Derby Parking Garage Report

Embed Size (px)

Citation preview

  • 8/12/2019 Derby Parking Garage Report

    1/15

    PRIME AE Group, Inc.55 Capital Boulevard Second Floor | Rocky Hill, CT 06067 | P: 860 436 5600 | F: 860 436 5601

    CITY OF DERBY

    MUNICIPAL PARKING GARAGE

    PRELIMINARY SITE VISIT

    REPORT ON EXISTING CONDITIONS

    Thompson PlaceDerby, Connecticut

    March 3, 2014

    Prepared for:Anita Dugatto

    Mayor - City of Derby

    Prepared by:

  • 8/12/2019 Derby Parking Garage Report

    2/15

    CITY OF DERBY MUNICIPAL PARKING GARAGEPRELIMINARY SITE VISIT & REPORT ON EXISTING CONDITIONSTHOMPSON PLACE, DERBY CONNECTICUT

    PRIME AE Group, Inc. Page 1

    55 Capital Boulevard Second Floor | Rocky Hill, CT 06067 | P: 860 436 5600 | F: 860 436 5601

    TABLE OF CONTENTS

    INTRODUCTION ....................................................................................................................................................2

    OBSERVATIONS ....................................................................................................................................................2

    Site Visit - Friday, Feb. 28th,

    2014 .....................................................................................................................2

    Site Visit - Saturday, March 1st,

    2014 ...............................................................................................................2

    RECOMMENDATIONS ..........................................................................................................................................3

    Immediate ........................................................................................................................................................3

    Near Term ........................................................................................................................................................3

    CONCLUSION ........................................................................................................................................................3

    APPENDIX A PHOTOGRAPHS .......................................................................................................................

    APPENDIX B PARKING LOT SKETCHES

  • 8/12/2019 Derby Parking Garage Report

    3/15

    CITY OF DERBY MUNICIPAL PARKING GARAGEPRELIMINARY SITE VISIT & REPORT ON EXISTING CONDITIONSTHOMPSON PLACE, DERBY CONNECTICUT

    PRIME AE Group, Inc. Page 2

    55 Capital Boulevard Second Floor | Rocky Hill, CT 06067 | P: 860 436 5600 | F: 860 436 5601

    INTRODUCTIONThe City of Derby (City) owns and operates the City of Derby Municipal Parking Garage (Garage)

    located between Olivia Street and Elizabeth Street with the north side of the building facing

    Thompson Place.

    Due to a recent incident involving a piece of concrete falling from the ceiling of the Garage, the City

    ordered the Garage to be closed.

    On February 28, 2014, The City asked Prime AE Group, Inc. (PRIME) to evaluate the existing

    condition of the Garage to determine whether it could be safely reopened.

    OBSERV TIONS

    Site Visit - Friday, Feb. 28

    th,

    2014PRIME visited the Garage on Friday February 28, 2014 to conduct a preliminary inspection of the

    buildings condition. Based on this preliminary site visit, PRIME noted the following:

    The Garage appeared to have been constructed circa 1975; The surrounding terrain is on slope; The Garage was constructed using a steel frame, cast in place concrete slabs and pre-cast

    parapets;

    The columns and beams are wide section painted steel members and are joined with bolted

    connections;

    The steel members are not protected against fire; Cracks with leaking water marks were observed;

    Spalling damage was observed on the ceiling in numerous locations;

    Exposed and rusting rebar was observed at numerous locations;

    Rusting and loss of paint was noted on the structural steel frame members, to varying

    degrees;

    Concrete appeared to be in fair condition in other areas observed.

    Photographs taken during this site visit are provided in Appendix A.

    Site Visit - Saturday, March 1st,

    2014

    PRIME visited the Garage on Saturday March 1, 2014 to mark the areas where there is a chance of

    debris falling from the ceiling. These areas were marked on the floor with a large yellow cross in the

    parking lots identified as A through H.

    These markings are noted as a large red Xon the Figures provided in Appendix B.

  • 8/12/2019 Derby Parking Garage Report

    4/15

    CITY OF DERBY MUNICIPAL PARKING GARAGEPRELIMINARY SITE VISIT & REPORT ON EXISTING CONDITIONSTHOMPSON PLACE, DERBY CONNECTICUT

    PRIME AE Group, Inc. Page 3

    55 Capital Boulevard Second Floor | Rocky Hill, CT 06067 | P: 860 436 5600 | F: 860 436 5601

    RECOMMEND TIONSBased on this preliminary site visit, PRIME recommends that the City take immediate action to

    ensure the safety of the parking garage users and to commence a rehabilitation or replacementprogram.

    Immediate

    The structure appears to be in fair condition and does not appear to be in danger of immediate

    collapse as there are no visible signs of distress which would normally precede a failure (i.e. no

    excessive deflections were observed in either concrete or structural steel). However, areas where

    falling concrete debris can occur should not be used, to avoid vehicular damage and personal injury.

    PRIME has identified these areas throughout the garage and recommends installing physical barriers

    to prevent their use.

    Near Term

    The City should perform a thorough condition assessment of the Garage and develop alternatives for

    rehabilitation or replacement. This assessment should be completed no later than June 3, 2014

    and should evaluate the following options:

    Repair: Repair or replace severely damaged concrete and steel throughout the building.

    Partial Replacement: Replace the floor slabs and rehabilitate the existing steel frame.

    Full Replacement: Demolish and rebuild a new garage.

    The alternatives should be developed with opinions of probable costs and should evaluate otherconsiderations such as loss of revenue, life span, etc.

    CONCLUSIONBased on the preliminary site visit detailed herein, it appears that the City can safely reopen the

    Garage if the recommendations noted in this Report are followed. However, since this Conclusion is

    based on a very cursory evaluation, it could change in the event that adverse revelations are

    discovered during subsequent building investigations or the review of existing plans and reports.

  • 8/12/2019 Derby Parking Garage Report

    5/15

    APPENDIX A

    PHOTOGRAPHS

  • 8/12/2019 Derby Parking Garage Report

    6/15

    DERBY PARKING GARRAGE - PRELIMINARY VISIT ON 02.28.2014

    TYPICAL CONCRETE DAMAGE TYPICAL CONCRETE DAMAGE

    TYPICAL CONCRETE DAMAGE CLOSE UP CEILING AREAS COVERED WITH WOOD

  • 8/12/2019 Derby Parking Garage Report

    7/15

  • 8/12/2019 Derby Parking Garage Report

    8/15

    DERBY MUNICIPAL PARKING GARAGE

    DERBY, CONNECTICUT

    1 OF 8

    CONSULTANT

    FILE

    NAME:

    P

    LOT

    DATE:

    DERBY PARKING

    GARAGE SURVEY

    PARKING

    LOT "A"

    X

    X

    X

    X

    X

    X

    X

    X

    X

    NOTE:LARGE AREA OF CEILING

    OVER THIS PARKING LOT

    IS COVERED WITH WOOD

    FRAMING.

  • 8/12/2019 Derby Parking Garage Report

    9/15

    DERBY MUNICIPAL PARKING GARAGE

    DERBY, CONNECTICUT

    2 OF 8DERBY PARKING

    GARAGE SURVEYCONSULTANT

    FILE

    NAME:

    P

    LOT

    DATE:

    PARKING

    LOT "B"

    X

    X

    X

    X

    X

    NOTE:PARTIAL AREA OF CEILING

    OVER THIS PARKING LOT

    IS COVERED WITH WOOD

    FRAMING.

  • 8/12/2019 Derby Parking Garage Report

    10/15

    DERBY MUNICIPAL PARKING GARAGE

    DERBY, CONNECTICUT

    3 OF 8DERBY PARKING

    GARAGE SURVEYCONSULTANT

    FILE

    NAME:

    P

    LOT

    DATE:

    PARKING

    LOT "C"

    XX

    X

    X

    X

    XXX

    X X

    XX

    X

    X

    X

    X

  • 8/12/2019 Derby Parking Garage Report

    11/15

    DERBY MUNICIPAL PARKING GARAGE

    DERBY, CONNECTICUT

    4 OF 8DERBY PARKING

    GARAGE SURVEYCONSULTANT

    FILE

    NAME:

    P

    LOT

    DATE:

    PARKING

    LOT "D"

    X

    X

    X

    X

    X

    X

    X

  • 8/12/2019 Derby Parking Garage Report

    12/15

    DERBY MUNICIPAL PARKING GARAGE

    DERBY, CONNECTICUT

    5 OF 8DERBY PARKING

    GARAGE SURVEYCONSULTANT

    FILE

    NAME:

    P

    LOT

    DATE:

    PARKING

    LOT "E"

    X

    X

    X

    X

    X

    X

    X

    XX

    X

  • 8/12/2019 Derby Parking Garage Report

    13/15

    DERBY MUNICIPAL PARKING GARAGE

    DERBY, CONNECTICUT

    6 OF 8DERBY PARKING

    GARAGE SURVEYCONSULTANT

    FILE

    NAME:

    P

    LOT

    DATE:

    PARKING

    LOT "F"

    XX

  • 8/12/2019 Derby Parking Garage Report

    14/15

    DERBY MUNICIPAL PARKING GARAGE

    DERBY, CONNECTICUT

    7 OF 8DERBY PARKING

    GARAGE SURVEYCONSULTANT

    FILE

    NAME:

    P

    LOT

    DATE:

    PARKING

    LOT "G"

    XX

    X

    X

    X

  • 8/12/2019 Derby Parking Garage Report

    15/15