36
General Presentation 1 General presentation Design, Engineering, Manufacture, Assembly and maintenance of Flare system EIFFAGE CONSTRUCTION METALLIQUE 481 rue du faubourg d’Esquerchin 59553 CUINCY Téléphone + 33 327 95 75 00 - Fax + 33 327 95 75 02 GSM + 33 603 36 03 63 Email [email protected]

Design, Engineering, Manufacture, Assembly and maintenance

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

General Presentation

1 General presentation

Design, Engineering, Manufacture,

Assembly and maintenance of

Flare system

EIFFAGE CONSTRUCTION METALLIQUE

481 rue du faubourg d’Esquerchin 59553 CUINCY

Téléphone + 33 327 95 75 00 - Fax + 33 327 95 75 02

GSM + 33 603 36 03 63 Email [email protected]

General presentation2

GIATEC Services

Turnkey Solutions

1) Design

2) P.I.D.(piping and instruments diagram)

3) Engineering

4) Manufacture

5) Revamping

6) Survey

7) Maintenance

8) Assembly

9) Commissioning

10)Piping

3

References

NOVAPEX / TRANSUGIL PROPYLENE

General presentation

4

Quality system iso 9001- Engineering

- Supply

- Welding process

- Qualified welders

- Non destructive controls

- Documentation

General presentation

5

Flare design

FLARESIM software :

gas properties

combustion (stœchiométry)

design

radiations

emissions

General presentation

6

P.I.D.Burn pit 10 and 20’’

SONATRACH

Hassi R’Mel & Ghardaia

Algeria

General presentation

7

Engineering

10’’and 20’’ Burn Pit

SONATRACH / Algeria

General presentation

8

P.I.D.Ground Flare

Ground Enclosed Flare

Degassing railways Tanks

Special burner

Multi products

SDH Ferroviaire

Orléans / France

General presentation

Titre de la présentation9

P.I.D.

20’’ Biomass Flare

10

Engineering

General presentation

20’’ Biomass Flare

11

Engineering

Front flame generator

General presentation

12

Engineering

Airrestore

- Purge reducing device

- Designed to minimize air

infiltration into the flare tip

with significant purge gas

saving

General presentation

13

Engineering

Molecular seal

-Designed to minimize air

infiltration into the flare system

- Even when the purge gas is

interrupted, the molecular seal

provides protection for a period of

time

- The protection from Airrestore

and similar devices is immediatly

lost if the purge gas flow is

interrupted.

General presentation

14

Engineering

Knock Out Drum

- Separates liquid from gas

- Increases flare tip life

- Prevents or reduces smoke because of

reduced liquid in the flame

- Prevents liquids from being discharged to

atmosphere (fire)

General presentation

15

Engineering

Liquid seal

- Commonly incorporated into the flare stack base,

the liquid seal is used to provide positive pressure

on the flare gas relief header and to be a positive

flame arrestor in the event a flashback occurs in

the flare stack.

-The internals are specially designed to ensure a

stready flow of gases to the tip thus increasing the

maximum smokeless capacity of the flare without

supplemental energy.

-The liquid seal internals also decrease the noise

caused by combustion at the flare.

General presentation

16

Engineering

Flare Stack

Guyed support stack Fixed derrick structure Self supported structure

General presentation

17

Manufacture

General presentation

18

Manufacture

Enclosed Ground FlareSpecial burner

Multi products

General presentation

19

Manufacture

Welding process (TIG, arc, flux cored wire)

SS 310S, 316L, 304L, CS…

Non destructive controls (Xrays, penetration test, PMI…)

documentation

General presentation

20

Revamping

24’’tip

Penetration test

Sand blasting

Sound insulation

High energy igniter

General presentation

21

Revamping

Short radius bending

(Steam injection)

General presentation

22

Revamping

Reconstruction of 2 Tips 36 and 30’’

Steam injection, new pilots

New internal refractory

General presentation

23

Survey

Flare 90m High

Stack + Tip, Platform

Temperature control

Front flame generator

Cables tension + lubrication

Verticality

General presentation

24

Maintenance

Most major maintenance has to occur during a Shutdown

Consideration for inspection, repair or replacement

- Tip

- Pilots

- Thermocouples

- Clean/ check fuel and FFG piping for leaks and pluggage

- Critical instrumentation

- Stack (feeder, Platform and ladders)

- Guy wire connections at stack (cables tension, lubrication and

Verticality)

- Molecular seal

- Water seal

- KO Drum

- Aviation lights

General presentation

25

Maintenance

Works in hight (140m) Cables lubrication

General presentation

26

Maintenance

Handling of Tips (45m)

General presentation

27

Maintenance

Installation of new pilots Piping 1’’(front flame + pilot gas)

General presentation

28

Maintenance

Temperature control

(thermocouples, ATEX Junction box)Pilot gas lines

General presentation

29

Refractory

Concrete and ceramic fiber repairs

General presentation

30

Assembly

Ground Enclosed flare Handling

Front flame generator

General presentation

31

Commissioning

Control cabinet

Pressure, flow

Temperature,

Ignition2500 Nm3/h biogas burner

General presentation

32

Piping

ANGUILLE project / TOTAL Gabon

54000 welded inches by ETCM

Structures 1200t by ECM

General presentation

33

Piping

ANGUILLE project / TOTAL Gabon

ECM yard in Fos sur Mer France

EIFFAGE CONSTRUCTIONS METALLIQUES

General presentation

34

Installation 3 new ground enclosed flare 2500 Nm3h Biogas + maintenance 5

flares + delivery and installation 1 tip 10’’

Shutdown 1 flare 45m + installation 2 new tips + 600m piping 1’’

Maintenance 12 flares, 4 different site, maintenance 1 burner 40’’

Delivery 1 tip 24’’ steam assisted + 1 front flame generator

NOVAPEX / TRANSUGIL PROPYLENE Maintenance 1 flare 16m 8’’

Installation 1 new ground enclosed flare

Delivery 2 burn pits 10 and 20’’ + 2 front flame generators

+ 2 purge gas skids (Algeria)

General presentation

Survey 2 flares 90 and 45m, fabrication 8 pilot burners Revamping 2 tips

30 and 36’’ + maintenance flare24m 8’(TOTAL E&P)

Installation 1 flare 20’’ + front flame generator

Installation 1 flare 15 Nm3h + front flame generator

Maintenance 2 flares MABRUCK offshore site AL JURF (Libya)

35

Thank you for your attention

General presentation

36 General presentation