Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Creating Value …
… Delivering Solutions
New Jersey Roadway Centerline Enhancement
MAGTUG September 21, 2011
Agenda
Description of Project
Methodology
Challenges
Status
Wrap-up
9/21/2011 2NJOIT Centerline Enhancement
Project Description
Intended to replace TeleAtlas
NJDOT Roadway Network as starting point
Include sources from Census, County, Local, MOD-IV
Broad user base
9/21/2011 3NJOIT Centerline Enhancement
Project Description Add private roads
Data Source PriorityGEOMETRY
NJDOTCounty
LocalTIGER
Digitize from Project Aerials
9/21/2011 4NJOIT Centerline Enhancement
Project Description
Data Model Adapted from NJDOT data
model
Enhancements to meet broader needs
Production Model
Reporting Model NJOIT users and
applications
NJDOT users and applications
9/21/2011 NJOIT Centerline Enhancement 5
Project Description
9/21/2011 NJOIT Centerline Enhancement 6
Project Description
Look-up tables
Multiple LRSs
Change Table
9/21/2011 NJOIT Centerline Enhancement 7
Project Description
9/21/2011 NJOIT Centerline Enhancement 8
Project Description
Reporting Tables NJ_CARTO
NJ_GEOCODING
NJ_ROADWAY_NETWORK
Extract Transform and Load Process Summary level
segmentation
SLD attributes/ event tables
9/21/2011 NJOIT Centerline Enhancement 9
Project Description
Limitations Inconsistency
between source datasets
Updates to NJDOT data Ramps
New alignments
9/21/2011 NJOIT Centerline Enhancement 10
Project Description
Project Team Michael Baker Jr., Inc.
Civil Solutions, Inc.
9/21/2011 NJOIT Centerline Enhancement 11
Methodology
9/21/2011 NJOIT Centerline Enhancement 12
Methodology
Data Analysis Gather data
Planarize
Format table structure
Project as State Plane
9/21/2011 NJOIT Centerline Enhancement 13
Methodology Standardization Production
Geodatabase
MXD
9/21/2011 NJOIT Centerline Enhancement 14
Methodology
Production Tiles (PTiles)
9/21/2011 NJOIT Centerline Enhancement 15
Methodology Pre-processing: Stage 1 Flag segments and drop points
Production codes (PCODEs):
QC I Utilize PPoints
9/21/2011 NJOIT Centerline Enhancement 16
COPY DOTEDIT
ADDNEW RESACC
EXTD ADDUNIMP
TRIM OMIT
CIRCU OTHER
MODGEOM MANUALCON
ADDBRDG RAMPEDIT
Methodology
New Segments 2007 NJ Orthophotography
9/21/2011 NJOIT Centerline Enhancement 17
Methodology
New Segments 2010 NJ Orthophotography
9/21/2011 NJOIT Centerline Enhancement 18
MethodologyNew Segments Business
Rules Emergency
access
9/21/2011 NJOIT Centerline Enhancement 19
Methodology
New Segments Business
Rules Connectivity
Visibility
9/21/2011 NJOIT Centerline Enhancement 20
Methodology
Pre-processing: Stage 2 Copy segments
SRI/ Route Creation
Connectivity and Topology
Attribute Population
Verified field
9/21/2011 NJOIT Centerline Enhancement 21
Methodology
Attribute population Jurisdiction type Public
– Segments currently in NJDOT
– Single family dwellings
Private– Schools
– Shopping centers
– Business Complexes
– Parks
Unknown– Subject to inventory
9/21/2011 NJOIT Centerline Enhancement 22
MethodologyQC II
Pre-conflation Evaluate table structure
Remove Geometry Identifier
Direction detection
9/21/2011 NJOIT Centerline Enhancement 23
Methodology Automated conflation Query omitted segments
based on production code
Query ramps
One automated pass per dataset
9/21/2011 NJOIT Centerline Enhancement 24
Methodology
Manual Processing Directionality and mis-conflation
Manual Conflation
Parcel Conflation
Postal codes
Psuedo-node merging
M and MP values
Elevations
QC III
9/21/2011 NJOIT Centerline Enhancement 25
Methodology
Post-processing Load to staging area in SDE
Automated validation
Load to delivery versions Metadata
Final review prior to delivery
9/21/2011 NJOIT Centerline Enhancement 26
Challenges
Source geometry Paper Streets
Alignment Issues
9/21/2011 NJOIT Centerline Enhancement 27
Challenges
TIGER addresses
TIGER zip codes Gaps
Alphanumeric data
9/21/2011 NJOIT Centerline Enhancement 28
Challenges Road names Variation
between sources
Variation in abbreviations
Spelling mistakes
9/21/2011 NJOIT Centerline Enhancement 29
Challenges
Road name prioritization
Parsing routines Concatenate and standardize source names
Parse into prefix, name, suffix, etc.
9/21/2011 NJOIT Centerline Enhancement 30
Highway Names Local Names
NJDOT TIGER
TIGER NJDOT
County County
Local Local
MOD-IV MOD-IV
Challenges
Conflation Issues Unexpected
results
9/21/2011 NJOIT Centerline Enhancement 31
Challenges
M-values for self-intersecting segments
9/21/2011 NJOIT Centerline Enhancement 32
Status
Pilot Area
9/21/2011 NJOIT Centerline Enhancement 33
Municipality County Challenge
Bridgewater Somerset Apartment and business complexes,circle
Carney’s Point
Salem NJTA toll
Kearny Hudson Port
New Hanover
Burlington Fort Dix
Stafford Ocean Sand roads
Status Tracking iDV tracking website
Total new mileage added to date
9/21/2011 NJOIT Centerline Enhancement 34
County Additional MileageAtlantic 323.17Bergen 185.96Burlington (pilot only) 77.05Camden 152.01Cape May 172Cumberland 155.39Essex 151.16Gloucester 140.48Hudson 55.86Hunterdon * 0Mercer 283.32Middlesex * 0Monmouth (70%) 342.41Morris (80%) 367.74Ocean (partial) 498.05Passaic 237.31Salem 60.54Somerset (pilot only) 48.16Sussex * 0Union 59.97Warren * 0Total 3310.58
Status
Percent complete to date
Data Maintenance Reconcile
process
Quarterly release
9/21/2011 NJOIT Centerline Enhancement 35
Production Stage % of Stage Complete
Weighted % Complete
Setup 100% 3%Stage 1 94% 9%QC1 82% 1%Stage 2 61% 18%QC2 41% 2%Pre-conflation 24% 1%Conflation 18% 1%Manual Processing 13% 4%
QC3 2% 0%Post-Processing 2% 0%QC4 2% 0%Delivery 2% 0%Total Percent Complete
37%
Questions and Wrap-up
9/21/2011 NJOIT Centerline Enhancement 36