DAFTAR TUGAS KELOMPOKINSTALASI LISTRIK TEGANGAN MENENGAH SEMESTER 5
TAHUN AKADEMIK 2013/2014
KELAS : TL-5BKel NAMA MAHASISWA JUDUL TUGAS KETER
1 MichaelM. Fikri Aditama
Rencana SKTM PT. SINAR ABADI, Daya 5.5 MVA/20 KV, cos phi = 0,84,L = 12 km
Merencanakan
JTM dari
Pembangkit/GI
sampai
pelanggan
Proyek di
…………………
……
2 Ledyane Tiara ANathya Chairani
Rencana SKTM PT. ARENA ELEKTRIKA, Daya 6.5 MVA/20 kV, cos phi = 0,80, L = 13 km, MELINTAS JALAN RAYA
3 Isna Wahyu WOny Kusuma
Rencana SKTM PT. ADI SARANA KARYA, Daya 7 MVA/20 kV, cos phi = 0,82, L = 14 km, MELINTASI SUNGAI
4 Ika NofitasariRisma Fauziyah R
Rencana SKTM PT. INTI BERKAH, Daya 8 MVA/20 kV, cos phi = 0,86, L = 13 km, DI PEMUKIMAN PADAT
5 Guntur Adhi SRistiadi T
Rencana SKTM PT. CIPTA UTAMA, Daya 3.5 MVA/20 kV,cos phi = 0,83, L = 16 km
6 Sidik PBilly Yulio H
Rencana SUTM PT. DIPA DWI UTAMA, Daya 2 MVA/20 kV, cos phi = 0,89, L = 9 km
7 Anggit PVerdy Adelwin
Rencana SUTM BC PT. RAHARDIAN JAYA UTAMA, Daya 1.5 MVA/20 kV, cos phi = 0,76, L = 10 km, JALAN BERBELOK 90° DIPERTENGAHAN JALAN
8 Wahyu PuguhAndri Rahadian
Rencana SUTM PT. SUMBER PELITA ABADI, Daya 10 MVA/20 kV, cos phi = 0,87, L = 11 km
9 Agustinus PriyokoWito D
Rencana SUTM TIC PT. INTI UTAMA PARAGITA, Daya 7,5 MVA/20 kV, cos phi = 0,80, L = 8 km
10 YusrinaAditya
Rencana SUTM BC PT. VICTORIA, Daya 4,5 MVA/20 kV, cos phi = 0,85, L = 16 km
Tugas :1. Membuat/merencanakan JTM dari pembangkit/GI sampai pelanggan (TIC/BC/SKTM)2. Menghitung Bill of quantity3. Membuat schedule pekerjaan4. Menghitung BEP