DRAWING INDEX SAFETY x PERSONAL PROTECTIVE EQUIPMENT SHALL BE WORN AS REQUIRED IN ALL APPLICABLE AREAS. LIMIT ACCESS BY UNAPPROVED PERSONNEL TO APPLICABLE AREAS x IF WORK IS BEING DONE IN AN AREA WHERE PEDESTRIANS MAY WALK THROUGH, MAKE SURE THE AREA IS BARRICADED OR CONED OFF APPROPRIATELY. x IF WORKING NEAR DOORS OF OFFICE SUITES MAKE SURE SIGNS ARE PLACED ON OTHER SIDE OF DOOR INDICATING WORKERS NEAR DOORWAY x PERMITS MUST BE OBTAINED FROM THE AHJ FOR ENERGIZED ELECTRICAL, HOT WORK, CONFINED SPACE ENTRY AS WELL AS LIFE SAFETY WORK ARE OBTAINED PRIOR TO BEGINNING WORK. x $// (03/2<((6 :25.,1* 21 ´/2&.(' 287 ´(48,30(17 6+$// +$9( 7+(,5 /2&. $1' 7$* 21 7+( 6285&( 2) (1(5*< x FOLLOW ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL ENVIRONMENTAL HEALTH AND SAFETY REGULATIONS. x PROJECT MANAGERS, CONTRACTORS, EHS SHOULD CONFIRM THAT ASBESTOS/HAZARDOUS MATERIALS HAVE BEEN IDENTIFIED, TESTED AND ABATED PRIOR TO ALL WORK. REDLINES CONTRACTOR SHALL SUBMIT PROJECT REDLINES MERGED TO ONE CLEAN SET OF DRAWINGS. DRAWINGS WILL BE MARKED: CHANGE - RED PENCIL / REMOVAL - RED PENCIL HATCH / NOTE TO DESIGNER - GRAY PENCIL. SUBMITTALS SCOPE OF WORK US-3 IS TO BE REPLACED FIRST WITH LOADS TEMPORARIES OFF OF US-2. US-2 WILL THEN BE REPLACED WITH TEMPORARIES OFF OF US-3. 1U01: RECAP US-2 & US-3 THIS PROJECT CONTAINS ASBESTOS, ABATEMENT REQUIRED. THIS PROJECT CONTAINS HAZARDOUS MATERIALS, SPECIAL PRECAUTIONS REQUIRED. YES NO GENERAL INFORMATION 1 G-001 COVER (INDEX) SHEET 2 G-002 GENERAL INFORMATION CIVIL ARCHITECTURAL STRUCTURAL MECHANICAL PLUMBING FIRE PROTECTION ELECTRICAL 3 E-001 ELECTRICAL NOTES, SYMBOLS, AND LEGEND 4 E-101 ELECTRICAL DEMOLITION PLAN - LOWER B & G BLOCK 5 E-102 ELECTRICAL DEMOLITION PLAN - LOWER C BLOCK 6 E-103 ELECTRICAL DEMOLITION PLAN - UPPER C BLOCK 7 E-201 ELECTRICAL NEW WORK PLAN - LOWER B & G BLOCK 8 E-202 ELECTRICAL NEW WORK PLAN - LOWER C BLOCK 9 E-203 ELECTRICAL NEW WORK PLAN - UPPER C BLOCK 10 E-501 US-2 ELECTRICAL DETAILS 11 E-502 US-3 ELECTRICAL DETAILS 12 E-601 ELECTRICAL PANEL SCHEDULES 13 E-602 ELECTRICAL PANEL SCHEDULES 14 E-603 ELECTRICAL PANEL SCHEDULES 15 E-604 ELECTRICAL PANEL SCHEDULES 16 E-701 US-2 ONE-LINE DIAGRAM - DEMOLITION PLAN 17 E-702 US-2 FEEDER TABLES 18 E-703 US-2 ONE-LINE DIAGRAM - NEW WORK PLAN 19 E-704 US-3 ONE-LINE DIAGRAM - DEMOLITION PLAN 20 E-705 US-3 FEEDER TABLES 21 E-706 US-3 ONE-LINE DIAGRAM - NEW WORK PLAN TELECOMMUNICATIONS AV / SECURITY G-001 COVER (INDEX) SHEET x x STATUS: DESIGNER: PROJECT INFORMATION DESCRIPTION REVISIONS: REV. SHEET TITLE PROJECT #: DATE DRAWN BY: ENGINEERED BY: CHECKED BY: EntCadStd-v2.1 3/10/15 WORK # : DRAWING NUMBER CONSTRUCTION KEY PLAN: PROJ MGR: LOCATION: APPROVALS: DESIGN MGR: 90% SUBMITTAL NOT FOR 1U01: RECAP US-2 & US-3 01/09/19 80086086 4020847 EMG STEVE K. STEVE K. DAVE K. ERROL B.

DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

DRAWING INDEX

SAFETY

PERSONAL PROTECTIVE EQUIPMENT SHALL BE WORN AS REQUIRED IN ALL APPLICABLE AREAS.

LIMIT ACCESS BY UNAPPROVED PERSONNEL TO APPLICABLEAREAS

IF WORK IS BEING DONE IN AN AREA WHERE PEDESTRIANS MAY WALK THROUGH, MAKE SURE THE AREA IS BARRICADED OR CONED OFF APPROPRIATELY.

IF WORKING NEAR DOORS OF OFFICE SUITES MAKE SURE SIGNS ARE PLACED ON OTHER SIDE OF DOOR INDICATING WORKERS NEAR DOORWAY

PERMITS MUST BE OBTAINED FROM THE AHJ FOR ENERGIZED ELECTRICAL, HOT WORK, CONFINED SPACE ENTRY AS WELL AS LIFE SAFETY WORK ARE OBTAINED PRIORTO BEGINNING WORK.

ALL EMPLOYEES WORKING ON “LOCKED OUT “EQUIPMENT SHALL HAVE THEIR LOCK AND TAG ON THE SOURCE OF ENERGY.

FOLLOW ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL ENVIRONMENTAL HEALTH AND SAFETY REGULATIONS.

PROJECT MANAGERS, CONTRACTORS, EHS SHOULD CONFIRM THAT ASBESTOS/HAZARDOUS MATERIALS HAVE BEEN IDENTIFIED, TESTED AND ABATED PRIOR TO ALLWORK.

REDLINESCONTRACTOR SHALL SUBMIT PROJECT REDLINES MERGED TO ONE CLEAN SET OF DRAWINGS. DRAWINGS WILL BE MARKED: CHANGE - RED PENCIL / REMOVAL - RED PENCIL HATCH /

NOTE TO DESIGNER - GRAY PENCIL.

SUBMITTALS

SCOPE OF WORK

US-3 IS TO BE REPLACED FIRST WITH LOADS TEMPORARIES OFF OF US-2.

US-2 WILL THEN BE REPLACED WITH TEMPORARIES OFF OF US-3.

1U01:RECAP US-2 & US-3

THIS PROJECT CONTAINS ASBESTOS, ABATEMENT REQUIRED.

THIS PROJECT CONTAINS HAZARDOUS MATERIALS, SPECIAL PRECAUTIONS REQUIRED.

YES NO

GENERAL INFORMATION1 G-001 COVER (INDEX) SHEET

2 G-002 GENERAL INFORMATION

CIVIL

ARCHITECTURAL

STRUCTURAL

MECHANICAL

PLUMBING

FIRE PROTECTION

ELECTRICAL3 E-001 ELECTRICAL NOTES, SYMBOLS, AND LEGEND

4 E-101 ELECTRICAL DEMOLITION PLAN - LOWER B & G BLOCK

5 E-102 ELECTRICAL DEMOLITION PLAN - LOWER C BLOCK

6 E-103 ELECTRICAL DEMOLITION PLAN - UPPER C BLOCK

7 E-201 ELECTRICAL NEW WORK PLAN - LOWER B & G BLOCK

8 E-202 ELECTRICAL NEW WORK PLAN - LOWER C BLOCK

9 E-203 ELECTRICAL NEW WORK PLAN - UPPER C BLOCK

10 E-501 US-2 ELECTRICAL DETAILS

11 E-502 US-3 ELECTRICAL DETAILS

12 E-601 ELECTRICAL PANEL SCHEDULES

13 E-602 ELECTRICAL PANEL SCHEDULES

14 E-603 ELECTRICAL PANEL SCHEDULES

15 E-604 ELECTRICAL PANEL SCHEDULES

16 E-701 US-2 ONE-LINE DIAGRAM - DEMOLITION PLAN

17 E-702 US-2 FEEDER TABLES

18 E-703 US-2 ONE-LINE DIAGRAM - NEW WORK PLAN

19 E-704 US-3 ONE-LINE DIAGRAM - DEMOLITION PLAN

20 E-705 US-3 FEEDER TABLES

21 E-706 US-3 ONE-LINE DIAGRAM - NEW WORK PLAN

TELECOMMUNICATIONS

AV / SECURITY

G-001

COVER(INDEX)SHEET

x

x

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

Page 2: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

GENERAL NOTES

ELEVATIONNUMBER

PLATE ON WHICHELEVATION ISSHOWN

CLOUDAROUNDREVISEDITEM ORAREA

SHADED AREAINDICATESELEVATIONSHOWN

SURROUNDINGLETTERSINDICATEELEVATION

COLUMN LINES

DRAWING TITLE

REVISIONNUMBER

REVISION

DESIGNATESWHICH DOOR

D INDICATES DOORW INDICATES WINDOWL INDICATES LOUVER

INDICATES ROOM NUMBER

ASSIGNEDROOMNUMBER

DOORS, WINDOWS AND LOUVERS

SECTION REFERENCE

ELEVATION MARKERS

ROOM TAG

1

A601

A

B

C

D

INTERIOR ELEVATION

ABBREVIATIONS SYMBOLS

PLATE ON WHICHDETAIL IS SHOWN

DETAIL NUMBER

PLATE ON WHICHELEVATION ISSHOWN

ELEVATION NUMBER

REFERENCE

DETAIL REFERENCE

ELEVATION REFERENCE

PLATE ON WHICHSECTION IS SHOWN

SECTION NUMBER

VENT THRU ROOFVTR

NORTHN

DIM DIMENSION

DOWN

DISPENSER

DRAWING

DRAWER

DEPRESSION

DOWNSPOUT

DOOR

DOOR OPENING

ELEVATION

EACH

EAST

ENCLOSURE

EMERGENCY

ELEVATOR

ELECTRICAL

EXPANSION JOINT

ELECTRICAL PANELBOARD

EQUAL

EQUIPMENT

EXPANSION

EXISTING

EXPOSED

EXTERIOR

FIRE ALARM

FIRE ALARM CONTROL PANEL

FOUNDATION

FINISH

EXTINGUISHER

FLOOR DRAIN

FLOOR CLEAN OUT

FULL HEIGHT

FINISH FACE OF WALL

FIRE HOSE CABINET

FLOOR

FLASHING

FIREPROOF

FURRING

FOOTING

FACE OF FINISH

FLUORESCENT

FACE OF CONCRETE

FACE OF STUDS

FULL SIZE, FLOOR SINK

GALVANIZED

GRAB BAR

GAUGE

FUTURE

GLASS

GRADE

GROUND

GOVERNMENT FURNISHEDGFE

GND

GL

GR

FUT

GALV

GB

GA

FPRF

FOS

FTG

FS

FURR

FL

FOF

FOC

FLASH

FLUOR

EQ (EQL)

FES

FHC

FH

FFOW

FD

FDN

FCO

FEC

FE (FEXT)

EXT

FACP

FA

EXPO

EQPT

EWC

EXP

EXIST

ELEC

ELEV

EP

EMER

ENCL

EL

EA

E

DR

DEP

DWG

DS

DWR

DN

DISP

DO

RWL

RF

RO

RM

RGTR

RWD

REINF

REC

RBP

RESIL

RAIN WATER LEADER

ROUGH OPENING

REGISTER

REDWOOD

RADIO FREQUENCY

ROOM

RECESSED

REQUIRED

REINFORCED

RESILIENT

W/O

WNSCT

RATG

RD

REF

RAD

REFR

PVC

R

QT

PTR

PTD

PTN

PTD/R

PT

PM

PRCST

PR

POP

PLYWD

RATING

RADIUS

ROOF DRAIN

REFERENCE

REFRIGERATOR

QUARRY TILE

POLYVINYL CHLORIDE

RISER

PRESSED METAL FRAMES

PAPER TOWEL DISPENSER

PAINTED

PARTITION

& WASTE RECEPTACLE

POINT

PRE-CAST

PLYWOOD

POINT OF PRESENCE

PAIR

OD

PD

PLAS

PLAM

PL

OPNG

OPP

OPS

OD

OC

OA

OBS (OB)

NO/#

NIC

NOM

NTS

OVERFLOW DRAIN

PIT DRAIN

PLASTER

PLASTIC LAMINATE

PLATE

OPPOSITE

OPERATIONS

OPENING

WR

WT

OVERALL

OBSCURE

ON CENTER

OUTSIDE DIMENSION

NOMINAL

NUMBER

NOT TO SCALE

NOT IN CONTRACT

WC

WD

WP

WH

W

W/

WAINSCOT

WATER RESISTANT

WEIGHT

WATERPROOF

WATER CLOSET

WATER HOSE,

WOOD

WEST (WIDTH)

WITH

WITHOUT

DIRECT APPLIED EXTERIOR

AREA DRAIN

ACOUSTICAL TILE CEILING

AT

AND

ALUMINUM

AGGREGATE

ADJUSTABLE

ASPHALT

BOARD

BITUMINOUS

APPROXIMATE

ABOVE FINISH FLOOR

ARCHITECTURAL

BLOCK

BLOCKING

BUILDING

BEAM

BOTTOM

CABINET

CENTER LINE

BOTTOM OF STEEL

CAST IRON

CERAMIC

CEMENT

CLEAR

CEILING

CAULKING

CLOSET

CATCH BASIN

CONTRACTOR INSTALLED

CONCRETE MASONRY UNIT

COUNTER

COLUMN

CONCRETE

CORRIDOR

CONNECTION

COMMUNICATION

CONSTRUCTION

CONTINUOUS

CONFERENCE

DOUBLE

DETAIL

DIAMETER

COUNTERSUNK

DRINKING FOUNTAIN

DRY FILM THICKNESS

DEPARTMENT

CENTERCTR

DEPT

DF

DFT

DIA

CTSK

DBL

DEFS

CONF

CONT

CONN

CORR

CONSTR

CNTR

COL

COMMO

CONC

CLKG

CLG

CLO

CLR

CMU

CB

CEM

CER

CI

CI

CAB

CL

BM

BLDG

BLK

BOS

BMS

BITUM

ASPH

BD

BLKG

ARCH

AFF

ADJ

APPROX

AGGR

ATC

AD

@

&

SPEC

SSK (SS)

SST

STD

STOR

SUSP

T & G

SYST

TBD

TOC

THK

TOS

TRD (T)

TPD

UON

UPS

UNF

VERT

VCT

VEST

VSC

MIN

MTD

MULM

mm

MISC

MIR

MO

MK

MEMB

MH

MGR

MATL

MAX

MECH

MC

MINIMUM OR MINUTES

MOUNTED

MULLION

METER (METRIC)

MILLIMETER (METRIC)

MIRROR

MISCELLANEOUS

MASONRY OPENING

MARK

UR

MEMBRANE

MANUFACTURER

MANHOLE

MANAGER

METAL

MAXIMUM

MATERIAL

MECHANICAL

MEDICINE CABINET

TV

TW

TYP

TP

LVR (L)

LT

MAINT

MACH

LAB

LAM

LP

LKR

LAV

JT

JAN

KIT

INSUL

ID

INT (INTR)

LOUVER

MACHINE

MAINTENANCE

LIGHT

LABORATORY

LAMINATE

LOCKER

LOW POINT

LAVATORY

TB

TC

TER

TEL

JANITOR

KITCHEN

JOINT

INSIDE DIAMETER

INSULATION

INTERIOR

INTERMEDIATE

STA

STL

SQ

SP

UNFINISHED

UNLESS OTHERWISE

VINYL COMP. TILE

VERTICAL SLIDE CLIP

UNINTERRUPTIBLE

VERTICAL

VESTIBULE

URINAL

TOP OF CONCRETE

TOP OF PAVEMENT

TOP OF STEEL

TOP OF WALL

TOILET PAPER

TREAD

TYPICAL

TELEVISION

THICK

SUSPENDED

SYMMETRICAL

TONGUE AND GROOVE

TELEPHONE

TO BE DETERMINED

TOWEL BAR

TOP OF CURB

TERRAZZO

SYSTEM

SPECIFICATION

STAINLESS STEEL

SERVICE SINK

STRUCTURAL

STANDARD

STATION

STORAGE

STEEL

SQUARE

SPACE

SCD

SCHED

SEC

SCN

SECT

SHT

SHR

SND

SNR

HORIZ

HR

HP

HDWD

HC

HM

HMI

HDW (HW)

GYP

GYP BD

HB

HOLLOW METAL INSULATED

HORIZONTAL

HEIGHT

HIGH POINT

HOUR

HOLLOW CORE

HARDWOOD

HARDWARE

HOLLOW METAL

SIM

SD

SH

GYPSUM

HOSE BIBB

GYPSUM WALLBOARD

S

SC

SECRETARIES

SOAP DISPENSER,

SANITARY NAPKIN

SANITARY NAPKIN

SIMILAR

SHEET

SHOWER

SCREEN

SHELF

SECTION

SOLID CORE

SOUTH

SCHEDULE

ARCHITECTURAL SYMBOLS

NEW WORK

WALL TYPE

FURNITURE / EQUIPMENT

DEMOLITION

DOOR

REVISION TRIANGLE

ARCHITECTURAL TAGS:

T.O. TOP OF

SATC

PTI PROPERTY TURN IN

AREA OFWORK

WORK AREA

FRONTFR

MOUNTED

FINISH SYSTEM

(OUTSIDE DIAMETER)

WALL HYDRANT

EQUIPMENT

POWER SUPPLY

NOTED

DISPENSER

(PROJECT MANAGER)

DISPENSER

RECEPTACLE

STORM DRAIN

TILE CEILING

G-002

GENERALINFORMATION

A

1

1

SCALE: REF.

PLAN/DETAIL TITLE1A-101 AX-YYY

AX-YYY

1. THIS PROJECT SHALL COMPLY WITH LATEST EDITION OF THEFOLLOWING CODES: UNIFIED FACILITIES CRITERIA, UFC 1-200-01, GENERAL BUILDING

REQUIREMENTS UNIFIED FACILITIES CRITERIA, UFC 3-600-01, FIRE PROTECTION ENGINEERING

FOR FACILITIES UNIFIED FACILITIES CRITERIA, UFC 3-301-01, STRUCTURAL ENGINEERING UNIFIED FACILITIES CRITERIA, UFC 3-310-04; SEISMIC DESIGN OF BUILDINGS INTERNATIONAL BUILDING CODE, IBC, EXCEPT AS MODIFIED BY UFC 1-200-01 NFPA 1, FIRE CODE IN LIEU OF INTERNATIONAL FIRE CODE NFPA 101 LIFE SAFETY CODE AS SPECIFIED IN UFC 3-600-01 ABA ACCESSIBILITY STANDARD FOR DEPARTMENT OF DEFENSE ELECTRICAL: IBC, CHAPTER 27 ELECTRICAL: NFPA 70, NATIONAL ELECTRIC CODE, NEC ELECTRICAL: UFC 3-501-01, ELECTRICAL ENGINEERING ELECTRICAL: UFC 3-520-01, INTERIOR ELECTRICAL SYSTEMS ELECTRICAL: UFC 3-530-01, DESIGN: INTERIOR AND EXTERIOR LIGHTING AND

CONTROLS ELECTRICAL: UFC 3-550-01, EXTERIOR ELECTRICAL POWER DISTRIBUTION ELECTRICAL: UFC 3-560-01, ELECTRICAL SAFETY, OPERATIONS AND

MAINTENANCE ELECTRICAL: UFC 3-580-01, TELECOMMUNICATIONS, BUILDING CABLING

SYSTEMS PLANNING AND DESIGN FIRE PROTECTION: NFPA 13, STANDARD FOR THE INSTALLATION OF

SPRINKLER SYSTEMS FIRE PROTECTION: NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE MECHANICAL: UFC 410-01FA, HEATING, VENTILATING AND AIR CONDITIONING

IN LIEU OF IBC MECHANICAL: NFPA 90A, INSTALLATION OF AIR-CONDITIONING AND

VENTILATING SYSTEMS IN LIEU OF THE INTERNATIONAL MECHANICAL CODE MECHANICAL: UFC 3-400-02, DESIGN: ENGINEERING WEATHER DATA, TO

ACCESS CLIMATOLOGICAL DATA FOR DESIGN OF MECHANICAL SYSTEMS PLUMBING: IBC CHAPTER 29 PLUMBING: UFC 3-420-01, PLUMBING SYSTEMS PLUMBING: INTERNATIONAL PLUMBING CODE NFPA 75 STANDARD FOR THE PROTECTION OF INFORMATION TECHNOLOGY

EQUIPMENT EIA/TIA 568 COMMERCIAL BUILDINGS COMMUNICATIONS WIRING STANDARDS EIA/TIA 569 COMMUNICATIONS PATHWAYS AND SPACES EIA/TIA 607 COMMUNICATIONS GROUNDING AND BONDING ANSI/EIA/ETI 758 CONSUMER OWNED OUTSIDE PLANT TELECOMMUNICATIONS

STANDARDS EIA/TIA 492/455 OPTICAL FIBER SPECIFICATIONS AND TESTING BICSI TELECOMMUNICATIONS DISTRIBUTION METHODS SPECIFICATIONS ALL ELECTRICAL FITTINGS SHALL BE STEEL.

2. SHOULD PROJECT CIRCUMSTANCES REQUIRE CLARIFICATION, SENDRFIs TO SITE PROJECT MANAGER FOR RESOLUTION.

3. UNLESS OTHERWISE NOTED, PLAN DIMENSIONS AT NEW WORK ARE TOFACE OF EXISTING FINISH WALL AND TO THE CENTER OF NEWPARTITIONS.

4. CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT SPREAD OFCONSTRUCTION DUST. REFER TO SPECIFICATION SECTION 01 50 00,TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS AND SECTION01 74 19, CONSTRUCTION DEMOLITION AND WASTE MANAGEMENT.

5. VERIFY ALL ROUGH-IN DIMENSIONS FOR EQUIPMENT PROVIDED IN THISCONTRACT, OR BY OTHERS.

6. ENGINEERING DRAWINGS SUPPLEMENT THE ARCHITECTURALDRAWINGS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECKWITH THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OFOTHER WORK. BRING DISCREPANCIES TO THE SITE PROJECT MANAGER'SATTENTION FOR CLARIFICATION PRIOR TO INSTALLATION OF SAID WORK.ANY WORK INSTALLED IN CONFLICT WITH THE ARCHITECTURALDRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT HISEXPENSE AND AT NO ADDITIONAL COST TO THE GOVERNMENT.

8. DO NOT SCALE DRAWINGS. VERIFY IN FIELD ALL DIMENSIONS, GRADES,CONDITIONS AT SITE PRIOR TO COMMENCING THE WORK, AND REPORTANY DISCREPANCIES TO FSB DESIGN PROJECT MANAGER IN WRITING.DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ONDRAWINGS. CONTRACTOR SHALL NOTIFY FSB WHERE DISCREPANCIESOCCUR BETWEEN DRAWINGS, GENERAL NOTES. THE CONTRACTORSHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF THEWALLS.

9. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARECONSIDERED TO BE STANDARDS. IF THE CONTRACTOR HAS ANYQUESTIONS REGARDING SAME, OR OTHER EXACT MEANING, FSB SHALLBE NOTIFIED FOR CLARIFICATION.

10. CONTRACTOR SHALL PROVIDE TEMPORARY EXIT SIGNS TO ASSURE AMEANS OF EGRESS DURING CONSTRUCTION.

11. GENERAL CONTRACTOR SHALL COORDINATE SITE PLUMBING,DRAINAGE, ELECTRICAL, TELEPHONE WORK AND EXISTING UTILITIES TOPROVIDE A COMPLETE OPERATING SYSTEM.

12. CONTRACTOR SHALL VERIFY ALL CONCRETE AND MASONRY OPENINGSIN THE FIELD PRIOR TO FABRICATION OF DOORS, WINDOWS, LOUVERSAND FRAMES.

13. CONTRACTOR SHALL VERIFY SIZES AND LOCATION OF MECHANICALEQUIPMENT PADS AND BASES AS WELL AS POWER AND WATER ORDRAIN INSTALLATION WITH EQUIPMENT MANUFACTURERS BEFOREPROCEEDING WITH THE WORK. CHANGES TO ACCOMMODATE FIELDCONDITIONS OR SUBSTITUTIONS SHALL BE MADE WITHOUTADDITIONAL COST TO THE GOVERNMENT.

14. CONTRACTOR SHALL REVIEW THE LOCATION OF ALL FIRE LIFE SAFETYDEVICES WITH FSB FOR ON SITE APPROVAL PRIOR TO INSTALLATION.

15. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACESWILL BE FLUSH.

16. INSTALL ALL METAL CORNER BEADS TO ALL EXPOSED WALL BOARDEDGES. INSTALL CASING BEAD WHEREVER WALLBOARD, PLASTER, ETC.ABUTS A DISSIMILAR FINISH MATERIAL AND PROVIDE SEALANT ASREQUIRED.

17. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS,BRACING, BLOCKING, HANGERS, BACK-UP PLATES AND SUPPORTINGBRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK,FIXTURES AND PARTITIONS AND ALL WALL MOUNTED OR SUSPENDEDMECHANICAL, ELECTRICAL, OR MISCELLANEOUS EQUIPMENT ANDFURNISHINGS.

18. AN ACOUSTICAL SEAL SHALL BE PROVIDED BETWEEN ALL DUCTS,PIPING, AND PARTITIONS.

19. ALL DOOR SIZES SHOWN ON DOOR SCHEDULE ARE OPENING SIZES.FRAMES SHALL BE REINFORCED WHERE REQUIRED FOR CLOSURES,STOPS AND HARDWARE.

20. IN CASES WHERE MATERIALS AND PRODUCTS DIFFER BETWEEN THEDRAWINGS AND SPECIFICATIONS THE DRAWINGS SHALL PREVAIL.

21. "ALIGN" - INDICATES THAT WHERE NEW CONSTRUCTION ABUTSEXISTING CONSTRUCTION WALL FINISHES ARE TO ALIGN. TAPE,SPACKLE AND PAINT TO PROVIDE AN EVEN SURFACE OF UNIFORMCOLOR AND APPEARANCE.

22. FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS PRIOR TOFABRICATION OR INSTALLATION OF ANY ITEM. SHOULD CONDITIONSVARY FROM DRAWINGS, PLEASE CONTACT FSB.

24. DOOR LOCATIONS NOT DIMENSIONED ARE:A. JAMB FACE 6" (152mm) FROM FACE OF WALL.B. CENTER LINE OF DOOR ON CENTER LINE OF ROOM OR CORRIDOR.

SPECIFICATIONS

1. ALL PROJECTS ARE SUBJECT TO THE REQUIREMENTS OF THE SITE GUIDESPECIFICATION, AS ADAPTED FOR THIS SPECIFIC PROJECT. THE SITE GUIDESPECIFICATION IS BASED UPON THE UNIFIED FACILITIES GUIDESPECIFICATION (UFGS) ARMY VERSION, CURRENT EDITION.

2. CONTRACTOR WORKFORCE SHALL ALWAYS ADHERE TO THEREQUIREMENTS OF SECTION 01 45 00.10 50, QUALITY CONTROL FORMINOR PROJECTS, AND THE QUALITY ASSURANCE PARAGRAPH OF EACHINDIVIDUAL SPECIFICATION SECTION USED ON THE PROJECT.

3. DIVISION 01, GENERAL CONDITIONS OF THE CONTRACT, ARE ALWAYS INEFFECT FOR ALL PROJECTS.

4. THE CONTRACTOR WORKFORCE SHOULD CONTACT THE CFOAM PM,SHOULD ANY OF THE PROVISIONS OF THE SPECIFICATION REQUIRECLARIFICATION.

5. FOLLOW THE PROJECT QUALITY CONTROL PLANNING CHECKLIST.

6. PRODUCTS USED ON THE PROJECT SHALL COMPLY WITH THE STANDARDSLISTED IN THE REFERENCES PARAGRAPH OF THE APPLICABLESPECIFICATION SECTION.

7. PROVIDE SUBMITTALS AS CALLED FOR IN THE SUBMITTALS PARAGRAPH OFEACH SPECIFICATION SECTION. IN THE CASE WHERE STATION STANDARDPRODUCTS ARE BEING ORDERED, PROVIDE CONFIRMATION OF SUCH TOTHE DESIGNER OF RECORD.

8. ALL PRODUCTS USED ON THIS PROJECT SHALL CONFORM TO THEREQUIREMENTS OF THE PRODUCTS PORTION OF THE APPLICABLESPECIFICATION SECTION.

9. INSTALLATION OF MATERIALS SHALL CONFORM TO THE REQUIREMENTS OFTHE EXECUTION PORTION OF THE APPLICABLE SPECIFICATION SECTION. INALL CASES, FOLLOW THE MANUFACTURERS' WRITTEN INSTRUCTIONS.

10. THE QUALITY ASSURANCE PARAGRAPH OF EACH PROJECT SPECIFICATIONSECTION WILL PROVIDE A LISTING OF DEFINABLE FEATURES OF WORK,WHICH ARE THE BASIS FOR INSPECTIONS OF INSTALLED WORK.

11. CONTRACTOR IS REQUIRED TO CORRECT ALL NON-COMPLIANT WORKFOLLOWING THE ISSUANCE OF A FINDING OF NON-COMPLIANCE.

12. THE FOLLOWING SPECIFICATION SECTIONS ARE HEREBY INCORPORATEDINTO THE PROJECT CONTRACT DOCUMENTS:

A. DIVISION 01 - GENERAL REQUIREMENTS, COMPLETE

B. DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

DEMOLITION NOTES1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING &

FIRE PROTECTION DEMOLITION DRAWINGS FORWORK NOT SHOWN ON ARCHITECTURAL DEMOLITIONDRAWINGS.

2. CONTRACTOR SHALL INVESTIGATE PROJECT EXISTINGCONDITIONS. BRING ANY CONFLICTS AND/ORDISCREPANCIES BETWEEN DRAWINGS,SPECIFICATIONS, AND SITE CONDITIONS AND ANYUNUSUAL OR SPECIAL CONDITIONS TO THEATTENTION OF SITE PROJECT MANAGER.

3. CONTRACTOR SHALL PROVIDE ALL TEMPORARYFACILITIES REQUIRED FOR A SAFE CONSTRUCTIONOPERATION. CARE SHALL BE TAKEN TO PROTECTEXISTING CONSTRUCTION, EQUIPMENT, FURNITUREAND PERSONNEL IN THE AREA OF CONSTRUCTION.

4. CONTRACTOR SHALL PATCH AND REPAIR ALLDAMAGE RESULTING FROM PROJECT WORK TOMATCH EXISTING ADJACENT SURFACES OR NEWWORK AS NOTED.

5. PROVIDE MATERIALS AND WORKMANSHIP WHENPATCHING/REPAIRING TO ACCURATELY MATCHSURROUNDING EXISTING AND/OR NEW WORK.

6. UPON COMPLETION OF WORK, REMOVE TOOLS,EQUIPMENT AND MATERIALS FROM THE SITE.REMOVE PROTECTIONS NO LONGER NEEDED ANDLEAVE INTERIOR AREAS BROOM CLEAN.

7. CEASE OPERATIONS AND NOTIFY THE PROJECTMANAGER IMMEDIATELY IF SAFETY OF STRUCTUREOR WORK AREA APPEARS TO BE ENDANGERED. TAKEPRECAUTIONS TO SUPPORT STRUCTURE AND SECUREAREA UNTIL DETERMINATION IS MADE FORCONTINUING OPERATIONS.

8. DRAWINGS OF AREAS NOT WITHIN THE PROJECTAREA OF WORK ARE NOT PART OF PROJECT SCOPEAND MAY NOT ACCURATELY REFLECT EXISTINGCONDITIONS.

9. CONTRACTOR SHALL KEEP THE PREMISES CLEANAND FREE FROM AN ACCUMULATION OF WASTEMATERIAL AND RUBBISH. AT THE END OF EACH WORKDAY, LEAVE THE AREA OF WORK IN A BROOM CLEANCONDITION. CONTRACTOR SHALL SUPPLY OWNTRASH BINS.

10. CONTRACTOR SHALL PROVIDE ADEQUATESUPERVISION FOR ALL PROJECT OPERATIONS. THESUPERVISOR SHALL HAVE THE NECESSARYKNOWLEDGE, EXPERIENCE AND AUTHORITY TOCONDUCT THE REQUIRED ACTIVITIES IN COMPLIANCEWITH THESE NOTES.

11. THE FACILITY IS TO REMAIN OPEN AND OPERATIONALDURING CONSTRUCTION. THE CONTRACTOR SHALLCOORDINATE WITH AND GET THE APPROVAL OF SITEPROJECT MANAGER IN ESTABLISHING THE HOURS OFOPERATION.

12. THE CONTRACTOR SHALL MAINTAIN THE REQUIREDTEMPORARY EXITS AND PATHS OF TRAVEL FROMBUILDING AREAS THAT DO NOT FALL WITHIN THESCOPE OF THIS CONTRACT.

MATERIAL SYMBOLS

NEW WALL/ PARTITION

WOOD, FRAMING

METAL STUD WALL

WOOD BLOCKING

INSULATION, RIGID

INSULATION, BATT

ACOUSTICAL TILE

GYPSUM BOARD

METAL

WALL/ PARTITIONTO BE DEMOLISHED

EXISTING WALL/ PARTITION

2C02C

NEW WORK

2C02C

DEMOLITION:

2G03

EXISTING

EXISTING WALL TO REMAIN

EXISTING DOOR TO REMAIN

EXISTING ROOM NUMBER

EXISTING RAISED ACCESS FLOOR

EXISTING SUSPENDED CEILING

PARTITION TYPE

NEW DOOR

NEW ROOM NUMBER

NEW RAISED ACCESS FLOOR

NEW 2'x2' SUSPENDED CEILING

EXISTING WALL TO BE REMOVED

EXISTING DOOR TO BE REMOVED

EXISTING ROOM NUMBER TO BE REMOVED

EXISTING SUSPENDED CEILING TO BEREMOVED

EXISTING RAISED ACCESS FLOOR TO BEREMOVED

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

Page 3: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

EQUIPMENT RECEPTACLE WALL MTD 6" BELOW SUSPENDED CEILING.

EQUIPMENT RECEPTACLE WALL MTD 12" AFF (UON)

EQUIPMENT RECEPTACLE MTD BELOW RAISED FLOOR

CONDUIT EMBEDDED IN OR BELOW CONCRETE SLAB OR UNDERGROUND

LOCAL CONTROL STATION, TYPE AS INDICATED ON DRAWINGS

EXISTING ELECTRICAL DUCT BANK/GROUND CONDUCTOR AS INDICATED

SV = SOLENOID VALVE, TS = TEMPERATURE SWITCH/TIME SWITCH

MOTOR OPERATED VALVE

TRANSFORMER

MAGNETIC MOTOR STARTER, MH AS INDICATED ON PLANS

HOMERUN TO SOURCE, SOURCE AND CIRCUIT NO.(S) SHOWN

FLUORESCENT LIGHT FIXTURE, STRIP OR INDUSTRIAL TYPE

COMBINATION MOTOR STARTER & CKT BKR, AS INDICATED ON PLANS

FLUORESCENT LIGHT FIXTURE, STRIP OR INDUSTRIAL TYPE,

INCANDESCENT OR HID LIGHT FIXTURE, UNSWITCHED ON EMERG/NL CKT

PANELBOARD, 208Y/120V, SURFACE MOUNTED

GROUND WIRE SYSTEM (DASHED=EXPOSED), WIRE SIZE SHOWN.

FLEXIBLE CONNECTION, SIZE AS INDICATED ON PLANS

MANUAL MOTOR SWITCH, WITH THERMAL OVERLOAD, MH + 4'-0" AFF UON

PANELBOARD, 480/277V, SURFACE MOUNTED

CONDUIT RUN, EXPOSED

CONDUIT RUN, CONCEALED

MECHANICAL UNIT IDENTIFICATION (TYPICAL). UH/4 INDICATES UNIT HEATER #4

2' x 4' FLUORESCENT LIGHT FIXTURE

UNSWITCHED ON EMERG/NL CKT (UON)

JUNCTION BOX, CEILING MOUNTED (SIZE PER 2005 NEC REQUIREMENTS)

PULL BOX OR ENCLOSURE.

J

PLAN SYMBOLSPANELBOARD, 208/120V FLUSH MOUNTED

PANELBOARD, 480/277V, FLUSH MOUNTED

TRACK LIGHTING CEILING MTD, NUMBER OF FIXTURES AS INDICATED

2' x 2' FLUORESCENT LIGHT FIXTURE

1' x 4' FLUORESCENT LIGHT FIXTURE

DASH AND BOLD MARK INDICATES ITEMS TO BE REMOVED

JUNCTION BOX, WALL MOUNTED, MH AS INDICATED ON PLAN DWGS

DEMOLITION NOTES

ONE-LINE SYMBOLS

CONDUIT TURNING UP

CONDUIT TURNING DOWN

UNDERFLOOR BOX FOR UTILITY POWER. POINT OF DISTRIBUTION.

UNDERFLOOR BOX FOR TECHNICAL POWERPOINT OF DISTRIBUTION.

MH + 6'-0"AFF TOHIGHEST BREAKER

CONDUIT HASH MARKS INDICATE NO. OF #12 IN CODE SIZE CONDUIT,3/4"C MIN. LONG MARK INDICATES NEUTRAL CONDUCTOR; GREENGROUND CONDUCTOR IS NOT SHOWN BUT SHALL BE PROVIDED.

JUNCTION BOX, MOUNTED ON SLAB UNDERFLOOR (SIZE PER 2005 NEC REQUIREMENTS)J

J JUNCTION BOX, MOUNTED ON SLAB UNDERFLOOR

TYPE 5-20R.

OVERLOAD ELEMENTS, NO. INDICATED, MOTOR CONTROLLER

SELECTOR SWITCH (SPDT), THREE POSITION

SOLENOID OPERATED VALVE COIL

SELECTOR SWITCH (SPST), TWO POSITION

TOGGLE SWITCH (SPST)

ONE-LINE SYMBOLS

AS = AMMETER SWITCH, VS = VOLTMETER SWITCH

MOTOR WITH HORSEPOWER INDICATED

CIRCUIT BREAKER, 3P, FRAME & TRIP RATING AS INDICATED

TS=CKT BKR TEST SWITCH, CS=CKT BKR CONTROL SWITCH

120 VAC SHUNT TRIP, SOLID IS NEW, DASHED IS FUTURE

CONTROL TRANSFORMER, 1Ø, WINDING VOLTAGES AS INDICATED

CONDUCTORS CONNECTED

CONDUCTORS NOT CONNECTED

A= AMMETER V= VOLTMETER

INTERLOCK CIRCUIT

INDICATES FEEDER No.

KEY INTERLOCK

AUTOMATIC TRANSFER SWITCH

EMERGENCY/STANDBY GENERATOR SET

GROUND CONNECTION

BATTERY, DC VOLTAGE AS INDICATED

HIGH VOLTAGE LOAD INTERRUPTER SWITCH, NON-FUSED

POWER TRANSFORMER, RATINGS AS PER SINGLE LINE

POWER TRANSFORMER WITH ELECTROSTATIC SHIELD

GROUNDING RESISTOR, RESISTANCE AS INDICATED

LOW VOLTAGE DRAWOUT CIRCUIT BREAKER

FUSE, TYPE AS INDICATED

DRAW-OUT STAB CONNECTOR

E.O. = ELECTRICALLY OPERATED

S

HARDWIRE CONNECTION TO EQUIPMENT AS INDICATED ON DRAWINGS.

PLUG STRIP

SERVICE OUTLET BOX, (1) SINGLE 5-20R ON TECHNICAL POWERAND (1) DUPLEX 5-20R ON UTILITY POWER.

VIDEO INTERFACE BOXV

FLASHING LIGHT

OCCUPANCY SENSOR, PASSIVE DUAL TECHNOLOGY, WIDE VIEW, WALL MTD,MH 8'-6"AFF. INFRARED/MICROPHONIC TECHNOLOGIES, a = SWITCHCONTROLLING LIGHTING FIXTURES WITH DESIGNATIONS SHADED PORTIONS OFSYMBOL INDICATE SENSOR INSTALLATION DIRECTION FOR MAXIMUM AREACOVERAGE, 6-DESIGNATES CONTROLLED CIRCUIT (OPEN OFFICE AREAS).

HEAVY LINE IS NEW WORK BY THE CONTRACTOR UON.

LIGHT LINE IS EXISTING WORK AND IS SHOWN FOR REFERENCE ONLY UON.

CONDUIT HASH MARKS INDICATE NO. OF #12 IN CODE SIZECONDUIT, 3/4"C MIN. LIGHT HASH MARKS INDICATE EXISTING 2WIRES; BOLD HASH MARKS INDICATE NEW WIRES, SIZE ASINDICATED.

ACCESS CONTROL REMOTE RELEASE BUTTON

LIGHTNING PROTECTION AIR TERMINAL

EMERGENCY POWER SWITCH ("EPO" BUTTON) ANNUCIATOR PANEL.

EQUIPMENT DISCONNECT SWITCH.

PUBLIC ANNOUNCER SYSTEM SPEAKER

M

M5

1. SOME SYMBOLS SHOWN ON THIS DRAWING ARE NOT BEING USED.

2. ENSURE POWER OUTAGE AUTHORIZATION IS APPROVED PRIOR TOSHUTTING ANY POWER SOURCE.  COORDINATE ALL POWEROUTAGES WITH CFOAM PM AT LEAST ONE WEEK IN ADVANCE.

3. THE CONDUIT SYSTEM SHALL NOT BE USED AS EQUIPMENTGROUNDING. FOR SYSTEMS 600 VOLTS AND BELOW, ALL POWER ANDCONTROL/INSTRUMENTATION FEEDERS SHALL HAVE A GREENGROUND CONDUCTOR. ALL NON-CURRENT CARRYING PARTS OFSUCH EQUIPMENT, LIGHTING FIXTURES, RECEPTACLES, ETC SHALLBE GROUNDED BY MEANS OF A GREEN INSULATED GROUNDCONDUCTOR RUN IN THE RACEWAY WITH PHASE CONDUCTORSSIZED PER 2017 NEC (OR MOST CURRENT VERSION) UNLESSOTHERWISE INDICATED ON THE DRAWING.

4. ALL "SPARE" CONDUITS AND "CONDUIT ONLY" SHALL BE PROVIDEDWITH A 200 POUND NYLON PULLCORD.

5. ALL NOTES ON DRAWINGS WITHOUT OR ARE GENERALNOTES.

6. ALL CONDUIT ABOVE CEILING SPACE SHALL BE INSTALLED ABOVEMECHANICAL PIPING/DUCT WORK.

7. OCCUPANCY SENSORS SHALL BE OF THE TWO-WAY TYPE, WHICHDETECT CHANGES IN LOW INTENSITY, INAUDIBLE SOUND WAVES.SENSORS SHALL HAVE ADJUSTABLE SENSITIVITY AND TIME DELAY (15SEC. TO 30 MINUTES), AND MANUAL OVERRIDE SWITCH. SET SENSORTIME DELAY AT 10 MINUTES. ADJUST SENSITIVITY AS REQUIRED.SENSORS SHALL HAVE MULTIPLE FREQUENCIES TO ENABLESEPARATE CONTROL OF ADJACENT AREAS. THREE AREAS WHEREOCCUPANCY SENSORS SHALL BE PROVIDED ARE: OPEN OFFICESPACES, RESTROOMS, AND CORRIDORS. OCCUPANCY SENSORSSHALL BE CAPABLE OF OPERATION IN OPEN OFFICE SPACE WITHMODULAR OFFICE WALLS AT 84 INCHES HIGH.

8. FOR ALL TRANSFORMERS, THE SECONDARY NEUTRAL CONDUCTORSHALL BE GROUNDED IN ACCORDANCE WITH THE 2017 NEC (ORMOST CURRENT VERSION).

9. ALL CONTROL/POWER WIRING REQUIRED BUT NOT SHOWN FORTHERMOSTATS, CONTROLLERS, VARIABLE FREQUENCY DRIVECONTROL, MANUFACTURE EQUIPMENT CONTROL PANEL, DAMPERMOTORS, VARIABLE VOLUME CONTROLS, MOTORS, SMOKE DAMPERS,SENSING DEVICES SUCH AS TEMPERATURE, PRESSURE, HUMIDITY,LEVEL, FLOW, AND VOLUME ETC. SHALL BE PROVIDED BYCONTRACTOR AS PART OF INSTALLATION PACKAGE.

10. CONTRACTOR SHALL MAKE FINAL CONNECTION TO FLOOR BOXESAND LAN FDF RACKS FOR A COMPLETE FUNCTIONAL SYSTEM.

11. FIELD VERIFY AND UPDATE ALL POWER PANEL SCHEDULES.

12. ALL WORK SHALL BE IN ACCORDANCE TO THE LATEST VERSION OFUFGS SPECIFICATIONS.

13. CONTRACTOR SHALL NOT USE METAL CLAD CABLE UNLESS NOTEDON DRAWINGS.

14. ALL CONDUIT RUNS SHOWN ARE FOR ILLUSTRATION ONLY.CONTRACTOR SHALL FIELD VERIFY FOR EXACT CONDUIT ROUTINGPATHS. PROJECT MANAGER SHALL BE NOTIFIED IMMEDIATELY OFANY DEVIATIONS FROM THE DRAWINGS.

15. AREA SHALL BE CLEAN AND LEFT IN SAFE WORKING CONDITIONS PEROSHA REQUIREMENTS UPON COMPLETION OF PROJECT.

16. EACH NEW RECEPTACLE FEEDING A SERVER RACK IN DATA CENTERSHALL BE FED FROM A DEDICATED CIRCUIT.  MULTIPLERECEPTACLES FED FROM THE SAME CIRCUIT SHALL NOT BEPERMITTED.

1. THE CONTRACTOR SHALL VERIFY ALL EXISTING EQUIPMENT SHOWNON THE DEMOLITION DRAWINGS TO BE REMOVED/RELOCATEDDURING THE JOB WALK.

2. WHERE EXISTING CIRCUITS FEED DEVICES TO BE REMOVED AND TOBE RELOCATED, CONTRACTOR SHALL MAINTAIN EXISTING CIRCUITCONTINUITY TO THE PORTION OF THE CIRCUIT REQUIRED TOREMAIN IN SERVICE.

3. CONTRACTOR SHALL REMOVE ALL DEMOLISHED ELECTRICALEQUIPMENT FROM THE SITE UNLESS OTHERWISE NOTED. WORKAREAS SHALL BE CLEAR PRIOR TO STARTING NEW ELECTRICALWORK.

4. ALL HOLES AND DAMAGE CAUSED BY ELECTRICAL DEMOLITION ANDMODIFICATIONS SHALL BE REPAIRED AND PAINTED TO MATCHADJACENT AREA AND EXISTING CONDITIONS.

5. THE CONTRACTOR SHALL COORDINATE ANY ELECTRICALDEMOLITION WITH THE GOVERNMENT BEFORE STARTING ANYWORK.

6. THE CONTRACTOR SHALL RETURN TO THE GOVERNMENT, ORPROVIDE THE GOVERNMENT WITH COMPENSATION FOR ANYTHINGSALVAGED.

7. PRIOR TO DE-ENERGIZING POWER SOURCE OF ANY EXISTINGRECEPTACLE IN A DATA CENTER, CONTRACTOR SHALL FIELD VERIFYTO ENSURE THE DEMOLISHED RECEPTACLE HAS NO POWER CORDPLUGGED INTO IT.  IF A POWER CORD IS STILL PLUGGED IN THERECEPTACLE TO BE DEMOLISHED, CONTRACTOR SHALL NOTIFYPROJECT MANAGER IMMEDIATELY.  ONLY END USER ISAUTHORIZED TO UNPLUG THE POWER CORD.

8. UNLESS OTHERWISE NOTED, WHEN MULTIPLE CIRCUITS RUN IN THESAME RACEWAY TO FEED MULTIPLE RECEPTACLES AND ONE OFTHOSE RECEPTACLES IS NOT IN USE.  THE UNUSED RECEPTACLESHALL NOT BE DEMOLISHED AND IT SHALL REMAIN IN PLACE. LABEL CIRCUIT FEEDING THE UNUSED RECEPTACLE AS “U/F SPAREREC @ XXYY.”  XXYY IS THE ACTUAL GRID LOCATION.

MEDIUM VOLTAGE DRAW-OUT VACUUM CIRCUIT BREAKER,SIZE AND CAPACITY AS INDICATED

ELECTRICAL CONNECTION

WINDOW TYPE CURRENT TRANSFORMER. 1-INDICATESNUMBER OF CT'S AND 50/5-INDICATES TURN RATIO

CURRENT TRANSFORMER. 3-INDICATES NUMBER OF CT'S AND2000/5-INDICATES CURRENT RATIO

COMBINATION STARTER FULL VOLTAGE NONREVERSING; 1 = NEMA STARTER SIZE

COMBINATION CONTACTOR, 1 = NEMA CONTACTOR SIZE

CONTACTOR, 1 = NEMA CONTACTOR SIZE

LIGHTING FIXTURE TYPE, SEE LIGHTING FIXTURE SCHEDULE MOUNTINGHEIGHT AFF IS AS INDICATED. FIXTURE IS SURFACE OR RECESSED MOUNTEDWHEN MOUNTING HEIGHT IS OMITTED.

FLUORESCENT LIGHT FIXTURE, LETTER a INDICATES ONE HALF ON NORMALPOWER SWITCHED LEG AND THE OTHER HALF UNSWITCHED ON EMERG/NLCIRCUIT. ABSENCE OF CONTROL SW LETTER INDICATES ENTIRE FIXTURE ISUNSWITCHED ON EMERG/NL CKT.

INCANDESCENT, COMPACT FLUORESCENT OR HID LIGHT FIXTURE, CEILING MOUNTED,UON

EXIT LIGHT, CEILING MTD, SINGLE OR DOUBLE FACE AS INDICATED BY THE NUMBER OFDIRECTIONAL ARROWS SHOWN. SHADED AREA INDICATES FACE OF THE EXIT SIGN.

INCANDESCENT OR HID LTG FIXTURE WALL MTD UON, MOUNTINGHEIGHT AS NOTED ON LIGHTING PLAN

EXIT LIGHT, BACK WALL MOUNTED, WITH OR WITHOUT DIRECTIONALARROW AS INDICATED. SHADED AREA INDICATES FACE OF THE EXITSIGN.

LIGHT SWITCH, WALL MTD 42" AFF., LETTERS AND NUMBERS INDICATE: a = SWITCHCONTROLLING LTG FIXTURES W/DESIGNATION; 3 = THREE WAY SWITCH; 2 =DOUBLE POLE, SINGLE THROW; D = DIMMER (20A, 120-277VAC)

OCCUPANCY SENSOR, PASSIVE DUAL TECHNOLOGY, WIDE VIEW, WALL MTD, MH42"AFF. INFRARED/MICROPHONIC TECHNOLOGIES, a = SWITCH CONTROLLINGLIGHTING FIXTURES WITH DESIGNATIONS SHADED PORTIONS OF SYMBOL INDICATESENSOR INSTALLATION DIRECTION FOR MAXIMUM AREA COVERAGE. (PRIVATEOFFICES). PROVIDE IVORY COLORED DECORATOR STYLE AND FIT INTO A SINGLEGANG SWITCH BOX.

OCCUPANCY SENSOR (INFRARED TECHNOLOGY), WIDE VIEW, WALL MTD, MH 6"BELOW CEILING, a = SWITCH CONTROLLING LIGHTING FIXTURES WITHDESIGNATION, SHADED PORTIONS OF SYMBOL INDICATE SENSOR INSTALLATIONDIRECTION FOR MAXIMUM AREA COVERAGE (CORRIDORS).

20A, 120V, 1 PHASE POWER-PACK: a = IDENTIFIES CONTROLLINGOCCUPANCY SENSOR(S). CIRCUIT NUMBER ON THE LIGHTING FIXTURESALSO FEEDS THE POWER PACK NEAREST TO THE FIXTURE.

EMERGENCY POWER OFF "EPO" BUTTON MOUNTED 42" AFF. BUTTON SHALL BE REDMUSHROOM TYPE, SPRING ACTION MOMENTARY CONTACT, AND 40MM CLEARHINGED LOCKOUT LIP.

QUADRUPLEX RECEPTACLE, (2)20A, 125V, 2P-3W, NEMA 5-20R, 18"AFF (UON).MOUNTED IN DOUBLE GANG UTILITY BOX

FLOOR UTILITY ACCESS BOX WITH NEMA TYPE RECEPTACLES AS INDICATED ONDRAWINGS.

DUPLEX CONVENIENCE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, 18"AFF (UON).GFCI INDICATES GROUND FAULT CURRENT INTERRUPTER.

SINGLE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, 54" AFF (UON).

DUPLEX CONVENIENCE RECEPTACLE ON EMERGENCY CIRCUIT, 20A, 125V, 2P-3W,NEMA 5-20R, 18" AFF (UON). RECEPTACLES SHOWN ON SYSTEMS FURNITUREPARTITION PANELS ARE LOCATED IN BASE OF PANELS. GFCI INDICATES GROUNDFAULT CURRENT INTERRUPTER

DUPLEX CONVENIENCE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, MOUNTEDAT CEILING.

DUPLEX CONVENIENCE RECEPTACLE, 15A, 125V, 2P-3W, NEMA 5-15R, MOUNTEDUNDER RAISED FLOOR

SINGLE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, MOUNTED UNDERRAISED FLOOR

TWIST LOCK RECEPTACLE, AMPACITY AND VOLTAGE AS INDICATED ONRENOVATION PACKAGE.

TWIST LOCK SINGLE RECEPTACLE, 20A, 125V, 2P-3W, NEMA L5-20R, MOUNTEDUNDER RAISED FLOOR

TWIST LOCK SINGLE RECEPTACLE, 30A, 125V, 1P-3W, NEMA L5-30R, MOUNTEDUNDER RAISED FLOOR

TWIST LOCK SINGLE RECEPTACLE, 30A, 250V, 2P-3W, NEMA L6-30R, MOUNTEDUNDER RAISED FLOOR

TWIST LOCK SINGLE RECEPTACLE, 20A, 208/120V, 3P-5W, NEMA L21-20R,MOUNTED UNDER RAISED FLOOR

TWIST LOCK SINGLE RECEPTACLE, 20A, 250V, 2P-3W, NEMA L6-20R, MOUNTEDUNDER RAISED FLOOR

TWIST LOCK SINGLE RECEPTACLE, 30A, 120/208V, 3Ø, 3P-5W, NEMA L21-30R,MOUNTED UNDER RAISED FLOOR

SYSTEMS FURNITURE PARTITION POWER ENTRY (UTILITYPOWER)

CLOCK OUTLET, WALLMOUNTED

POWER DISTRIBUTION UNIT. K RATEDISOLATION TRANSFORMER WITH THREESECTION, 126 POLE PANELBOARD.

EMERGENCY POWER OFF (EPO) SWITCH FOROPERATION OF SHUNT TRIP BREAKER.

WALL OR CEILING MOUNTED EMERGENCYLIGHTING UNITS MAINTENANCE FREE WITHLEAD-CALCIUM BATTERIES

STREET LIGHT, 277AC, ON 25' (VON) POLE AND METAL HALIDE SOURCE.

AREA/WALKWAY LIGHT, 277AC, ON 10' (VON) AND METAL HALIDE SOURCE.

DIRECT BURIED PULL BOX FOR ELECTRICAL POWER FEEDS. (MANHOLE)

ELECTRICAL MOTOR. SIZE, CONDUIT, ANDCONDUCTORS AS INDICATED ON ONE-LINE DIAGRAM

COMBINATION HIGH VOLTAGE SELECTOR AND LOADINTERRUPTER WITH MECHANICAL INTERLOCK

POTENTIAL OR CONTROL POWER TRANSFORMER WITHFUSES QUANTITY AND WINDING VOLTAGES AS INDICATED

SURGE ARRESTER, VOLTAGE RATING AND QUANTITY ASINDICATED

MAGNETIC ONLY CIRCUIT BREAKER WITH MOTOR CIRCUITPROTECTOR

LOW VOLTAGE DISCONNECT SWITCH NON FUSED, 30A/3P UON

LOW VOLTAGE FUSED DISCONNECT SWITCH, 3 POLE SIZE ASSHOWN 60A INDICATES SWITCH SIZE (50A) INDICATES FUSESIZE

COIL, R=RELAY, D=DAMPER MTR, M=MOTOR STARTER COIL,TC=TRIP COIL, TS=TIME SWITCH

STARTER RELAY CONTACT, NORMALLY OPEN, R-1=DEVICECONTACT NO.1CIRCUIT BREAKER AUXILIARY CONTACT, b = NORMALLYCLOSED.

TEMPERATURE SWITCH, NORMALLY OPEN, CLOSES ON INCREASINGTEMP

TEMPERATURE SWITCH, NORMALLY CLOSED, OPENS ON INCREASINGTEMPTIMER CONTACT, NORMALLY OPEN, TIME DELAY CLOSE ATENERGIZING

TIMER CONTACT, NORMALLY CLOSED, TIME DELAY OPEN ATENERGIZINGINSTANTANEOUS CLOSE WHEN RELAY IS ENERGIZED. TIMEDELAY OPEN WHEN RELAY IS DEENERGIZED.

INSTANTANEOUS OPEN WHEN RELAY IS ENERGIZED. TIMEDELAY CLOSE WHEN RELAY IS DEENERGIZED.

PILOT LIGHT, A-AMBER, B-BLUE, G-GREEN, R-RED, W-WHITE,Y-YELLOW

GENERAL NOTES

CEILING MOUNTED BEACON LIGHTR: REDB: BLUEY: YELLOW

E-001

ELECTRICAL NOTES,SYMBOLS AND

LEGEND

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

Page 4: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

T

L1AUE

L1

ATA

L1ATBE L1ATBF L1ATBC

L1AUBB

L1ATE

L1ATBB

L1AUBD

L1

AU

G

L1ATBA

E-101

ELECTRICALDEMOLITION

PLANLOWER B&G BLOCK

INSTALL TEMPORARY CABLING FROM P1HUA TO THE JUNCTIONBOX SHOWN. THIS TEMPORARY WILL ALLOW FOR THEUNLOADING OF P1GUA TO MAKE ROOM FOR THE NEWEQUIPMENT. (SEE SHEET E-201 FOR NEW WORK IN THIS AREA)

REMOVE 480V 3-WIRE FEEDER CABLE AND ALL ASSOCIATEDCONDUIT AND PULLBOXES BACK TO US-3. MCC-40 IS TOREMAIN AND BE REFED.

REMOVE HP1GUA, 112.5 KVA TRANSFORMER, P1GUA AND ALLASSOCIATED CONDUIT, CABLING AND JUNCTION BOXES BACKTO US-2.

REMOVE P1BUA AND THE THREE SUB PANEL FEEDS SHOWN.REMOVE EXISTING FEEDER FROM CONDUIT IN SLAB BACK TOPULL BOX IN LOWER C-BLOCK.

REMOVE SURFACE MOUNT PANELBOARD L1BUC AND ALLASSOCIATED FEEDERS.

DEMOLITION KEY NOTES:

1

LOWER B & G BLOCK - ELECTRICAL DEMOLITION PLAN 1E-101

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.

5. SEE E-600 SERIES FOR PANEL SCHEDULES.

6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.

GENERAL NOTES:

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

3/32"= 1'-0"

SEE SHEET E-102 FOR CONTINUATION

2

3

4

2

3

1

1

4

EXISTINGIN SLAB

TO REMAIN

5

5

5

Page 5: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

T

T T

L1CXB

DP1CXA

T

T

T

SUB US-2

SUB US-3

VF

D

T

T

T

T

T

ATS

T

UP

UP

UP

DN

UP

E-102

ELECTRICALDEMOLITION

PLANLOWER C BLOCK

EXISTING FEEDER TO REMAIN FOR REUSE. NO TEMPORARYNEEDED.

EXISTING FEEDER TO REMAIN FOR REUSE. INSTALLTEMPORARIES ACCORDING TO THE EXISTING FEEDERTABLES ON SHEETS E-702 & E-705.

EQUIPMENT AND ASSOCIATED FEEDER TO BE REMOVED BYOTHERS.

REMOVE 225KVA TRANSFORMER, SWITCH AND ASSOCIATEDCONDUIT AND CABLING FOR P1BUA.

REMOVE FEEDER AND ALL ASSOCIATED CONDUIT AND PULLBOXES. INSTALL TEMPORARIES ACCORDING TO THEEXISTING FEEDER TABLES ON SHEETS E-702 & E-705.

REMOVE EQUIPMENT, FEEDER AND ALL ASSOCIATEDCONDUIT AND PULL BOXES AFTER RELOCATING LOADSONTO NEW EQUIPMENT.

REMOVE EQUIPMENT AND FEEDER FROM CONDUIT IN SLABAFTER RELOCATING LOADS ONTO NEW EQUIPMENT.

REMOVE EXISTING SWITCHES, TRANSFORMERS AND 480VSWITCHGEAR. 5KV FEEDERS ARE TO REMAIN FOR REUSEUNLESS OTHERWISE NOTED.

REMOVE 5KV FEEDER CABLE BACK TO BUILDING 2802.

REMOVE SURFACE MOUNT PANELBOARD.

DEMOLITION KEY NOTES:

1

LOWER C BLOCK - ELECTRICAL DEMOLITION PLAN 1E-102

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

3/32"= 1'-0"

SEE SHEET E-101 FOR CONTINUATION

2

3

4

5

6

7

8

9

1

3

5 55

9

5

2

1 1

6

77

6

58

2

4

3

EXISTINGIN SLAB

TO REMAIN

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.

5. SEE E-600 SERIES FOR PANEL SCHEDULES.

6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.

GENERAL NOTES:

8

10

10

Page 6: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

L2

CTS

TS

1A

L2

CTS

TS

1B

T

E-103

ELECTRICALDEMOLITION

PLANUPPER C BLOCK

REMOVE 480V 3-WIRE FEEDER CABLE AND ALL ASSOCIATEDCONDUIT AND PULLBOXES BACK TO US-3. MCC-21 IS TOREMAIN AND BE REFED.

REMOVE 480V 3-WIRE FEEDER CABLE AND ALL ASSOCIATEDCONDUIT AND PULLBOXES BACK TO US-2. MCC-20 IS TOREMAIN AND BE REFED.

REMOVE EQUIPMENT, FEEDER AND ALL ASSOCIATEDCONDUIT AND PULL BOXES AFTER RELOCATING LOADSONTO NEW EQUIPMENT.

REMOVE SURFACE MOUNT PANELBOARD.

DEMOLITION KEY NOTES:

1

UPPER C BLOCK - ELECTRICAL DEMOLITION PLAN 1E-103

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

3/32"= 1'-0"

2

3

1

2

3

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.

5. SEE E-600 SERIES FOR PANEL SCHEDULES.

6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.

GENERAL NOTES:

4

4

Page 7: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

5-4" CONDUITS

3-4" CONDUITS

2" CONDUIT

T

L1AUE

L1

ATA

L1ATBE L1ATBF L1ATBC

L1AUBB

L1ATE

L1ATBB

L1AUBD

L1

AU

G

L1ATBA

E-201

ELECTRICALNEW WORK

PLANLOWER B&G BLOCK

REFEED PANELS L1AUE, L1BUC, AND L1BUG FROML1CUMDP1 IN LOWER C-BLOCK.

INSTALL NEW 480V 3-WIRE FEEDER TO MCC-40 FROM US-3.

INSTALL NEW EQUIPMENT AND FEEDER FROM US-2.PROVIDE NEW HOUSEKEEPING PADS AS NECESSARY.

REFEED EXISTING HP1GUA AND P1GUA LOADS FROM NEWH1GUMDP1 AND L1GUMDP1 RESPECTIVELY.

INSTALL NEW SURFACE MOUNT PANELBOARD.

1

LOWER B & G BLOCK - ELECTRICAL NEW WORK PLAN 1E-201

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

3/32"= 1'-0"

SEE SHEET E-202 FOR CONTINUATION

NEW WORK KEY NOTES:

2

3

4

1

3 4

2

3

3

1

1

4

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.

5. SEE E-600 SERIES FOR PANEL SCHEDULES.

6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.

GENERAL NOTES:

EXISTINGIN SLAB

TO REMAIN

5

5

5

1

Page 8: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

T T

L1CXB

DP1CXA

T

T

T

SUB US-2

SUB US-3

VF

D

T

T

T

T

ATS

T

T

UP

UP

UP

DN

UP

E-202

ELECTRICALNEW WORK

PLANLOWER C BLOCK

INSTALL NEW BREAKERS IN L1CUMDP1 AND REFEED PANELSL1AUE, L1BUC, AND L1BUG.

INSTALL NEW FEEDER TO NEW H1GUMDP1 IN ROOM 1G14.

INSTALL NEW 480V 3-WIRE FEEDER TO MCC-40 IN ROOM1G14 FROM US-3.

RECONNECT EXISTING FEEDER CABLE TO NEW UNITSUBSTATION.

INSTALL NEW 480V 4-WIRE FEEDER TO EXISTING 3-WIREMCC-20 & 21. CAP OFF AND SECURE NEUTRALCONDUCTORS ON BOTH ENDS FOR FUTURE USE.

INSTALL PULL BOX NEAR THE MCC TO ACCOMMODATEFUTURE REPLACEMENT OF THE EQUIPMENT.

INSTALL NEW EQUIPMENT AND FEEDER FROM US-3.

REFEED EXISTING HP1CUA AND P1CUA LOADS FROM NEWH1CUMDP2 AND L1CUMDP2 RESPECTIVELY.

INSTALL NEW FEEDER TO NEW H2CUMDP1 IN ROOM 2U01.

EXTEND EXISTING HOUSKEEPING PAD APPROXIMATELY 12"TO SUPPORT NEW SWITCHGEAR.

INSTALL NEW CLOSE COUPLED SWITCHES, TRANSFORMERSAND 480V SWITCHGEAR PER SPECIFICATIONS. ALLEQUIPMENT TO BE FITTED WITH IR WINDOWS TO ALLOW FORINFRARED SCANNING OF ALL CRITICAL BUS AND CABLECONNECTIONS WHILE ENERGIZED.

INSTALL NEW 5KV FEEDER FROM BLDG. 2802.

INSTALL NEW SURFACE MOUNT PANELBOARD.

1

LOWER C BLOCK - ELECTRICAL NEW WORK PLAN 1E-202

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

3/32"= 1'-0"

SEE SHEET E-201 FOR CONTINUATION

NEW WORK KEY NOTES:

2

3

4

5

6

7

8

9

4

7 8

7 8 7

5

65

5

6 4

9

1

4

5

3

2

4 4

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.

5. SEE E-600 SERIES FOR PANEL SCHEDULES.

6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.

GENERAL NOTES:

10

11

12

1010

1111

EXISTINGIN SLABTO REMAIN

13

13

12

Page 9: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

L2

CTS

TS

1A

L2

CTS

TS

1B

T

E-203

ELECTRICALNEW WORK

PLANUPPER C BLOCK

INSTALL NEW 480V 4-WIRE FEEDER TO EXISTING 3-WIREMCC. CAP OFF AND SECURE NEUTRAL CONDUCTORS ONBOTH ENDS FOR FUTURE USE.

INSTALL PULL BOX NEAR THE MCC TO ACCOMMODATEFUTURE REPLACEMENT OF THE EQUIPMENT.

INSTALL NEW EQUIPMENT AND FEEDER FROM US-2.

REFEED EXISTING HP2CUA AND P2CUA LOADS FROM NEWH2CUMDP1 AND L2CUMDP1 RESPECTIVELY.

INSTALL NEW SURFACE MOUNT PANELBOARD.

1

UPPER C BLOCK - ELECTRICAL NEW WORK PLAN 1E-203

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

3/32"= 1'-0"

NEW WORK KEY NOTES:

2

3

4

3 443 3

21

1

2

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.

5. SEE E-600 SERIES FOR PANEL SCHEDULES.

6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.

GENERAL NOTES:

5

5

Page 10: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-501

US-2ELECTRICAL

DETAILS

US-2 - ELECTRICAL SWITCH DETAIL 1E-501

KIRK KEY INTERLOCKS TO BE COORDINATEDBETWEEN SWITCH AND DISTRIBUTIONMANUFACTURERS.

1

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.

GENERAL NOTES:

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

NEW WORK KEY NOTES:1

Page 11: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-502

US-3ELECTRICAL

DETAILS

US-3 - ELECTRICAL SWITCH DETAIL 1E-502

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

KIRK KEY INTERLOCKS TO BE COORDINATEDBETWEEN SWITCH AND DISTRIBUTIONMANUFACTURERS.

1

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.

GENERAL NOTES:

NEW WORK KEY NOTES:1

Page 12: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-601

ELECTRICALPANEL

SCHEDULES

GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR

CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

REPLACE SURFACE MOUNT PANELBOARD.1

NEW WORK KEY NOTES:

1

1 1

1

Page 13: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-602

ELECTRICALPANEL

SCHEDULES

GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR

CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

REPLACE SURFACE MOUNT PANELBOARD.1

NEW WORK KEY NOTES:

1

1

1

1

Page 14: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-603

ELECTRICALPANEL

SCHEDULES

GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR

CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

REPLACE SURFACE MOUNT PANELBOARD.1

NEW WORK KEY NOTES:

1 1

1 1

Page 15: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-604

ELECTRICALPANEL

SCHEDULES

GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR

CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

REPLACE SURFACE MOUNT PANELBOARD.1

NEW WORK KEY NOTES:

1 1

11

Page 16: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-701

US-2ONE-LINE DIAGRAMDEMOLITION PLAN

US-2 - ONE-LINE DIAGRAM - DEMOLITION PLAN 1E-701

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.

GENERAL NOTES:

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

Page 17: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-702

US-2FEEDER TABLES

US-2 - EXISTING FEEDER TABLE 1E-702

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

US-2 - NEW FEEDER TABLE2E-702

Page 18: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-703

US-2ONE-LINE DIAGRAMNEW WORK PLAN

US-2 - ONE-LINE DIAGRAM - NEW WORK PLAN 1E-703

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.

3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.

4. SEE E-600 SERIES FOR PARTIAL ONE-LINE DIAGRAM ANDPANEL SCHEDULES.

5. ALL 480 VOLT CONDUITS AND CONDUCTORS WITHIN SCOPE

OF WORK ARE 3.5" EMT WITH (3) 600 KCMIL AND 1 3/0 GROUND

UNLESS NOTED.

6. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.

GENERAL NOTES:

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

Page 19: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-704

US-3ONE-LINE DIAGRAMDEMOLITION PLAN

US-3 - ONE-LINE DIAGRAM - DEMOLITION PLAN 1E-704

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OFUFGS.

2. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.

GENERAL NOTES:

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

Page 20: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-705

US-3FEEDER TABLES

US-3 - EXISTING FEEDER TABLE 1E-705

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.

US-3 - NEW FEEDER TABLE2E-705

Page 21: DESIGNER: RECAP US-2 & US-3 · xunified facilities criteria, ufc 3-310-04; seismic design of buildings xinternational building code, ibc, except as modified by ufc 1-200-01 xnfpa

E-706

US-3ONE-LINE DIAGRAMNEW WORK PLAN

US-3 - ONE-LINE DIAGRAM - NEW WORK PLAN 1E-706

1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.

2. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.

GENERAL NOTES:

STATUS:

DESIGNER:

PROJECT INFORMATION

DESCRIPTION

REVISIONS:

REV.

SHEET TITLE

PROJECT #:

DATE

DRAWN BY:ENGINEERED BY:

CHECKED BY:

EntCadStd-v2.1 3/10/15

WORK # :

DRAWING NUMBER

CONSTRUCTION

KEY PLAN:

PROJ MGR:

LOCATION:

APPROVALS:

DESIGN MGR:

90% SUBMITTAL

NOT FOR

1U01:RECAP US-2 & US-3

01/09/19

80086086

4020847

EMG

STEVE K.

STEVE K.

DAVE K.

ERROL B.