY

    DN

    LIFT

    DN

    O/A

    44260

    150

    LIFT

    2300 240

    LOBBY

    2410 220

    UNIT 8

    4930 220

    UNIT 9

    4930 220

    UNIT 10

    4930 220

    UNIT 11

    4930 220

    UNIT 12

    4930 220

    UNIT 13

    4930 220

    UNIT 14

    5115 240

    EXT. STAIRS

    2535 150

    8400

    240

    STA

    IRS

    3000

    240

    LIFT

    2000

    240

    HO

    US

    E K

    EE

    PIN

    G

    2304

    7630

    0

    3300

    EX

    T. S

    TAIR

    S

    4950

    150

    240

    CO

    RR

    .

    1650

    92

    UN

    ITS

    5326

    92

    BA

    LC.

    1000

    1000

    92

    BE

    D

    3450

    76

    BA

    TH

    2250

    92

    CO

    RR

    .

    1200

    240

    5210 5150 5150 5150 5150 5150 5150 5150 3000

    BDAWA Inc. Member

    1 : 1

    00 @

    A1

    PRO

    POSE

    D D

    EVEL

    OPM

    ENT

    For S

    teph

    en W

    hite

    829

    Sout

    h W

    este

    rn H

    wy,

    BYF

    OR

    D W

    A 61

    22

    0735

    SK01

    Shee

    t 4Ju

    ly 2

    020

    M.S

    ibum

    N

    N

    Scale 1 : 100

    FIRST FLOOR PLAN

    Scale 1 : 100

    SECOND FLOOR PLAN

  • Ground Floor0

    First Floor2700

    Second Floor5760

    1 2 3 4 5 6 7 8

    4097

    3060

    2700

    9857

    2450

    CONCRETE TILT PANEL WALL CONSTRUCTION.

    PAINTED STEEL PERIMETER BEAM.

    TIMBER BATTEN SCREENING.

    CONCRETE COLUMNS TO CARPARK.

    Ground Floor0

    First Floor2700

    Second Floor5760

    ADJACENT BUILDING (APPROX.)

    CONCRETE TILT PANEL WALL CONSTRUCTION.

    PAINTED STEEL PERIMETER BEAM.

    TIMBER BATTEN SCREENING.

    Ground Floor0

    First Floor2700

    Second Floor5760

    12345678

    2400

    BD

    Y W

    ALL

    PA

    RA

    PE

    T

    9510

    347

    ADJACENT BUILDING (APPROX.)

    CONCRETE TILT PANEL WALL CONSTRUCTION.

    Ground Floor0

    First Floor2700

    Second Floor5760

    9857

    4097

    3060

    2700

    9534

    2450

    ADJACENT BUILDING (APPROX.)

    CONCRETE TILT PANEL WALL CONSTRUCTION.

    PAINTED STEEL PERIMETER BEAM.

    TIMBER BATTEN SCREENING.

    CONCRETE COLUMNS TO CARPARK.

    BDAWA Inc. Member

    1 : 1

    00 @

    A1

    PRO

    POSE

    D D

    EVEL

    OPM

    ENT

    For S

    teph

    en W

    hite

    829

    Sout

    h W

    este

    rn H

    wy,

    BYF

    OR

    D W

    A 61

    22

    0735

    SK01

    Shee

    t 5Ju

    ly 2

    020

    M.S

    ibum

    Scale 1 : 100

    SOUTH ELEVATION

    Scale 1 : 100

    WEST ELEVATION

    Scale 1 : 100

    NORTH ELEVATION

    Scale 1 : 100

    EAST ELEVATION

  • BDAWA Inc. Member

    @ A

    1

    PRO

    POSE

    D D

    EVEL

    OPM

    ENT

    For S

    teph

    en W

    hite

    829

    Sout

    h W

    este

    rn H

    wy,

    BYF

    OR

    D W

    A 61

    22

    0735

    SK01

    Shee

    t 6Ju

    ly 2

    020

    M.S

    ibum

  • BDAWA Inc. Member

    @ A

    1

    PRO

    POSE

    D D

    EVEL

    OPM

    ENT

    For S

    teph

    en W

    hite

    829

    Sout

    h W

    este

    rn H

    wy,

    BYF

    OR

    D W

    A 61

    22

    0735

    SK01

    Shee

    t 7Ju

    ly 2

    020

    M.S

    ibum

  • Urbis

    AS 3959 Bushfire Attack Level (BAL) Assessment Report

    Lot 4 South Western Highway, Byford

    15 September 2020

    59702/ Rev A

    JBS&G Australia Pty Ltd T/A Strategen-JBS&G

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A ii

    Table of Contents

    1. Site assessment and site plan ........................................................................................ 1

    2. Vegetation classification ................................................................................................ 1

    3. Relevant Fire Danger Index ............................................................................................ 1

    4. Potential bushfire impacts ............................................................................................. 1

    5. Determined Bushfire Attack Level (BAL) ....................................................................... 2

    6. Shielding provisions ....................................................................................................... 2

    7. Limitations ..................................................................................................................... 4

    List of Tables

    Table 1: Method 1 Bushfire Attack Level (BAL) analysis .......................................................... 1

    List of Figures

    Figure 1: BAL assessment map ................................................................................................. 3

    Appendices

    Appendix A Proposed building plan

    Appendix B Vegetation plot photos and description

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A 1

    Site details

    Address Lot 4 South Western Highway, Byford, WA, 6122

    Local government area Shire of Serpentine-Jarrahdale

    Main BCA class of the building Class 1a

    Use(s) of the building Residential dwelling

    Description of the building or works Construction of single residential dwelling and associated Class 10a structure

    Report details

    Project/Document number

    59702 Report reference 59702_BAL Lot 4 South Western Hwy R001 Rev A

    Assessment date 4 September 2020 Report date 15 September 2020

    BPAD Accredited Practitioner Details

    Name Euan Sutherland

    Endorsement/Review Louisa Robertson (BPAD 36748, Level 1)

    Company details JBS&G Australia Pty Ltd T/A Strategen-JBS&G, Perth

    Reliance on the assessment and determination of the Bushfire Attack Level contained in this report should not extend beyond a period of 12 months from the

    date of issue of the report. If this report was issued more than 12 months ago, it is recommended that the validity of the determination be confirmed with

    the Accredited Practitioner and where required, an updated report issued.

    1. Site assessment and site plan

    The assessment of this site/development was undertaken on 11 September 2020 by a BPAD Accredited Practitioner for the purpose of determining the Bushfire Attack Level in accordance with AS 3959 - 2018 (Simplified Procedure [Method 1]).

    The site assessment results are depicted in Figure 1. The Site Plan is included in Appendix A.

    2. Vegetation classification

    All vegetation within 150 m of the site/development was classified in accordance with Clause 2.2.3.2 of AS 3959-2018 Construction of buildings in bushfire prone areas (AS 3959) and the Visual Guide for Bushfire Risk Assessment in Western Australia. Each distinguishable vegetation class with the potential to determine the Bushfire Attack Level is identified in Appendix B and in Figure 1.

    3. Relevant Fire Danger Index

    The fire danger index for this site/development has been determined in accordance with Table 2.1 of AS 3959 or otherwise determined in accordance with a jurisdictional variation applicable to the site.

    Fire Danger Index

    FDI 40 ☐

    Table 2.4.5

    FDI 50 ☐

    Table 2.4.4

    FDI 80 ☒

    Table 2.4.3

    FDI 100 ☐

    Table 2.4.2

    4. Potential bushfire impacts

    The potential bushfire impact to the site/development from each of the identified vegetation plots are identified in Table 1.

    Table 1: Method 1 Bushfire Attack Level (BAL) analysis

    Method 1 BAL determination

    Plot Vegetation classification Effective slope Separation (m) BAL

    1 Class G Grassland Flat/upslope (0°) 77.8 BAL–Low

    2 Class G Grassland Flat/upslope (0°) 78.2 BAL–Low

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A 2

    Method 1 BAL determination

    Plot Vegetation classification Effective slope Separation (m) BAL

    3 Class G Grassland Flat/upslope (0°) 55.7 BAL–Low

    4 Class A Forest Flat/upslope (0°) 21.1 BAL–29

    5 Class D Scrub Flat/upslope (0°) 39.7 BAL–12.5

    6 Excluded – Non-vegetated and Low threat (Clause 2.2.3.2 [e] and [f])

    N/A N/A N/A

    5. Determined Bushfire Attack Level (BAL)

    The Determined Bushfire Attack Level (highest BAL) for the site / proposed development has been determined in accordance with Clause 2.2.6 of AS 3959-2018 using the above analysis.

    Determined Bushfire Attack Level BAL–29

    6. Shielding provisions

    Shielding provisions in accordance with Clause 3.5 of AS 3959 are not applicable to the proposed building as all elevations are exposed to a direct line of bushfire attack.

  • PITMAN WY

    EDWAR

    DCR

    CLARA ST

    BLYTHESWOOD AV

    GEO

    RG

    E ST

    SOUTH

    WESTERN

    HWY

    PLOT 1

    PLOT 2

    PLOT 2

    PLOT 2

    PLOT 6

    PLOT 3

    PLOT6

    PLOT 4

    PLOT 5

    PLOT 6

    21.1m

    39.7

    m55.7m

    77.8m

    78.2m

    File Name: \\008pmpmr004v001.jbsg.aust\JBS Perth\Projects\1)Open\Urbis\59702 BAL Lot 4 South Western Hwy, Byford\GIS\Maps\R01_Rev_A\59702_02_BALs.mxdImage Reference: www.nearmap.com© - Imagery Date: 31 August 2020.

    829 South Western HighwayByford, WA

    BAL CONTOUR MAP

    Scale 1:2,000 at A4 0 25 50metres

    Coord. Sys. GDA 1994 MGA Zone 50 ZJob No: 59702

    Client: Urbis

    Version: A

    Checked By: CT

    Date: 15-Sep-2020

    FIGURE 2

    Drawn By: hsullivan

    LegendProject area100m assessment area150m assessment areaCadastral boundaryClassified vegetationDistance measurementRoads (MRWA)

    BAL contoursBAL FZBAL 40BAL 29BAL 19BAL 12.5BAL Low

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A 4

    7. Limitations

    Scope of services

    This report (“the report”) has been prepared by Strategen-JBS&G in accordance with the scope of services set out in the contract, or as otherwise agreed, between the Client and Strategen-JBS&G. In some circumstances, a range of factors such as time, budget, access and/or site disturbance constraints may have limited the scope of services. This report is strictly limited to the matters stated in it and is not to be read as extending, by implication, to any other matter in connection with the matters addressed in it.

    Reliance on data

    In preparing the report, Strategen-JBS&G has relied upon data and other information provided by the Client and other individuals and organisations, most of which are referred to in the report (“the data”). Except as otherwise expressly stated in the report, Strategen-JBS&G has not verified the accuracy or completeness of the data. To the extent that the statements, opinions, facts, information, conclusions and/or recommendations in the report (“conclusions”) are based in whole or part on the data, those conclusions are contingent upon the accuracy and completeness of the data. Strategen-JBS&G has also not attempted to determine whether any material matter has been omitted from the data. Strategen-JBS&G will not be liable in relation to incorrect conclusions should any data, information or condition be incorrect or have been concealed, withheld, misrepresented or otherwise not fully disclosed to Strategen-JBS&G. The making of any assumption does not imply that Strategen-JBS&G has made any enquiry to verify the correctness of that assumption.

    The report is based on conditions encountered and information received at the time of preparation of this report or the time that site investigations were carried out. Strategen-JBS&G disclaims responsibility for any changes that may have occurred after this time. This report and any legal issues arising from it are governed by and construed in accordance with the law of Western Australia as at the date of this report.

    Environmental conclusions

    Within the limitations imposed by the scope of services, the preparation of this report has been undertaken and performed in a professional manner, in accordance with generally accepted environmental consulting practices. No other warranty, whether express or implied, is made.

    The advice herein relates only to this project and all results conclusions and recommendations made should be reviewed by a competent person with experience in environmental investigations, before being used for any other purpose.

    Strategen-JBS&G accepts no liability for use or interpretation by any person or body other than the client who commissioned the works. This report should not be reproduced without prior approval by the client, or amended in any way without prior approval by Strategen-JBS&G, and should not be relied upon by other parties, who should make their own enquiries.

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Appendix A Proposed building plan

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Appendix B Vegetation plot photos and description

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Photo ID: 1a

    Photo ID: 1b

    Plot number Plot 1

    Vegetation classification

    Pre-development Class G Grassland

    Post-development Class G Grassland

    Description / justification Grassland greater than 100 mm in height

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Photo ID: 2a

    Photo ID: 2b

    Plot number Plot 2

    Vegetation classification

    Pre-development Class G Grassland

    Post-development Class G Grassland

    Description / justification Grassland greater than 100 mm in height

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Photo ID: 3a

    Photo ID: 3b

    Plot number Plot 3

    Vegetation classification

    Pre-development Class G Grassland

    Post-development Class G Grassland

    Description / justification Grassland greater than 100 mm in height

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Photo ID: 4a

    Photo ID: 4b

    Plot number Plot 4

    Vegetation classification

    Pre-development Class A Forest

    Post-development Class A Forest

    Description / justification Trees 10-30 m high at maturity, dominated by Eucalypts, multi-tiered structure comprising tall canopy layer, shrubby middle layer and grass/herb/sedge understorey

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Photo ID: 5a

    Plot number Plot 5

    Vegetation classification

    Pre-development Class D Scrub

    Post-development Class D Scrub

    Description / justification Vegetation with a continuous horizontal and vertical structure, greater than 2 m high at maturity

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Photo ID: 6a

    Photo ID: 6b

    Plot number Plot 6

    Vegetation classification

    Pre-development Excluded – Non-vegetated and Low threat (Clause 2.2.3.2 [e] and [f])

    Post-development Excluded – Non-vegetated and Low threat (Clause 2.2.3.2 [e] and [f])

    Description / justification Low threat cultivated gardens and maintained lawns within surrounding properties and non-vegetated areas including roads, footpaths, driveways and building footprints

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    © JBS&G Australia Pty Ltd T/A Strategen-JBS&G

    This document is and shall remain the property of Strategen-JBS&G. The document may only be used for the purposes for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorised use of this document in any form whatsoever is prohibited.

    Document Status

    Report version

    Rev No. Purpose Author Reviewed and Approved for Issue

    Name Date

    Draft Report Rev A Choose an item. Choose an item. Click or tap to enter a date.

    Final Report Rev 0 Choose an item. Choose an item. Click or tap to enter a date.

  • ©JBS&G Australia Pty Ltd T/A Strategen-JBS&G | 59702/ Rev A

    Development Application - Serviced Apartments Final.pdf1. Overview1.1. Introduction1.2. Site location and Lot Particulars1.3. Previous Planning Approval on Subject Site

    2. Proposed Development2.1. Land use and configuration2.2. Vehicle access and Car Parking

    3. Planning Framework Assessment3.1. State Planning Assessment3.2. Local Planning Framework3.2.1. Land Use Permissibility3.2.1.1. LPS23.2.1.2. DLPS33.2.1.3. Byford Town Centre Local Structure Plan (BTCSP)

    3.2.2. Byford Town Centre Built Form Guidelines

    ConclusionDisclaimerAppendix A Certificate of TitleAppendix B Development Plans

    CT.pdfCertificate of Title with Sketch 1918-585 829 South Western Highway BYFORD 6122 - Certificate of Title 1918-585.pdfCertificate of Title with Sketch 1918-585 829 South Western Highway BYFORD 6122 - Sketch for 1918-585.pdf

    Byford Serviced Apartments - Plans.pdf0735-SK02-Sheet-Sheet 1-Site Demolition Plan.pdfSheetsSheet 1 - Site Demolition PlanSheet 2 - Site PlanSheet 3 - Ground Floor PlanSheet 4 - First & Second Floor PlansSheet 5 - ElevationsSheet 6 - Perspective ViewsSheet 7 - Perspective Views

    0735-SK02-Sheet-Sheet 2-Site Plan.pdfSheetsSheet 1 - Site Demolition PlanSheet 2 - Site PlanSheet 3 - Ground Floor PlanSheet 4 - First & Second Floor PlansSheet 5 - ElevationsSheet 6 - Perspective ViewsSheet 7 - Perspective Views

    0735-SK02-Sheet-Sheet 3-Ground Floor Plan.pdfSheetsSheet 3 - Ground Floor Plan

    0735-SK02-Sheet-Sheet 4-First & Second Floor Plans.pdfSheetsSheet 4 - First & Second Floor Plans

    0735-SK02-Sheet-Sheet 5-Elevations.pdfSheetsSheet 5 - Elevations

    0735-SK02-Sheet-Sheet 6-Perspective Views.pdfSheetsSheet 1 - Site Demolition PlanSheet 2 - Site PlanSheet 3 - Ground Floor PlanSheet 4 - First & Second Floor PlansSheet 5 - ElevationsSheet 6 - Perspective ViewsSheet 7 - Perspective Views

    0735-SK02-Sheet-Sheet 7-Perspective Views.pdfSheetsSheet 7 - Perspective Views