1
DN DN DEMOLITION KEYED NOTES 1 REMOVE EXISTING WALL IN ITS ENTIRETY. SALVAGE EXISTING WOOD TRIMS ASSOCIATED WITH EXISTING WALL TO BE REFINISHED AND REUSED IN OTHER AREAS OF THE BUILDING. 2 REMOVE EXISTING DOOR AND FRAME IN ITS ENTIRETY. CATALOG AND STORE DOORS AND FRAMES INCLUDING TRIMS TO USE IN THE REFURBISHING OF EXISTING DOORS TO REMAIN. ALL DOORS SCHEDULED TO REMAIN ARE REFURBISHED AND INSTALLED THE CONTRACTOR SHALL DELIVER THE REMAINING DOORS TO THE USING AGENCY. 3 REMOVE EXISTING LAY-IN SUPSPENDED CEILINGS. REFER TO MECHANICAL AND ELECTRICAL FOR LIGHTING AND MECHANICAL DEMOLITION. ALL EXISTING PLASTER CEILING SHALL REMAIN INTACT. 4 REMOVE ALL EXISTING FLOORING TO EXPOSE EXISTING SLAB. 5 6 7 REMOVE EXISTING EXTERIOR STAIRS/RAMP AND RAILINGS. 8 9 REMOVE EXISTING TOILET PARTITIONS AND RESTROOM ACCESSORIES. 10 REMOVE EXISTING PLUMBING FIXTURES 11 PROVIDE OPENING IN EXISTING WALL AS REQUIRED TO INSTALL NEW DOOR AND FRAME. 12 REMOVE EXISTING WINDOW AND PROVIDE OPENING FOR NEW DOOR AND FRAME 13 PROVIDE OPENING FOR NEW WINDOW REMOVE AND DISPOSE OF EXISTING WOOD RAISED PLATFORM AND ASSOICATED STAIRS. REMOVE EXISTING MILLWORK DEMOLITION SYMBOLS LEGEND BUILDING ELEMENTS TO BE REMOVED EXISTING CONSTRUCTION TO REMAIN NOTE: NOT ALL KEYED NOTES ARE SPECIFIC TO THIS SHEET. REMOVE EXISTING STRUCTURE IN ITS ENTIRETY. PROTECT EXISTING MAIN BUILDING WALL. 14 SAW CUT AND REMOVE EXISTING CONCRETE SLAB AS REQUIRED FOR INSTALLATION OF NEW PLUMBING. PUT BACK IN THESE AREAS SHALL INCLUDE SLOPE FOR DRAINING. FIELD VERIFY AMOUNT/DIMENSIONS TO BE REMOVED. BUILDING SLAB TO BE REMOVED (E)101 (E)102 (E)103 (D)101 (D)102 (D)125 (D)124 (E)121 (D)123 (D)122 (D)121 (E)120 (E)119 (D)120 (E)118 (E)111 (E)112 (D)119 (E)110 (D)118 (E)109 (E)108 (D)112 (E)107 (D)111 (D)109 (D)110 (E)105 (D)108 (E)106 (D)116 (D)115 (D)114 (D)113 (D)117 (E)104 (D)103 (D)104 (D)105 (D)106 (D)107 (E)113 (E)114 (E)115 (E)116 (E)117 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 6 7 7 7 7 7 7 8 8 8 8 7 9 10 11 13 14 14 14 14 14 14 See 1/D1.3 for Rail Renovation Detail for Stairs See 1/D1.3 for Rail Renovation Detail for Stairs REGISTEREDRETIHCACTSTATEOFISSSSIIIMPPMichaelW.4822TaylorPROJECT NO. CHECKED BY: DRAWN BY: PryorMorrow PC C 2016 Copyright SCALE: PryorMorrow 9/1/2017 3:43:23 PM As indicated Columbus, Mississippi 2016111 LAS MWT FIRST FLOOR - DEMO PLAN D1.10 Demonstration School Renovation G.S.#104-187 Bureau of Building, Grounds and Real Property Management 1/8" = 1'-0" 1 FIRST FLOOR MARK DATE DESCRIPTION SD June 17, 2016 SCHEMATIC DESIGN DD November 30, 2016 DESIGN DEVELOPMENT CD May 31, 2017 CONSTRUCTION DOCUMENTS (75%) CD July 14, 2017 CONSTRUCTION DOCUMENTS (100%) CD September 5, 2017 OFFICIAL BID DOCUMENTS 2017

DEMOLITION KEYED NOTES NOTE: NOT ALL KEYED … · dn dn demolition keyed notes 1 remove existing wall in its entirety. salvage existing wood trims associated with existing wall to

Embed Size (px)

Citation preview

Page 1: DEMOLITION KEYED NOTES NOTE: NOT ALL KEYED … · dn dn demolition keyed notes 1 remove existing wall in its entirety. salvage existing wood trims associated with existing wall to

DN DN

DEMOLITION KEYED NOTES

1 REMOVE EXISTING WALL IN ITS ENTIRETY. SALVAGE EXISTING WOOD TRIMS ASSOCIATEDWITH EXISTING WALL TO BE REFINISHED AND REUSED IN OTHER AREAS OF THE BUILDING.

2

REMOVE EXISTING DOOR AND FRAME IN ITS ENTIRETY. CATALOG AND STORE DOORSAND FRAMES INCLUDING TRIMS TO USE IN THE REFURBISHING OF EXISTING DOORS TOREMAIN. ALL DOORS SCHEDULED TO REMAIN ARE REFURBISHED AND INSTALLED THECONTRACTOR SHALL DELIVER THE REMAINING DOORS TO THE USING AGENCY.

3REMOVE EXISTING LAY-IN SUPSPENDED CEILINGS. REFER TO MECHANICAL ANDELECTRICAL FOR LIGHTING AND MECHANICAL DEMOLITION. ALL EXISTING PLASTERCEILING SHALL REMAIN INTACT.

4 REMOVE ALL EXISTING FLOORING TO EXPOSE EXISTING SLAB.

5

6

7

REMOVE EXISTING EXTERIOR STAIRS/RAMP AND RAILINGS.

8

9

REMOVE EXISTING TOILET PARTITIONS AND RESTROOM ACCESSORIES.

10

REMOVE EXISTING PLUMBING FIXTURES

11

PROVIDE OPENING IN EXISTING WALL AS REQUIRED TO INSTALL NEWDOOR AND FRAME.

12

REMOVE EXISTING WINDOW AND PROVIDE OPENING FOR NEW DOORAND FRAME

13

PROVIDE OPENING FOR NEW WINDOW

REMOVE AND DISPOSE OF EXISTING WOOD RAISED PLATFORM ANDASSOICATED STAIRS.

REMOVE EXISTING MILLWORK

DEMOLITION SYMBOLS LEGEND

BUILDING ELEMENTS TO BE REMOVED

EXISTING CONSTRUCTION TO REMAIN

NOTE: NOT ALL KEYED NOTES ARE SPECIFIC TO THIS SHEET.

REMOVE EXISTING STRUCTURE IN ITS ENTIRETY. PROTECT EXISTING MAIN BUILDINGWALL.

14SAW CUT AND REMOVE EXISTING CONCRETE SLAB AS REQUIRED FOR INSTALLATION OFNEW PLUMBING. PUT BACK IN THESE AREAS SHALL INCLUDE SLOPE FOR DRAINING. FIELDVERIFY AMOUNT/DIMENSIONS TO BE REMOVED.

BUILDING SLAB TO BE REMOVED

(E)101

(E)102(E)103

(D)101 (D)102(D)125(D)124

(E)121

(D)123

(D)122 (D)121

(E)120

(E)119

(D)120

(E)118

(E)111

(E)112

(D)119

(E)110

(D)118

(E)109

(E)108

(D)112

(E)107

(D)111(D)109 (D)110

(E)105

(D)108

(E)106

(D)116

(D)115 (D)114 (D)113(D)117

(E)104

(D)103

(D)104

(D)105

(D)106

(D)107

(E)113(E)114(E)115(E)116(E)117

1

1 1

1

1

1

1

11

1

1

11

1

1

1

1

1

22222

2 2 22

2

2

2

2

2

2

2222

222

2

2

3

3

3 3

3

3

3

33

4

4 4

4

4

4

44

44

4

44

4

4 4

4

4 4

4

4

4

4

4

4 44

4

4

4

4

444

4

4

4

4

4

55 5

6

7

777

7

7

8 8 8

8

7

9

10

11

13

14

1414

14

14

14

See 1/D1.3 for Rail Renovation Detailfor Stairs

See 1/D1.3 for Rail Renovation Detailfor Stairs

REGISTERED R

ETIHCA

CT

ST A T E O F ISS SSI

II

M

PP

Michael W.

4822

Taylor

PROJECT NO.

CHECKED BY:DRAWN BY:

PryorMorrow PCC 2016Copyright

SCALE:

PryorMorrow

9/1/

2017

3:4

3:23

PM

As indicated

Col

umbu

s, M

issi

ssip

pi

2016111LAS

MWT

FIRST FLOOR - DEMO PLAN

D1.10

Demo

nstra

tion S

choo

l Ren

ovati

onG.

S.#1

04-18

7

Bure

au o

f Bui

ldin

g, G

roun

ds a

nd R

eal P

rope

rty M

anag

emen

t

1/8" = 1'-0"1 FIRST FLOOR

MAR

KDA

TEDE

SCRIPT

ION

SDJu

ne 1

7, 2

016

SCH

EMAT

IC D

ESIG

ND

DN

ovem

ber 3

0, 2

016

DES

IGN

DEV

ELO

PMEN

TC

DM

ay 3

1, 2

017

CO

NST

RU

CTI

ON

DO

CU

MEN

TS (7

5%)

CD

July

14,

201

7C

ON

STR

UC

TIO

N D

OC

UM

ENTS

(100

%)

CD

Sept

embe

r 5, 2

017

OFF

ICIA

L BI

D D

OC

UM

ENTS

2017