D E P E N D A B L E N A T U R A L G A S
www.elpaso.com | NYSE:EP
Customer WebexOctober 5, 2011
Review of Upcoming OutagesOctober & Winter 2011
Gulf CoastCentralNorthern
Q&A
Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary.Unless otherwise stated, all scheduled dates represent gas days as defined in the Tennessee Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time).
Scheduled dates are subject to change.Projects may be added, altered, delayed or cancelled. TGP will provide notice of such additions or changes via PASSKEY postings.Dates as posted on PASSKEY should be deemed correct in the event of conflicts between PASSKEY posted dates and dates within this presentation.
GreenNo Impact Anticipated
YellowRestrictions are possible, but not likely.With extended duration, restrictions could be necessary from time to time.
RedRestrictions are probable, ORMeter(s) affected, ORCombination of the above.
Branch line inspection (M)MLV 33-1 to 34-1 10/18 to 10/20MLV 26-1 to 27-1 10/11 to 10/13
MLV 19-1 to 20-1 10/3 to 10/8MLV 14-1 to 15-1 10/24 to 11/2
Station 703Repair seal 10/4 to 10/6
Station 40 Unit 500 C1Unit inspection 10/10 to 10/13
MLV 834-1 to 835-1 Cleaning/Caliper/ILI pigging
10/10 to 10/13
523M-7300 and 523M-7600Line abandonment (M)
10/4 to 10/15
Anomaly remediation MLV 41-1 to 42-1 (M) 10/3 to 10/12
MLV 45-1 to 47-1 10/7 to 10/14
MLV 43A-100 to 43-101A Maintenance pigging (M) 10/12
Station 827Peco filter change
10/12 to 10/14
Vermilion 245Vent stack/filter
separator installation10/1 to 10/15
MLV 20 to 21 (all three lines) Line lowering 9/10 to 10/17
Station 409Unit 1A Maintenance 10/17
Maintenance PiggingSt 823 to St 40 10/20St 823 to St 827 10/20
Bluewater—SystemPigging operations
10/18 to 10/23
MLV 16-3 to 17-3Relocate pig receiver
10/6 to 10/24
Bear Creek StorageFall shut in test. 10/18 to 10/24
Station 1ESD Test 10/27
MLV 9-1 to 11-1Maintenance pigging 10/27
Hydrostatic testMLV 25-2 to 27-2 10/4 to 10/31MLV 32-3 to 34-3 10/4 to 10/31
MLV 21-3A to 22-3Line lowering (M) 8/18 to 11/1
MLV 7-2 to 9-2Emergent anomaly
7/19 to 12/31
Maintenance pigging409A-1100 (Rio Bravo) 11/1
409A-100 (Pemex) 10/27
Anomaly remediationMLV 541-1 to 542-1 (M) 9/20 to 10/5
MLV 540-2 to 541-2 (M) 10/26 to 10/29MLV 539-2 to 540-2 (M) 10/5 to 10/12
Station 96MCC replacement 10/3 to 10/14
Anomaly remediation MLV 550-1 to 552-1 10/24 to 11/18MLV 540-1 to 541-1 10/12 to 10/26MLV 539-1 to 540-1 9/19 to 10/7
MLV 114-2 to 110-2ILI pigging10/13
MLV 115-2 to 116-2Anomaly remediation 10/3 to 10/14
Anomaly remediationMLV 83-1 to 85-1 10/5 to 10/20MLV 80-1 to 82-1 10/17 to 11/8 MLV 562-2 to 565-2
Emergent anomaly7/27 to 10/21
Station 87 E Bldg outage10/17 to 10/21
MLV 847-1 to 851-1 Cleaning/Caliper/ILI pigging
10/17 to 10/27
Station 843Yard welding
10/26 to 10/27
Station 200MCC replacement 10/17 to 10/31
MLV 100-4 to 101-4Pipe replacement 10/22 to 11/4
MLV 200-4B to 204-4Valve replacements 10/24 to 12/2
MLV 40-2 to 47-2 Pipeline Outage4/14 to 11/1 (est)
Anomaly remediationMLV 313A-403 to -404 9/20 to 10/8MLV 313A-406 to -407 10/3 to 10/5MLV 313A-410 to -410 10/3 to 10/5
300 Line Tie-insMLV 314A-101 to 315-2 10/17 to 10/20MLV 317-AD2 to 317A-101 9/26 to 10/5
MLV 320-2L to 320-2 10/17 to 10/20MLV 321-2 to 321-101 10/6 to 10/12
MLV 325-2 to 325D-101 10/16 to 10/20
Emergent anomalyMLV 213-1 to 214-1 9/12 to 10/7MLV 208-1 to 209-1 8/24 to 10/5
Station 319ESD test (1 day)
9/28 to 10/7
Station 265EReplace BPS system
10/3 to 10/7
Fall shut in testHarrison Storage 10/3 to 10/7
Hebron/Ellisburg 10/24 to 10/28
MLV 237-1 to 245-1Efficiency pigging 10/11
MLV 356-1 to 336-1 Cleaning Pig 10/11
Station 245Unit maintenance
10/3 to 10/13
Station 229Unit maintenance
10/11 to 10/13
MLV 270B-101.1 to -105 ILI pigging 10/11 to 10/13
Meter 020200 (Union City) Meter modifications (M)
10/12 to 10/13
MLV 270B-105 to -106ILI pigging 10/110to 10/14
Station 241B Unit maintenance 10/10 to 10/15Unit 3A maintenance 10/16 to 10/28
Meter 020914 (Sabinsville) Meter upgrade (M)
10/1 to 10/16Station 313
Unit maintenance9/6 to 10/20
Station 270BESD Test 10/25 to 10/26
Anomaly remediationsMLV 318-1 to 319-1 MLV 320-1 to 321-1MLV 322-1 to 323-1
10/18 to 10/28
MLV 334-1 to 336-1 Pipe relocation (M)
10/24 to 10/31
MLV 213-3 to 214-3Hydrostatic test 10/24 to 11/4
MLV 267-1 and Concord LateralEmergent anomaly 9/13-11/1
Pipeline OutageMLV 214-4 to 216-4 3/1 to 11/1 (est)MLV 209-1 to 210-1 3/1 to 11/1 (est)
Efficiency piggingMLV 32-1 to 40-1 (M) 11/8MLV 32-3 to 40-3 (M) 11/9
MLV 17-1 to 9-1Maintenance pigging 11/16
Branch line inspection (M)MLV 14-1 to 15-1 10/24 to 11/2MLV 15-1 to 16-1 11/8 to 11/10
MLV 3-1 to 4-1 11/14 to 12/3
CarthageSt 40 Pipe replacement 11/1 to 11/3
Station 703 Unit maintenance 11/1 to 11/3
Station 527MCC replacement 11/7
MLV 526-1 to 527-1 Maintenance Pigging
11/7 to 11/12
MLV 533-1 to 534-1Anomaly remediation (M)
11/11 to 11/14
Line 21B-100 (Tomball Line) Hydrostatic test (M) 12/1 to 12/20
MLV 550-1 to 552-1Anomaly remediation
10/24 to 11/18
Anomaly remediationMLV 557-1 to 559-1 11/28 to 12/2MLV 555-1 to 557-1 11/4 to 11/18MLV 550-2 to 554-2 11/28 to 12/5MLV 541-2 to 542-2 11/15 to 11/18
MLV 40-2 to 47-2 Pipeline Outage4/14 to 11/1 (est)
MLV 80-1 to 82-1Anomaly remediation
10/17 to 11/8
MLV 100-4 to 101-4Pipe replacement 10/22 to 11/4
MLV 200-4B to 204-4Valve replacements 10/24 to 12/2
MLV 260A-100 (Northampton) Cleaning Pig 11/8 to 11/9
Station 319Emissions Testing
11/28 to 12/2
Line 217A (Pittsburg Spur) Cleaning and ILI pigging 12/1
Station 315Crane Install11/8/ to11/10
Pipeline OutageMLV 214-4 to 216-4 3/1 to 11/1 (est)MLV 209-1 to 210-1 3/1 to 11/1 (est)
MLV 267-1 and Concord LateralEmergent anomaly 9/13-11/1
12
MLV 314
Meters in the MLV 318-1 to 319-1 valve section:012823 ELLIOTT DEHY: RIP 318 101.1 012769 EVANCHICK DEHY: RIP 318C 101.1 020652 WYALUSING SALES
Station315
Station317
Station325
Station313 MLV 316 MLV 318 MLV 320 MLV 324MLV 322
Meters in the MLV 320-1 to 321-1 valve section:012751 HOP BOTTOM DEHYD: RIP 320C 101.1 012841 AUBURN DEHYDRATION: RIP 320-1 0.04 012782 LOTT DEHYDRATION: RIP 320D 101.1A 012778 TEEL DEHYDRATION: RIP 320H 101.1A 012825 STRICKLAND HILL DEHY: RIP 320K 101.1 012793 SPRINGVILLE DEHY: RIP 320I 101.1 012821 DIMOCK DEHY: RIP 320J 101.1 012794 KORBAN DEHY:RIP 320E 101.1
Meters in the MLV 322-1 to 323-1 valve section:020277 HONESDALE PENNSYLVANIA SALES
Station319
Station321
Station323
Reduced operating pressures by 20%
MLV 318-1 to 319-1, 320-1 to 321-1, and 322-1 to 323-1
Anomaly remediations (M) 10/18 to 10/28
Station315
Station323
Station325
Station313
13
Station40
MLV 707
MLV 706
MLV 705
MLV 704
MLV 703
MLV 702
MLV 701
MLV 700
0126
88 P
ANOL
A TR
ANSP
ORT
2
0120
33 C
ARTH
AGE
TRAN
SPOR
T
0121
41 C
ARTH
AGE
GAS U
NIT
13 (B
i 2 0
723
0207
23 C
ARTH
AGE
GAS
UNIT
13
(Bi 1
214
1)
0100
31 E
AST
TEXA
S PLA
NT D
EHYD
RATI
ON
0112
00 E
NTEX
PAN
OLA
TRAN
SPOR
T (C
I)
0115
25 B
ELLE
BOW
ER D
EHYD
RATI
ON
0127
64 S
TATE
LINE
PRO
CESS
ING:
RIP
704
F
0128
07 LO
GANS
PORT
B: R
IP 7
04H
101.
1A
0127
59 B
URFO
RD G
ATHE
RING
: RIP
704
E 1
01.1
0120
81 B
ETHA
NY LO
NGST
REET
FIE
LD
0120
26 G
RAND
CAN
E
0127
06 LO
GANS
PORT
0113
27 S
PIDE
R DE
HYDR
ATIO
N
0127
25 D
E SO
TO G
ATHE
RING
0126
07 D
ESOT
O HO
LLY
FIEL
D01
2583
BEN
SON
AND
CONV
ERSE
0128
14 B
LACK
STON
E NO
1: R
IP 7
03K
101.
1
0114
42 N
ABOR
TON
DEHY
D D
N BE
LL 1
(CI)
0127
75 T
RENT
ON S
ALES
: RIP
703
H 1
5.38
0127
65 H
ARRI
S 19
.1: R
IP 7
03G
101.
1
0127
36 M
ARTI
N TI
MBE
R (C
O)
0126
10 W
EST
MAN
SFIE
LD02
0628
PLE
ASAN
T HI
LL T
RANS
PORT
(CI)
0127
86 B
LACK
STON
E IV
ORY:
RIP
702
M 1
01.1
0116
68 B
RUSH
Y BA
YOU
FIEL
D
0117
55 G
ROGA
N FI
ELD
(CI)
0113
30 C
HEM
ARD
LAKE
DEH
YDRA
TION
0115
90 G
ROGA
N FI
ELD
(CI)
0115
98 SA
N M
IGUE
L CRE
EK FI
ELD
(CI)
0111
43 G
ROGA
N DE
HYDR
ATIO
N
TRAN
SPOR
T (C
I)
Pipe replacement in Station 40 yard.11/1-11/3
Impact: Carthage Lateral shut in at Station 40.-Physical flow into the Carthage Lateral must match physical flow out of the Carthage Lateral.-All receipt meters between MLV 707 (end of lateral) and MLV 700—at Station 40 would have to shut in or schedule flow to Enterprise meter 020723.
Station703
Questions?
Suggestions for improvements to this meetingAre the meetings beneficial?Is additional information needed?Questions after the meeting?Other?
Email to one of the following:Your schedulerPASSKEY Portal