  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    1/16

    Revision Date:10/05/2008

    ESTIMATION

    Messrs : Sankyu - Thai Co.,Ltd.

    Wellgrow Industrial Estate Ph III

    90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong

    Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

    Attn. : Mr. Surathep Lertsara

    Manager

    CC. :

    Project: New Injection Machine Installation

    Locatio: Wellgrow Industial Estate

    Title of works : New Injection11 Machine Install

    Job No.: SKT 080921

    Revisio: 1

    EIR ENGINEERING CO.,LTD.

    228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

    228/94 5 . . . . 10270

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    2/16

    Revision Date:10/05/2008

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    3/16

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    4/16

    Revision Date:10/05/2008

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    5/16Page 5 of 16 EIR Engineering Co.,Ltd.

    EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 102

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .co

    QUOTATION

    Quotation: SKT 080921

    Messrs. : Sankyu - Thai Co.,Ltd. Date : 25 August 2008

    : Wellgrow Industrial Estate Ph III Validity of Quotation :

    : 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,Preparing Period :

    : .A.Bangpakong Chachoengsao 24180 Delivery :

    Tel. : Tel 038-522280 - 7 Fax. 038-522288 Revised : 1

    Attn. : Mr. Surathep LertsaraP/O No.

    :

    : Manager

    1) Price ( Baht ### Excluded Vat 7%

    2) Project New Injection Machine Installation

    3) Title of work New Injection11 Machine Install

    4) Term of Payment Within 30 days

    Item Description uantitUnit Amount

    1 DIRECT COST 1 LOT 258,550.00

    2 INDIRECT COST 1 LOT 7,500.00

    3 EXPENSE & PROFIT 1 LOT 39,907.50

    TOTAL 305,957.50VAT 7% 21,417.03

    FINAL AMOUNT 327,374.53

    We hope that our confirmation will meet with your requirement and look forward to receiving your val

    Your Faithfully,

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    6/16Page 6 of 16 EIR Engineering Co.,Ltd.

    Sukhon Thewaran

    Manager

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    7/16Page 7 of 16 EIR Engineering Co.,Ltd.

    0

    uable order in due course

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    8/16Page 8 of 16 EIR Engineering Co.,Ltd.

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    9/16

    EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakar

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @

    SUMMARY OF QUOTATION

    Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080921

    Client : Sankyu - Thai Co.,Ltd. Date : ###

    Project : New Injection Machine InstallationRevision No. : 1

    Title of : New Injection11 Machine Install

    ItemDescription Q'ty UnitUnit Cost Total Amount

    1 Direct Cost

    A NEW INJECTION M/C NO.11 INSTALL WORK 1 lot ### 258,550.00

    Subtotal 1 ###

    2 Indirect Cost

    2.1 Site Staff and Supervisor 1 lot

    2.2 Transportation 1 lot 5,000.00

    2.3 Tool and consumption 1 lot 2,500.00

    2.4 Site Expense 1 lot

    1 Temporary Facilities

    2 Small Construction Supplies

    3 Utility Supply Costs

    Subtotal 2 7,500.00

    3 Expense & Profit 39,907.50

    GRAND TOTAL ###

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    10/16

    10270

    gmail .com

    COST Different

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    11/16

    8453278.xlsBOQ Page 11 of16 EIR Engineering Co.,Ltd.

    Estimation SheetClient Sankyu - Thai Co.,Ltd. Date : ###

    Project New Injection Machine Installation Job Number : SKT 080921

    Location Wellgrow Industial Estate Revision : 1

    Title Of W New Injection11 Machine Install

    No. Description Q'ty Unit nit Pric Total Cost Remark

    1 DIRECT COST

    A NEW INJECTION M/C NO.11 INSTALL WORK

    A1 NEW INJECTION M/C INSTALL WORK

    - PM11 MDB PANEL 1 SET Existing

    -Sub-Panel 250 A. 1 SET Existing

    -NEW INJECTION MACHINE 700 A. 1 SET Existing

    -CHILLER MACHINE 100 A. 1 SET Existing

    -MOLD TEMP MACHINE 1 SET Existing

    -HOPPER DRYER MACHINE 1 SET Existing

    - JET LOADER 1 SET Existing

    -CRUSHER 1 SET Existing

    -WIRE AND CABLE CV 1 C - 185x3 (x2) sq. R,S,T 230 M 750.00 172,500.00 Inj. M/C No.11

    - WIRE AND CABLE THW 1C - 50 sq. G 40 M 207.00 8,280.00 Inj. M/C No.11

    -WIRE AND CABLE CV 4 C - 25 sq. 10 M Supply By Owner Chiller

    -WIRE AND CABLE CV 4 C - 16 sq. 15 M Supply By Owner Mold Temp

    -WIRE AND CABLE CV 4 C - 10 sq. 15 M Supply By Owner Dryer

    -WIRE AND CABLE CV 4 C - 6 sq. 15 M Supply By Owner Jet Loader

    -WIRE AND CABLE CV 4 C - 2.5 sq. 20 M Supply By Owner Crusher

    -WIRING CONNECT ACCESSORIES 1 LOT 2,000.00 2,000.00

    -FLEXIBLE CONDUI 3 " 3 M 400.00 1,200.00

    -FLEXIBLE CONDUI 1 1/2 " 3 M 170.00 510.00

    -FLEXIBLE CONDUI 1 1/4 " 3 M 140.00 420.00

    -FLEXIBLE CONDUI 1 " 3 M 90.00 270.00

    -FLEXIBLE CONDUI 3/4 " 3 M 65.00 195.00

    -FLEXIBLE CONDUI 1/2 " 3 M 45.00 135.00

    -FLEX CONDUIT ACCESSORIES 1 LOT 2,000.00 2,000.00

    -CABLE RACK W:300 L:3000 5 SET 1,340.00 6,700.00

    -CABLE RACK W:200 L:3000 6 SET 1,230.00 7,380.00

    -CABLE RACK TEE REDUCE W:300/200 2 SET 820.00 1,640.00

    -CABLE RACK HORIZONTAL W:200 2 SET 570.00 1,140.00

    -CABLE RACK VER-IN W:200 1 SET 500.00 500.00

    -CABLE RACK VER-OUT W:200 1 SET 500.00 500.00

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    12/16

    8453278.xlsBOQ Page 12 of16 EIR Engineering Co.,Ltd.

    -CABLE RACK COVER W:200 8 SET 930.00 7,440.00

    - CABLE RACK COVER HORIZONTAL W:200 2 SET 430.00 860.00

    -CABLE RACK COVER VER-IN W:200 1 SET 350.00 350.00

    -CABLE RACK COVER VER-OUT W:200 1 SET 350.00 350.00

    -CABLE RACK ACCESSORIES 1 LOT 2,000.00 2,000.00

    -WIREWAY W:300 2 SET 1,670.00 3,340.00

    -WIREWAY VER-OUT W:300 2 SET 670.00 1,340.00

    - STEEL SUPPORT C:75 800X660X400 10 SET 1,600.00 16,000.00

    - STEEL SUPPORT C:75 1500X300X1500 1 SET 2,000.00 2,000.00

    -MISCELENEOUS 1 LOT 3,000.00 3,000.00

    -PAINTING WORK 1 LOT 1,500.00 1,500.00

    - LABOR CHARGE 1 LOT ### 15,000.00

    TOTAL A1 ###

    TOTAL A ###

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    13/16

    8453278.xlsBOQ Page 13 of16 EIR Engineering Co.,Ltd.

    MD Ratio

    Materials 1.10

    install 1.000 350.00 400.00

    Material Cost Labour Cost

    Q'ty Unit Unit Price Total Cost nit M/D otal M/D Unit Price labour cost

    230 M 609.00 140,070.00

    40 M 159.00 6,360.00

    - M 450.00 -

    - M 280.00 -

    - M 190.00 -

    - M 130.00 -

    20 M 73.00 1,460.00

    1 LOT ### 2,000.00

    3 M 400.00 1,200.00

    3 M 170.00 510.00

    3 M 140.00 420.00

    3 M 90.00 270.00

    3 M 65.00 195.00

    3 M 45.00 135.00

    1 LOT ### 1,000.00

    - SET ### -

    6 SET ### 7,326.00

    2 SET 759.00 1,518.00

    2 SET 528.00 1,056.00

    1 SET 440.00 440.00

    1 SET 440.00 440.00

    Cost /m Offer /md

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    14/16

    8453278.xlsBOQ Page 14 of16 EIR Engineering Co.,Ltd.

    6 SET 756.00 4,536.00

    2 SET 336.00 672.00

    1 SET 300.00 300.00

    1 SET 300.00 300.00

    1 LOT ### 2,000.00

    2 SET ### 2,806.00

    2 SET 616.00 1,232.00

    10 SET ### 15,000.00

    1 SET ### 2,000.00

    1 LOT ### 2,500.00

    - LOT ### -

    1 LOT ### 30,000.00

    225,746.00

  • 8/14/2019 Den So 080921 Revise1 New Inj11 Install

    15/16

    8453278.xlsBOQ Page 15 of16 EIR Engineering Co.,Ltd.