Markup Summary
Subject: CalloutPage Label: 4Author: dsdlaforceDate: 8/28/2018 1:46:19 PMColor:
Storm Pipe P&P is missing.
dsdlaforce (18)
Subject: CalloutPage Label: 1Author: dsdlaforceDate: 8/28/2018 4:00:45 PMColor:
3:1 Max
Subject: LinePage Label: 1Author: dsdlaforceDate: 8/28/2018 4:01:10 PMColor:
Subject: HighlightPage Label: 1Author: dsdlaforceDate: 8/28/2018 4:01:17 PMColor:
Subject: LinePage Label: 1Author: dsdlaforceDate: 8/28/2018 4:02:32 PMColor:
Subject: HighlightPage Label: 1Author: dsdlaforceDate: 8/28/2018 4:02:38 PMColor:
Subject: CalloutPage Label: 1Author: dsdlaforceDate: 8/28/2018 4:03:04 PMColor:
Revise the extents of the aggregate base courseper the standard detail.
Subject: CalloutPage Label: 1Author: dsdlaforceDate: 8/28/2018 4:03:30 PMColor:
Include El Paso County PCD
Subject: CalloutPage Label: 2Author: dsdlaforceDate: 8/28/2018 4:05:02 PMColor:
Provide Vehicle Tracking Pad
Storm Pipe P&P ismissing.
3:1 Max
Revise the extents of the aggregatebase course per the standard detail.
Include El PasoCounty PCD
Provide VehicleTracking Pad
Subject: Cloud+Page Label: 2Author: dsdlaforceDate: 8/28/2018 4:13:23 PMColor:
Channel should be design so it approaches theconfluence at an angle.
With 173 cfs being conveyed by the proposedchannel it appears that erosion protection isrequired.
Subject: CalloutPage Label: 2Author: dsdlaforceDate: 8/28/2018 4:23:01 PMColor:
update street names to match the plat
Subject: Text BoxPage Label: 2Author: dsdlaforceDate: 8/28/2018 4:27:23 PMColor:
Identify the staging area.
FYI: Moving forward PCD Engineering will requirethat the GEC plan show the staging/storage area
Subject: CalloutPage Label: 4Author: dsdlaforceDate: 8/28/2018 4:30:02 PMColor:
show the proposed culvert crossings
Subject: CalloutPage Label: 6Author: dsdlaforceDate: 8/28/2018 4:37:37 PMColor:
Revise to 30"x30"
Subject: CalloutPage Label: 6Author: dsdlaforceDate: 8/28/2018 4:39:40 PMColor:
Callout the required posted speed limit.Identify the size of the R2-1 sign.
Subject: Text BoxPage Label: 6Author: dsdlaforceDate: 8/28/2018 4:39:43 PMColor:
Revise "Stop" signs to 30"x30"
Subject: CalloutPage Label: 2Author: dsdlaforceDate: 8/28/2018 4:46:33 PMColor:
Provide a typical cross section detail of theproposed channel.
Subject: CalloutPage Label: 2Author: dsdlaforceDate: 8/28/2018 4:47:54 PMColor:
Provide details for the outlet protection and FES. FES should include toe walls.
Channel should be design so itapproaches the confluence at anangle.
With 173 cfs being conveyed by theproposed channel it appears thaterosion protection is required.
update street namesto match the plat
Identify the staging area.
FYI: Moving forward PCDEngineering will require thatthe GEC plan show thestaging/storage area
show the proposedculvert crossings
Revise to 30"x30"
Callout the requiredposted speed limit.Identify the size ofthe R2-1 sign.
Revise "Stop" signs to 30"x30"
Provide a typicalcross section detail ofthe proposedchannel.
Provide details forthe outlet protectionand FES. FESshould include toewalls.
Subject: CalloutPage Label: 4Author: Daniel TorresDate: 8/27/2018 1:25:39 PMColor:
Indicate road classification and provide roadnames per final plat
Daniel Torres (39)
Subject: HighlightPage Label: 4Author: Daniel TorresDate: 8/27/2018 1:25:44 PMColor:
Subject: HighlightPage Label: 5Author: Daniel TorresDate: 8/27/2018 1:25:49 PMColor:
Subject: CalloutPage Label: 5Author: Daniel TorresDate: 8/27/2018 1:42:20 PMColor:
Label existing and proposed grade lines andindicate whether grade lines shown are atcenterline
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 8/27/2018 11:11:07 AMColor:
SP-18-003SF-18-024
Subject: CalloutPage Label: 4Author: Daniel TorresDate: 8/27/2018 11:21:57 AMColor:
Install a temporary barricade
Subject: HighlightPage Label: 4Author: Daniel TorresDate: 8/27/2018 11:58:00 AMColor:
Subject: HighlightPage Label: 4Author: Daniel TorresDate: 8/27/2018 11:58:04 AMColor:
Subject: HighlightPage Label: 4Author: Daniel TorresDate: 8/27/2018 11:58:14 AMColor:
Indicate roadclassification andprovide road namesper final plat
Label existing andproposed grade linesand indicate whethergrade lines shown areat centerline
SP-18-003SF-18-024
Install a temporarybarricade
Subject: CalloutPage Label: 4Author: Daniel TorresDate: 8/27/2018 11:58:41 AMColor:
Min. K=37 at sag vertical curves per ECM figure2-20, typical
Subject: HighlightPage Label: 4Author: Daniel TorresDate: 8/27/2018 12:38:49 PMColor:
Subject: HighlightPage Label: 4Author: Daniel TorresDate: 8/27/2018 12:38:52 PMColor:
Subject: CalloutPage Label: 4Author: Daniel TorresDate: 8/27/2018 12:40:52 PMColor:
Min. K=19 at crest vertical curves per ECM figure2-19, typical
Subject: HighlightPage Label: 5Author: Daniel TorresDate: 8/27/2018 12:53:35 PMColor:
Subject: HighlightPage Label: 5Author: Daniel TorresDate: 8/27/2018 3:13:55 PMColor:
Subject: HighlightPage Label: 5Author: Daniel TorresDate: 8/27/2018 3:14:27 PMColor:
Subject: CalloutPage Label: 5Author: Daniel TorresDate: 8/27/2018 3:32:19 PMColor:
Min. K=19 at crest vertical curves per ECM figure2-19, typical
Subject: CalloutPage Label: 5Author: Daniel TorresDate: 8/27/2018 3:33:08 PMColor:
Min. K=37 at sag vertical curves per ECM figure2-20, typical
Min. K=37 at sagvertical curves perECM figure 2-20,typical
Min. K=19 at crestvertical curves perECM figure 2-19,typical
Min. K=19 at crestvertical curves perECM figure 2-19,typical
Min. K=37 at sagvertical curves perECM figure 2-20,typical
Subject: CalloutPage Label: 5Author: Daniel TorresDate: 8/27/2018 3:33:33 PMColor:
Adjust cul-de-sac grade for a max 2% slope perECM figure 2-31. As shown there is a ±8% gradefrom center of cul-de-sac to low point.
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:06:07 AMColor:
Planning and Community Development (PCD)
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:06:56 AMColor:
PCD
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:07:16 AMColor:
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:07:18 AMColor:
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:07:22 AMColor:
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:08:14 AMColor:
Department of Public Works
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:08:19 AMColor:
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:08:21 AMColor:
Adjust cul-de-sacgrade for a max 2%slope per ECM figure2-31. As shown thereis a ±8% grade fromcenter of cul-de-sacto low point.
Planning andCommunityDevelopment (PCD)
PCD
Department of PublicWorks
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:08:52 AMColor:
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:12:30 AMColor:
Planning and Community Development
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:12:41 AMColor:
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 8/28/2018 10:12:45 AMColor:
Subject: HighlightPage Label: 6Author: Daniel TorresDate: 8/28/2018 10:22:34 AMColor:
Subject: HighlightPage Label: 6Author: Daniel TorresDate: 8/28/2018 10:24:50 AMColor:
Subject: CalloutPage Label: 6Author: Daniel TorresDate: 8/28/2018 10:25:05 AMColor:
Planning and Community Develpment
Subject: CalloutPage Label: 6Author: Daniel TorresDate: 8/28/2018 10:25:51 AMColor:
Department of Public Works (DPW)
Subject: HighlightPage Label: 6Author: Daniel TorresDate: 8/28/2018 10:25:59 AMColor:
Planning and CommunityDevelopment
Planning andCommunityDevelpment
Department of PublicWorks (DPW)
Subject: CalloutPage Label: 6Author: Daniel TorresDate: 8/28/2018 10:39:00 AMColor:
"D"
Subject: HighlightPage Label: 6Author: Daniel TorresDate: 8/28/2018 10:39:05 AMColor:
Subject: Text BoxPage Label: 2Author: Daniel TorresDate: 8/28/2018 5:23:31 PMColor:
Delineate the limits of construction
"D"
Delineate the limits of construction