Corporate Presentation J.P. Morgan’s Asia Yield 1x1 Forum in Japan
September 17-18, 2015
This presentation was made from the analysis of reliable information in order to assist investment community
to better understand the company's financial status and operation. It also supports the "Good Corporate
Governance Project" of the Securities and Exchange Commission (SEC).
However, the information within this presentation has been derived from the existing factors in the present
time. Therefore, the forward-looking information on this presentation may not occur in the future if the
aforementioned factors or situations are changed. Investors are, however, required to use their own discretion
regarding the use of information contained in this presentation for any purpose.
For further information, please contact Investor Relations Section of the Electricity Generating Public Company
Limited (EGCO) at Tel: (662) 998-5145-8 or Email: [email protected]
2
3
Thailand Electricity’s Overview
EGCO Group’s Overview
Financial Performances
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
4 Source: EPPO, ERC and EGAT
EGAT Electricity Generating Authority of Thailand IPP Independent Power Producer
MEA Metropolitan Electricity Authority SPP Small Power Producer
PEA Provincial Electricity Authority VSPP Very Small Power Producer
ERC Energy Regulatory Commission IMPORT Purchasing from Laos & Malaysia
EGAT Generators Transparent transfer pricing
IPPs
END User
Transmission System Owner (TSOw)
MEA
Industrial
User
PEA
IMPORT SPPs
Re
gula
tors
(ER
C)
Single Buyer Transmission
Network System Operator (NSO)
VSPPs
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
5
Classified by Producer Classified by Fuel type
As of July 2015, Thailand’s Power Installed Capacity was 36,171.03 MW.
EGAT : 15,492 MW SPP : 3,816 MW
IPP : 13,967 MW Import : 2,896 MW
Natural Gas : 24,938 MW Coal : 4,556 MW
Hydro : 6,002 MW Others* : 675 MW
*OTHERS = Fuel Oil, Diesel, Renewable Source: EGAT
43%
38%
11%
8%
EGAT IPP SPP IMPORT
69%
17%
12%
2%
NATURAL GAS HYDRO COAL OTHERS*
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
15,000
20,000
25,000
30,000
January Februaary March April May June July August September October November December
2010 2011 2012 2013 2014 2015
6
MW
Source: EGAT
1.5% 26,942.10 MW (April 23, 2014)
26,049.50 MW (July 2, 2015)
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
27,345.80 MW (June 11, 2015)
7
On May 14, 2015, The National Energy Policy Council approved Thailand’s Power Development Plan (PDP 2015). The Plan was endorsed by the Cabinet on June 30, 2015.
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
To reduce gas-fired portion from 65% to 30-40% in 2036
To increase coal-fired portion from
20% to 25%
To increase renewable
portion from 8% to 20-25%
To set Reserve Margin at least 15% of peak electricity
demand.
The average tariff rate over PDP 2015 is 4.587 Baht/kWh.
At the end of 2036, Thailand’s power installed capacity would
be up to 70.4 GW.
8
Total capacity (as of December 2014)
37,612 MW
Total additional capacity during 2015 - 2036
57,459 MW
Total retired capacity during 2015 - 2036
-24,736 MW
Grand total capacity (at the end of 2036)
70,335 MW
The total generating capacity during 2015 – 2036 can be summarized as the following:
• Gas-fired power plants 17,478 MW
• Renewable power plants 12,205 MW
• Import from other countries 11,016 MW
• Coal-fired power plants 7,390 MW
• Cogeneration power plants 4,119 MW
• Pumped Storage Hydro power plants 2,101 MW
• Nuclear power plants 2,000 MW
• Combined Cycle power plants 1,250 MW
57,459 MW
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
9
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
Thailand Electricity’s Overview
EGCO Group’s Overview
Financial Performances
10
The first Independent Power Producer (IPP) in
Thailand established on May 12, 1992 through
a spin off by EGAT.
Listed on the Stock Exchange of Thailand
on January 16, 1995
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
EGAT 25.41%
TEPDIA 23.94%
Thai Investors
12.48%
Foreign Investors
20.88%
NVDR 17.29%
TEPCO 50%
Mitsubishi 50%
NDF* 50.11%
Others 49.89%
* Nuclear Damage Liability Facilitation Fund
As of September 4, 2015
11
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
12
BOD
President
1 seat
EGAT
4 seats
TEPDIA
4 seats
Independent Directors
6 seats
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
13
EGCO (President)
EGAT
Mitsubishi Corporation TEPCO EGAT
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
Power Business
To develop and acquire power plants with multiple fuel types.
Service Business
To provide operation, maintenance, engineering and construction services to power plants and other industries.
Other Business
To invest in water businesses that supply raw and tap water and the integrated energy business.
14
EGCO Group’s business lines can be categorized into 3 business groups:
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
EGCO Contract
Shares Years
IPP
Thermal 20 Jun 19, 1996 Jun 2016
Combined Cycle 20 Jun 19, 1996 Jun 2016
GPG (KK2) Saraburi Natural Gas Combined Cycle 50.00% 1,468.00 734.00 25 May 5, 2007 & Mar 1, 2008 May 2032 & Mar 2033
BLCP Rayong Coal Thermal 50.00% 1,346.50 673.25 25 Oct 2006 & Feb 2007 Oct 2031 & Feb 2032
2,155.45
SPP
EGCO Cogen Rayong Natural Gas Cogeneration 80.00% 112.18 89.74 21 Jan 28, 2003 Jan 2024
GCC Saraburi Natural Gas Cogeneration 50.00% 108.63 54.32 21 Sep 3, 1998 Sep 2019
NKCC Saraburi Natural Gas Cogeneration 50.00% 121.30 60.65 21 Oct 12, 2000 Oct 2021
SCC Samut Prakan Natural Gas Cogeneration 50.00% 114.45 57.23 21 Sep 23, 1999 Sep 2020
GYG Yala Parawood Thermal 50.00% 20.20 10.10 25 Nov 28, 2006 Nov 2031
272.04
Renewable (Domestic)
NED Lop Buri Solar PV Solar PP 66.67% 63.00 42.00 10 Dec 22, 2011 & May 2, 2013 Dec 2021 & May 2023
SPP2 Saraburi Solar PV Solar PP 100.00% 8.00 8.00 10 May 2, 2012 May 2022
SPP3 Si Sa Ket Solar PV Solar PP 100.00% 8.00 8.00 10 Feb 21, 2012 Feb 2022
SPP4 Si Sa Ket / Ubon Ratchathani Solar PV Solar PP 100.00% 6.00 6.00 10 Jan 24, 2012 Jan 2022
SPP5 Roi Et Solar PV Solar PP 100.00% 8.00 8.00 10 Jun 22, 2012 Jun 2022
GPSNakhon Sawan /
Chai Nat / PhetchabunSolar PV Solar PP 60.00% 26.00 15.60 10 Mar 1-5, 2012 & Feb 1, 2013 Mar 2022 & Feb 2023
TWF Chaiyaphum Wind Wind Turbine 90.00% 6.90 6.21 10 Jul 18, 2013 Jul 2023
Roi-Et Green Roi Et Rice Husk Thermal 70.30% 8.80 6.19 21 May 29, 2003 May 2024
SolarcoNakorn Pathom / Suphan
Buri Solar PV Solar PP 49.00% 57.00 27.93 10 Nov 18, 2013 & Dec 16, 2013 Dec 2023
GIDEC Songkhla Waste Thermal 50.00% 6.50 3.25 10 Dec 11, 2014 Dec 2024
131.18
Overseas
QPL Philippines Coal Thermal 98.00% 460.00 450.80 25 May 30, 2000 Jun 2025
NTPC (NT2) Laos Hydro Hydro PP 35.00% 1,023.00 358.05 25 Apr 30, 2010 Apr 2035
MPPCL Philiphines Coal Thermal 40.95% 589.00 241.17 3-16 Jun 1998 & Dec 1998 Jan 2022 (Meralco)
SEG Indonesia Geothermal Thermal 20.00% 227.00 45.40 30 Jun 2000 & Mar 2009 Jun 2030 & Mar 2039
BRWF Australia Wind Wind Turbine 100.00% 113.00 113.00 15 Nov 28, 2014 Nov 2029
1,208.42
3,767.09
Total Renewable
Total Operating Projects
Total Overseas
748.20
CODPlant TypeContracted
Capacity (MW)
Attrib. Capacity
(MWe)
Total SPPs
ExpiredPower Plant
100.00%Natural Gas
Total IPPs
KEGCO (KN2&3)
Province/Country Fuel Type
Nakhon Si Thammarat 748.20
15
Currently, EGCO Group’s portfolio comprises of 23 operating power plants, totaling contracted capacity 3,767.09 MWe.
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
16
Currently, EGCO Group’s portfolio consists of 3 under construction projects and 4 under development projects, totaling contracted
capacity 1,720.95 MWe.
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
EGCO Contract
Shares Years
Under Construction
KEGCO (KN4) Nakhon Si Thammarat Natural Gas Combined Cycle 100.00% 930.00 930.00 25 Jun 2016 Jun 2041
XPCL Laos Hydro Hydro PP 12.50% 1,280.00 160.00 29 Oct 2019 Oct 2048
CWF Chaiyaphum Wind Wind Turbine 90.00% 90.00 81.00 25 Dec 2016 Dec 2041
1,171.00
Under Development
TP Cogen Ratchaburi Natural Gas Cogeneration 100.00% 113.00 113.00 25 Oct 2017 Oct 2042
SK Cogen Ratchaburi Natural Gas Cogeneration 100.00% 107.00 107.00 25 Oct 2017 Oct 2042
TJ Cogen Pathum Thani Natural Gas Cogeneration 100.00% 107.00 107.00 25 Jun 2017 Jun 2042
SBPL Philippines Coal Thermal 49.00% 455.00 222.95 20 Q1/2019 Q1/2039
549.95
1,720.95
Plant Type
Total Under Construction and Under Development Projects
Total Under Construction
Total Under Development
Contracted
Capacity (MW)
Attrib. Capacity
(MWe) COD ExpiredPower Plant Province/Country Fuel Type
17
KEGCO (KN2&3), GPG (KK2),
EGCO Cogen, GCC, NKCC, SCC
Total 1,744 MW
Roi-Et Green, NED, SPP2,
SPP3, SPP4, SPP5, GYG,
GPS, TWF, SEG Solarco,
GIDEC, BRWF
Total 300 MW
BLCP, QPL, MPPCL
Total 1,365 MW
NTPC (NT2)
Total 358 MW
46%
36%
10% 8%
Natural Gas Coal Hydro Renewable
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
As of September 11, 2015
57%
7%
4%
32%
IPP SPP Renewable (Domestic) Oversea
18
Quezon, NTPC (NT2), MPPCL, SEG, BRWF
Total 1,208 MW
KEGCO (KN2&3), GPG (KK2),
BLCP
Total 2,155 MW
NED, SPP2, SPP3, SPP4, SPP5, GPS, TWF, Solarco, GIDEC,
Roi-Et Green
Total 131 MW
EGCO Cogen, GCC, NKCC, SCC, GYG
Total 272 MW
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
As of September 11, 2015
61% 33%
5% 1%
Thailand Philippines Australia Indonesia
19
Thailand 52% Laos 9% (NTPC, XPCL)
As of July 30, 2015
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
XPCL
Laos QPL Quezon
BRWF
New South Wales
AUSTRALIA
INDONESIA
PHILIPPINES
MME
Muara Enim
Asia Pacific Region
THAILAND
MPPCL Zambales
20
NTPC
Laos
SEG
West Java
SBPL Quezon
21
Saraburi GCC; Gas
NKCC; Gas GPG (KK2); Gas
SPP2; Solar
Yala GYG; Parawood
Nakhon Sri Thammarat KEGCO (KN2&3); Gas
KEGCO (KN4); Gas Samutprakarn SCC; Gas
Rayong
BLCP; Coal
EGCO Cogen; Gas
Roi-Et Roi-Et Green; Rice Husk SPP5; Solar
Srisaket SPP3; Solar SPP4; Solar
Ratchaburi TP Cogen; Gas SK Cogen; Gas Pathumthani
TJ Cogen; Gas
Chaiyaphum TWF; Wind Farm CWF; Wind Farm
Nakhon Pathom/Suphanburi Solarco; Solar
Nakhon Sawan GPS (Ta Keet); Solar GPS (Ta Sang); Solar
Lopburi NED; Solar
Phetchabun GPS (Bueng Sam Phan); Solar
Songkhla GIDEC; Waste
Chai Nat GPS (Dong Korn); Solar
● IPP
● SPP
● Renewable
2020 2019 2018 2017 2016 2015
22
Under Development Projects
Under Construction Projects
KEGCO (KN4) (Gas)
CWF (Wind)
XPCL (Hydro)
TP Cogen (Gas)
SK Cogen (Gas)
TJ Cogen (Gas)
SBPL (Coal)
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
-1,500
-1,000
-500
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
5,500
6,000
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
23
1994: 1,232 MW
RYPP
(1,232)
(749)
(55) (75)
KEGCO (KN1) Retired
RYPP Retired
KEGCO (KN2&3) Retired
GCC Retired
CONAL: WMPC (19), SPPC (10) Divestment
KEGCO (KN1,2&3) GCC
SCC Conal - WMPC Conal - SPPC
NKCC
EGCO Cogen Roi-Et Green
BLCP GYG
GPG (KK2) QPL
NTPC (NT2)
NED
SPP2-5 GPS
TWF Solarco
MPPCL SEG BRWF GIDEC
CWF KEGCO (KN4)
TP Cogen SK Cogen TJ Cocen
XPCL SBPL
(29)
MWe
NED (Add.)
Thai Market EGCO Group’s Overview Financial Performance
4,685 MWe
Currently, EGCO Group’s other business portfolio comprises 5 companies:
Company Business Type
EGCO Engineering and Service Co., Ltd. (ESCO)
Pearl Energy Philippines Operating Inc. (PEPOI)
Quezon Management Services Inc. (QMS)
Eastern Water Resources Development and Management Plc. (EASTW)
Manambang Muara Enim Co., Ltd. (MME)
O&M
O&M
Management Service
Water
Coal Mining
24
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
25
Operate power plants to achieve optimum efficiency and manage projects under construction to achieve COD on time
Acquire operating assets to realize quick earning
Boost long-term earning by acquisition of greenfield projects and/or expansion of existing projects
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
26
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
Thailand Electricity’s Overview
EGCO Group’s Overview
Financial Performances
(84)
Q2/2014 Q2/2015
Unit: Million Baht
MD&A +31 MB or +1 %
2,597
2,471
1,397
Net Profit before FX, DT and TFRIC 4&12
FX
Deferred Tax
TFRIC 4&12
(1,191)
27
2,566
13
(234)
126
75
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
(135)
6M/2014 6M/2015
Unit: Million Baht
MD&A -536 MB or -12 %
3,899
4,956
2,930
Net Profit before FX, DT and TFRIC 4&12
FX
Deferred Tax
TFRIC 4&12
(1,077)
28
4,435
54
173
294
243
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
Note: Excluding EGCO
Quezon 1,113 MB
BLCP 1,220 MB
Renewable (Domestic) 943 MB
NTPC 693 MB
MPPCL 479 MB
SPP 194 MB (GEC, EGCO Cogen)
29
KK2 606 MB
Other Business 130 MB, 2% (Egcom Tara, ESCO, MME) Renewable (Overseas)
42 MB, 1%
22%
20%
17%
13%
11%
9%
3%
KEGCO 123 MB, 2%
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
2012 2013 2014 2011
11,240
7,164
Unit: Million Baht
7,667
30
Gain from Combination
4,310 MB
6,930
4,990
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
USD 1,380 M
THB 19,097 M
JPY 17,194 M
Total Outstanding (Baht equivalence)
THB 74,040 M
Total Outstanding
As of June 30, 2015
USD 1,432 M
THB 22,899 M
JPY 17,194 M
THB 81,741 M
Total Outstanding
As of March 31, 2015
AUD 244 M AUD 249 M
31
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
Times (X)
0
0.2
0.4
1.2
0.8
1.0
0.6
1.6
1.4
2010 2011 2012 2013 2014 Q2/2015
EGCO
EGCO +
Subsidiaries
Debt 95,046 MB
Equity 76,195 MB
Equity 57,261 MB
Debt 44,453 MB
EGCO + Subsidiaries EGCO
32
0.21 0.25
0.70
0.87
1.17
1.25
0.17 0.23
0.41 0.44
0.78 0.78
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
-
1.00
2.00
3.00
4.00
5.00
6.00
7.00
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
1.00 1.25 1.25 1.50 1.50 2.00 2.25 2.50 2.50 2.50 2.50 2.75 2.75 3.00 3.00 1.25
1.25 1.50 1.50 1.75
2.00
2.50 2.50 2.75 2.75 2.75
3.25 3.25 3.25
Baht/Share
33
6.00
5.25 5.25 5.25
4.75
4.00
3.25 3.00
2.75 2.50
2.25
6.00
5.00
6.25
Interim Payment Second Payment
Note : BOD in the 20th August’s Meeting approved the appropriation of net profit from the first-half year operation of 2015 at 3.00 baht for the interim dividend payment which will be paid on September 18, 2015.
Thailand Electricity’s Overview EGCO Group’s Overview Financial Performances
THANK YOU
Divestment of EGCOM Tara
Co., Ltd. (EGCOM Tara) Sale all ESCO’s shares in EGCOM
Tara (74.19% of shares in EGCOM Tara) to Universal Utility Co., Ltd, a wholly owned subsidiary of East Water .
The divestment of EGCOM Tara was completed on August 31, 2015.
Type : Tap Water Producer
Location : Ratchaburi and Samut
Songkram Province
Contractual Type : BOO Term of Contract : 30 years from
April 7, 2001
with PWA
36
Khanom Power Plant Project Unit 4 (KN4)
Overall Progress : As of July 2015, the overall progress was 93.30%.
Details of Construction work :
• All major equipment were on base.
• Related piping and electrical works are being conducted.
Type : Combined Cycle Power Plant
Location : Khanom, Nakhon Si Thammarat
Shareholders : EGCO 100%
SCOD : June 19, 2016
Contractual Type : IPP
Contracted Capacity : 930 MW
PPA : 25 years with EGAT
37
Xayaburi Power Plant Project
(XPCL) Overall Progress : As of June 2015,
the overall progress was 46.43%.
Details of Construction work :
• Construction work of Navigation Lock Control Building is ongoing.
• Excavation for Powerhouse and Fish Pass is ongoing.
Type : Hydro Power Plant (Run of River)
Location : Xayaburi District, Laos PDR
Shareholders : EGCO 12.5%, CK 30%, EDL 20%, BECL 7.5%, GPSC 25%, PT Construction and Irrigation Co., Ltd. 5%
SCOD : October 29, 2019
Contractual Type : IPP
Contracted Capacity : 1,220 MW with EGAT and 60 MW with EDL
PPA : 29 years with EGAT and EDL
38
Chaiyaphum Wind Farm
(CWF) Overall Progress : As of July 2015,
the overall progress was 16.75%.
• Details of Construction work :
• Excavation, lean concrete work and anchor bolt installation for WTG foundations are ongoing.
Type : Wind Power Plant
Location : Sub Yai, Chaiyaphum
Shareholders : EGCO 90%, PVI Group 10%
SCOD : December 1, 2016
Contractual Type : SPP Non-Firm
Contracted Capacity : 90 MW with EGAT
Adder : 3.50 Baht/kWh for 10 years
39
TJ Cogeneration Project
(TJ Cogen) EPC Contract : EPC signing was
executed on April 1, 2015.
Financing : Financial Close is expected to be achieved in November 2015.
Others : EIA for natural gas pipeline and EIA for power plant were approved on July 31, 2014 and February 5, 2015, respectively. BOI certification issuance is in process.
Type : Cogeneration Power Plant
Location : Klong Luang, Pathum Thani
Shareholders : EGCO 100%
SCOD : June 1, 2017
Contractual Type : SPP Cogeneration
Installed Capacity : 110 MW
Contracted Capacity : 90 MW with EGAT
Contracted Capacity with IU : 17 MW and 10 t/h of steam
40
TP & SK Cogeneration
Project (TP Cogen &
SK Cogen)
EPC Contract : EPC Contract was signed on November 1, 2014.
Financing : Financial Close is expected to be achieved in September 2015.
Others : EIA for natural gas pipeline and EIA for power plant were approved on March 20, 2014 and March 19, 2015, respectively . BOI certification is in process.
Type : Cogeneration Power Plant
Location : Ban Pong, Ratchaburi
Shareholders : EGCO 100%
SCOD : October 1, 2017
Contractual Type : SPP Cogeneration
Installed Capacity : 125 MW each
Contracted Capacity : 90 MW each with EGAT
Contracted Capacity with IU : TP Cogen 23 MW and 40 t/h of steam SK Cogen 17 MW and 60 t/h of steam
41
San Buenaventura Power Co., Ltd.
(SBPL) EPC : EPC contract was signed on
October 8, 2014.
Financing : Financial Close is expected to be achieved in Q3/2015.
Others : On May 20, 2015, the ERC of Philippines approved the Power Supply Agreement (PSA) between SBPL and MERALCO.
Type : Coal-Fired Power Plant
Technology : Supercritical Boiler Location : Quezon Province, Luzon, The Philippines
Shareholders : EGCO 49%, MPG 51%
SCOD : March 1, 2019
Contractual Type : IPP
Installed Capacity : 500 MW
Contracted Capacity : 455 MW with Meralco
PSA Term : 20 years with 5-year extension
42
43 43
44
Currently, EGCO Group’s portfolio comprises of 9 domestic renewable power plants and 2 oversea renewable power plants, totaling
contracted capacity 283.39 MWe.
EGCO Contract
Shares Years
Renewable (Domestic)
NED Lop Buri Solar PV Solar PP 66.67% 63.00 42.00 10 Dec 22, 2011 & May 2, 2013 Dec 2021 & May 2023
SPP2 Saraburi Solar PV Solar PP 100.00% 8.00 8.00 10 May 2, 2012 May 2022
SPP3 Si Sa Ket Solar PV Solar PP 100.00% 8.00 8.00 10 Feb 21, 2012 Feb 2022
SPP4 Si Sa Ket / Ubon Ratchathani Solar PV Solar PP 100.00% 6.00 6.00 10 Jan 24, 2012 Jan 2022
SPP5 Roi Et Solar PV Solar PP 100.00% 8.00 8.00 10 Jun 22, 2012 Jun 2022
GPSNakhon Sawan /
Chai Nat / PhetchabunSolar PV Solar PP 60.00% 26.00 15.60 10 Mar 1-5, 2012 & Feb 1, 2013 Mar 2022 & Feb 2023
TWF Chaiyaphum Wind Wind Turbine 90.00% 6.90 6.21 10 Jul 18, 2013 Jul 2023
Roi-Et Green Roi Et Rice Husk Thermal 70.30% 8.80 6.19 21 May 29, 2003 May 2024
Solarco Nakorn Pathom / Suphan Buri Solar PV Solar PP 49.00% 57.00 27.93 10 Nov 18, 2013 & Dec 16, 2013 Dec 2023
GIDEC Songkhla Waste Thermal 50.00% 6.50 3.25 10 Dec 11, 2014 Dec 2024
131.18
Renewable (Overseas)
SEG Indonesia Geothermal Thermal 20.00% 227.00 45.40 30 Jun 2000 & Mar 2009 Jun 2030 & Mar 2039
BRWF Australia Wind Wind Turbine 100.00% 113.00 113.00 15 Nov 28, 2014 Nov 2029
158.40
289.58
Total Renewable (Domestic)
Total Renewable (Overseas)
Total Renewable
Power Plant Province/Country Fuel Type Plant TypeContracted Capacity
(MW)
Attrib. Capacity
(MWe) COD Expired
Muara Enim MME; Coal Mining Project
45
Rayong ESCO; O&M and Engineering Services
Chachoengsao
East Water; Pipe Water Generating Chon Buri
Rayong
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
3M 6M
1,869
4,435
1,299
3,899
2014 2015
Million Baht
46
47
# : Unit : Actual in 6M/2014
: Actual in 6M/2015 D : Days
Jan Feb Mar Power Plant
QPL
MPPCL
(46D)
(7D) (43D)
#2
(17D)
(12D) (21D)
BLCP (9D) (22D)
Apr May Jun
#1 #1
#1
#1 #2
#2 (19D)