39
GREEN INDIA MISSION 1 DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB GREEN INDIA MISSION MICRO PLAN H.B. NO. 338 VILLAGE - SISWAN RANGE SISWAN DIVISION SAS NAGAR FROM DIVISIONAL FOREST OFFICER SAS NAGAR

DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

  • Upload
    ngokiet

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

1

DEPARTMENT OF FOREST AND WILD

LIFE PRESERVATION, PUNJAB GREEN INDIA MISSION

MICRO PLAN

H.B. NO. – 338

VILLAGE - SISWAN

RANGE – SISWAN

DIVISION – SAS NAGAR

FROM DIVISIONAL FOREST OFFICER

SAS NAGAR

Page 2: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

2

Micro Plan (Prepared Under Green India Mission Project)

SISWAN VFC Month/Year 2016-17

Address of FPC/VFC -V.P.O SISWAN Revenue Village/Villages - - SISWAN Post Office - MAJRA Police Station - MULLAPUR District -SAS NAGAR

Page 3: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

3

Location Map of FPC/VFC

2 KM

15 KM

MAJRA

SISWAN

BADDI

Page 4: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

4

1. Basic Information sheet

1. Name of the FPC/VFC Siswan

2. Reference No./ID of FPC/VFC (To be provided by PMU)

HB NO. 338

3. Name of Gram Panchayat Gram Panchayat Siswan

4. Name of the FMU/ Range Siswan

5. Name of the DMU/Forest Division S A S NAGAR.

6. Name of the Panchayat Samity BLACK MAJRI

7.

Name of the District

S A S NAGAR

8. Period of Micro Plan From Month: Year: To Month: Year: 2016-17 to 2021-22

9. Date of approval of Micro Plan by FPC/VFC (Executive Committee)

(The copy of the resolution of Executive Committee to be attached

10. Date of approval of Micro Plan by Head of DMU/ DFO

11. Key team members engaged in Preparation of Micro Plan

Range officer, Block Officer, Forest Guard, Facilitator, Sarpanch, Villagers.

2. General Profile of FPC/VFC 2.1 Date & No. of registration of FPC/VFC 2.2 Land availability in the FPC/VFC

Sl. Description Area (acre.)

1

Forest area 3300 acre

Reserved Forest (RF): -

Protected Forest (PF): 3300 acre

Unclassed Forest (UF): -

2 Agriculture land 200 acre

3 Fallow land/ waste land 37 acre

4 Water bodies 8 acre

5 Habitation/ homestead area 10 acre

6 Any other category of land -

2.3 No. of Revenue/ Forest Villages covered 2.4 Bank Account details a) Name of the Bank: - IDBI Bank Mullapur b) Date of A/c opened: - 01.01.2017 c) Bank A/c Number:- 1932104000008983

Page 5: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

5

2.5 No. of Households in the Village and households represented in FPC/VFC

Category Village (s) FPC/VFC

Total HH 77 68

ST - -

SC 33 27

OBC 22 20

Others 22 20

2.6 Details of Executive Committee Members of FPC/VFC

Sl. Designation Name M/F

1 Chairman Parveen Kaur F

2 Vice chairman Rajinder Singh M

3 Secretary Manjeet Singh(FG) M

4 Member Shushma F

5 Member Ikbal Khan M

6 Member Sanjeev Kumar M

7 member Dilbag Gir M

8 Member Gurdeep Kaur F

9 Member Mukesh Kumar M

3. Socio-Economic Profile of FPC/VFC 3.1 General description of the FPC/VFC

Siswan village has an Gram Panchayat. The total population of village is 474. Comprising of

254 Male, 220 female. There are 101 houses in the village the literacy ratio of male and female is 5:4 .

People of different Castes live in the Village.

3.2 Population (FPC/VFC)

Social category

Population

Male Female Total

Scheduled Tribes

- - -

Scheduled Castes

112 90 202

OBC 70 65 135

Others 72 65 137

Total 254 220 474

Page 6: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

6

3.3 Educational Status (Adults) – FPC/VFC

Level

Nos.

Male Female Total

Literate without formal education 55 55 110

Primary education 45 35 80

Middle education (8th ) 110 97 207

Higher Secondary (10th ) 32 25 57

Graduates and above 12 8 20

Total literates (a+b+c+d+e) 254 220 474

Percentage of total literates 79% 75% 77%

3.4 Enrolment of Children (5-16 years) – FPC/VFC

Total children (5-16 yrs)

Enrolled

Percentage of enrolment

M F M F M F

Schools/ Colleges

68 65 68 65 100% 100%

3.5 Landholding details of FPC/VFC

Category No. of Households (HH)

Landless households 40

Marginal land holding households (0.1 to 2.5 Acre) 27

Marginal land holding households above 2.5 acre 10

3.6 Livestock population (FPC/VFC)

Type No. of animals – approx.

Cows 10

Buffaloes 57

Bullocks 5

Goats 15

Sheep -

Poultry 37

Others –specify 10

Page 7: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

7

3.7 Status of access to basic services/ amenities

Sl. Type of service/ amenities

Whether available within FPC/VFC area (Yes/No)

If No, where available and distance

Functional (Yes/No)

1 Drinking water

Yes - Yes

2 Electricity

Yes - Yes

3 Sanitation

Yes - Yes

4 School

Yes - Yes

5 Health services for people

- BLACK MAJRI 08 Km

Yes

6 Health services for livestock

- Majra Yes

7 Telecommunication

Yes - Yes

8 Transport and communication

- Majra 4Km Yes

9 Postal and Banking services

Post Office Majra 4 Km Yes

10 Market services

- Kurali 17 Km Yes

11 Public Distribution System/ Ration

Yes - Yes

12 Cow Shad - - -

13 Others - specify Siswan Nature Trail

Siswan Forest

Yes

14 Others - specify Siswan Dam Siswan Forest Yes

15 Others - specify - - -

Page 8: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

8

3.8 Dependence of households on different livelihood sources

Sl. Source of livelihood Number of Households Problems and opportunities

1 Agriculture 12 Lack of Irrigation Land and Resource , need tube well

2 Forestry 42 Lack of labor, Lack of Funds

3 Livestock/ Animal Husbandry

36 Lack of grass

4 Wage labour 40 Need of work

5 Small business 25 Requirement financial and Technical Support

6 Service/Job 32 -

7 Any other – specify - -

3.9 Identification of households, who need immediate attention by the Project and other Departments

Sl. Name of head of household

HH No. in social map

Main sources of livelihood

Problems Opportunities

1 Jagdesh kumar

5 Agriculture Lack of irrigation

Need income generating activates

2 Kamla devi 15 HW Lack of Wages and Work

Need income generating

activites

3 Jitender singh 35 Labour Lack of Wages and Work

Need income generating

activites

4 Kailesh kumar 22 Agriculture Lack of irrigation

Need income generating

activites

5 Asha rani 32 HW Lack of Wages and Work

Need income generating

activites

6 Daya krishan 42 Agriculture Lack of irrigation

Need income generating

activites

7 Rakesh kumar 33 Agriculture Lack of irrigation

Need income generating

activites

8 Pawan kumar 7 Labour Lack of Wages and Work

Need income generating

Page 9: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

9

activites

9 Ajab singh 28 Labour Lack of Wages and Work

Need income generating

activites

10 Mukesh gupta 9 Shopkeeper Lack of Loan Need income generating

activites

11 Sanjeev kumar 14 Agriculture Lack of irrigation

Need income generating

activites

12 Ikbal khan 37 Labour Lack of Wages and Work

Need income generating

activites

13 Satnam singh 39 Labour Lack of Wages and Work

Need income generating

activites

14 Sushma 3 HW Lack of Wages and Work

Need income generating

activites

15 Prem singh

39 Agriculture Lack of irrigation

Need income generating

activites

16 Parveen kumara

41 Shopkeeper Lack of money Need income generating

activites

3.10 Wealth ranking

Sl. Category Criteria/ Indicators

No. of HH Category code*

1. Better off Monthly income 12 A

2 Manageable

Monthly income 25 B

3 Poor

Monthly income 18 C

4 Vulnerable (need immediate attention)

Monthly income 22 D

Note: * Category code will be used for the Household Database.

Page 10: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

10

3.11 Different Programmes/ Schemes implemented by different Departments/ Agencies in FPC/VFC during last 5 years

Sl.

Name of the Project/ Scheme/ Activity

Year

Achievements

Implementing Department/ Agency

Specify Unit Physical Financial (Rs.)

1 Campa 2016-17 Plantation 01

200000/- Forest Department

2 Green India Mission

2016-17 Plantation 15

500000/- Forest Department

3 Green India Mission

2016-17 Soler Lentren, Light, Stitching machines

20 500000/- Forest Department

4 Capacity Building

2016-17 04 80000/- Forest Department

Page 11: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

11

3.12 Social Map prepared by the FPC/VFC

Page 12: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

12

3.13 Occupational pattern

Agri. Forestry Veg. Labour

Govt. Job Animal Hub. Private

Page 13: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

13

Participatory Resource Assessment 4.1 Describe different resources available to FPC/VFC

The total area of the village is 3500 acre, out of which 500 acre is mustarken malkan forest land,

2800 acre are panchayat forest land and other agriculture land are 200 acre. The Minor Forest Produce

are grass, babar and kharkana, which is used as fodder and for rope making.

4.2 Different events of the past and their influence on the resource management and people

Sl. Decade/ Period Event Effect, Influence and Impact on the Resource/ People

Response of community to the situation

1 JBIC Project JFMC/SHG Coordination between villeges and department is devolped

Awareness about natual resoures develpment.

2 Pun Campa JFMC/SHG Coordination between villeges and department is devolped

Awareness about natual resoures develpment.

3 Green India Mission

JFMC/SHG Coordination between villeges and department is devolped

Awareness about natual resoures develpment.

4 Eco-truism project Siswan nature trail Development of siswan nature trail as eco turisum spot

Awareness of nature and its resources

4.3 Describe the efforts for Biodiversity Conservation (especially in case of EDCs)

With the conservation campaign the joint forest management committee making the people aware of environment and it’s conservation. In departmental interaction the emphasis is being given on the biodiversity conservation and also emphasis is always given in nature, fire camps organized by the department for biodiversity conservation.

Page 14: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

14

4.4 (a) Status of different resources available to FPC/VFC Sl.

Sl. Type of resource Area (acre) Current status Key problems in resource management

1 Reserve Forest

1.1 High forest - - -

1.2 Harvestable Plantation - - -

1.3 Other Plantation - - -

1.4 Degraded forest - - -

1.5 Open/ Blank - - -

2 Protected Forest

2.1 High/Coppice Forest 2800 Khair,shisham,reru, kikar and

dhak

Soil eras on

2.2 Harvestable Plantation - - -

2.3 Other Plantation - - -

2.4 Degraded forest 500 Khair,dek, shisham, kikaretc.

Plantation

Biotic pressure

2.5 Open/ Blank - - -

2.6 Degraded Sal area fit for Coppicing

- - -

3 Plantations on the community land

- - -

4 Any other plantations outside the forest

- - -

5 Agriculture land 200 Under wheat and makka

crop.

Wild animal destroy crop

6 Water resources 8

Tube well Need more resources

7 Any other resource – Specify

1 Dam -

Page 15: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

15

4.4 (b) Resource Map prepared by FPC/VFC

Page 16: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

16

4.5 (a) Forest resources

Sl. Plant (local name)

Main uses Relative abundance

Perceived value of plant (scale of 1-10, 1 being lowest)

Men Women

1 Karri Patta Medicinal use - 2 10

2 Giloy Medicinal use - 8 2

3 Mango Fruit - 6 6

4 Jamun Fruit - 3 4

5 Amla Fruit - 4 6

6 Babar grass grass - 6 6

7 Karonda Wild fruit - 2 10

4.5 (b) Describe the faunal resources available in the area and issues in habitat management and conservation The Siswan forest is situated north-east of village. There is rainy river row is pass out the forest. 4.6 (a) Collection and Management of NTFPs

Sl. Name NTFP

Collection time – Months

No. of HHs engaged - approx.

Unit Quantum collected in a season/ year

Quantum consumed by the FPC/VFC

Quantum sold in a season/ year

Sale value in Rs.

From FPC Area - yes/no

Any pro- blem

1 Karkhana July to March

50 250 250 100 - - Yes -

2 Babber July to March

20 40 40 40 - - Yes -

3 Mango April to July

- - - - - - - -

4.6 (b) Describe if the FPC is engaged in some processing/ value addition activities of NTFPs

The villegers are making rope from babber and kharkhana.

Page 17: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

17

4.7 (a) Consumption of fuel wood and dry leaves

Sl. Type of fuel used

Approx. No. of HHs (qtl)

Approx. Annual Consumption (Specify unit) by the FPC

Sources Problems

1 Fuel wood 71 710 Qtl Forest Agriculture

-

2 Lantana 35 350 Qtl Forest Agriculture

-

3 Karri Patta 10 50 Qtl Forest Agriculture

4.7 (b) Describe how the FPC/VFC is managing the gap in demand and supply of fuel wood

With LPG Connection and agricultural fuel, cowdungs. 4.8 (a) Utilization of timber, small timber/poles, bamboo

Sl. Product Approx. Annual utilization by the FPC/VFC

Current source of collection/ purchase

Problems

1 Timber 150 Qtl Forest Unstable rates of Timber

2 Poles 48 Qtl Forest Unstable rates of Timber

3 Bamboo 25 Qtl Forest -

4.8 (b) Describe how the FPC/VFC is managing the gap in demand and supply of timber, small timber and bamboo Collect from Forest (Dry timber) 4.9 Agriculture resources

Sl. Crop No of farmers engaged

Yield – approx. Problems Opportunities

1 Wheat 12 10-12 Qtl Wild animals Barbered wire

2 Rice - -

3 Bazra 8 10 Qtl

4 Makka 12 8 Qtl

5 Potatoes - NA

Page 18: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

18

4.10 Water resources

Sl. Type Nos. Availability of water (Months)

Uses Problems Opportunities

1 Water supply

1 12 Drinking ,daily uses

Lack of water

-

2 Tube well 9 12 Irrigation Lack of water

resources and water level very

down

-

4.11 Utilization of fodder in FPC/VFC

Sl. Type of Fodder used

Approx. No. of HHs using it

Sources Problems

1 Maize 36 Agriculture/Market -

2 Chari 12 -

3 Bazra 20 -

4 Javi - -

5 Barsin 32 -

4.12 Activity calendar –Livelihoods

Sl. Month (local) Main activities carried out during the month

Agriculture Forestry Works Wage Work

1 Jan. - -

2 Feb. - Planting/Sowing

3 Mar. - Planting/Sowing

4 Apr. Harvesting Protection from fire

5 May Harvesting

6 Jun. Sowing

7 Jul. Sowing Plantation Works

8 Aug. Sowing Plantation Works

9 Sep. Harvesting Plantation Works

10 Oct. Sowing Watch & ward

11 Nov. Sowing Watch & ward

12 Dec. Sowing Watch & ward

Page 19: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

19

5. Assessment of Local and External Institutions

5.1 Venn diagram 5.2 Local Institutions in FPC/VFC area and their functions

Type of Institution No . Total Members/ HHs having membership

Functions and benefits to the community

Self Help Groups 1 14 Saving and Inter loan

Cooperatives/ Credit unions

Nil Nil Nil

Women organizations Nil Nil Nil

Youth clubs 1 12 Social Work

Forest society 1 68(9) Profit distribution

Any other – specify Nil Nil Nil

5.3 Institutional Analysis – External Institutions operating in the FPC/VFC

Sl.

Name of the Institution/ Organisation

Since when operating in the FPC/VFC

Target group/ beneficiary

Activities undertaken so far

Problems faced by these Institutions/ Organisation

Plans for the future

What the FPC/VFC shall do in collaboration with these institution

1 Post Office 1970 Total VFC Communic ation, Saving Scheme

Communication problems due to

situated at kubaheri

2 School 1971 Total VFC Education Up gradation upgradation

Concern with edu. department

3 Anganwari 1995 Total VFC Welfare of children &

- - -

VILL- SISWAN

School

Post

offic

e

Dam

ws

B stand

Tehshil

Grain

mkt

Bank

Page 20: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

20

Womans

4 Panchyat 1975 Total VFC Development of village

Co-ordination with other departments

Development of village

VFC make Co-ordination with other departments

5.4 Profile of existing SHGs

Sl. No. Name of the SHG

Members of SHG

Income Generating Activities (IGA) undertaken

Approx. funds invested in IGA

Loan taken from Bank /other agencies

Any support needed from the Project

Male Female Total

1 Shree ram

Nil 14 14 Yes - VFC Require fund

6. Problem analysis and problem prioritization During conversation with villages find many problems identified related to village development. All problems are divided in different cat. And try to resolve the problems as possible. 6.1 Problem identification and analysis

Sl. Key Stakeholder groups of FPC/VFC

Key problems identified by each stakeholder group

Most important causes of each problem

Perceived solutions to each problem

Activities to be carried out by FPC/VFC to address the problem

1 Women Drinking Water, P.H.C.

P.H.C. Co-ordination with Govt.

Co-ordination with Govt.

2 Farmers Irrigation, wild animals

Irrigation Co-ordination with Govt.

Co-ordination with Govt.

3 Labourers P.H.C., Lack of wages

Lack of wages Co-ordination with Govt.

Co-ordination with Govt.

4 Forest Lantana, soil erason timely fund availability

timely fund availability

Co-ordination with Govt.

Co-ordination with Govt.

Page 21: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

21

6.2 Scoring and Ranking of Problems/ Activities

Sl. Activities identified from the Stakeholders analysis

Scoring of Activities by different stakeholders – Score – 1 to 10

(1 being the lowest)

Total Scores

Ranks

Name of Stakeholder Group

Name of Stakeholder Group

Name of Stakeholder Group

Name of Stakeholder

Women Farmers Forest Labourers

1 Drain water problem

10 6 5 1 22 1

2 P.H.C. 8 8 1 4 21 2

3 wild animals 3 10 4 2 19 3

4 Self Employment

5 3 - 5 13 4

5 Laltana buti 2 3 5 2 12 5

6.3 SWOT Analysis of the FPC/VFC

Strength Weakness

- Involvement of villagers - Panchyat co-ordination - Machnism for forest management - Working for women empowerment.

- Lock of co-ordination with other deptt. - Lock of Funds for income generating

activites.

Opportunity Threat

- - Availability of funds under new project.

- External pressure on NTFP.

Page 22: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

22

7. Setting the objectives for Development of FPC/VFC for 5 years 7.1 Objectives for Development

Years Name of work Name of forest scheme Total area

2017-18 Plantation SISWAN GIM 10haq

2017-18 Check Dam SISWAN GIM 100 sq.mtr

2017-18 Create wire structure SISWAN GIM 50sq.mtr

2017-18 Cement structure SISWAN GIM 5 no.

2018-19 Plantation SISWAN GIM 20haq

2018-19 Check Dam SISWAN GIM 100 sq.mtr

2018-19 Create wire structure SISWAN GIM 100sq.mtr

2018-19 Cement structure SISWAN GIM 5 no.

2019-20 Plantation SISWAN GIM 20haq

2019-20 Check Dam SISWAN GIM 100 sq.mtr

2019-20 Create wire structure SISWAN GIM 100sq.mtr

2019-20 Cement structure SISWAN GIM 5 no.

2020-21 Plantation SISWAN GIM 15haq

2020-21 Check Dam SISWAN GIM 100 sq.mtr

2020-21 Create wire structure SISWAN GIM 100 sq.mtr

2020-21 Cement structure SISWAN GIM 6 no.

2021-22 Plantation SISWAN GIM 10 haq

2021-22 Check Dam SISWAN GIM 100 sq.mtr

2021-22 Create wire structure SISWAN GIM 50sq.mtr

2021-22 Cement structure SISWAN GIM 5 no.

1. Awareness in school going and youths for attach with VFC. 2. Formation of SHG’s 3. Income Generating Activities for poor and backward sections. 4. Linkage with other department. 5. Improved quality of Forest/Non Forest Lands. 6. Increased forest based livelihood income.

Page 23: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

23

8. Activities for Institution Development (Capacity Building) of FPC/VFC and SHGs 8.1 Details of Proposed Training Programmes, awareness camps, exposure visits to be conducted (FPC/VFC and SHGs)

Sl. Subject/ Theme

Target group No of Participants

Duration Tentative Month and Year

1 Food Processing

Women 10 2 Months 2017-18

2 Beauty Paler Women 30 3 months 2017-18

3 Exposure visits. VFC 30 2 months 2017-18

4 Awareness camps

VFC 30 3 months 2017-18

5 Stitching women 40 3 months 2017-18

6 computer Youth 35 3 months 2017-18

8.2 Formation of various working groups for smooth implementation of activities mentioned in the Micro Plan

Name of the working group

Name of the Leader Members Responsibility

VFC Smt Parveen kumara 9 To achieve the objectives of Project

SHG Smt. Sushma 14 To achieve the objectives of Project

8.3 Records to be maintained by the FPC/VFC and SHGs

Sl. Name of the record/ register to be maintained

To be maintained by whom

To be verified by whom

1 Proceeding Register Sectary Forest Range Officer

2 Cash Book Sectary Forest Range Officer

3 Stock Register Sectary Forest Range Officer

4 Bank Pass book Sectary Forest Range Officer

5 Voucher File Sectary Forest Range Officer

8.4 Fund management by FPC/VFC Describe how the FPC/VFC is managing their funds/ financial resources received from different sources ….They Utilize their funds according to the Joint forest Management Guidelines.

Page 24: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

24

8.5 Social audit Describe how the FPC/VFC is planning to conduct social audit as part of their efforts to maintain transparency and accountability The VFC conduct social audit twice in a year in general house. 8.6 Monitoring mechanism Describe the monitoring mechanism for different activities prescribed in the micro plan VFC, Facilitators ,Staff 9. FPC/VFC Development and Perspective Plan for 5 years 9.1 Activities to be carried out for overall development of FPC/VFC for 5 years (Consolidated)

Sl. Activities Physical Target Financial Target Rs.

Indicative list of Departments/ Agencies for support

1 Basic services

2 Community Infrastructure Development

1 (Room & Shed community centre construction)

10,00,000 GIM

3 Livelihood Enhancement

22 Soler Lentren, 10 Street Light and 15 stitching machines

44,000 1,80,000

Green India Mission

4 Resource development

Plantation 10,00,000 GIM

5 Capacity Building

10 1.5 Lac Green India Mission

Page 25: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

25

9.2 Year-wise break up of different activities to be carried out by FPC/VFC for 5 years

Proposed Activity

Year 1 Year 2 Year 3 Year 4 Year 5

Physical Financial (Lac)

Physical

Financial

Physical

Financial

Physical

Financial

Physical

Financial

Basic services

- - - - - - - - - -

Community Infrastructure Development

1 0.6 - - - - - - - -

Livelihood Enhancement

50 Soler Lentren, 15 stitching machines

1 0.65

- - - - - - - -

Resource Development

- - - - - - - - - -

Capacity Building

- - - - - - - - - -

Signature of Member Secretary of FPC/VFC: Approval by Head of DMU:

Page 26: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

26

Attachment I

Forest dwellers’ development plan

1. Total number of forest dwellers in the FPC/VFC:

Category Total Families

Total population

Total claimants under FRA

Total families got patta under FRA

Total forest areas given under FRA

Any other information on the forest dwellers

ST - - - - - -

Other Forest Dwellers

60 358 45 - - -

Total 60 358 45 - - -

2. Potential social and environmental impact of interventions by the FPC/VFC on the forest dwellers and suggested mitigation measures

Activities to be carried out by FPC/VFC

Positive environmental and social impact on the forest dwellers

Negative environmental and social impact on the forest dwellers

Suggested Measures for mitigation of negative impact

Basic services

- - -

Community infrastructure development

- - -

Livelihood enhancement

- - -

services - -

Resource development - - -

Capacity building - - -

3. Activities suggested for the Forest Dwellers and estimated costs

Year Activities Physical target Financial target in Rs.

- - - -

- - - -

- - - -

Signature of Member Secretary of FPC/VFC:

Page 27: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

27

Attachment II Resolution of FPC/VFC for approval of Micro Plan

Page 28: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

28

Attachment III

Photographs of Microplanning Process in FPC/VFC

Page 29: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

29

Attachment IV

GPS Survey Map of FPC/VFC

Page 30: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

30

Attachment V

Proposed Land-use Map of FPC/VFC

Page 31: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

31

Attachment VI

Household database (for all households in the FPC/VFC)

Sl. Name of Head of Household

Sources of livelihood

Wealth* ranking

Primary Secondary

1 Jagdeesh kumar Agri./Labour - A

2 Kamla devi Agri./Labour - C

3 Jatinder singh Agri./Labour - B

4 Kailesh kumar Agri./Labour - B

5 Daya krishan Agri./Labour - C

6 Rakesh kumar Govt. job - A

7 Pawan kumar Agri./Labour - B

8 Gujar singh Agri./Labour - B

9 Sanjugta Agri./Labour - C

10 Sushil chand Agri./Labour - C

11 Kulbeer singh Agri./Labour - B

12 Dilbag singh Agri./Labour - C

13 Rakesh kumar Govt. job - A

14 Kanta devi Agri./Labour - B

15 Rattan chand Agri./Labour - A

16 Asha rani Agri./Labour - B

17 Hariom Agri./Labour - B

18 Tarshem kumar Agri./Labour - C

19 Ajab singh Agri./Labour - B

20 Gafar khan Agri./Labour - B

21 Garish kumar Agri. - A

22 Satnam singh Agri./Labour - D

23 Jasvinder singh Agri./Labour - B

24 Bhupinde singh Agri./Labour - B

25 Sohan kumar Agri./Labour - C

26 Bharkha Agri./Labour - B

27 Ikbal khan Agri./Labour - D

28 Afthar khan Agri./Labour - D

29 Surjeet singh Agri./Labour - A

30 Prem singh Agri./Labour - B

31 Gurmeet singh Agri./Labour - B

32 Swarno devi Agri./Labour - D

33 Ajeb singh Labour - C

34 Chaanan singh Labour - D

35 Balbeer singh Labour - D

36 Ragubir singh Labour - C

37 Ashok kumar Agri./Labour - C

38 Balinder singh Labour - D

39 Balbir chand Labour - D

Page 32: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

32

40 Parshotam singh Labour - D

41 Gurmukh singh Labour - D

42 Sher khan Labour - D

43 Lal khan Agri. - C

44 Ramjan khan Agri. - C

45 Baldev singh Labour - C

46 Sahiram Labour - D

47 Rajinder pal Agri./Labour - C

48 Surinder singh Labour - D

49 Dalmir singh Labour - C

50 Khusiya ram Labour - C

51 Jaspal Labour - C

52 Surjeet singh Labour - D

53 Balwant ram Govt. job - A

54 Babita Labour - C

55 Dharma pal Labour - D

56 Bhishan singh Labour - D

57 Dalbir singh Labour - C

58 Naresh kumar Labour - C

59 Sanjeev kumar Business - A

60 Pritam singh Agri. - A

61 Rajinder singh Agri. - C

62 Randeer singh Labour - C

63 Balak ram Labour - B

64 Abdul krim Govt. job - A

65 Rhim khan Labour - B

66 Subhash Sharma Labour - C

67 Parveen kumari Labour - C

68 Bhushan kumar Labour - B

69 Ravinder Sharma Labour - B

70 Kanta devi Private - C

71 Ghandarav shen Labour - B

72 Mukesh gupta Labour - C

73 Bhupinder kumar Labour - C

74 Sushma Labour - B

75 Dilbag gir Labour - C

76 Gurdeep kaur Govt. job - A

77 Sanjeev kumar SHOPKEEPER - A

Note: * For category code refer table 3.10 of Micro Plan (Wealth Ranking)

Page 33: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

33

Part II of Micro Plan Attachment A

Annual Action Plans of FPC/VFC for 2016-17 (Year)

Sl. Project Packages/ Activities

Units Total target-Micro Plan

Target and Achievement of the Previous Year _______

Physical target for the Current Year____

Total Funds required in Rs.

Sources of finance and anticipated amount

Physical Financial WBFBCP FPC/VFC Others specify

Others specify Target Achieved Target Achieved

1 Basic services - - - - - - - - - - - -

1.1 - - - - - - - - - - - -

1.2 - - - - - - - - - - - -

2. Community Infra structure Development

- - - - - - - - - - - -

2.1 - - - - - - - - - - - -

2.2 - - - - - - - - - - - -

3. Livelihood Enhancement

- - - - - - - - - - - -

3.1 - - - - - - - - - - - -

3.2 - - - - - - - - - - - -

3.3 - - - - - - - - - - - -

4. Resource Development

- - - - - - - - - - - -

4.1 - - - - - - - - - - - -

4.2 - - - - - - - - - - - -

5 Capacity Building - - - - - - - - - - - -

5.1 - - - - - - - - - - - -

5.2 - - - - - - - - - - - -

6 Administration - - - - - - - - - - - -

6.1 - - - - - - - - - - - -

6.2 - - - - - - - - - - - -

Signature of Member Secretary of FPC/VFC:

Page 34: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

34

Attachment B Information received from Office of Block Development Officer on various Development Schemes proposed to be implemented in FPC/VFC area

Name of the FPC/VFC: Gram Panchayat: SISWAN Panchayat Samity: BLACK MAJRI District: S A S NAGAR.

Sl. Name of the Scheme

Name of the Implementation Agency/ Dept.

Activities implemented in FPC/VFC area during the Previous Year ____________ along with quantity of work

Funds utilized during the Previous Year 2013 to 2017 (In Rs.)

Activities proposed to be implemented in FPC/VFC area during Current Year ____________ along with quantity of work

Financial Target for the Current Year ____________ (In Rs.)

1 Panchyat Fund Panchyat R.C.C Street 200000

2 MLA Fund Firni 50000

Signature of BDO: Date:

Page 35: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

35

Annexure-II (Format)

Household Socio-Economic Baseline Survey 1.1 Basic information:

Name of the FPC

SISWAN Gram Panchayat

SISWAN

Panchayat Samiti

BLACK MAJRI FMU

SAS NAGAR

1

Name of the Head of Household (HoH)

Parveen kumara

Sex

F Age

50

2 Name of Respondent Sex

Age

3 Households economic status as Per record

APL Yes

BPL

Any other card, specify-

No card

4 Whether family has “job card’ under MGNREGA?

Yes/ No Yes

1.2 Type of House (Tick mark)

Wall Type Roof Type Floor Type

Concrete PAKKA PAKKA

1.3 Family profile

Sl. No.

Name of person

Sex Relation with Head of Family

Age Literacy Level

Primary Occupation

Any other information

1 Parveen kumara

F Self 50 10th Shopkeeper -

2 - - - - - - -

3 - - - - - - -

4 - - - - - - -

Page 36: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

36

1.4 Facilities in House

a) Electricity in house

Yes/No Yes

b) Drinking water

In house Yes

Near House

Away from house

c)

Sanitation - toilets

Yes/No Yes

d) Homestead plot

Yes/No No

If yes, then what is the use - No

e) Cattle shed Yes/No No

If yes, type of shed: NO

f) Fuel used Fuel wood* Dry leaves LPG (Gas) Electricity

If fuel wood and / or dry leaves used (Specify unit)

Fuel wood (annual consumption)

No Yes No

Dry leaves (annual consumption)

No No No

1.5 Household assets

a) House items : Bed etc. Yes

Television Yes Radio/Tape etc.

Stove (LPG) Yes

Table /Chair Yes Others – specify

Cell phone Yes

b) Vehicles : Cycle Yes Moped/Scooter/Motorcycle Yes

Car/Jeep No

Others specify

c)

Agricultural equipment

No NO

Page 37: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

37

1.6 Land holding status (Local term 1 bigha = 30 Marle)

a) Total land holding

15 bigha - - - -

b) Total cultivable land

- - - - -

c) Homestead & habitation area

20 Marle - - - -

d) Land given on rent for cultivation

-

e) Land taken on rent for cultivation

- - - - -

f) Source of Irrigation (If available)

- - - - -

1.7 Livestock details

Sl. Animal 2

a) Cow -

b) Bullock -

c) Buffalo 2

d) Poultry -

e) Goat -

f) Sheep -

g) Duck -

h) Pig -

i) Others, specify -

1.8 Fodder requirement

(a) If free grazing

a) Forest Months: 2 Specify months: Nil

b) Agricultural fields Months: 10 Specify months: Nil

c) Other specify Months: 12 Specify months: Nil

(b) If stall fed then annual requirement of fodder (to be calculated on the basis of weekly requirement):

Nil

Page 38: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

38

1.9 Requirement of timber, small timber/poles (a) What is the annual requirement of timber and small timber? 7 Qtl (b) Where from you are getting it? Forest and Agriculture Land

1.10 Saving and Debt related details

(a) Do you or your family members have a bank account? Yes /No

Yes (b) Are you or other family members associated with any SHGs? Yes/ No

No 1.11 Annual Income from Agriculture

Sl. Crops Total area cultivated (bigha)

Total Production (Qntls.)

Total Consumptions (Qntls.)

Total Sold (Qntls.)

Sale value in Rs.

1 wheat 10 20 10 10 15000

1.12 Problems of the family in carrying out different agricultural activities: 1.13 Annual Income from livestock

Sl. Quantity Unit Rate Total Income Problems, if any

1 Sale of Livestock

1 50000 50000 Nil

2 Dairy – milk and other products

2000 kg 50 100000 Nil

3 Others, specify Nil Nil Nil

4 Others, specify Nil Nil Nil

Page 39: DEPARTMENT OF FOREST AND WILD LIFE PRESERVATION, PUNJAB NAGAR/Micro Plan final in English... · green india mission 1 department of forest and wild life preservation, punjab green

GREEN INDIA MISSION

39

1.14 Annual Income from wage employment

Sl. Type of work

No. of days Place of work

Wage rate Total Income

Problems, if any

1 Agriculture 200 Siswan 300 0.60 Lac -

1.15 Annual Income from NTFP collection

Sl. Item Months when available

Total days spent

Total Collection (specify the unit)

Total Consumed

Total Sold

Sale value in Rs.

Problems, if any

1 - - - - - - - -

1.16 Annual Income from other sources

Sl. Source of income Nature / Quantity Unit Rate Total Income

1 Service /Salary - - -

2 Skill based work/ handicraft

- - -

3 Trading / vending (shop)

- - -

4 Remittances - - -

5 Others. Specify - - -

Name of Surveyor

:

Signature : Place : Date : Signature of Respondent

: