6
We support renewable energy and partner with our customers to ensure safe and reliable interconnection to the electric grid. NET ENERGY METERING AND SMALL GENERATOR INTERCONNECTIONS

COVER - Atlantic City Electric | Atlantic City Electric... · [email protected] 1-866-634-5571 atlanticcityelectric.com. Created Date: 8/11/2016 12:24:12 PM

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COVER - Atlantic City Electric | Atlantic City Electric... · gpc-north@pepcoholdings.com 1-866-634-5571 atlanticcityelectric.com. Created Date: 8/11/2016 12:24:12 PM

COVER

We support renewable energy and partner with our customers to ensure safe and reliable interconnection to the electric grid.

NET ENERGY METERING AND SMALL GENERATOR INTERCONNECTIONS

Page 2: COVER - Atlantic City Electric | Atlantic City Electric... · gpc-north@pepcoholdings.com 1-866-634-5571 atlanticcityelectric.com. Created Date: 8/11/2016 12:24:12 PM

WE CAN HELP YOU MAKE A SAFE AND RELIABLE INTERCONNECTIONIf you’re an Atlantic City Electric customer thinking of generating your own electricity with renewable energy sources, our Green Power Connection™ process can help make it possible. Before you purchase or install renewable energy systems, it is important that you first submit an interconnection application and agreement, along with supporting documentation. Our dedicated team of account coordinators will process your application and provide you with additional guidance. When you have successfully met the requirements, we welcome the opportunity to have your energy generating system interconnect to the electric grid.

QUALIFYING RENEWABLE TECHNOLOGIESn Solar (photovoltaic cells or solar heating)

n Wind (turbines or windmills)

n Biomass (using plant or animal matter as fuel)

n Electric-geothermal (heat from the earth)

n Anaerobic Digestion (micro-organisms break down organic materials)

n Fuel Cells (chemical energy from a fuel)

n Hydropower (water turbines and dams)

Customer-generated electricity can offset all or part of the energy normally used from Atlantic City Electric.

Unauthorized Interconnections Are UnsafeRenewable energy systems installed or operating without written authorization from Atlantic City Electric endanger our workers, who will not have a record of the system. These systems pose a safety risk to our customers, system components, facilities and general public. They can also cause voltage overload problems on the electric grid, preventing safe and reliable electric service. We can send a cease-and-desist notification to stop generation or disconnect electric service at your home or business.

Page 3: COVER - Atlantic City Electric | Atlantic City Electric... · gpc-north@pepcoholdings.com 1-866-634-5571 atlanticcityelectric.com. Created Date: 8/11/2016 12:24:12 PM

Contact Our Green Power Connection™ TeamThere are many factors to consider as you look into generating electricity using renewable energy sources. To learn more or access our online application and links to useful information, visit atlanticcityelectric.com/gpc or call 1-866-634-5571.

Page 4: COVER - Atlantic City Electric | Atlantic City Electric... · gpc-north@pepcoholdings.com 1-866-634-5571 atlanticcityelectric.com. Created Date: 8/11/2016 12:24:12 PM

RENEWABLE ENERGY CAN HELP YOU EARN CREDITS ON YOUR MONTHLY BILLn After you successfully complete the interconnection application

and screening process, we will send you an Authorization to Operate letter

n At the end of the installation process, we will install a net-capable meter at your home or business

n A net-capable meter measures energy that flows in both directions between the customer-generator system and the electric grid

n Excess generation is shown in the “Details of Your Energy Charges” section of your Atlantic City Electric bill

HELPFUL TIPS BEFORE YOU INSTALLn Follow the Net Energy Metering and Small Generator Interconnection

Application Checklist shown in the next section

n Thoroughly research renewable technologies that are eligible for interconnection and net energy metering

n Work closely with your contractor to ensure you understand the interconnection application process, fees and documentation

n Electricity generation fluctuates as a result of several factors – clouds, darkness and dirty panels all limit solar generation. We recommend you understand how your system will operate under varying conditions, and how these conditions can impact your Atlantic City Electric bill

n The renewable system should be sized to meet your electrical needs

n Ensure you have passed our screening results and have received a written Approval to Install letter before you begin construction

n Visit atlanticcityelectric.com/gpc

Page 5: COVER - Atlantic City Electric | Atlantic City Electric... · gpc-north@pepcoholdings.com 1-866-634-5571 atlanticcityelectric.com. Created Date: 8/11/2016 12:24:12 PM

FOLLOW OUR STEP-BY-STEP PROCESSBefore you start, carefully review this checklist. Each step must be followed in the order shown before you can operate your renewable energy system.

Steps Actions to TakeResponsible

Party

1. RESEARCH • Research the various types of renewable energy systems available and decide which system best fits your consumption needs. Renewable energy-generating systems should be sized to meet part or all of your energy needs

• Understand your electrical load and energy consumption

• Customer

• Customer

2. SELECT • Interview and select a licensed and reputable installing contractor • Customer

3. APPLY • Understand the documentation needed with the interconnection agreement (e.g., rebate forms, permit applications, inspection forms)

• Apply and submit Part I of Atlantic City Electric’s interconnection application and agreement along with supporting documentation. Apply online at atlanticcityelectric.com/gpc

• Applications without supporting documentation will be delayed. You can re-submit a corrected application and documentation

• Customer

• Customer

• Customer

4. APPROVAL • Wait for Atlantic City Electric’s Approval to Install letter before installing any renewable generator equipment

• Atlantic City Electric will provide you a written screening result or an Approval to Install letter

• Customer

• Atlantic City Electric

5. INSTALL • Begin constructing and installing your renewable generator facility • Customer

6. INSPECT • After installation, submit Part II of our interconnection agreement, including a copy of the certificate of completion and the inspection certificate

• Atlantic City Electric will review your documentation to verify the interconnection application meets regulatory requirements

• Customer

• Atlantic City Electric

7. METER • Atlantic City Electric will install your net-capable meter • Atlantic City Electric

8. AUTHORIZATION • Atlantic City Electric will send you an Authorization to Operate letter • Atlantic City Electric

9. OPERATE • Receipt of the authorization letter means you can operate your renewable system

• Customer

Page 6: COVER - Atlantic City Electric | Atlantic City Electric... · gpc-north@pepcoholdings.com 1-866-634-5571 atlanticcityelectric.com. Created Date: 8/11/2016 12:24:12 PM

Please Recycle

© Atlantic City Electric, 2016 20160801

Please contact our Green Power Connection team to learn more.

atlanticcityelectric.com/gpc [email protected]

atlanticcityelectric.com