DELIVERING DISCIPLINEDGROWTH
GMP SECURITIES SALES DESK PRESENTATION
August 17, 2011
2
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation, including any information as to the future performance of Kinross, constitute “forward looking statements” within the meaning of applicable securities laws, including the provisions of the Securities Act (Ontario) and the provisions for “safe harbour” under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this presentation. Forward looking statements include, without limitation, possible events; opportunities; statements with respect to possible events or opportunities; estimates and the realization of such estimates; future development, mining activities, production and growth, including but not limited to cost and timing; success of exploration or development of operations; the future price of gold and silver; currency fluctuations; expected capital expenditures and requirements for additional capital; government regulation of mining operations and exploration; environmental risks; unanticipated reclamation expenses; and title disputes. The words “plans”, “expects”, “subject to”, “budget”, “estimate”, “scheduled”, “timeline”, “projected”, “pro forma”, “estimates”, “envision”, “view”, “forecasts”, “guidance”, “conceptual”, “target”, “possible”, “illustrative”, “model”, “opportunity”, “objective”, “potential”, “intends”, “anticipates” or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “can”, “could”, “would”, “should”, “might”, “indicates”, “will be taken”, “become”, “create”, “occur”, or “be achieved”, and similar expressions identify forward looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Statements representing management’s financial and other outlook have been prepared solely for purposes of expressing their current views regarding the Company’s financial and other outlook and may not be appropriate for any other purpose. Many of these uncertainties and contingencies can affect, and could cause, Kinross’ actual results to differ materially from those expressed or implied in any forward looking statements made by, or on behalf of, Kinross. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All of the forward looking statements made in this presentation are qualified by these cautionary statements, and those made in our filings with the securities regulators of Canada and the U.S., including but not limited to those cautionary statements made in the “Risk Factors” section of our most recently filed Annual Information Form, the “Risk Analysis” section of our FYE 2010 Management’s Discussion and Analysis and the “Cautionary Statement on Forward-Looking Information” in our news release dated August 10, 2011, to which readers are referred and which are incorporated by reference in this presentation, all of which qualify any and all forward‐looking statements made in this presentation. These factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward‐looking statements or to explain any material difference between subsequent actual events and such forward‐looking statements, except to the extent required by applicable law.Other information
Where we say "we", "us", "our", the "Company", or "Kinross" in this presentation, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as may be applicable. The technical information about the Company’s mineral properties (other than drilling and other exploration activities) contained in this presentation has been prepared under the supervision of Mr. Rob Henderson, an officer of the Company who is a “qualified person” within the meaning of National Instrument 43-101 (“NI 43-101”). The technical information about the Company’s exploration activities contained in this presentation has been prepared under the supervision of and verified by Dr. Glenton Masterman, an officer of the Company who is a “qualified person” with the meaning of NI 43‐101.
3
WHY GOLD?WHY KINROSS?WHY NOW?
4
2,100
2,200
2,300
2,400
2,500
2,600
2,700
2,800
2009 2010 2011 2012 2013 2014 2015 2016 2017
Gol
d Pr
oduc
tion
(Ton
nes)
INDUSTRY PRODUCTION DECLINING
• Forecasted world production from gold mining likely to decline
Source: GFMS 10 Year Outlook on Gold (December 2010)
5
INCREASING DEMAND FOR GOLD
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
$0
$25
$50
$75
$100
$125
$150
$175
$200
$225
$250
$275
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Gol
d Pr
ice
(US$
/oz.
)
Tota
l Gol
d D
eman
d (U
S$ b
illio
ns)
Investment / OtherTotal FabricationGold Price (US$/oz)Current gold price
Source: GFMS Gold Survey 2011
6
FEWER GOLD DISCOVERIES
Source: Metals Economics Group and Company estimates
0
10
20
30
40
50
60
70
80
90
-
500
1,000
1,500
2,000
2,500
3,000
3,500
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Total gold ounces discovered (mm oz.)Gold exploration spending (US$ mm)
Gol
d ex
plor
atio
n sp
endi
ng (U
S$ m
m)
Ounces discovered (m
m oz.)
7
WHY GOLD?
WHY KINROSS?WHY NOW?
8
WHY KINROSS?
1. Industry-leading growth from a senior gold producer
2. World-class projects with experienced teams and financial resources to build them
3. Attractive valuation
9
CONTINUING THE KINROSS TRANSFORMATION
1.6
2.3
2005 2010
Gol
d eq
uiva
lent
pro
duct
ion
(mm
oz)
2.6 – 2.7
4.5 – 4.9
2011e(revised upwards)
2015e
Gol
d eq
uiva
lent
pro
duct
ion
(mm
oz)
(1) Refer to endnote #1.
Kinross Gold Production Yesterday Kinross Gold Production Now(1)
10
FOCUSED IN THE WORLD’S BEST DISTRICTS
10 operating mines
5 development projects
Fort Knox
Kettle River-Buckhorn
Round Mountain
Tasiast
Chirano
Fruta del Norte
La Coipa
Maricunga
Paracatu
Crixas
KupolDvoinoye
Lobo-Marte
Cerro Casale
11
Q2 2011 RESULTS: CONTINUING TO DELIVER
Revenue +42%
Adjusted Operating Cash Flow(2)
+46%
Adjusted Net Earnings(2)
+103%
US
$ m
illio
ns
(2) Refer to endnote #2.
$697
$988
Q2 2010 Q2 2011
$283
$413
Q2 2010 Q2 2011
$111
$227
Q2 2010 Q2 2011
$0.40/sh
$0.16/sh$0.36/sh
$0.20/sh
12
DELIVERING EXPANDING MARGINS
2005 – H1 2011:• Average realized gold price: +212%• Kinross’ attributable margin(3,4): +387%
+387%
2005
$170
2006
$279
2007
$329
2008
$436
2009
$530
2010
$683
H1 2011
$828
Attr
ibut
able
Mar
gin
(US
$/oz
)
(3) Refer to endnote #3.(4) Refer to endnote #4.
13
• 5-yr CAGR : 21%
GROWING CASH FLOW PER SHARE
$0.51
$0.80
$0.56
$1.01
$1.36 $1.32
2005 2006 2007 2008 2009 2010
Adj
uste
d C
ash
Flow
per
Sha
re (U
S$)(2
)
(2) Refer to endnote #2.
H1 2011
$0.71
14
24.7 27.9
46.6 45.651.0
62.4 63.36.1
8.0
11.1 13.7
16.6
17.724.7
2.9
3.9
7.0
20.7
16.2
24.0
20.0
0
20
40
60
80
100
120
140
0
10
20
30
40
50
60
70
80
90
100
110
2005 2006 2007 2008 2009 2010 June 2011
Gol
d re
sour
ce o
z pe
r 1,0
00 s
hare
s
Gol
d re
sour
ces
(mm
oz.
)
Inferred Mineral Resources
Measured & Indicated Mineral Resources
Proven and Probable Mineral Reserves
Total resource ounce per 1,000 shares
INCREASING GOLD RESOURCES(5)
(5) Refer to endnote #5.
15
IMPROVING GRADE PROFILE
Source: Company reports
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
2005 2006 2007 2008 2009 2010
Prov
en a
nd P
roba
ble
Res
erve
Gra
de G
row
th
(200
5 in
dex
= 1)
Kinross Barrick Goldcorp Newmont
16
2011 OUTLOOK UNCHANGED
(1) Refer to endnote #1.
Region Production(000 ounces )
% of TotalProduction
Production Cost of Sales(2)
($/oz)
South America 1,000 – 1,070 39% $585 - $650
North America 590 – 630 23% $625 - $685
West Africa (attributable) 440 – 500 18% $595 - $655
Russia (now 100%) 535 – 555 20% $395 - $435
Total Kinross: 2.6 – 2.7 million 100% Gold equivalent: $565 - $610/ozBy-product(3): $520 - $570/oz
• Costs expected to be toward the lower end of guidance range
Key Sensitivities: Approximately 60%-70% of the Company’s costs are denominated in US dollars. A 10% change in foreign exchange couldresult in an approximate $7 impact on cost of sales per ounce. A $10 change in the price of oil could result in an approximate $3 impact on costof sales per ounce. The impact on royalties of a $100 change in the gold price could result in an approximate $3 impact on cost of sales perounce.
17
STRONG BALANCE SHEET
• Equity pipeline investment portfolio valued at $104 million• Revolving credit facility of $1.2 billion• Commitments received for $200 million non-recourse Kupol financing• Completed $1.0 billion debt financing
$1,080
$591$466
Cash and cash equivalents Long-term investments &investments in associates
Total debt
US$
mill
ions
As at June 30, 2011
18
Project 2011E 2012E 2013E 2014E 2015E
Paracatu desulphurization
Paracatu 3rd ball mill
Maricunga SART plant
Paracatu 4th ball mill
Dvoinoye
Tasiast
Lobo-Marte
Fruta del Norte
Cerro Casale
Org
anic
gro
wth
Dev
elop
men
t
PROJECT PIPELINE
Conceptual timeline based on current Company estimates.
19
GOLD PRODUCTION FROM NEW PROJECTS
+1.3(i)
+0.41(ii)+0.35(ii)
Tasiast Expansion Fruta del Norte Lobo-Marte
Estim
ated
ave
rage
ann
ual g
old
prod
uctio
n (m
m o
z)
(i) Does not include current Tasiast production; estimated average annual production for first full 8 years(ii) Estimated average annual life of mine production
20
TASIAST,MAURITANIA
21
MAURITANIA: KEY FACTS
• Among most sparsely-populated countries
• Gained independence from France in 1960
• Islamic state and democratic republic
President Aziz elected in July 2009 in UN-endorsed election
International agencies such as IMF and World Bank active in country
• Mining-friendly jurisdiction:
Well-developed, competitive mining law
Mining major export industry
• Major foreign companies include: Xstrata, BHP, First Quantum, SNC Lavalin, Elf Aquitaine, Bumi
Source: EIU April 2010 Country Report; the CIA World Factbook 2010 & Government of Mauritania
Tasiast (Kinross) - Au
Askaf (Xstrata) – Iron OreGuelb el Aouj (Xstrata) – Iron OreLebtheinia (Xstrata) – Iron Ore
POPULATION 3.2 million
LANGUAGE Arabic (official); French (working)
GDP US$6.3 billion (2008)
MINING AS % of GDP 20%
MINING AS % of EXPORTS 40%
22
TASIAST, MAURITANIA
• Expanded drilling program focused around existing Tasiast mine
• Only 8 km of 80 km strike length tested
Greenstone Rocks
Tasiast Shear
Banded Iron Fm
Tenements
Intrusives
2010 Resource Shell
Felsic VolcanicsGreenschist
20.0 km
23
RESOURCE GROWTH AT TASIAST(5,6)
7.6 7.63.7
5.49.2 9.3
2.1
9.1
0.81.4
1.95.1
8.6
4.6
Year-end 2008 November 2009 September 2010 November 2010 Year-end 2010 June 2011
Oun
ces
(mill
ions
)
Inferred Mineral Resources Measured & Indicated Mineral ResourcesMeasured & Indicated Mineral Resources (inclusive of 2P reserves) Proven and Probable Mineral Reserves
(5) Refer to endnote #5.(6) Refer to endnote #6.
24
EXPLORATION UPDATE AT TASIAST
• 15 core and 8 RC drill rigs in operation
• Drilled 124,000 metres in Q2; 250,000 metres drilled year-to-date
• Drilling encountering a number of new opportunities: Potential new Greenschist-style mineralization identified 500 strike metres from
West Branch
Potential heap leach opportunity at West Branch
Potential deep extension of West Branch orebody
• Encouraging results in district drilling north and south of the mine
• Work in the second half will focus on: Infill & deepening mineralization in the Piment Zone
Exploration for new Greenschist-style mineralization
District oxide targets
25
TASIAST LONG-SECTION
>= 250200 to 250150 to 200100 to 15050 to 10025 to 50< 25
GXM>= 250200 to 250150 to 200100 to 15050 to 10025 to 50< 25
GXM
TA05148DD22m @ 4.49 g/t Au, and
13m @ 0.95 g/t Au
TA05148DD22m @ 4.49 g/t Au, and
13m @ 0.95 g/t Au
TA05149DD9m @ 4.32 g/t AuTA05149DD
9m @ 4.32 g/t Au
TA05154RD45m @1.22 g/t AuTA05154RD
45m @1.22 g/t Au
0 2000
metersTA05155ARD
32m @ 1.64 g/t AuTA05155ARD
32m @ 1.64 g/t Au
Assays pending
TA05152RD61m @ 1.75 g/t Au
TA05152RD61m @ 1.75 g/t Au
TA05162RD56m @ 1.55 g/t Au
TA05162RD56m @ 1.55 g/t Au
$1300 Pit ShellInterp. GST Fold Hinge
Refer to Kinross’ news release dated August 10, 2011 for the technical information regarding this slide, which is available on our website at www.kinross.com.
26
TASIAST DISTRICT
• Regional soil geochemistry and drilling
• Highly prospective district, large scale mineral system
• Drilling now focused on:
Testing extensions of mineralization intersected in previous drilling at the C69 and Charlize targets
Awaiting assay results on C67 to guide further work
Refer to Kinross’ news release dated August 10, 2011 for the technical information regarding this slide, which is available on our website at www.kinross.com.
Mining Licenses
Tasiast Sud
C67
C69 Mining License
27
TASIAST SCOPING STUDY
• Scoping study complete
• New processing plant with expected 60,000 tpd throughput – total 68,600 tpd
1 SAG and 2 ball mills ordered
• 16-year mine life
• Expected avg. annual production of 1.5 mm oz (first 8 full yrs)
Expected avg. grade of 2 g/t Expected avg. recoveries of 93%
28
TASIAST, MAURITANIA
• Expansion project remains on schedule:
Construction expected to start mid-2012 Project start-up of 60,000 tpd mill is targeted for early 2014
• New opportunities to optimize the project to be considered as part of the feasibility study Exploring natural gas / LNG options as alternative to HFO
• Detailed engineering has commenced on 60,000 tpd process plant
• Feasibility study extended to Q1 2012
• Capital expected to be $500 mm - $1 bn higher than scoping study estimate from December 2010 Will provide an updated estimate with feasibility study
• Advancing project procurements and equipment orders Year-to-date commitments total $515 mm Expect capital commitments $1 bn by year-end
NEW ADR PLANT 74% COMPLETE
SHELL PLATE OF NEW SAG MILL
29
FRUTA DEL NORTE, ECUADOR
30
FRUTA DEL NORTE, ECUADOR
• Prepared pre-feasibility study and technical report• Underground operation estimated 16-year mine life• LOM avg. production estimate : 410k Au eq. oz. / year
Expected avg. gold grade of 8.07 g/t Expected avg. gold recovery of 93%
• LOM avg. cost of sales expected to be ~$370/oz• Phased commissioning:
Plant expected to process 2,500 tpd initially POX circuit added 18 months post-commissioning
– Ramp up over 3 years to ~5,000 tpd• Estimated capital:
Phase 1: $700 mm Phase 2: $400 mm
Underground Mine Layout
Portal Construction
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 26,117 8.07 6,775
M&I Resources 3,583 5.50 634
Inferred Resources 19,553 5.50 3,460
31
FRUTA DEL NORTE, ECUADOR
• Advancing the exploration decline:
Construction of the portal high wall is complete and 70 metres of the exploration decline has been developed to date
On target to develop 600 metres by year-end 2011
Exploration decline is expected to be complete in 2013
• Advancing permitting:
EIA for building and operating the FDN mine submitted in May
EIA for advanced exploration at Colibri was approved
• Negotiations continue on exploitation agreement
• Feasibility study expected in H2 2011
• Expected to commission in late 2014
32
LOBO-MARTE,CHILE
33
LOBO-MARTE, CHILE
• Completed pre-feasibility study update• 10-year mine life• Expected 47,000 tpd heap leach with SART plant• Annual production estimate: 350k oz. per year
Expected avg. grade: 1.17 g/t Expected avg. recovery: 60-70%
• Cost of sales estimate: ~$500/oz; Including by-product copper credit: ~$450/oz
• Initial capital estimate: $700 million Optimized layout of site
Lobo Final Pit
Marte Final Pit
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 164,230 1.14 6,028
M&I Resources 34,052 0.83 908
Inferred Resources 112,767 0.78 2,834
34
LOBO-MARTE, CHILE
• 20,000 metre drill campaign 70% complete
Geotechnical drilling has been completed
Geotechnical and mine block models expected to be completed in Q3 2011
• Environmental Impact Assessment was submitted in June, ahead of schedule
• Feasibility study expected in Q4 2011
• Expected to commission in 2014
35
KUPOL & DVOINOYE,RUSSIA
36
INCREASING KUPOL OWNERSHIP TO 100%
• Kinross increased Kupol ownership to 100%
Includes the Kupol East-West exploration licenses
• Total consideration: approx. $350 million
To be financed through proceeds of Harry Winston share sale and non-recourse debt facility of $200 million
• Consolidates Kinross’ ownership in a world-class gold district
Low-cost, high-margin producing asset
Key region with significant exploration potential
• Pre-approved by the State Commission for the Control of Foreign Investments
37
DVOINOYE, RUSSIA
• Underground mine with an expected 8-year mine life Expected avg. output of 900 tonnes per day (2013-2020)
• Ore to be processed at the Kupol mill Throughput expected to increase to 4,000 tpd
• Initial capital estimate: ~$300 million
• Development of exploration decline advanced 250 metres at end of Q2
• Feasibility study expected to be completed Q1 2012
• Targeted to commence in H2 20132010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
M&I Resources 1,047 31.48 1,059
Inferred Resources 645 19.47 404
38
WHY GOLD?WHY KINROSS?
WHY NOW?
39
GMP: P / NAV
1.4 1.4
1.21.1
1.0
0.9
AGNICO BARRICK YAMANA GOLDCORP NEWMONT KINROSS
Source: GMP research – August 16, 2011
40
GMP: P / 2011e CFPS
15.014.2 13.7
9.0 8.9 8.7
AGNICO KINROSS GOLDCORP YAMANA NEWMONT BARRICK
Source: GMP research – August 16, 2011
41
RESERVE OUNCES PER $1,000 INVESTED
3.43.2
2.8
2.3
1.9 1.9
1.5
1.0
KINROSS NEWMONT BARRICK NEWCREST AGNICO YAMANA GOLDCORP IAMGOLD
Oun
ce o
f Pro
ven
and
Prob
able
Res
erve
s A
cqui
red
per $
1,00
0 in
vest
ed (o
z/$1
,000
)
Source: Company reports and Bloomberg L.P. – August 15, 2011
42
TOTAL RESOURCE OUNCES PER $1,000 INVESTED
5.8
5.04.6
4.34.0
3.4
2.92.6
KINROSS BARRICK NEWMONT NEWCREST YAMANA AGNICO IAMGOLD GOLDCORP
Oun
ce o
f Tot
al R
esou
rces
Acq
uire
d pe
r $1,
000
inve
sted
(o
z/$1
,000
)
Source: Company reports and Bloomberg L.P. – August 15, 2011
43
2011e PRODUCTION PER $1,000 INVESTED
0.18
0.150.14
0.10 0.100.08
0.06 0.06
NEWMONT BARRICK KINROSS AGNICO YAMANA NEWCREST GOLDCORP IAMGOLD
Oun
ces
of E
stim
ated
201
1 Pr
oduc
tion
per $
1,00
0 in
vest
ed
(oz/
$1,0
00)
Source: Company reports and Bloomberg L.P. – August 15, 2011
44
KEY OBJECTIVES FOR 2011
Complete Tasiast scoping study Declare NI 43-101 resource at Dvoinoye Complete Fruta del Norte pre-feasibility study Complete Dvoinoye scoping study Complete purchase of Kupol minority interest Commence construction on La Zarza exploration decline at Fruta del Norte Commissioning of the 3rd ball mill at Paracatu (H1 2011) Commence construction of 4th ball mill at Paracatu Commission ADR plant at Maricunga Complete Lobo-Marte feasibility study (Q4 2011) Complete Fruta del Norte feasibility study (H2 2011) Negotiate Fruta del Norte exploitation agreement & investment protection agreement Commission SART plant at Maricunga (moved to Q1 2012 due to weather) Complete Tasiast feasibility study (work extended to Q1 2012)
45
WHY KINROSS?
1. Industry-leading growth from a senior gold producer
2. World-class projects with experienced teams and financial resources to build them
3. Attractive valuation
46
APPENDIX
47
FORT KNOX, USA (100%)
• Located in Alaska
• Expansion and new heap leach to extend mine life
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST ($/oz)
H1 2011 142,774 $655
H1 2010 155,910 $582
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 253,434 0.44 3,579
M&I Resources 160,458 0.43 2,214
Inferred Resources 12,547 0.46 187
(5) Refer to endnote #5.
48
ROUND MOUNTAIN, USA (50%)
• Kinross-operated JV with Barrick
• Located in Nevada, USA
• Open-pit mine
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST ($/oz)
H1 2011 89,272 $764
H1 2010 92,556 $562
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 66,241 0.62 1,319
M&I Resources 46,145 0.75 1,107
Inferred Resources 22,562 0.61 443
(5) Refer to endnote #5.
49
KETTLE RIVER-BUCKHORN, USA (100%)
• Entered production in Q4/08
• Small foot-print, underground mine
• Near-mine exploration targets
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST($/oz)
H1 2011 92,089 $389
H1 2010 98,868 $295
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 1,545 11.30 562
M&I Resources - - -
Inferred Resources 319 10.00 103
(5) Refer to endnote #5.
50
KUPOL, RUSSIA (100%)
• Completed transaction increasing ownership to 100% from 75% on April 27, 2011
• 3,000 tpd mill with open-pit and underground• Mill to process high-grade ore from nearby
Dvoinoye depositOPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST($/oz)
H1 2011 323,726 $335
H1 2010 284,959 $310
2010 GOLD RESERVES AND RESOURCES (100%)(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 9,661 10.66 3,309
M&I Resources - - -
Inferred Resources 1,463 9.86 464
Kinross increased its ownership in the Kupol mine to 100% on April 27, 2011. As a result, the results up to April 27, 2011 reflect 75% ownership, and results thereafter reflect 100% ownership.
51
PARACATU, BRAZIL (100%)
• Recoveries near target
• Major expansion commissioning
• 3rd ball mill commissioned; 4th ball mill to be operational in H1 2012
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST ($/oz)
H1 2011 200,320 $744
H1 2010 235,573 $540
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 1,461,061 0.39 18,485
M&I Resources 356,806 0.33 3,782
Inferred Resources 117,530 0.42 1,572
(5) Refer to endnote #5.
52
CRIXAS, BRAZIL (50%)
• JV with AngloGold Ashanti
• Underground mine located in the Brazil
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST ($/oz)
H1 2011 30,251 $796
H1 2010 36,932 $474
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 3,283 3.71 392
M&I Resources 434 3.73 52
Inferred Resources 2,278 5.00 366
(5) Refer to endnote #5.
53
LA COIPA, CHILE (100%)
• Gold/silver mine in the Maricunga district
• Comprehensive exploration program
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST($/oz)
H1 2011 105,313 $651
H1 2010 82,839 $635
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 21,728 1.34 938
M&I Resources 14,662 1.03 486
Inferred Resources 3,123 4.70 472
(5) Refer to endnote #5.
54
MARICUNGA, CHILE (100%)
• Located the highly prospective Maricunga District
• Open pit, heap leach operation
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST($/oz)
H1 2011 128,845 $445
H1 2010 94,767 $620
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 269,801 0.70 6,089
M&I Resources 187,611 0.57 3,428
Inferred Resources 201,092 0.46 3,004
(5) Refer to endnote #5.
55
TASIAST, MAURITANIA (100%)
• Open-pit mine ~300 km north of the city of Nouakchott
• Remote, flat, sparsely populated desert
OPERATING RESULTS
PRODUCTION(Au eq. oz)
PRODUCTION COST($/oz)
H1 2011 98,570 $616
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 128,916 1.82 7,563
M&I Resources 237,300 1.19 9,050
Inferred Resources 218,903 0.65 4,590
(5) Refer to endnote #5.
Kinross acquired the Tasiast mine on September 17, 2010.
56
CHIRANO, GHANA (90%)
• 90% owned by Kinross; Government of Ghana holds a 10% carried interest
• 9 open-pits and 2 recently-discovered underground deposits
OPERATING RESULTS (90%)
PRODUCTION(Au eq. oz)
PRODUCTION COST($/oz)
H1 2011 107,942 $684
2010 GOLD RESERVES AND RESOURCES(5)
TONNES(thousands)
GRADE (g/t)
OUNCES(thousands)
2P Reserves 30,561 2.48 2,434
M&I Resources 4,058 1.46 191
Inferred Resources 2,468 2.33 185
(5) Refer to endnote #5.
Kinross acquired the Chirano mine on September 17, 2010.
57
ENDNOTES
1) For more information regarding Kinross’ production and cost forecasts for 2011, please refer to the press release dated August 10, 2011. For Kinross’ production target for 2015, please refer to the press release dated February 16, 2011. Both news releases are available on our website at www.kinross.com. Unless otherwise noted, gold equivalent production, gold equivalent ounces sold and production cost of sales figures in this presentation are based on Kinross’ ownership interest in Kupol (75% to April 27, 2011 and 100% thereafter) and 90% interest in Chirano.
2) Adjusted net earnings attributed to common shareholders and adjusted operating cash flow numbers are non-GAAP financial measures which are meant to provide additional information and should not be used as a substitute for performance measures prepared in accordance with GAAP. For more information about these non-GAAP measures, and a reconciliation of these non-GAAP financial measures for the three and six months ended June 30, 2011 and June 30, 2010, please refer to the press release dated August 10, 2011, under the heading “Reconciliation of non-GAAP financial measures”, available on our website at www.kinross.com.
3) Production cost of sales per gold equivalent ounce is a non-GAAP measure defined as attributable production cost of sales divided by the attributable number of gold equivalent ounces sold. Production cost of sales is equivalent to total cost of sales per the financial statements less depreciation and amortization, and is generally consistent with cost of sales as reported under Canadian GAAP prior to the adoption of IFRS.
4) Attributable margin is defined as the average realized price of gold less attributable production cost of sales per ounce.
5) For more information regarding Kinross’ mineral reserves and mineral resources, please refer to Kinross’ Annual Mineral Reserve and Mineral Resource Statement as of December 31, 2010, contained in the press release dated February 16, 2011, available on our website at www.kinross.com. “June 2011” reflects Kinross’ Mineral Reserve and Mineral Resource Statement as at December 31, 2010, updated to reflect Kinross’ increase in ownership in the Kupol mine to 100% and the updated Tasiast mineral resource estimate contained in our press release dated August 10, 2011.
6) For historical mineral resource estimates relating to the Tasiast property, please refer to Red Back Mining’s public filings, available under Red Back’s profile on SEDAR.
58
KINROSS GOLD CORPORATION
25 YORK STREET, 17TH FLOORTORONTO, ON M5J 2V5
WWW.KINROSS.COM