General Presentation
1 General presentation
Design, Engineering, Manufacture,
Assembly and maintenance of
Flare system
EIFFAGE CONSTRUCTION METALLIQUE
481 rue du faubourg d’Esquerchin 59553 CUINCY
Téléphone + 33 327 95 75 00 - Fax + 33 327 95 75 02
GSM + 33 603 36 03 63 Email [email protected]
General presentation2
GIATEC Services
Turnkey Solutions
1) Design
2) P.I.D.(piping and instruments diagram)
3) Engineering
4) Manufacture
5) Revamping
6) Survey
7) Maintenance
8) Assembly
9) Commissioning
10)Piping
4
Quality system iso 9001- Engineering
- Supply
- Welding process
- Qualified welders
- Non destructive controls
- Documentation
General presentation
5
Flare design
FLARESIM software :
gas properties
combustion (stœchiométry)
design
radiations
emissions
General presentation
8
P.I.D.Ground Flare
Ground Enclosed Flare
Degassing railways Tanks
Special burner
Multi products
SDH Ferroviaire
Orléans / France
General presentation
12
Engineering
Airrestore
- Purge reducing device
- Designed to minimize air
infiltration into the flare tip
with significant purge gas
saving
General presentation
13
Engineering
Molecular seal
-Designed to minimize air
infiltration into the flare system
- Even when the purge gas is
interrupted, the molecular seal
provides protection for a period of
time
- The protection from Airrestore
and similar devices is immediatly
lost if the purge gas flow is
interrupted.
General presentation
14
Engineering
Knock Out Drum
- Separates liquid from gas
- Increases flare tip life
- Prevents or reduces smoke because of
reduced liquid in the flame
- Prevents liquids from being discharged to
atmosphere (fire)
General presentation
15
Engineering
Liquid seal
- Commonly incorporated into the flare stack base,
the liquid seal is used to provide positive pressure
on the flare gas relief header and to be a positive
flame arrestor in the event a flashback occurs in
the flare stack.
-The internals are specially designed to ensure a
stready flow of gases to the tip thus increasing the
maximum smokeless capacity of the flare without
supplemental energy.
-The liquid seal internals also decrease the noise
caused by combustion at the flare.
General presentation
16
Engineering
Flare Stack
Guyed support stack Fixed derrick structure Self supported structure
General presentation
19
Manufacture
Welding process (TIG, arc, flux cored wire)
SS 310S, 316L, 304L, CS…
Non destructive controls (Xrays, penetration test, PMI…)
documentation
General presentation
20
Revamping
24’’tip
Penetration test
Sand blasting
Sound insulation
High energy igniter
General presentation
22
Revamping
Reconstruction of 2 Tips 36 and 30’’
Steam injection, new pilots
New internal refractory
General presentation
23
Survey
Flare 90m High
Stack + Tip, Platform
Temperature control
Front flame generator
Cables tension + lubrication
Verticality
General presentation
24
Maintenance
Most major maintenance has to occur during a Shutdown
Consideration for inspection, repair or replacement
- Tip
- Pilots
- Thermocouples
- Clean/ check fuel and FFG piping for leaks and pluggage
- Critical instrumentation
- Stack (feeder, Platform and ladders)
- Guy wire connections at stack (cables tension, lubrication and
Verticality)
- Molecular seal
- Water seal
- KO Drum
- Aviation lights
General presentation
28
Maintenance
Temperature control
(thermocouples, ATEX Junction box)Pilot gas lines
General presentation
31
Commissioning
Control cabinet
Pressure, flow
Temperature,
Ignition2500 Nm3/h biogas burner
General presentation
32
Piping
ANGUILLE project / TOTAL Gabon
54000 welded inches by ETCM
Structures 1200t by ECM
General presentation
33
Piping
ANGUILLE project / TOTAL Gabon
ECM yard in Fos sur Mer France
EIFFAGE CONSTRUCTIONS METALLIQUES
General presentation
34
Installation 3 new ground enclosed flare 2500 Nm3h Biogas + maintenance 5
flares + delivery and installation 1 tip 10’’
Shutdown 1 flare 45m + installation 2 new tips + 600m piping 1’’
Maintenance 12 flares, 4 different site, maintenance 1 burner 40’’
Delivery 1 tip 24’’ steam assisted + 1 front flame generator
NOVAPEX / TRANSUGIL PROPYLENE Maintenance 1 flare 16m 8’’
Installation 1 new ground enclosed flare
Delivery 2 burn pits 10 and 20’’ + 2 front flame generators
+ 2 purge gas skids (Algeria)
General presentation
Survey 2 flares 90 and 45m, fabrication 8 pilot burners Revamping 2 tips
30 and 36’’ + maintenance flare24m 8’(TOTAL E&P)
Installation 1 flare 20’’ + front flame generator
Installation 1 flare 15 Nm3h + front flame generator
Maintenance 2 flares MABRUCK offshore site AL JURF (Libya)