14
siemens.com/das Unrestricted © Siemens AG 2018 DCS Application Services Modernize your DCS libraries to APL

DCS Application Services - support.industry.siemens.com · „DCS Library Services“ offers you the ideal solution for ... • Standardized library exchange at a fixed price and

Embed Size (px)

Citation preview

Unrestricted © Siemens AG 2018

siemens.com/dasUnrestricted © SiemensAG 2018

DCS Application ServicesModernize your DCS libraries to APL

Unrestricted © Siemens AG 2018

• Use of current and future DCS innovations

• Visually attractive user interface with high operating

comfort

• Reduction of time and costs for further upgrades

• Increased service capability

• Long-term investment protection

DCS Application ServicesChallenges

Unrestricted © Siemens AG 2018

DCS Application ServicesSolution – „DCS Library Services“

For an integrated DCS system modernization, not only theupgrade of the system software is required, but also themodernization and standardization of the individualapplications.„DCS Library Services“ offers you the ideal solution forlibrary exchnage to APL:

• Standardized library exchange at a fixed price andproject-specific implementation of AS and OScomponents

• AS/ OS analysis creates transparency• More flexible components and higher-quality control

algorithms• Fast and safe implementation with short test phase With the APL-based individual control level you create

your basis for current and future DCS innovations!

Unrestricted © Siemens AG 2018

DCS Application Services

Unrestricted © Siemens AG 2018

DCSApplicationServices

DCS LibraryServicesDCS LibraryServices

DCS Application ServicesDCS Library Services

Modernization of your DCS Libraries with the libraryexchange to APL

Use Case 1:Block Exchange AS Basic Package(Library Exchange PCS 7 Library to APL)

Analysis:Block Exchange Analysis

Use Case 2:Block Exchange AS Basic Package & project-specific additional services(e.g. additional libraries, OS processing…)

Requirement - Block Exchange : PCS 7 V8.2 or PCS 7 V9.0 SP1

Requirement - analysis: from version PCS 7 V6.1

Unrestricted © Siemens AG 2018

DCS Application ServicesDCS Library Services

Use Case 1:Block Exchange AS Basic Package (library exchange PCS 7 Library to APL)

Block Exchange AS Basic Package

Services:Automatic conversion of modules according to predefined conversion rules.The list of contained conversion rules can be found in the manual „DCS Library Services“.

Modular structure:• Processing per PCS 7 multi-project• Additional modules for each automation system (AS type dependent)

Standardized offer(MLFB)

Customer-specific offer:Price on request, based on AS/OSdata analysis

Unrestricted © Siemens AG 2018

AS Analysis:

DCS Application ServicesDCS Library Services

Required if:• Scopen and type of the modules to be implemented or the necessary work are not known• Additional libraries are included in the project (e.g. SC, PTE, customer-specific libraries…)

⋅ Transparency as a basis for further technical clarification and project processing

Note:Analysis depending on project size (number of automation systems)

Block ExchangeAS Analysis

Block ExchangeAS Analysis

Offer/clarification

Project-specificconversion rules, test

conversion, etc. …

Project-specificconversion rules, test

conversion, etc. …

BlockExchange AS

Basic Package

BlockExchange AS

Basic PackageProject-specific

acceptanceProject-specific

acceptance

Standardized offer(MLFB)

Customer-specific offer:Price on request, based on AS/OSdata analysis

Unestricted © Siemens AG 2018

DCS Application ServicesDCS Library Services

Use Case 2:Block Exchange AS Basic Package & project-specific additional services(e.g. additional libraries…)

Block ExchangeAS Analysis

Block ExchangeAS Analysis

Offer/clarification

Project-specificconversion rules, test

conversion, etc. …

Project-specificconversion rules, test

conversion, etc. …

BlockExchange AS

Basic Package

BlockExchange AS

Basic PackageProject-specific

acceptanceProject-specific

acceptance

Standardized offer(MLFB)

Customer-specific offer:Price on request, based on AS/OSdata analysis

Services:

• Creation/ adjustment of project-specific implementation rules

• Type test, test implementation

• Project processing (detailed clarification, project management, acceptance test)

Unrestricted © Siemens AG 2018

DCS Application ServicesDCS Library Services

OS adaptations after library exchange

• Exchange of the module symbols (Block Icons)

• Adaptations of the dynamic dialogs

• Adaptation of the variable connections (e.g. I/O fields )

• Revision of the curve display

• Adjustment of the image display in format and resolution(e.g. 4:3 => 16:9)

Unrestricted © Siemens AG 2018

DCS Application ServicesDCS Library Services

OS-steps during library exchange

OS Analysis:

Required:• To evaluate the necessary work packages for exchanging the block icons and adjusting the remaining dynamics⋅ Transparency as a basis for further technical clarification and project processing

Note:OS image analysis is required per PCS 7 Server.Additional detailed analysis data available as MS Access database for own evaluations

Standardized offer(MLFB)

Customer-specific offer:Price on request, based on AS/OSdata analysis

Block ExchangeOS Analysis

Block ExchangeOS Analysis

Offer/clarification

SpecificationBlock Icon assignment

rules, etc.

SpecificationBlock Icon assignment

rules, etc.OS adaptationsOS adaptations

Project-specificacceptance

Project-specificacceptance

Unrestricted © Siemens AG 2018

DCS Application ServicesDCS Library Services

Use Case 2 and additional OS services:

Block ExchangeOS Analysis

Block ExchangeOS Analysis

Offer/clarification

SpecificationBlock Icon assignment

rules, etc.

SpecificationBlock Icon assignment

rules, etc.OS adaptationsOS adaptations

Project-specificacceptance

Project-specificacceptance

OS steps for the library exchange

Standardized offer(MLFB)

Customer-specific offer:Price on request, based on AS/OSdata analysis

OS services:• Exchange module symbols (Block Icons)• Adjusting dynamic dialogs and variable connections• Revision of the curve display• Adjusting the image display (format and resolution)• Project processing (detailed clarification, project management, acceptance tests)

Unrestricted © Siemens AG 2018

Your advantages in the applications

Modernization

In order to ensure long-term plant availability and to fully exploit the potential of the system, it is necessary tomodernize the PCS 7 plant at regular intervals.In addition to upgrading the system and further standardization, the library exchange is an importantcomponent of a successful modernization. DCS Application Services offers you an approach with tool-supported solution packages.

Systematic plant optimization

We offer you a standardized library exchange at a fixed price and project-specific implementation of AS and OScomponents.Standardized packages can be flexibly extended to include project-specific requirements. The previous analysisenables a reliable calculation and at the same time a reduction of risks when exchanging libraries.

Professional service concept

The library exchange is handled by your regional Siemens sales partner.With the use of software-based implementation tools we guarantee you a fast and secure modernization.Ideally, the library service is performed simultaneously with a PCS 7 upgrade. We offer you ideal conditionswith first-class resources and possible further lifecycle services.

Unrestricted © Siemens AG 2018

Take advantage of DCS Application Services

The modernization of the libraries enablesparticipation in current and future DCS innovations.

Innovative

Cost-efficientThe use of a uniform library reduces maintenanceand care costs and avoids unplanned servicecosts.

Effective The system-oriented and individual processingwith a standardized procedure leads to efficientsolutions - even for complex tasks.

Unrestricted © Siemens AG 2018

www.siemens.com/das

DCS Application Services

Subject to changes and errors. The information given in this document only contains general descriptions and/or performance features which maynot always specifically reflect those described, or which may undergo modification in the course of further development of the products. The requestedperformance features are binding only when they are expressly agreed upon in the concluded contract.

All product designations, product names, etc. may contain trademarks or other rights of Siemens AG, its affiliated companies or third parties.Their unauthorized use may infringe the rights of the respective owner.

siemens.com