Deep tubewell installation
Situation Analysis: As a part of project implementation AMRF Conducted 100% Arsenic screening of tubewell in the project area . Most of the Shallow tubewell are arsenic affected. Maximum community people use Arsenic contaminated water for all purpose. As per community action plan (CAP), there was a need to install alternative water facilities in the community level. One of most popular water technology is Deep tubewell for community.
Initiative Taken: AMRF is working with the community people by forming CBO in every ward of Union Parishad. With this consistence CBO representatives visited the venerable area where less number of Arsenic free Tubewell . As per community demand CBO felt it need to installed Deep tubewell for Arsenic free safe water as on priority based and subsequently they decided to apply to AMRF for Deep Tw installation.
Construction Process: • Application: Every CBO chairmen have applied to AMRF on behalf of community people
for the Installed of tubewell with the appropriate prescribed format. • Approval: Based on CBO’s application union supervisor and project engineer visited the
proposed tube-‐well site, then union supervisor recommended installed those platform. On the other hand engineer recommended that there are no technical obligations to installation of Deep tubewell.
• Contribution money: According to WAB cost sharing strategy CBO decided to take cost sharing money approximate 8% of of total installation of every single tubewell as per wellbeing ranking.
• Contractor/Boring Mistree Selection: Selection of contractor as per organizational financial policy.
• Tubewell installation work: Installation work has started as priority basis. Both of CBO and Engineer monitor the TW installation work for ensuring the quality of materials and installation work.
• Handover: After the completion (Installation, platform construction, Water quality test etc) of installation work AMRF handed over the Tubewell for using water facilities.
Covered Population: In the last WAB financial year ( April 2014 to March 2015) AMRF installed 14 numbrr of Deep Tubewell in 4 union of sreenagar and Louhajong upzila. Now 1712 people get safe water from those Tubewell.