1:16 - det3396
OREGON DEPARTMENT OF TRANSPORTATIONTECHNICAL SERVICES
BULB-I GIRDER SCHEDULE,POST-TENSIONED END BLOCK
AND MISCELLANEOUS DETAILS
DETAIL NO.
DET3396
DETAILS
DE
T3
396
FIGURES
FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4
"N"
"y "c
"N"
"y "c
FIGURE 5 FIGURE 6 FIGURE 7 FIGURE 8
Reinforcing Bars
"a" "b" "m" "D "L R"D "
En
d B
lock
Back End (On Stationing)G
irder
Type
Sp
an
Nu
mb
er
"F "L"E "L
"E "R "F "R "F "L
"E "L"E "
R "F "R
GIRDER SCHEDULE
1"c
l.
Possible strand locations.
2-2" w/8" web
1"c
l.
2"
3"
#3 "U3" bars, seeMidspan Section forbar spacing.
2"
1 3/4 "cl. w/7 1/2 " web
1-8" w/8" web
No Scale
"X
" B
B
(Alternate B)Cable restraints top
and bottom at each
Beam D.
MidspanDeck
Build-upas required
A
A
varie
s
B B B
B
B
B
6 @ 3"
Bar "U5"stirrups
Bar "U4" stirrups spacing
"b" @ 12" 18" max. spcg.
w/
7 1
/2 "
web
w/
8" w
eb
12"
4-0" transition Midspan section
1 1/2 "| 6 spcs. @ 10" max.(9 1/2 " average spacing)
Skew end plan
#4 "U9" bar
Gir
der
Dep
th-2
3/8
"
(Normal dimension,adjust first barfor skew)
EST. MIDSPANDEFLECTION
Gir
der
Mass
, K
ips
2"cl. w/8" web
2-#5 x cont. bars,stagger splices.
#4 "U1" bars at18" max. ctrs.
2-#5 x 2-6" epoxycoated dowels eachside projecting 12"out of beam end.
1-7 1/2 " w/7 1/2 " web
2-#5 x 2-6" epoxycoated dowels each sideprojecting 12" outof beam end.
1 3/4 "cl. w/7 1/2 " web
2"cl. w/8" web2-1 1/2 " w/7 1/2 " web
6"
1 3/4 "cl. w/7 1/2 " web
2"cl. w/8" web
#4 longit. btwn. ducts eachface of web when clear distancebtwn. ducts is 4" or greater.
7 @ 1-3"1 @ 1-0 3/4 "1 @ 10 1/2 "1 @ 8"
6"6"
4-9" 3-3"
3 @ 9"
3-3 3/8 "
1-
4"
#4 "U11" bar2
-1
1/2
"
2-
2"
1 3/4 " 9 @ 4" "a" @ 6"
5-0" end block
7-
0" B
I84
8-
0" B
I96
9-
0" B
I108
6"
#5 x 2-6" epoxycoated dowels btwn.post-tensioning ductseach side projecting12" out of beam end.
Note:
For temporary diaphragm
beam details, see dwg. BR350
BUILD - UP DECK DETAIL
END BLOCK END VIEW
STEM SECTION AT END BLOCK
END BLOCK SIDE ELEVATION
#4 "U11" BAR
#4 "U9" BAR
Gir
der
Nu
mb
er
Num
ber
Requir
ed
LT
. =
Lt.
Exte
rior
RT
. =
Rt.
Ex
teri
or
Sp
an
ctr
. -
ctr
.B
en
ts a
lon
g
Gir
der
{
"A
",
o-o
Gir
der
(Hor
iz. L
engt
haft
er
Sh
ort
en
ing
)
Concre
te S
trength
@ 2
8 D
ay
s, K
si
Concre
te S
trength
@ R
ele
ase
, K
si
Init
ial
Ten
sio
np
er
Str
an
d,
Kip
s
Num
ber
of
Str
ands
per
Gir
der
"N"
Fig
ure
Nu
mb
er f
or
Str
and P
att
ern
(Stir
rup
Leg)
StirrupSpaces
Negative ValueIndicates Backfrom Midspan
Diaphragm Ahead End (On Stationing)
En
d B
lock
Negative Value IndicatesPoint Beyond Girder End
Negative Value IndicatesPoint Beyond Girder End
Upward atRelease
Upward 3Months after
Release
Est
imat
ed
Sh
ort
enin
g 2
Wee
ks
aft
er
Rele
ase
#4 "U9" bars at 8" max.
#4 "U9" bars @ 8" max.
W12 "U2" bars(galv.) at 6" alternate "U5" stirrups (1st., 3rd, 5th, and 7th).
2-#13 x cont. each side, stagger splice.
2-#6 x cont.each side,stagger splices.
SECTION A-A
W12 "U2" bars @ 6" ctrs. on 1st, 3rd, 5th and 7th stirrups (from girder ends).
8"
(Alternate A)One cable restraint at location
shown. After restraint is removed,
fill hole with concrete and finish
flush with surface of girder
(exterior girders only).
Minimum deck thickness. Thisdimension assumes girderfabrication and erection will meetthe required deck elevations. Incase of variations, lower girderto meet corrected elevation.
GIRDER RESTRAINT DIAGRAM
Snug fit prestressed girders against forms prior to diaphragm
pour. Keep restraints in place a min. of two days after
completion of diaphragm pour.
DE
T3
396
NOTE TO DESIGNER
Design girders using 3/4 " min.build-up over girders.
Ensure girder soffits are on level grade prior
to prestressing. Use build-up over girder to
compensate for the difference between deck
elevation and girder camber.
When the girder build-up exceeds 3" and/or
the girder stirrups extend less than 2" into
the deck, add #4 stirrup extensions.
Place stirrup extensions at each girder
stirrups and tie to the girder stirrup.
Where girder stirrup spacing is
6" or less, place stirrup
extentions @ 12" max.
#4 stirrup
extension
Note:Transport members in accordance with Section 00550.51 of theStandard Specifications for Highway Construction. Place membersno less than _____ days after casting.
NOTE TO DESIGNER
Remove note if 7 day transport and placementis okay without placement restrictions.
NOTE TO DESIGNER
End Blocks are typically notnecessary at continous bents.