2
DAFTAR TUGAS KELOMPOK INSTALASI LISTRIK TEGANGAN MENENGAH SEMESTER 5 TAHUN AKADEMIK 2013/2014 KELAS : TL-5B Kel NAMA MAHASISWA JUDUL TUGAS KETER 1 Michael M. Fikri Aditama Rencana SKTM PT. SINAR ABADI, Daya 5.5 MVA/20 KV, cos phi = 0,84,L = 12 km Merencanakan JTM dari Pembangkit/GI sampai pelanggan Proyek di ……………………… 2 Ledyane Tiara A Nathya Chairani Rencana SKTM PT. ARENA ELEKTRIKA, Daya 6.5 MVA/20 kV, cos phi = 0,80, L = 13 km, MELINTAS JALAN RAYA 3 Isna Wahyu W Ony Kusuma Rencana SKTM PT. ADI SARANA KARYA, Daya 7 MVA/20 kV, cos phi = 0,82, L = 14 km, MELINTASI SUNGAI 4 Ika Nofitasari Risma Fauziyah R Rencana SKTM PT. INTI BERKAH, Daya 8 MVA/20 kV, cos phi = 0,86, L = 13 km, DI PEMUKIMAN PADAT 5 Guntur Adhi S Ristiadi T Rencana SKTM PT. CIPTA UTAMA, Daya 3.5 MVA/20 kV,cos phi = 0,83, L = 16 km 6 Sidik P Billy Yulio H Rencana SUTM PT. DIPA DWI UTAMA, Daya 2 MVA/20 kV, cos phi = 0,89, L = 9 km 7 Anggit P Verdy Adelwin Rencana SUTM BC PT. RAHARDIAN JAYA UTAMA, Daya 1.5 MVA/20 kV, cos phi = 0,76, L = 10 km, JALAN BERBELOK 90° DIPERTENGAHAN JALAN 8 Wahyu Puguh Andri Rahadian Rencana SUTM PT. SUMBER PELITA ABADI, Daya 10 MVA/20 kV, cos phi = 0,87, L = 11 km 9 Agustinus Priyoko Wito D Rencana SUTM TIC PT. INTI UTAMA PARAGITA, Daya 7,5 MVA/20 kV, cos phi = 0,80, L = 8 km 10 Yusrina Aditya Rencana SUTM BC PT. VICTORIA, Daya 4,5 MVA/20 kV, cos phi = 0,85, L = 16 km Tugas : 1. Membuat/merencanakan JTM dari pembangkit/GI sampai pelanggan (TIC/BC/SKTM) 2. Menghitung Bill of quantity 3. Membuat schedule pekerjaan 4. Menghitung BEP

Daftar Tugas Kel -5b-13

Embed Size (px)

DESCRIPTION

tugasku

Citation preview

Page 1: Daftar Tugas Kel -5b-13

DAFTAR TUGAS KELOMPOKINSTALASI LISTRIK TEGANGAN MENENGAH SEMESTER 5

TAHUN AKADEMIK 2013/2014

KELAS : TL-5BKel NAMA MAHASISWA JUDUL TUGAS KETER

1 MichaelM. Fikri Aditama

Rencana SKTM PT. SINAR ABADI, Daya 5.5 MVA/20 KV, cos phi = 0,84,L = 12 km

Merencanakan

JTM dari

Pembangkit/GI

sampai

pelanggan

Proyek di

…………………

……

2 Ledyane Tiara ANathya Chairani

Rencana SKTM PT. ARENA ELEKTRIKA, Daya 6.5 MVA/20 kV, cos phi = 0,80, L = 13 km, MELINTAS JALAN RAYA

3 Isna Wahyu WOny Kusuma

Rencana SKTM PT. ADI SARANA KARYA, Daya 7 MVA/20 kV, cos phi = 0,82, L = 14 km, MELINTASI SUNGAI

4 Ika NofitasariRisma Fauziyah R

Rencana SKTM PT. INTI BERKAH, Daya 8 MVA/20 kV, cos phi = 0,86, L = 13 km, DI PEMUKIMAN PADAT

5 Guntur Adhi SRistiadi T

Rencana SKTM PT. CIPTA UTAMA, Daya 3.5 MVA/20 kV,cos phi = 0,83, L = 16 km

6 Sidik PBilly Yulio H

Rencana SUTM PT. DIPA DWI UTAMA, Daya 2 MVA/20 kV, cos phi = 0,89, L = 9 km

7 Anggit PVerdy Adelwin

Rencana SUTM BC PT. RAHARDIAN JAYA UTAMA, Daya 1.5 MVA/20 kV, cos phi = 0,76, L = 10 km, JALAN BERBELOK 90° DIPERTENGAHAN JALAN

8 Wahyu PuguhAndri Rahadian

Rencana SUTM PT. SUMBER PELITA ABADI, Daya 10 MVA/20 kV, cos phi = 0,87, L = 11 km

9 Agustinus PriyokoWito D

Rencana SUTM TIC PT. INTI UTAMA PARAGITA, Daya 7,5 MVA/20 kV, cos phi = 0,80, L = 8 km

10 YusrinaAditya

Rencana SUTM BC PT. VICTORIA, Daya 4,5 MVA/20 kV, cos phi = 0,85, L = 16 km

Tugas :1. Membuat/merencanakan JTM dari pembangkit/GI sampai pelanggan (TIC/BC/SKTM)2. Menghitung Bill of quantity3. Membuat schedule pekerjaan4. Menghitung BEP