Upload
ali-tahir
View
234
Download
1
Embed Size (px)
Citation preview
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
1/23
Labor Costing
Lecture-13
Main Ahmad Farhan (ACA)
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
2/23
Time Base Bonus Plans
Halsey Premium Plan. Halsey wire Premium Plan.
Rowans Premium Plan.
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
3/23
Halsey Premium Plan
Bonus pay = 50% of time saved x normal wage rate
Halsey Wire Premium Plan.
Bonus pay = 30% of time saved x normal wage rate
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
4/23
Rowans Premium Plan
Time saved = Standard time Actual time taken
Premium Rate =Time saved
Standard time
* 100
Bonus Pay = Premium rate * Normal wages
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
5/23
Example
Standard hours 40 hoursCompletion time 30 hours
Time saved 10 hoursHourly rate Rs. 10 per hour
i. Halsey Plan
ii. Halsey wire planiii. Rowan plan
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
6/23
Solution
Halsey Premium Plan 50%
Normal wages = Actual time taken * wage rate
= 30 * 10 = Rs. 300
Bonus = 50% of time saved x normal wage rate
(50% * 10 hours ) 5 x 10 = 50
Gross wages = 50 + 300
= 350
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
7/23
Effective Wage Rate
Bonus Pay
Actual time given
350 = 11.667 per hours
30
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
8/23
Halsey Wire Premium Plan
Normal wages = Actual time taken * wage rate= 30 * 10 = Rs. 300
30% of time saved x Normal wage Rate
(30% * 10 hours) 3 x 10 = 30300 + 30 = 330
Effective Wage Rate
330 = 11 p/hr30
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
9/23
Rowans Premium Plan
Basic wages = Actual time x normal wage rate
30 x 10 = 300
Time Saved = Standard hours-Actual hours taken
40 - 30 = 10
Time saved/standard time x 100
10 / 40 x 100 = 25%
300+(300 * 25%) = 375
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
10/23
Effective Wage Rate
Gross pay
Actual hours
375 = Rs. 12.50 p/hr
30
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
11/23
Piece Rate Base Premium Plans
Straight Piece Rate plan
Unit produced * Standard rate (p.u)
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
12/23
Example
Hourly wage rate = Rs. 50
One units produced = 30 minutes
Normal production in 1 hour = 2 units50 = 25 P.U
2
Per Piece wages x units manufactured
25 X 15 = 375
Per Piece wages =
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
13/23
Piece Rate With Minimum Guarantee Time Base
Wages
A protections is given to the worker against lowproductivity and low wages caused by factors beyond
their control.
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
14/23
Example
Normal wage Rate Rs. 50 Per hours.Unit Rate Rs. 10 Per unitScenario
1- Actual product (8hours) 20 units2- Actual product (8hours) 50 units
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
15/23
SolutionScenario-1
Time base wage guaranteed 8x50 = 400
Piece rate base wages 30x10 = 300Guaranteed wages given = 400
Scenario-2
Time base wage guarantee 8x50 = 400Piece Rate base wage 50x10 = 500
Wages = 500
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
16/23
Differential Piece Rate Plans
Tailors differential piece rate / Two piece rateplan
Marix differential piece rate.
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
17/23
Tailors Piece Rate Plan
Standard or at par
Below Standard (Quantity wise)
At standard
50 x 12 p.u = 600
Below standard
40 x 10 p.u = 400
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
18/23
Marix Piece Rate
At below (Rs 10 80% standard rate)
At Par (Rs 15 80%-100%)
At above (Rs 12 at above 100%)
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
19/23
Example
Three workers A, B & C
Standard out put 40 units
Piece Rate 10 p.uA produced 25 units
B produced 35 units
C produced 45 units
Calculate the wage rate by Tailor or Marix methods.
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
20/23
Solution
Standard out put 40 units
A&B are below standard
C is above standard units
Tailors Method.
A 25 x 10 = 250
B 35 x 10 = 250C 45 x 12 = 540By MatrixA 25 x10 = 250B 35 x 12 = 420
C 45 x 15 = 765
Below 80%
80%-100%
Above 100%
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
21/23
Contribution By employer
The employer can be provide some benefits toemployee.
Provident Fund.
Group Insurance.
E.O.B.I benefits.
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
22/23
Entries
Employee benefit
To Social Security
To Provident Fund
To E.O.B.I Fund
8/13/2019 Cost & Management Accounting - MGT402 Power Point Slides Lecture 13
23/23
Entries
Employee benefit 10,000
To Social Security 3,000
To Provident Fund 5,000
To E.O.B.I Fund 2,000
Distribution employer benefit
Administration (25%) 2,500
F.O.H Cost (60%) 6,000
Selling Exp (15%) 1,500
To employees benefit 10,000