Upload
vuonglien
View
215
Download
2
Embed Size (px)
Citation preview
north-south corridor Darlington Upgrade Project
Concept of lowered motorway, South Road/Sturt Road intersectionConcept of lowered motorway, South Road/Sturt Road intersection
MA
RIO
N R
D
MO
RP
HE
TT
RD
TAP
LE
YS
HIL
L R
DB
RIG
HT
ON
RD
LON
SDALE R
D
GO
OD
WO
OD
RD
FU
LL
AR
TO
N R
D
MA
IN N
OR
TH R
D
ANZAC HW
Y
GRAND JUNCTION RD
GREENHILL RD
CROSS RD
DAWS RD
STURT RD
SOUTH TCE
PO
RT
WA
KE
FIE
LD
RD
VIC
TO
RIA
RD
MIL
ITA
RY
RD
PORT RD
TORRENS RD
GRANGE RD
PORTADELAIDE
FINDON
ADELAIDEMILE END
MARION
HALLETTCOVE
PROSPECT
NORTHADELAIDERIVER TORRENS
Outer HarborOuter Harbor
GrangeGrange
GlenelgGlenelg
MarinoMarino
Old NoarlungaOld Noarlunga
GawlerGawler
SO
UT
H R
D
Torrens Road toRiver Torrens upgrade
Darlington Upgrade Project
Glenelg TramOverpass
Gallipoli Underpass
Southern Expressway Duplication
South Road Superway
Northern Expressway
Proposed Northern Connector
backgroundThe North-South Corridor is one of Adelaide’s most important transport corridors. It is the major route for north and south bound traffic including freight vehicles running between Gawler and Old Noarlunga, a distance of 78 kilometres.The Australian Government has committed to upgrade the North-South Corridor over the next decade and together with the South Australian Government has committed $620 million to construct the Darlington Upgrade Project. The Australian Government will provide $496 million, with the remaining $124 million being contributed by the South Australian Government.
This stretch of road provides a series of strategic free-flowing road links to connect the rapidly expanding industrial and residential growth areas in the north and the south providing new opportunities for economic development.
The current roadway isn’t capable of handling projected growth and the number of vehicles that need to use the road or the size of freight carriers travelling along it. In response, the Australian and South Australian Governments are expanding the route by creating a dedicated non-stop North-South Corridor with a program to eliminate the worst bottlenecks already underway.
By mid 2014 almost 50km of the North-South Corridor will be complete. New road links have been built between Gawler and Port Wakefield Road (Northern Expressway), Regency Road and to the Port River Expressway (South Road Superway) and between Bedford Park and Old Noarlunga (Southern Expressway Duplication). Traffic flow along and across the route has also improved with the building of Gallipoli Underpass and the Glenelg Tram Overpass.
Oak Av
Birch Cr
Burbank Av
Laffer Dr
Ash Av
Flin
ders
Dr
Myrtle Gr
Kelvin Rd
Ruper
t Av
Riv
ersi
de D
r
Franklin Av
Lynton Av
Broo
ksid
e R
d
Penfold St
Wentworth Av
Ediso
n Rd
The
Cre
scen
t
Matthew St
Auricchio Av
Mim
osa
Tce
Mar
ion R
d
Sut
ton
Rd
Hugh Cairns Av
University Hall Accs
Richard S
t
Gum Tce
Macklin St
Map
le A
v
War
ripar
inga
Way
Klar Av
Chest
nut C
t
Linc
oln
Rd
Univer
sity D
r
Brookman Av
Letchford St
Mai
dsto
ne R
d
Laur
a Av
Main South Rd Service RdBra
dley
Gr
Travers St
Brayden C
t
Fran
cis S
t
Malcolm
St
Mar
ion R
d
Ediso
n Rd
Main South Rd Service Rd
Main South Rd
Sturt Rd
South
Rd
Ayliffes Rd
Mar
ion R
d
Southern Exp
Sheph
erds
Hill
Rd
Southern Exp
¯
Sou
rce:
DP
TI,
Aer
omet
rex
(Jan
201
4).
Dat
e: 2
0/05
/201
4. S
RP
S D
ocID
: 111
2
overview
Aerial concept of South Road/Sturt Road and South Road/Flinders Drive intersections
The next stage of the North-South Corridor to be upgraded is the 2.3km section of road between the Southern Expressway and Ayliffes Road at Darlington.
The Australian and State Governments have committed $620 million in total towards the construction of the Darlington Upgrade Project.
This segment of road is frequently congested for north bound vehicles in the morning peak period and south bound vehicles in the afternoon peak period.
During these periods vehicles are restricted to speeds lower than average for the city. Left as is, it will not be able to cope with the projected growth in traffic needing to use the roadway.
Properties to be acquired
Oak Av
Birch Cr
Burbank Av
Laffer Dr
Ash Av
Flin
ders
Dr
Myrtle Gr
Kelvin Rd
Ruper
t Av
Riv
ersi
de D
r
Franklin Av
Lynton Av
Broo
ksid
e R
d
Penfold St
Wentworth Av
Ediso
n Rd
The
Cre
scen
t
Matthew St
Auricchio Av
Mim
osa
Tce
Mar
ion R
d
Sut
ton
Rd
Hugh Cairns Av
University Hall AccsR
ichard St
Gum Tce
Macklin St
Map
le A
v
War
ripar
inga
Way
Klar Av
Chest
nut C
t
Linc
oln
Rd
Univer
sity D
r
Brookman Av
Letchford St
Mai
dsto
ne R
d
Laur
a Av
Main South Rd Service Rd
Bradl
ey G
r
Travers St
Brayden C
t
Fran
cis S
t
Malcolm
St
Mar
ion R
d
Ediso
n Rd
Main South Rd Service Rd
Main South Rd
Sturt Rd
South
Rd
Ayliffes Rd
Mar
ion R
d
Southern Exp
Sheph
erds
Hill
Rd
Southern Exp
¯
Sou
rce:
DP
TI,
Aer
omet
rex
(Jan
201
4).
Dat
e: 2
0/05
/201
4. S
RP
S D
ocID
: 111
2
what happens next?The next stage in this project is community engagement on key aspects of the design. A Project Office has been established in the Sir Mark Oliphant Building. This gives the opportunity for the community to meet with the project team and discuss any aspects of the project.In addition to this, a Community Liaison Group will be established to look at which aspects of the project need to be modified to minimise the impact of such a large and complex project.
If you are interested in nominating to be part of the Community Liaison Group please visit us at one of our upcoming Open Days. Included in this brochure is a nomination form. Alternatively, you can contact us via email to request an electronic form.
Lowered road
Oak Av
Birch Cr
Burbank Av
Laffer Dr
Ash Av
Flin
ders
Dr
Myrtle Gr
Kelvin Rd
Ruper
t Av
Riv
ersi
de D
r
Franklin Av
Lynton Av
Broo
ksid
e R
d
Penfold St
Wentworth Av
Ediso
n Rd
The
Cre
scen
t
Matthew St
Auricchio Av
Mim
osa
Tce
Mar
ion R
d
Sut
ton
Rd
Hugh Cairns Av
University Hall Accs
Richard S
t
Gum Tce
Macklin St
Map
le A
v
War
ripar
inga
Way
Klar Av
Chest
nut C
t
Linc
oln
Rd
Univer
sity D
r
Brookman Av
Letchford St
Mai
dsto
ne R
d
Laur
a Av
Main South Rd Service Rd
Bradl
ey G
r
Travers St
Brayden C
t
Fran
cis S
t
Malcolm
St
Mar
ion R
d
Ediso
n Rd
Main South Rd Service Rd
Main South Rd
Sturt Rd
South
Rd
Ayliffes Rd
Mar
ion R
d
Southern Exp
Sheph
erds
Hill
Rd
Southern Exp
¯
Sou
rce:
DP
TI,
Aer
omet
rex
(Jan
201
4).
Dat
e: 2
0/05
/201
4. S
RP
S D
ocID
: 111
2
community engagement timeline may 2014 june 2014 july 2014 september 2014 december 2014 mid 2015 2018
Announcement of funding
Community engagement
Call for nominations to be represented on the Community Liaison Group (CLG)
Site Office opensdiscuss issues with project team
Project Report released
Open Days to be held
Community Liaison Group established
Interest in joining the CLG
As a CLG representative, please indicate why you are interested in joining the chosen CLG?
Keeping the community informed
As a CLG representative, please indicate how you would disseminate information back to your local area and/or business or community interest group?
Making a contribution
The information provided in support of your nomination is very important, as it will be used by the project team as the basis of selecting members of the CLG.
Is there any other information you would like to provide which would support your reasons as to why you wish to be a CLG member and demonstrate that you are able to represent the interests of the local community you wish to represent?
Are you available to meet on a monthly basis for two hours on an evening? Yes No
Please return this nomination form with any attachments to:
North-South Corridor, Darlington Project Upgrade team Department of Planning, Transport and Infrastructure GPO Box 1533 ADELAIDE SA 5001 Email: [email protected]
Please feel free to attach further information in support of your nomination to join the CLG
may 2014 june 2014 july 2014 september 2014 december 2014 mid 2015 2018
Community engagement
Complete reference design
Project Assessment Report released
Early works commence
Project completionAward major works
contract
Darlington Upgrade ProjectCommunity Liaison Group (CLG) Nomination Form Note: Applications must be received by 1 July 2014.
Please take time to answer the questions below carefully, as nominations will be based on the information you provide within this form. To assist in the assessment of your nomination, it would be appreciated if you could print clearly.
Contact details:
(Mr/Mrs/Ms/Dr): Surname:
First Name: Preferred Name (if different):
Mailing Address:
Residential Address (if different from above):
Phone: (work) (home)
Mobile: Email:
Please identify if you are nominating for a position as:
local resident local business local community / environmental group local government
Please specify name of business OR community OR/ environmental groups OR Council you represent and details of your role or position:
Aerial concept of South Road/Sturt Road intersection
contact usFor more information or to provide your thoughts you can:
> call: 1300 759 334
> email: [email protected]
> visit: infrastructure.sa.gov.au/darlington
> visit the project office at Level 2, Sir Mark Oliphant Building 5 Laffer Drive, Bedford Park.
For more information on major projects around Adelaide
> visit www.infrastructure.sa.gov.au
Follow the project’s progress on the Department of Planning, Transport and Infrastructure’s Facebook and Twitter accounts:
> https://twitter.com/DPTI_SA
> https://www.facebook.com/DPTISA
HOW TO USE A QR CODE1. Download a FREE QR Code Reader App2. Scan the QR Code3. Link to online instantly
Concept of South Road/Flinders Drive intersection