8
CV SUMMARY DATA PERSONEL Name : ACHMAT MUNIB Birth / Place : PATI - SEMARANG /SEPTEMBER 10, 1971 Age : 38 YEAR'S Address : RT 13,Gg Jupiter PANJANG UTARA ,BANDAR LAMPUNG PHONE ; 62 0721 343053,HP ; 62 081311402041 Email ; [email protected] Last Education ( FORMAL) :BACHELOR, D3 Year Pass : MAY 6,1994 Study : MACHANICAL ENGINEERING Status : MARIEED Last Working Company : IN CURENT AT PT UT QUALITY Last Position : NDT COORDINATOR Professionals Work 1.Set up of Quality Management system and Quality control inspection 2. Build up and prepare of Certification of Quality Management(ISO) and ASME 3. Familiar code and standard ( Design, Fabrication, Inspection an Testing ) 4. Set up Welding Qualification Procedure and Welder or welding Qualification 5. Preparation operation procedure for operation Inspection and Examination 6. Managing of QA/QC or coordinating QC Personnel performing a variety of Complex Quality Control and Carrying out Inspection, Exam and Test 7. Familiar With ISO 9000 QMS requirements and fully conversant with applicable 1

CV Summary Achmat Munib ( up dated Feb 18 2015)

Embed Size (px)

Citation preview

Page 1: CV Summary  Achmat Munib  ( up dated Feb 18  2015)

CV SUMMARY DATA PERSONELName : ACHMAT MUNIBBirth / Place : PATI - SEMARANG /SEPTEMBER 10, 1971Age : 38 YEAR'SAddress : RT 13,Gg Jupiter PANJANG UTARA ,BANDAR LAMPUNG PHONE ; 62 0721 343053,HP ; 62 081311402041 Email ; [email protected] Education ( FORMAL) :BACHELOR, D3Year Pass : MAY 6,1994Study : MACHANICAL ENGINEERINGStatus : MARIEEDLast Working Company : IN CURENT AT PT UT QUALITY Last Position : NDT COORDINATOR Professionals Work 1.Set up of Quality Management system and Quality control inspection 2. Build up and prepare of Certification of Quality Management(ISO) and ASME 3. Familiar code and standard ( Design, Fabrication, Inspection an Testing ) 4. Set up Welding Qualification Procedure and Welder or welding Qualification 5. Preparation operation procedure for operation Inspection and Examination 6. Managing of QA/QC or coordinating QC Personnel performing a variety of Complex Quality Control and Carrying out Inspection, Exam and Test 7. Familiar With ISO 9000 QMS requirements and fully conversant with applicable Industry international standards and specification ( I.e. ISO, ASME,ANSI,API, ASTM, AWS, NACE, SSPC, TEMA, JIS,) 8.Developing and establishing multidisciplinary construction field and fabrication For Quality plan and Procedure and demonstrated knowledge in control of measuring & test equipment routinely used in conducting Inspect, Exam and Test including Destructive test and Non destructive Test 9. Provide Scheduling Fabrication and Construction field Base on Contract , Project Deviation of specification and Technical Meeting 10.Provide Plan of Man Power, Purchasing , Equipment and if available Man Power skill (If Required) to meet with Project Recruitments 11. Maintain and Communication with owner or representative to meet with Project Recruitments as like Schedule, Quality and Safety 12. Provide Agenda Meeting and Reporting Progress to Top Management and Owner ( Weekly and Monthly ) 13. Control of Budgeting Project and Flow Cost and Make analyst for over head cost 14. Release The Project to customer or Representative meet with Project Recruitments and Specifications

1

Page 2: CV Summary  Achmat Munib  ( up dated Feb 18  2015)

A..EXPERIANCE WORK

1. EXPERIANCE STEEL STRUCTURE & CONSTRUCTION

1.1. ENGINEERING , PT MULTIFAB ON DATE May 3,1993 ~ JULY 02,1994 1.2 .SUPERVISOR QUALITY CONTROL , PT GEMA SEMBROWN ON DATED JULY08,1994 ~DECEMBER 05,1994 1.3 .SUPERVISOR SHOP FABRICATION , PT KMT (KONSTRUKSI MUARA TAWAR) JOINT COOPERATION BETWEEN BBS AND PP TAISEI, ON DATED DEC. 06, 1994 ~ DEC. 01, 1996 1.4. INSPECTOR,KIDECO Dec. 02, 1996 ~ June 20, 1997

A1.5. Experience Quality Assurance/ Engineer/Inspection/Fab/Erection ( start 1997 Year at PT HI until May 2012 ) First Position : Coordinator QA/QE/QI and Last Position : GENERAL MANAGER

01. Steel Structure Project for Building , Pipe Rack ,,EPC and Power Plant-Local and Foreign PJT

02. Oil and Gas Project as like Pressure Vessel and Reactor ( Unocal, Caltex , Gulf Union, Kujang , Kaltim ) and Tank with qty 22 EA ( CGS 10 – Caltek Project )

03. Heavy Equipment Project ( RTGC, RMQC , Mono Crane ) -Local and Foreign PJT

04. Steel Bridge Project (Al Tawelah ,Merak Porth)05. Refenery PJT (Flare Stack , Steam Pipe Combution ,Electrostatic Precipitator,

Fire Heater ,06. Main Piping Line PJT ( Intake Pipe ,Incinerator)07. Off Shore oil & Gas PJT ( Plate form /Petronas , Bridge&Plate Form / Saipem )

B1..6 Experience Project Manager ( 2012 ~ 2013 at PT Tekniko Indonesia )

01 Project Name : Plate Mill KS Project (Client Posco – KS Cooperation) Type : Steel Structure, Piping and Erection Installation Total weight 1300 T Year /Status : 2012/ Local

02 Project Name : Steel Mill KS Project (Client Posco – KS Cooperation) Type : Steel Structure, Piping and Erection Installation Total weight 1250 T Year /Status : 2013/ Local

C1.7 Experience PLANT Manager ( 2013~ 2014 at PT ANUGERAH )

01 Project Name : Coal and Bulk Project (Client PT Anugerah Indonesia ) Type : Operational and Manage of Management Year /Status : May 2013 ~ Feb 17 2014/ Local—Job Completed

2

Page 3: CV Summary  Achmat Munib  ( up dated Feb 18  2015)

11. EXPERIANCE CIVIL CONSTRUCTION

11.1. Project Manager , CV Agung Mandiri On May 2010 ~ Nov ,2010 Land clearing Make The Office Site for Stone Mining at Bandar Lampung

11.2 .Project Manager , CV Agung Mandiri On Dec 2010 ~ June ,2011 Land clearing Make The Office Site for Stone Mining at Way kanan Bandar Lampung

11.3. Project Manager , CV Agung Mandiri On June 2011 ~ Sept ,2011 Provide for Box Culvert and Cutting Hill at Cikampek – Purwokarta

11.4. Site Manager , CV Agung Mandiri On Sept 2011 ~ Sept ,2012 Supplay Materials for Rod Way Sukarno Hatta at Bandar lampung

11.5. Site Manager , CV Agung Mandiri On Sept 2012 ~ Dec ,2012 Building Office with 2 nd Stage ( 20 x 50 x 5 M)

11.6. Site Manager , CV Agung Mandiri On Jan 2013 ~ May ,2013 Supplay Materials for Maintanance Tol Serang at Serang

11.7. Site Manager , CV Agung Mandiri On May 2013 ~ Sept ,2013 Building Property Class RE with 40 Unit at Bandar Lampung

11.8. Project Manager , CV Agung Mandiri On Sept 2013 ~ Jan ,2014 Cut Hill and The make Traditional fish Port at Kalianda - Bandar Lampung

1I1. EXPERIANCE SERVICE NDTAND PWHT

111.1 Operational Manager of PT PSI On Dec 2012 ~ 2014

111.2. Coordinator NDT of PT UT Q , On Sept , 2014 ~ Present

1V. EXPERIANCE THIRD PARTY AND CONSULTANCE

Owner Representative Joint with LR for Commissioning AND Certification Rail Mounted Quay Crane at Panjang Port Bandar Lampung Indonesia On Feb. 2012 Until Dec.2012

3

Page 4: CV Summary  Achmat Munib  ( up dated Feb 18  2015)

B.MANEGEMENT SYSTEM

1.ISO 9001 & ASME STAMP, To get Through ISO 9001 & ASME Stamp ( U, PP, A, S) Certificate To preparation QA Manual & QCP Manual & (Document’s, Demonstration, Joint Review, implementation & Stabilization of ISO Program on year 1998 2.ISO 9001 & ASME STAMP, Renewal ISO 9001 & ASME Stamp (U, PP, A, S) Certificate To implementation & Established ISO Program on year 1998-20013.ISO 9001 & ASME STAMP To get Through ISO 9001 & ASME Stamp ( U, PP, A, S) Certificate To preparation QA Manual & QCP Manual & (Document’s, Demonstration, Joint Review, implementation & Stabilization of ISO Program on year 2001 4.ISO 9001 & ASME STAMP, Renewal ISO 9001 & ASME Stamp (U,PP,A, S) Certificate To Implementation & Established ISO Program on year.2001-20045.ISO 9001 & ASME STAMP To get Through ISO 9001 & ASME Stamp ( U, PP, A, S ) Certification on year’s 2004 The preparation QA Manual & QCP Manual & (Document’s, Demonstration, Joint Review, implementation & Stabilization of ISO program.To achieve and established objective quality 2004 Foreign 6.ISO 9001 & ASME STAMP , To get Through ISO 9001 & ASME Stamp ( U, PP, S ) Certificate. - To preparation QA Manual & QCP Manual & (Document’s, Demonstration, Joint Review, implementation & Stabilization of ISO program.To achieve and established objective quality on year 2007 7.ISO 9001 & ASME STAMP , To get Through ISO 9001 & ASME Stamp ( U, PP, S ) Certificate. - To preparation QA Manual & QCP Manual & (Document’s, Demonstration, Joint Review, implementation & Stabilization of ISO program.To achieve and established objective quality on year 20118.Certification OHSAS 18001 Occupational Health and Safety ManagementLead Task team For Certification OHSAS 18001 -----on years 2012

C.TRAINING COURSE AND SEMINAR

1 NDT Training level 1( RT.UT.MT,PT) on Dated Jan, 1998

2 Protection Personnel Radiation ( PPR) , on Year 2001

3 Damage Mechanical & Risk Based Inspection on dated OCT. 2003

4 Welding Inspector, WELDING CORELATION WITH ASME, AWS, API CODE on dated AGUST31 ~ OCT.10 2004

4

Page 5: CV Summary  Achmat Munib  ( up dated Feb 18  2015)

5 AUDITOR -Awareness ISO 9001 : 2004 Program Internal Audit ISO 9001: :2000 on dated AUG.15 ~ 16 2007

6 RADIOGRAPHY TEST RT LEVEL II (ASNT-TC) on dated FEB, 2008 and Sept, 2014

7 PENETRANT TEST PT LEVEL II (ASNT-TC) on dated March , 2008 and Sept,2014

8 MAGNETIC TEST MT LEVEL II (ASNT-TC) on dated March , 2008 and Sept,2014

9. JOTUN PAINT SCHOOL on dated August 18 ~ 19 2009

10. INTERNATIONAL PAINT SCHOOL On dated Feb 10, 2010

11. SAFETY LEADER from LIS ( Saipem ), On dated March 3 and 4 2010

12. NATIONAL SEMINAR NDT EXPO On July 21 ~ July 23 2010

13 LEAD AUDITOR ISO 9001 : 2008 on Nov 1 ~ 3 2010 .

All the My data and CV above is true and I make these document’s base and for my Experience and my history with real time .

MOTTO: ” I WOULD LIKE TO MAKE THE BEST WORK AND TASK TEAM FOR EVERY BODY”

5

THE ENDTHANK’S YOU