Development and Implementation of the new
Mozambique National Health Information System
for M&E (SIS-MA), a systemic implementation using
DHIS2 platform
Ivan Pinto
Program Manager Jembi Health System NPC / MOASIS,
Mozambique
Alessandro Campione
Program Director Jembi Health Systems NPC / MOASIS,
Mozambique
Christopher Seebregts
CEO, Jembi Health Systems NPC
Hon Assoc Prof, Discipline of Computer Science, UKZN
Funded by
MOASIS is a non-profit organization of University Eduardo Mondlane,
Living Lab created and supported entirely by JEMBI with support of
IDRC, CDC, WHO, Rockefeller and others ORG. We aim to:
– Strengthen HIS local capabilities involving the public, private and
academic sectors
– reference and link between the MOH and public/private
partners
– Set up a South-South cooperation model
JEMBI/MOASIS model
MOASIS/JEMBI – MISAU (MOH)Funded by
PROJECT PROPOSAL
MISAU APPROVAL
REQUIREMENTSSPECIFICATIONS
RESPONSIBILITIES ATTRIBUTION
JOINT OPERATIONSFOR DEPLOYMENT
PARTICIPATORY SYSTEMDEVELOPMENT
DOCUMENTATION AND HAND OVER
5 years
Memorandum of Understanding renewed till 2020
Physical presence in the MISAU
Agenda DIS
AgendaMOASIS
Quarteror
Annual
results
Constant physical
presence in the MISAU of
MOASIS team
HIS strategic plan
DIS annual planMOASIS annual plan = projects
OVERALL STRATEGY
IT PROBLEM & TECHNOLOGY
MANY FOCUS HERE
NEED ASSESSMENT REQUIREMENTS
TRAINING DATA QUALITYPUBLICATION
AND USE
MAINTENANCESUPPORT AND
SUSTAINABILITY
CLINIC/PUBLIC HEALTH PROBLEM
PROJECT, AGREEMENTSFUNDRISING
COMMITMENTDEPLOYMENTINTEGRATION
Funded by
SIS-MA DEVELOPMENT PHASES:1- STUDY2- PROPOSAL SOFTWARE DEVELOPMENT3- SOFTWARE DESIGN4- DEVELOPMENT5- TEST PILOT INSTALLATION6- FINAL DELIVERY
SYSTEMATIC APPROACH TO SIS-MAFunded by
EVALUATION OF MODULO BASICO
REQUIREMENTS FOR A NEW
SYSTEM
DEVELOPMENT SCENARIOS &
METHODOLOGY
TENDER, MIXED OR IN-HOUSE
DEVELOPMENT CONTRACT (in phases) JEMBI-WINNING ORG
DHIS 2 PLATFORM SOLUTION
POOR QUALITY MB DATA
IMPLEMENTATION, INTEGRATION OF OTHER SYSTEM AND MAINTENANCE
BETTER & SUSTAINABLE QUALITY OF M&E DATA
MOH’s OWNED PROJECT
• Jembi/Moasis is providing support throughout the SIS-MA project (MoH
project) in systematic way by facilitating all steps:
i. Assessment MB
ii. Requirement for the new system SIS-MA
iii. Scenario analysis, methodology and costing
iv. Tender management activities (6 phases), contract tracking, technical
activities, quality assurance and transfer of historical data.
v. Implementation, integration of other systems and maintenance
• The project belongs in its entirety to the MoH and any relevant decision was
made by the same.
• Jembi/Moasis ensures the specialized management of the project, resources
(human and financial), monitoring and quality review and ensure compliance
according to laws and rules of the MoH.
SIS-MA PROJECT STRATEGYFunded by
MODULO BASICO
First M&E in Mozambique, developed by an external Consultant whose contract ran out in 2009.From that point there was no agreed sustainability plan, system support, maintenance, development of
new features.
Modulo Basico SIS-MA
Outdated and discontinued technology Open Source platforms and possible local development => SUSTAINABILITY
Difficulties in development of new functionalities and inclusion/modification of modules
Possibility to add new features and modules without highly skilled developers => EASIER ACCEPTANCE AND EXPANSION
Difficulties in creation of reports, graphs,geographical and other data representations
Introduction of Data warehousing, GIS and other simplified mechanism => MORE INFORMATION AVAILABLE
Lack of mechanisms for data validation Simpler and integrated rules for validation => BETTER QUALITY OF DATA
System not interoperable Interoperability standards and possibility to communicate with other systems => GREATER HIS COVERAGE
Funded by
STEP OF THE SYSTEMATIC APPROACH:
FROM MODULO BASICO TO SIS-MA
2009: EVALUATION OF MODULO BASICO2010: DEFINE THE REQUIREMENTS FOR THE
NEW M&E SYSTEM (SIS-MA)
Funded by
2010: DEFINE THE REQUIREMENTS FOR THE NEW M&E SYSTEM (SIS-MA)
USE CASES
SYSTEM PLATFORM
SYSTEM INDICATORS
Funded by
STEP OF THE SYSTEMATIC APPROACH:
FROM MODULO BASICO TO SIS-MA
2011: ANALYSIS OF SCENARIOS, METHODOLOGY AND COSTING, TIME, ETC.
Funded bySTEP OF THE SYSTEMATIC APPROACH:
FROM MODULO BASICO TO SIS-MA
2011: DEVELOPMENT PLAN AND RESOURCE MOBILIZATION
WITH THE REQUIREMENTS
DOC, DEVELOPMENT PLAN
AND COSTING JEMBI/MOASIS
WAS ABLE TO APPROACH
POTENTIAL FUNDERS
Funded bySTEP OF THE SYSTEMATIC APPROACH:
FROM MODULO BASICO TO SIS-MA
STEP: SIS-MA DEVELOPMENT
(INTERNATIONAL TENDER)
INTERNATIONAL RECRUITMENT
FOR THE SIS-MA PRODUCT
MANAGER
Funded by
SIS-MA INTERNATIONAL TENDER
Funded by
1. TENDER PREPARATION & ANNOUNCEMENT
2. REQUEST FOR EXPRESSION OF INTEREST & EVALUATION
3. TENDER EVALUATION
4. ORGANIZATIONAL
5. STRUCTURE & COMMUNICATION
6. CONTRACT MANAGEMENT AND QUALITY CONTROL
COST OF THE CONTRACT: 820.000 USD
TIME: 24 MONTHS
ORGANIZATIONAL STRUCTURE AND
COMMUNICATION
MOHOwner of the product
and decision maker
Critical SoftwareDeveloping the
system
Jembi/MoasisFacilitating
organization
Frequent interaction and
quality assurance
Formal approval at the end of each phase
CDCProvide financial
resources
Formal approval of resources and
workplan
Funded by
Phase 1 – Study
Phase 2 – Software
development proposal
Phase 3 – Software
design
Phase 4 – Development
Phase 5 – Test and pilot
installation
Phase 6 – Training and
implementation
• Team Contextualization.
• Analysis and requirements specification, HIS architecture,
data elements, flow, reports, forms etc..
• Alignment of expectations.
• Design the system architecture.
• Definition of the proposal and development methodology.
• Review of project plan for the next stages.
• Production of detailed design of the system
• Definition of test plan and acceptance criteria
• Setting the migration of historical data model.
• Develop the SIS-MA according to the requirements set out above.
• Iterative validation with Jembi, Moasis and MOH.
• Validate the developed system in a limited environment
• Tests in three districts of a province.
• Definition of training and materials plan.
• Implementation of the system at central, provincial and district levels.
• Training for system users.
SIS-MA TECHNICAL DEVELOPMENTFunded by
SIS-MA PROJECT - CURRENT STATUS
OBJECTIVE Support collection, analysis, interpretation and dissemination of health
data used to plan public health services across Mozambique
APPROACH 6 Phases:1) Study2) Proposal of software development and methodology3) Design of the application 4) Software Development 5) Installation and testing 6) Training and Implementation
KEY ACCOMPL. • System fully developed with translated manuals and training material • Migration of historic data from MB to SIS-MA • Development of additional modules: HIV, Nutrition, BES, SMI • Maputo City Implementation in 7 sites: Data available for HIV-PAV• Plan of National expansion according to MoH priorities ready and operational
2015 (Next
Steps)• Evaluate implementation• Identify corrective actions in coordination with the MOH• Further expansion to other provinces• Expand functionality
Funded by
SIS-MA TECHNICAL DEVELOPMENT
CURRENT STATUS
Complete analysis of HIS architecture and structure, data flow, forms, reports, mapping of all data elements, systematization and protocol ready for systems development phase
Conclusion of phase 5 (system development): SIS-MA inDHIS 2 completed with all MB modules, manuals and all training materials in Portuguese
Complete analysis of health sector structure and SIS-MA – Facility list ready for implementation phase
Migration of MB data from previous years to specific SIS-MA server for ready-to-go analysis and statistics comparisons.
Infrastructure ready and functional
All training materials, manuals and modules ready
Development of additional MODULES: NUTRITION, BES, HIV.
Funded by
SIS-MA NATIONAL IMPLEMENTATION
CURRENT STATUS
Development of all logistic for phase 6 (IMPLEMENTATION)
Support the MoH in the provincial training and implementation
Implementation of SIS-MA with the DHIS2 WEB based version completed in Maputo city (11) and Maputo Province (10)
National implementation ongoing: Gaza (9) and Niassa(1) are ongoing
Use of innovation technology developed by Jembi/Moasis to ensure connectivity, security, distance
support and dedicated tools: SIS COMPACT STATION
COMPLETED
COMPLETED
ONGOING
ONGOING
Funded by
SIS-MA CONNECTIVITY
AND SECURITYKIOSK HARDWARE (SIS COMPACT
STATION)
• Secure (all hardware is embedded including 3G card)
• WiFi/cable or 3G connected• Dedicated, no virus• Standard hardware (South Africa
MoH standard)
KIOSK SOFTWARE• Allow only HMIS systems• Dedicated internet connection• Distance support
Funded by
CHALLENGES & WAY FORWARD
Online only scenario adopted making the operation extremely difficult at
district and provincial level.
Continue support after installation in all districts and provinces with reduced
human and financial resources
MB data and operation transition to SIS-MA difficulties
Training, maintenance and capacity building
Funded by
Include offline mode were no other option available
Include all subsystems (national health programs)
Integrate and interoperate other national health systems
Expand functionalities
Expand to health facilities
Create a strong Mozambican DHIS community
Support in the data quality control, extraction, publication and use of the SIS-
MA information
KANIMAMBO!