DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE REALIZATION OF ECO/GREEN CAMPUS IPB Rizaldi Boer Centre for Climate Risk and Opportunity Management in Southeast Asia and Pacific of Bogor Agricultural University ECO/Green Campus of IPB Dramaga with Mount Salak Backgroud

DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE

REALIZATION OF ECO/GREEN CAMPUS IPB

Rizaldi Boer Centre for Climate Risk and Opportunity Management in

Southeast Asia and Pacific of Bogor Agricultural University

ECO/Green Campus of IPB Dramaga with Mount Salak Backgroud

Page 2: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

Indonesia Emission Reduction Target (26%+15% with International Support) by 2020 and beyond (INDC)

2010 Base year

2015 2020 2045 2030 2000

Emission [Gg CO2e/year] BAU

Mit-1.1 26%

Mit-1.2 Mit-2.1

+15%

Mit-2.2

? ?

Need participation of all

sectors and the presence of support and reliable MRV

Support and MRV

Page 3: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

MoE Regulation No.15/2013 on MRV Mi ga onAc onPlans:-Governments-Non-Governments

Recogni onandfinancialsupport

Na onalRegistrySystem

MPEPROtherMethodologies

V

RANGRKRADGRK

Otherini a ves

Selec oncriteria

RegisteringNAMAstoUNFCCC

ProposalSupportedNAMAs

UnilateralNAMA

Implementa on

CCNa onalFocalPoint

Na onalMRVCommi ee

NAMAsProposalNAMAsImplementa onNon-NAMAs

Page 4: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

Objective: Realization of IPB Campus that are conducive for a successful learning process, environmentally friendly, Comfortable and safe for supporting the

sustainable agro-eco-edu-tourism

Page 5: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

FOUR elements of Eco/Green

Campus

Green transportation

Green energy

Green building/open

space

Green movement

Elements of Eco/Green Campus

Page 6: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

Transportation mode without fossil fuel or with zero emission Electric car for transporting student

between building within campus (IPB at present already operates electric cars)

Electric bicycle/Gowes, Electric motor bike Proposed Program: OSOB (one student one bicycle)

Traffic regulation within campus Number of electric car, route and

time schedule Terminal feeder and charging facility

as well as portable charger

Page 7: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

Improving energy use

efficiency in all utilities and buildings

Reducing the use of energy from fossil fuel

Solar cell – Main road in campus already use solar PV

Micro hydro for substituting Electricity from PLN

Advancement of research on biomass-based-energy

Page 8: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

Limiting the use of AC by improving air circulation system in all buildings

Greening parking areas for improving the comfort and beauty of the campus

Developing agricultural germ-plasm collection for supporting regreening program in campus

Page 9: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

Change mindset, attitude, and behavior of faculties to be more oriented to environmental friendliness, awareness campaign, massive social movement, green champions, etc.

Construction of the canopy as pedestrian corridor

Realizing “zero waste campus”:

Sorting and processing of waste (soil, liquid, gases and organic)

Use of easily degradable materials.

Page 10: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

IPB has implemented many Community Development Program

related to low carbon society surrounding and outside campus in

collaboration with many agencies national and international

Community Development Activity sorrounding IPB

campus: Composting, biopori, bricket etc.

Page 11: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

New IPB Master Plan 2010-2030

• IPB is now entering the 3rd Stage of its development – Recondition. Master Plan of 1989 is revised for Master Plan Campus of 2010-2030

• The new Master Plan is designed to fit the real needs and condition and make it relevant to the changes in internal and external campus at present and future.

• All elements of Eco/green campus will be integrated into the master plan

Page 12: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

Development of Innovative MRV System

• Innovative monitoring system research

(2014-2017)

– Understanding pattern of energy

consumption at facilities at IPB

campus campaign for awareness

rising and change of mindset, attitude, and behavior of faculties

(eco green movements) and low

carbon policies in Campus

– Reducing uncertainty of statistical

data reliable measurement and

reporting Integrated modeling

research for low carbon society and

urban and regional eco-city design

model and simulation research

Step 1

Facility-

residence

Step 2

Campus

Step 3

Region(city)

Downscaled low carbon modeling to be more localized

and help to design effective low carbon policies/actions

systematic carbon credit certification (MoE Regulation

No.15/2013)

Page 13: DEVELOPING INNOVATIVE MRV SYSTEM TO SUPPORT THE ... · ini a ves Selec on criteria Registering NAMAs to UNFCCC Proposal Supported NAMAs Unilateral NAMA Implementa on CC Na onal Focal

FY2014 Innovative Monitoring System at IPB Campus

13