CPES MeetingApril 13, 2016Cromwell, CT

Mike DirraneDirector, Northeast Marketing

Page 2: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

2Algonquin Gas Transmission| August 2015

Spectra Energy’s Portfolio of Assets

Gas storage facilityGas processing plantPropane terminalNGL storageShale gas formationsCrude storageMajor oil pipeline terminal

• Based in Houston, TX with operations in 30 states

• Transports 15% of natural gas consumed in North America

• One of largest storage positions in North America

• Largest producer of natural gas liquids in U.S.

• One of largest transporters of crude in North America

• Over $10 Billion invested in system since ’07

• $35 Billion in new growth projects by ‘20

Page 3: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

3Algonquin Gas Transmission| August 2015

Algonquin Gas Transmission

Page 4: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

4Algonquin Gas Transmission| August 2015

Very Warm Market Area: Dec - Feb

Page 5: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

5Algonquin Gas Transmission| August 2015

Algonquin Gas TransmissionMonthly Deliveries

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

Nov Dec Jan Feb Mar

Mdt

h

Prev 5 Winter Avg W14_15 W15_16

-10.8%

-17.9%-7.5%

-12.0%

2.4%

-8.9%

-0.7%

-10.9%

-2.2%

-14.6%

Page 6: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

6Algonquin Gas Transmission| August 2015

Algonquin Gas TransmissionMonthly Power Load Deliveries

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

Nov Dec Jan Feb Mar

Mdt

h

Prev 5 Winter Avg Pwr W14_15 Pwr W15_16 Pwr

4.7%

-3.2%

29.7%

15.1%

24.7%

9.3%

21.3%

36.5%

5.6% 3.0%

Page 7: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

7Algonquin Gas Transmission| August 2015

Algonquin Gas TransmissionWest to East – Stony Point Compressor Station

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

11/1/2015 11/15/2015 11/29/2015 12/13/2015 12/27/2015 1/10/2016 1/24/2016 2/7/2016 2/21/2016

No Notice Scheduled Timely Qty Design Capacity Operational Capacity

Page 8: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

8Algonquin Gas Transmission| August 2015

Algonquin Incremental Market AIM Expansion

Purpose:Provide growing New England demand

with access to abundant regional natural gas supplies

Project Scope:Providing ~340 MMcf/d of additional

capacity to move Marcellus production to Algonquin City GatesCapEx: $1 BCustomers (15 year terms): LDC Affiliates of UIL Holdings, Northeast

Utilities, National Grid, NiSource City of NorwichMiddleboroughProject Status:Pre-filed with FERC Jun 2013 Filed FERC application Feb 2014Expect FERC certificate Q1 2015Commence construction Q2 2015 In-service Nov 2016

Preliminary Facilities: Take up segments of 26” pipeline and replace with 42”; one

segment of 36” loop; reinforcement of existing laterals; construction of new lateralHorsepower additions and modifications at 5 existing

compressor stationsNew meter station installations and modifications to existing

meter stations

Page 9: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

9Algonquin Gas Transmission| August 2015

Cromwell Compressor Station Construction

Page 10: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

10Algonquin Gas Transmission| August 2015

Cromwell CS Building

Page 11: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

11Algonquin Gas Transmission| August 2015

Cromwell Pipeline Loop Construction

Page 12: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

12Algonquin Gas Transmission| August 2015

West Roxbury Lateral

I-95 Road Bore

Page 13: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

13Algonquin Gas Transmission| August 2015

Burrillville Compressor Station

Page 14: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

14Algonquin Gas Transmission| August 2015

CT Meter Stations

Page 15: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

15Algonquin Gas Transmission| August 2015

Atlantic BridgePurpose: Increased pipeline capacity will allow

abundant, economic supplies of natural gas from regional production to flow to the New England and Atlantic Canada markets

Project Scope: Further expansion of the Algonquin and

Maritimes Pipelines with receipt/ delivery points ranging from Mahwah to AGT city gates and into the Maritimes PipelinesCapEx: $750 MM to $1 B

Customers:Agreements signed for some LDCs and

industrial shippers Late stage negotiations with other parties

in New England and Atlantic Canada

Project Status:Expected pre-filing with FERC Jan 2015Estimated in-service Nov 2017

Preliminary Facilities New compressor station near Weymouth, MAContinued take-up and relay of the AGT mainline Looping and take-up and relay of laterals in MACompressor station unit upgrades in CTMeter station modifications

Page 16: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

16Algonquin Gas Transmission| August 2015

Access Northeast is a Tailored Solutionfor the Region’s Electric Energy Needs

Algonquin Gas Transmission

Texas Eastern

MARCELLUS

UTICA

Gas-fired power plant connected to the Access Northeast ProjectNew England gas & electric markets served by Access Northeast

Iroquois

• Serves over 70% of New England generation

• Will provide fuel for 5,000 MW of electric generation Maritimes

& Northeast

NEW YORK

BOSTON

PORTLAND

• Upgrades Existing Pipelines– Innovative– Cost effective– Environmentally responsible

approach• Utilizes local natural gas storage• Increases natural gas supplies to

power plants by 0.9 Bcf /day– Ensuring energy security– Lowering electric costs – Reducing carbon emissions

• Provides rapid response capability – a first of its kind service to electric generators that will:– Meet peak winter day needs – Back stop intermittent solar and

wind-renewable power

Page 17: CPES Meeting April 13, 2016 Cromwell, CT · 2017-11-30 · April 13, 2016 Cromwell, CT Mike Dirrane. Director, Northeast Marketing. Algonquin Gas Transmission| August 2015. 2. Spectra

17Algonquin Gas Transmission| August 2015

Benefits of Expanding ExistingSpectra Energy Pipeline Infrastructure

Scalability brings relief ASAP

Connects supply directly to end use markets

Reliability

Provides least stakeholder impact