6
SO NO. 8401 SHEET NO. REV. NO. R-1 PREPARED SR APPROVED SN DOC. NO. DATE DESIGN OF BASE RAFT 1.0 General Data 1.1 Factored moment Direction X : Along transverse direction (span) Direction Y : Along longitudinal direction Along X SPAN MOMENT Load Combination 201 PL. No.-734 Maxm. Moment Mx = 38.92 kN-m/m Design Moment, Mxd Mxd = 38.92 kN-m/m SUPPORT MOMENT Load Combination 202 PL. No.- 819 Maxm. Moment Mxd = 43.6 kN-m/m Design Moment, Mxd Mxd = 43.60 kN-m/m 1.2 Section data Depth of section D = 300 mm Width of the section b = 1000 mm 1.3 Material Properties Compressive strength of concrete fck = 25 N/mm 2 Yield strength of steel fy = 500 N/mm 2 2.0 Computation of steel requirement in X direction SPAN MOMENT Steel rebar dia. ft = 16 mm Clear cover tension steel c1 = 40 mm Effective cover c1e = 48 mm Effective depth d = 252 mm Mu/bd² = 0.61 N/mm 2 per m. width As per SP-16 Table-3 100 As/bd = 0.145 As = 365.63 mm 2 > Minm reqd. 0.12% Spacing of 16 dia bars = 300 mm 360 mm 2 / m Area of provided steel As = 670 mm 2 100 As/bd = 0.27 SUPPORT MOMENT Steel rebar dia. ft = 16 mm Clear cover tension steel c1 = 40 mm Effective cover c1e = 48 mm Effective depth d = 252 mm Mu/bd² = 0.69 N/mm 2 per m. 4 MANGOE LANE, 7 FLOOR, PROJECT URANIUM ORE PROCESSING PLANT THIS DOCUMENT IS MBE’S PROPERTY AND MUST NOT BE USED EXCEPT IN CONNECTION WITH MBE’S WORK. REPRODUCTION, USE OR 2-M009-DC-6-007 McNally Bharat TITLE CONVEYOR TUNNEL 1BC-3 ENGINEERING COMPANY =

Design Tunnel

Embed Size (px)

DESCRIPTION

Tunnel Design

Citation preview

Page 1: Design Tunnel

SO NO. 8401

SHEET NO.

REV. NO. R-1

PREPARED SR

APPROVED SN

DOC. NO. DATE

DESIGN OF BASE RAFT

1.0 General Data

1.1 Factored moment

Direction X : Along transverse direction (span)

Direction Y : Along longitudinal direction

Along X

SPAN MOMENT

Load Combination 201 PL. No.-734

Maxm. Moment Mx = 38.92 kN-m/m

Design Moment, Mxd Mxd = 38.92 kN-m/m

SUPPORT MOMENT

Load Combination 202 PL. No.- 819

Maxm. Moment Mxd = 43.6 kN-m/m

Design Moment, Mxd Mxd = 43.60 kN-m/m

1.2 Section data

Depth of section D = 300 mm

Width of the section b = 1000 mm

1.3 Material Properties

Compressive strength of concrete fck = 25 N/mm2

Yield strength of steel fy = 500 N/mm2

2.0 Computation of steel requirement in X direction

SPAN MOMENT

Steel rebar dia. ft = 16 mm

Clear cover tension steel c1 = 40 mm

Effective cover c1e = 48 mm

Effective depth d = 252 mm

Mu/bd² = 0.61 N/mm2

per m. width

As per SP-16 Table-3 100 As/bd = 0.145

As = 365.63 mm2

> Minm reqd. 0.12%

Spacing of 16 dia bars = 300 mm 360 mm2/ m

Area of provided steel As = 670 mm2

100 As/bd = 0.27

SUPPORT MOMENT

Steel rebar dia. ft = 16 mm

Clear cover tension steel c1 = 40 mm

Effective cover c1e = 48 mm

Effective depth d = 252 mm

Mu/bd² = 0.69 N/mm2

per m.

4 MANGOE LANE, 7TH

FLOOR,

KOLKATA – 700 001., INDIA

PROJECT URANIUM ORE PROCESSING PLANTTHIS DOCUMENT IS MBE’S

PROPERTY AND MUST NOT BE

USED EXCEPT IN CONNECTION

WITH MBE’S WORK.

REPRODUCTION, USE OR 2-M009-DC-6-007

McNally Bharat TITLE CONVEYOR TUNNEL 1BC-3ENGINEERING COMPANY

LIMITED

=

Page 2: Design Tunnel

As per SP-16 Table-3 100 As/bd = 0.163

As = 411.12 mm2

> Minm reqd. 0.12%

Spacing of 16 dia bars = 300 mm 360 mm2/ m

Area of provided steel As = 670 mm2

100 As/bd = 0.27

3.0 Computation of shear steel

Load Combination 202 PL. No.-820

Maxm. Shear at d distance from wall face SQX = 0.207 N/mm2

Load Combination 202 PL. No.- 824

Maxm. Shear at d distance from wall face SQY = 0.008 N/mm2

Design Shear tv = 0.207

0.21 N/mm2

% steel provided at the section = 0.27

As per SP 16 Table:61/Table:19 IS456:2000

tc 0.370 N/mm2

(SAFE)

ALONG X

SPAN MOMENT

Provide 16Y @ 300 c/c as main reinf

SUPPORT MOMENT

Provide 16Y @ 300 c/c as main reinf

ALONG Y

Provide 12Y @ 300 c/c as transv. reinf

CHECK FOR DEPTH:

Ref: Chart 23 SP-16 (IS-456)

Reinf. percentage prov. = 0.27

Ratio ( span/eff. depth) = 23

For span = 4 Eff. Depth = 174 mm

( required )

Hence depth provided ( 300 mm ) is OK.

Dia @ mm c/c Dia @ mm c/c

=

=

m

Page 3: Design Tunnel

SO NO. 8401

SHEET NO.

REV. NO. R-1

PREPARED SR

APPROVED SN

DOC. NO. DATE

DESIGN OF TUNNEL WALL

`

1.0 General Data

1.1 Factored moment

Direction X : Along horizontal direction (span)

Direction Y : Along vertical direction

Along Y

SPAN MOMENT

Load Combination 203 PL. No.-653

Maxm. Moment My = 34.3 kN-m/m

Design Moment, Myd Myd = 34.30 kN-m/m

SUPPORT MOMENT

Load Combination 202 PL. No.- 422

Maxm. Moment Myd = 53.754 kN-m/m

Design Moment, Myd Myd = 53.75 kN-m/m

1.2 Section data

Depth of section D = 300 mm

Width of the section b = 1000 mm

1.3 Material Properties

Compressive strength of concrete fck = 25 N/mm2

Yield strength of steel fy = 500 N/mm2

McNally Bharat TITLE CONVEYOR TUNNEL 1BC-3

ENGINEERING COMPANY LIMITED

4 MANGOE LANE, 7TH

FLOOR,

KOLKATA – 700 001., INDIA

PROJECT URANIUM ORE PROCESSING PLANTTHIS DOCUMENT IS MBE’S

PROPERTY AND MUST NOT BE USED

EXCEPT IN CONNECTION WITH

MBE’S WORK. REPRODUCTION, USE

OR DISCLOSURE OF THE CONTENTS 2-M009-DC-6-007

1.0M 59.88 KN/M2 59.88 + 9

3 M

Dia @ mm c/c Dia @ mm c/c Y Spacing Dia @ mm c/c Dia @ mm c/c

X

Y

WALL 300 THK

Z

Page 4: Design Tunnel

2.0 Computation of steel requirement in Y direction

SPAN MOMENT

Steel rebar dia. ft = 16 mm

Clear cover tension steel c1 = 40 mm

Effective cover c1e = 48 mm

Effective depth d = 252 mm

Mu/bd² = 0.54 N/mm2

per m. width

As per SP-16 Table-3 100 As/bd = 0.128

As = 321.63 mm2

< Minm reqd. 0.12%

Spacing of 16 dia bars = 300 mm 360 mm2/ m

Area of provided steel As = 670 mm2

100 As/bd = 0.27

SUPPORT MOMENT

Steel rebar dia. ft = 16 mm

Clear cover tension steel c1 = 40 mm

Effective cover c1e = 48 mm

Effective depth d = 252 mm

Mu/bd² = 0.85 N/mm2

per m.

As per SP-16 Table-3 100 As/bd = 0.203

As = 510.59 mm2

> Minm reqd. 0.12%

Spacing of 16 dia bars = 300 mm 360 mm2/ m

Area of provided steel As = 670 mm2

100 As/bd = 0.27

3.0 Computation of shear steel

Load Combination 202 PL. No.-587

Maxm. Shear at d distance from wall face SQX = 0.018 N/mm2

Load Combination 203 PL. No.- 708

Maxm. Shear at d distance from wall face SQY = 0.3 N/mm2

Design Shear tv = 0.3

0.30 N/mm2

% steel provided at the section = 0.27

As per SP 16 Table:61/Table:19 IS456:2000

tc 0.370 N/mm2

(SAFE)

ALONG Y

SPAN MOMENT

Provide 16Y @ 300 c/c as main reinf

SUPPORT MOMENT

Provide 16Y @ 300 c/c as main reinf

ALONG X

Provide 12Y @ 300 c/c as transv. reinf

CHECK FOR DEPTH:

Depth provided is OK. Refer clarification given under Base Raft.

Dia @ mm c/c Dia @ mm c/c

=

=

=

Page 5: Design Tunnel

SO NO. 8401

SHEET NO.

REV. NO. R-1

PREPARED SR

APPROVED SN

DOC. NO. DATE

DESIGN OF TOP SLAB

1.0 General Data

1.1 Factored moment

Direction X : Along transverse direction (span)

Direction Y : Along longitudinal direction

Along X

SPAN MOMENT

Load Combination 201 PL. No.-25

Maxm. Moment Mx = 47.3 kN-m/m

Design Moment, Mxd Mxd = 47.30 kN-m/m

SUPPORT MOMENT

Load Combination 202 PL. No.-15

Maxm. Moment Mxd = 44.33 kN-m/m

Design Moment, Mxd Mxd = 44.33 kN-m/m

1.2 Section data

Depth of section D = 300 mm

Width of the section b = 1000 mm

1.3 Material Properties

Compressive strength of concrete fck = 25 N/mm2

Yield strength of steel fy = 500 N/mm2

2.0 Computation of steel requirement in X direction

SPAN MOMENT

Steel rebar dia. ft = 16 mm

Clear cover tension steel c1 = 40 mm

Effective cover c1e = 48 mm

Effective depth d = 252 mm

Mu/bd² = 0.74 N/mm2

per m. width

McNally Bharat TITLE CONVEYOR TUNNEL 1BC-3ENGINEERING COMPANY

LIMITED 4 MANGOE LANE, 7

TH FLOOR,

KOLKATA – 700 001., INDIA

PROJECT URANIUM ORE PROCESSING PLANTTHIS DOCUMENT IS MBE’S

PROPERTY AND MUST NOT BE

USED EXCEPT IN CONNECTION

WITH MBE’S WORK.

REPRODUCTION, USE OR 2-M009-DC-6-007

Page 6: Design Tunnel

As per SP-16 Table-3 100 As/bd = 0.178

As = 447.96 mm2

> Minm reqd. 0.12%

Spacing of 16 dia bars = 300 mm 360 mm2/ m

Area of provided steel As = 670 mm2

100 As/bd = 0.27

SUPPORT MOMENT

Steel rebar dia. ft = 16 mm

Clear cover tension steel c1 = 40 mm

Effective cover c1e = 48 mm

Effective depth d = 252 mm

Mu/bd² = 0.70 N/mm2

per m.

As per SP-16 Table-3 100 As/bd = 0.166

As = 418.36 mm2

> Minm reqd. 0.12%

Spacing of 16 dia bars = 300 mm 360 mm2/ m

Area of provided steel As = 670 mm2

100 As/bd = 0.27

3.0 Computation of shear steel

Load Combination 201 PL. No.-113

Maxm. Shear at d distance from wall face SQX = 0.265 N/mm2

Load Combination 201 PL. No.- 119

Maxm. Shear at d distance from wall face SQY = 0.013 N/mm2

Design Shear tv = 0.265

0.27 N/mm2

% steel provided at the section = 0.27

As per SP 16 Table:61/Table:19 IS456:2000

tc 0.370 N/mm2

(SAFE)

ALONG X

SPAN MOMENT

Provide 16Y @ 300 c/c as main reinf

SUPPORT MOMENT

Provide 16Y @ 300 c/c as main reinf

ALONG Y

Provide 12Y @ 300 c/c as transv. reinf

CHECK FOR DEPTH:

Depth provided is OK. Refer clarification given under Base Raft.

Dia @ mm c/c Dia @ mm c/c

=

=

=