Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
DCC GO LIVE IN 2016Jonathan Simcock
Data and Communications Company
V1.0 DCC Public
WHAT I’LL BE COVERING
The role of DCC – a reminderProgress to dateGo live in 2016Beyond go live
DCC Public 1
THE ROLE OF DCC
DCC Public 2
PROGRESSCSP t k CSP network
build progressing to
plan
DSP Stream 2.1 progressing to
plan
Entered
p
Parse and Systems
Integration Testing on time
Correlate 2.0 progressing to
plan
Services going live every
Service Management live every
month e.g. SMKI
registration
Management System
progressing to plan
DCC Public 3
GO LIVE IN 2016
Focused on industry go-live in August 2016Delivery plan:Delivery plan:
Release 1.0
April 2016
July 2016
Release 1.1
Release 1.2
Release 1 3
September 2016
Resilient early life experience – ramping up capability & engaging with industry
Release 1.3
capability & engaging with industryStable design baselineRegulatory pragmatismRegulatory pragmatism
DCC Public 4
BEYOND GO LIVE
Dual Band Communications HubIncreasing the number of connected Increasing the number of connected properties from 70% to 95%Target availability H2 2017
Enrolment and adoption of SMETS1 metersExtending the benefits of DCC to all consumersReport for industry consultation Q2 2016
Next Day Switching
DCC Public 5