18
Corporate Presentation

CorporatePresentation - · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Embed Size (px)

Citation preview

Page 1: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Corporate Presentation

Page 2: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

HistoryEmurtel, inc. is a technology leader company which offers its clients Engineering, Installation, Maintenance and Operation in the Telecommunications, Computer Systems, Energy and Electricity , and Industrial and Integral Maintenance fields.

Brief history

• 1998 The company Emurtel, inc. is constituted

• 2000 Emurtel spreads nationally, working for the main Telecommunication Operators of the country

• 2001 Emurtel sets up its civil service department, working for the main Governments, both regional and central, and the most important City Halls

• 2002 First abroad projects are developed, at Lisbon and Oporto.

• 2004 Emurtel joins Grupo ACS, consolidating its organizational structure and its financial solvency, and being even more capable on participating on huge projects at many fields.

• 2006 Constitution of COTA, joining Abertis and Cajamurcia.

• 2010 Turnkey projects development, over new business areas.

2

Page 3: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Economical solvency

• Emurtel held by “Grupo ACS” since 2004– Grupo ACS is a worldwide reference in construction and services activities.

– A group that holds the key sectors for the economy, as infrastructures and energy.

Annual turnover: 17 M€

Liability insurance: 20 M€

3

Page 4: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Public Communications

Networks

•Optical fiber/ Coaxial

•4G, LTE, ..

•Wireless networks (Wifi,

Wimax…)

Private radio communications

•TETRA

•DMR

•DPMR

•Remote control

Buildings installations

•Telephony, VoIP

•Structured Cabling

•Data center

Sanitation

Climate control

Domotics

Legal maintenance

Integral maintenance of

buildings

Hospital facilities

Electrical facilities

•Edification

•Industrial facilities

•Street lightning

•Infrastructures (Airport,

railway, tram, ports, …)

•Maintenance

LV and MV (Low and

medium voltage) lines Aerial and underground

Energetic efficiency•Audits and monitoring

Renewable energies•CHP

•Solar and wind power

Infrastructures

•Data center

•Storage

•Networks (switching and

routing)

Systems

•Servers

•Virtualization

•Storage systems

•Security

Outsourcing•Technologic consultancy

•Helpdesk

•Remote and local

supervision

HORIZONTAL SERVICES-Market research and gathering

-Engineering

-Field supervision and consultancy

-Handover documentation, certifications and quality

control

-Operation and Maintenance

Business Units

Page 5: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success Stories (Teleco)

• Client: RENFE

• Electrical, climate control, telecommunication and computational integral

maintenance of the Renfe southeastern stations (Murcia and Alicante regions);

• Number of affected stations: 27

• Fiber optics works: Interconnections of

different telecom operators with the ISP

(Telefónica, Vodafone, Jazztel, etc…)

• Client: ADIF

• Master agreement for the execution of works on the ADIF fiber optic network in

order to satisfy requests from clients and other urgent interventions.

• Scope: Northeast (Cataluña, Aragón) and East (Albacete, Alicante, Murcia, Madrid,

Toledo, Castellón, Valencia, Teruel) territorial headquarters.

5

Page 6: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success Stories (Teleco)

• Client: NOKIA SIEMENS NETWORK (NSN)

• Construction and installation of radio communication

sites for Telefónica Móviles;

• Scope: Eastern zone (Comunidad Valenciana, Baleares, Murcia) and Eastern

Andalucía (Almería, Granada, Jaén, Málaga)

• Developed projects: LLEM OA+OE, Refarming, extension to 2nd carrier, UMTS900,

900 Evolution.

• Interventions carried out over more than 800 locations.

• Maintenance of Orange Transformation and High Voltage sites, at Madrid,

Castilla-La Mancha, Andalucía, Murcia and C. Valenciana.

6

Page 7: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success Stories (Teleco)

• Client: CABLEUROPA (ONO)

• Outside Plant construction, conservation and maintenance.

• Scope: Comunidad de Madrid, Castilla-La Mancha, Región de Murcia and

Comunidad Valenciana.

• Works at railways with pilot presence are included

• Dimensions of the maintained network:

– 12,000 communication nodes

– Serving to 6,000,000 households

– Over 10,000 km of optic fiber/coaxial/copper network

7

Page 8: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success Stories (Teleco)

• Client: Murcia City Hall

• Design, construction, installation and maintenance of the Murcia Local Police Tetra communications network.

• Scope: Municipality of Murcia, 882 sq km

• Including 700 mobile and portable terminales,

Backbone network, Control Center.

• Client: Valencia City Hall

• WiMax network for the fire department, termographic cameras at Albufera Park for the fire control, WiFi at fire stations,…

• Supply and maintenance of the Tetra terminals for the Valencia firefighters internal communication.

8

Page 9: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success Stories (Systems)

• Client: SIEMENS

• ONE Proyect: Supply, installation and maintenance of the new Cartagena and Mar Menor Hospitals ICTinfrastructure.

• Amount: 6,300,000 € (4 years)

• Project description:

– Turnover project.

– Systems: Replicated double data center,

virtualization, FCoE, integrated box (NAS/SAN),

single management.

– Employment: +2000 permanent and mobile

jobs, VDI (60%), network impression.

– Integral maintenance: SLAs, 24x7, ITIL, dedicated resources, monitoring, 3 suport levels.

• References:

– @Aslan 2011 Award as a ‘Innovative success stories at public administrations’.

9

Page 10: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success Stories (Systems)

• Client: Consejería Economía y Hacienda (CARM)

• Project: Quality Assurance Service for the Corporate Communications of the CARM

• Amount: 800,000 € (4 years)

• Project Description:

– Billing control for all of the CARM telecommunications providers

– Economic management and distribution of the services.

– Evolution and continuous improvement of services.

– Management of user demands.

– Monitoring compliance with SLAs.

– Issue tracking.

– Implementation of processes based on managed services methodologies (ITIL).

– Development of Scorecards.

• References:

– Emurtel monitors CARM contracts of 50 M€.

– IT Governance model has been implemented.

10

Page 11: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success Stories (Systems)

• Client: Consejería de Educación (Junta de Andalucía)

• ITC 2.0 School Project: Supply, installation and maintenances of ITC infrastructure

at schools for the Junta de Andalucía.

• Amount: 6,000,000 € (2 years)

• Project Description:

– Audiovisual systems

– LAN/WiFi networks deployment

– Use of PLC technology.

• References:

– Emurtel is a leader in implementing ICT in schools, participating in similar

projects in other autonomous regions.

11

Page 12: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

12

Success Stories (Energy)

• THERMAL SOLAR INSTALLATION WORKS FOR ACS (SANITARY HOT WATER) AND INDOOR POOL HEATING

• Client: PICASSENT CITY HALL

• Amount: 191,060.55 €

• Project Description:

– Installation of 382 sq m of solar panels for a total of 230.34 kW over the

municipal indoor swimming pool.

• EMURTEL developed theproject and installation of thesolar modules at the rooftop,and also pump room, including a5,000 liters sanitary hot watertank and pools exchangers, all ofit controlled by a solar unit.

Page 13: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

13

Success Stories (Energy)

• 15 kWp PHOTOVOLTAIC INSTALLATION OVER THE ROOFTOP OF THE MUNICIPAL AUDITORIUM

• Client: SEGORBE CITY HALL

• Amount: 59,463.95 €

• Project Description:

– Installation of 54 280Wp photovoltaic modules over the metal structure of

the Municipal Auditorium rooftop

– Total installed power: 15 kWp• EMURTEL is responsible forrunning the installations, so theproject is reviewed including thenecessary safety and efficiencyimprovements for the properoperation of the facility.• As an improvement, thepreventive and correctivemaintenance of the facility isincluded, as well as the energeticcontrol of the performance.

Page 14: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

14

Success Stories (Energy)

• INSTALLATION OF THREE GENERATORS FOR EMERGENCIES AT THE UNIVERSITY GENERAL HOSPITAL “MORALES MESEGUER”

• Client: COMUNIDAD AUTÓNOMA DE LA REGIÓN DE MURCIA

< SERVICIO MURCIANO DE SALUD >

• Amount: 215,095.55 €

• Project Description:

– Installation of 3 500kVA generators, for parallel operation.

– Total installed power: 1,500 kVA

• EMURTEL is responsible forimplementing the worksurfaces,trunking, prefabricated trunking andconnections, smokestacks andindoor reforms, providing itsexpertise in the optimization ofsystems for optimal performanceand durability.

Page 15: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Success stories (Industry)

15

• SPORTS PALACE OF CARTAGENA

• Client: COMUNIDAD AUTÓNOMA DE LA REGIÓN DE MURCIA and AYUNT. DE CARTAGENA

• Amount: 18,453,531.85 €

• Project Description:

– Turnover project awarded to EMURTEL in temporary consortium with DRAGADOS

– Over 20,000 sq m of built area including: Indoor Soccer Track for 5,000 viewers, auxiliary indoor

soccer for 700 viewers, semiolympic Swimming Pool for 500 viewers, and Department of Sports of

Cartagena City Hall.

– EMURTEL is responsible for the implementation of the facilities, so the project was designed in order

to implement de following energetic efficiency measures:

• Electric installation: Automation control of the lighting

installation, installation of analyzers in the main draw,

high efficiency lighting, reduction of losses in wiring,

installation of capacitors for reactive, installation of

variators on pumps.

• Climate control installation: Heat recovery at chiller

plants; entalphy recovery at climate units, Free-cooling

at climate controls and Pool, integral control system with

centralized management using SCADA, Integration of the

heat and cold climate facilities, sanitary hot water and

pool in the same circuit in order to maximize energy

sources.

Page 16: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

16

Success Stories (Industry)• EXPANSION OF THE HOSPITAL VIRGEN DEL CASTILLO AT YECLA

• Client: COMUNIDAD AUTÓNOMA DE LA REGIÓN DE MURCIA

< SERVICIO MURCIANO DE SALUD >

• Amount: 5,031,464.66 €

• Project Description:

– Expansion project, phase II, awarded to EMURTEL in consortium with DRAGADOS

– 6,887 sq m of built reformed or expanded areas, including: Labs, OperatingRooms, consultations, Radiology, Access Blocks, Urbanization, …

• EMURTEL is responsible for the implementation of the facilities, climate control, centralized management, reform in the production of boilers and chillers, low voltage, reform of MLVS, Fire Protection, PA, Voice and Data, Plumbing, sanitation, Urbanization, Barriers, Pneumatic Transport, Medical Gases

Page 17: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

17

Success Stories (Industry)

• INSTALLATION OF THE CLIMATE CONTROL ON THE SIMULATOR PLATFORM OF THE S-80 SUBMARINE AT CARTAGENA

• Client: SERVICIO MILITAR DE CONSTRUCCIONES• Amount: 340,000 €• Project Description:

– Expansion Project of the School of Submarine Simulators for the new S-80

– 1,082.23 sq m of reformed or expanded built area, including: Offices, Classrooms, Tactical Instructors Facilities and Platform, Simulators Rooms, Electronic Equipment Rooms,…

• EMURTEL developed the Project and theinstallation of the climate control and thecentral control of the reformed building andthe new one. It was an automated centralclimate control and the installation of theautonomous units for the simulator roomsand electronic equipment.

Page 18: CorporatePresentation -  · PDF fileCorporatePresentation. History ... • 2001 Emurtelsets up its civil service department, ... • ONE Proyect: Supply,

Certifications

18

ICT Service Management

Quality Management

Environmental Management