Corporate Briefing
2012
Resources for Growth
MALAYSIAN RESOURCES CORPORATION BERHAD
Page 2
Contents:
1) MRCB Group of Companies
2) Property Development
3) Engineering & Construction
4) Infrastructure - Environmental Projects
5) Recurring Income Business Divisions: Toll Concessions, Property Investments and Building Facilities Management
Page 3
Top 3 Shareholders as at 29 June 2012
Top 3 Shareholders No. of shares %
Employees' Provident Fund 585,070,800 42.20%
Public Bank's Fund Management 149,821,000 10.81%
Lembaga Tabung Haji 61,867,273 4.46%
Total paid-up share capital 1,386,467,043 shares
Number of shareholders 36,991
Page 4
Consensus Revenues & Earnings Forecasts Net Profit 2012 2013 2014
Hwang DBS 78.0 102.0 113
Affin Securities 75.9 110.9 112.0
RHB Securities 87.4 122.7 165.8
OSK Research 85.0 105.3
CIMB Securities 78.9 100.1 122.7
KAF 83.2 78.0 153.0
Kenanga 109.2 116.2
UOB Kay Hian 83.0 187.0 205
CLSA 82.0 99.0 114.0
Hong Leong 69.4 162.2 251.2
AM Research 80.0 88.3 99.0
MIDF 85.0
SJ Securities 80.0
Average 82.8 115.6 148.4
Revenue 2012 2013 2014
Hwang DBS 1,374.0 1,600.0 1,588.0
Affin Securities 1,714.2 1,717.4 1,720.8
RHB Securities 1,507.7 1,905.6 2,748.1
OSK Research 1,213.1 1,522.3 1,660.6
CIMB Securities 1,757.0 2,006.0 2,293.0
KAF 1,489.8 1,385.6 2,009.7
Kenanga 1,305.5 1,281.3
UOB Kay Hian 1,749.0 1,969.0 2,093.0
CLSA 1,552.0 1,671.0 1,759.0
Hong Leong 1,637.5 1,970.0 2,327.0
AM Research 1,363.2 1,405.3 1,413.6
MIDF 1,897.3
SJ Securities 1,470.5
Average 1,540.8 1,675.8 1,961.3
Recommendation Call Target RM Date
Hwang DBS Buy 2.70 7-May-12
Affin Securities Buy 2.71 10-Feb-12
RHB Securities Trading Buy 2.02 18-Jun-12
OSK Research Trading Buy 2.38 23-May-12
CIMB Securities Trading Buy 1.90 23-May-12
KAF Buy 2.36 23-May-12
Kenanga Outperform 2.71 23-May-12
UOB Kay Hian Buy 2.03 18-Jun-12
CLSA Sell 1.80 9-Feb-12
Hong Leong Buy 2.50 25-Jun-12
AM Research Hold 2.30 23-May-12
MIDF Neutral 2.43 10-Feb-12
SJ Securities Neutral 2.45 15-Feb-12
All Calls 9 Buys; 3 Holds; 1 Sell 2.33
Section 1
MRCB Group of Companies
Page 6
A Focused Property Developer and Infrastructure / Construction
Group of Companies
Engineering &
Construction
Environment &
Infrastructure Property
Development
Buildings and high rise
Civil & Infra works
Residential Development
Energy-Power Network
Transmission
Coastal
engineering
River
rehabilitation
Urban high rise
residential &
commercial
developments
Transport hub
Township
Building Services
IT Services &
Infrastructure
Telecommunications
& Real Estate
Intelligent Systems
Facilities Management
Car Park Services
Industrial shop offices
Toll
concessions
&
expressways
Building Maintenance
Property Development
Section 2
Kuala Lumpur Sentral Development
Bandar Seri Iskandar
Senawang Sentral
Penang Sentral Development
Jalan Kia Peng/Stonor Residential Development
Batu Ferringhi, Penang
Selbourne 2
Setapak
Lot F
Page 8
Property
Development
Kuala Lumpur Sentral
Bandar Seri Iskandar
Senawang Sentral
Investment
Properties
Penang Sentral Development**
Platinum Sentral
Kompleks Sentral
Sooka Sentral
Plaza Alam Sentral
Lot G - Nu Sentral*
Lot 348 – Shell Tower
& Ascott Residences*
* Under construction
** To be developed
Jalan Kia Peng Residential**
Batu Ferringhi, Penang**
MRCB Land
Selborne 2**
Setapak**
Lot F**
Page 9
KUALA LUMPUR SENTRAL- An Integrated Development Within A World-Class Transportation Hub
TM
• The exclusive urban centre built around
Malaysia’s largest transit hub, offering global
connectivity, and business convenience.
• 72 acres development - city within a city concept,
at the nucleus is the Stesen Sentral Kuala Lumpur.
• Development phased until 2018, Kuala Lumpur
Sentral is a world-class city valued at a massive
RM15 billion.
• The development comprise of Stesen Sentral,
corporate office towers and business suites,
international hotels, luxury condominiums, a
shopping mall and lifestyle facilities.
• Stesen Sentral’s integrated rail network and city
air terminal facilities provide unparalleled
connectivity.
• The largest commercial development in Kuala
Lumpur today and enjoys close to 100%
occupancy.
• Awarded Malaysia’s first MSC Cybercentre status
in 2006 with tax advantages, full broadband
infrastructure, fiber optics connectivity and an
independent power supply.
• Completed RM4 billion worth of development, RM8
billion development value in progress and RM3 billion
value for future development.
Page 10
TM
Page 11
Kuala Lumpur Sentral Development Update
TM
Lot
GFA (sq ft)
(w/o car parks) NFA (sq ft)
Est GDV
RMm Exp Completion
MRCB's equity
interest
% Dev
Completion @
31 MAR 2012
COMPLETED
Investment Properties
Platinum Sentral E 937,891 533,082 700 2011 100.0% 100.0%
UNDER DEVELOPMENT
Investment Properties
Nu Sentral Retail Mall G, Parcel A 1,145,471 650,000 1,050 2012 51.0% 36.2%
348 Sentral:
Shell Tower Lot 348 800,231 542,358 728 2012 100.0% 44.9%
Ascott Residences Lot 348 215,017 134,561 180 2012 100.0% 44.9%
For Sale
2 Office Towers G, Parcel C 840,698 767,335 706 2012 60.0% 69.9%
Aloft Hotel G, Parcel D 348,700 309,898 217 2012 60.0% 69.9%
Q Sentral Office Tower B 1,449,749 1,003,677 1,228 2015 65.7% 14.9%
Sentral Residences D 1,549,418 1,084,593 1,307 2015 51.0% 4.7%
Construction Works
Perdana Sentral Office Tower G, Parcel B 563,574 440,000 385 2012 - 36.2%
CIMB-Mapletree Office Tower A 722,922 620,642 404 2012 - 78.7%
Investment or Sale
St Regis:
Hotel C 513,659 253,454 624 2014 30.0%
Residences C 512,876 390,940 646 2014 30.0%
8,662,315 6,197,458 7,475
FUTURE DEVELOPMENT Est Commencement
Office Towers F 3,147,964 2,500,000 3,800 2013 78.6%
3,147,964 2,500,000 3,800
Total 11,810,279 8,697,458 11,275
Legend:
Investment PropertiesFor Sale
Construction Works
Investment / Sale
Page 12
LOT A – CIMB MAPLETREE OFFICE TOWER
Development in Progress
TM
Sold to CIMB-Mapletree for CIMB Investment Banking Group HQ
S & P : 27 July 2007
GDV : RM404,193,010 (includes RM100m for
land consideration)
Completion : 2012
Land Area : 1.88 acres
GFA (w/o car park) : 722,922 sq ft
NFA : 620,642 sq ft
Car park bays : 662 bays
Building Particular : 1 Block Office Consist of:-
• 6 Levels of Basement Car Park
• 1 Level of Main Lobby / Office
• 4 Levels of Podium Car Park
• 2 Levels of Auditorium, Club House,
Restaurant and Crèche
• 1 Level Mechanical & Electrical
Room
• 27 Floors of Offices
Main contractor : MRCB Engineering Sdn Bhd
100%
E&C’s contract sum: RM273.6 million
% completion @ 31/3/2012: 75%
Exp completion: 2012
% dev comp
@ 31 March
2012: 78.7%
Page 13
• 45 storey strata Grade A office suites.
• GFA: 1.4 million sq ft (w/o car park)
• NFA: 1.0 million sq ft
• Estimated GDV of RM1.2 billion
• Completion by 2015
• Car parks: 1,407 bays
• Site area: 1.85 acres
• Features:
- 15 levels of Low Zone Offices (Levels 13A – 29) and 13 levels of High
Zone Offices (Levels 30 – 42). High Zone will present floor plates of up
to 40,000 sq ft.
- Sky Garden on Level 33A, a distinctive “open-to-the-sky” concept,
dining and extensive greenery
- Penthouse with15,000 sq ft private rooftop garden on Level 43
• Main contractor: MRCB Engineering / Quill Construction
• Commencement: 2Q 2011
• To comply with Green Building Index standards
LOT B – Q SENTRAL OFFICE TOWER
65.7% 34.3%
TM
@ 31 Mar 2012
Value sold:
RM722 m (60%)
% dev comp
@ 31 March
2012: 14.9%
Development in Progress
Page 14
• JV between MRCB and CMY Capital for the
development of St Regis Hotel and Residences.
• Components: 210 hotel rooms & 160 service
apartments under St Regis brand.
• Site area: 2.18 acres
• GFA (w/o car parks): 1.0 million sq ft
• NFA: 644,394 sq ft
• Car parks: 797 bays
• Est. GDV: RM1.3 billion.
• Commencement: 1Q 2011
• Completion: 2014
• To comply with Green Building Index standards
LOT C – ST REGIS HOTEL & RESIDENCES
30%
CMY Capital
Jitra Perkasa
60%
10%
TM
Page 15
• Total 752 units of luxury serviced residences - GDV of RM1.3 billion
• Facing the National Museum, Lake Garden as well as the KL City
Centre with roof-top sports & club amenities
• GFA: 1.5 million sq ft (w/o car park)
• NFA: 1.2 million sq ft
• Car parks: 2000 bays
• Site area: 2.35 acres
• Commencement: 2nd half 2011
• Estimated completion by 2015
• Main contractor: MRCB Engineering / Quill Construction
• To comply with Green Building Index standards
LOT D – THE SENTRAL RESIDENCES
51% 49%
TM
@ 31 Mar
2012
Value sold:
RM400 m
(30%)
% dev comp
@ 31 March
2012: 4.7%
Page 16
LOT E – PLATINUM SENTRAL Completed
TM
100%
• A business park with mixed used commercial and retail development set within a tranquil park setting.
• Prime office space with proximity to the transport hub, hotels, shopping complexes, office towers and
condominiums.
• Est. GFA of 937,891 sq ft (w/o car parks) with estimated development value of RM700 million.
• NLA: 533,082 sq ft – 69% secured tenancy. Average gross rent psf per month – (Office:RM8.50, Retail:RM5.50).
First office tenant moved in August 2011.
• Car park bays: 635 bays
• Another wholly-owned investment asset of the Group.
• Complied with Singapore’s BCA Green Mark (Platinum).
Page 17
TM
Tenants NLA sf
Block D office
area64,789
Blok D office
garden2,497
67,286
Block E office
area67,124
Blok E roof
garden &
terrace
2,497
69,621
Block B office
area137,060
Blok B office
garden 12,701
Block C office
area61,181
Blok C office
garden6,038
216,980
SBM MALAYSIA SDN BHD
SMALL AND MEDIUM
ENTERPRISES
CORPORATION MALAYSIA
SURUHANJAYA
PENGANGKUTAN AWAM
DARAT
KL SENTRAL PARK - OFFICE
Block A office
area91,115
Block A garden3,240
94,355
VACANT
NLA sf
Secured tenant
Prema Bonanza Sdn Bhd G02-G07 15,775
Vacant
Ground floor 55,015
Level 3A 8,560
NLA 79,350
No. of bays
Level 1 - car parks 348 bays
Level 2 - car parks 287 bays
635 bays
KL SENTRAL PARK - RETAIL AREA
KL SENTRAL PARK - PARKING BAYS
NLA sq ft
Office area 421,269
Office roof garden & terrace 26,973
Retail area 79,350
Multi purpose hall 5,490
Total 533,082 sq ft
TENANCY AT PLATINUM SENTRAL
Page 18
Hotel
Nu Sentral - An integrated mall within a world class
transport hub
GFA: 1,145,471 sf NFA: 650,0000 sf., 270 retail units
51%
49%
Development in Progress
TM
Office tower :
GFA 563,574 sf
NFA 440,000 sf
LOT G (PARCEL A & B) – NU SENTRAL RETAIL MALL AND PERDANA
SENTRAL OFFICE TOWER
• Developer: MRCB Sentral Properties
• JV Co (Retail): Nu Sentral Sdn Bhd (NSSB – a JV
between MRCB & PHB: 51%:49%)
• Car park: 1,990 bays
• Purchaser/owner:
Retail mall – the landowner, PQSB (subsidiary of
PHB) enter into 99 year lease with NSSB
Office tower – retained by PHB
• Main contractor: MRCB Engineering Sdn Bhd
• Est GDV: RM1.4 billion
• To comply with Green Building Index standards
E&C’s contract sum: RM698.48 m
% completion @ 31/3/2012: 41.8%
Exp completion: 3Q 2012
% dev comp
@ 31 Mar
2012: 36.2%
Page 19 Development in Progress
TM
LOT G (PARCEL C & D) – ALOFT HOTEL AND 2 OFFICE TOWERS
• A scenic 28 storey hotel adjoining two office towers (34 and 45
storey) have commenced construction. The hotel and office
towers cover a total of 2.18 acres of land area.
• NFA:
- Hotel: 300,000 sq ft
- Office Tower 1: 292,136 sq ft
- Office Tower 2: 548,562 sq ft
• Total car parks: 1,044 bays
• GDV of 2 office towers: RM775 million.
• GDV of hotel: RM217 million
• Completion by 2012
• Main contractor: MRCB Engineering (office towers only)
60%
40%
840,698 sq ft
E&C’s contract sum (2 office towers
only): RM243 million
% completion @ 31/3/2012: 74%
Exp completion: Aug 2012
% dev comp
@ 31 Mar
2012: 69.9%
Page 20
348 SENTRAL – SHELL TOWER & ASCOTT RESIDENCES
Developer : 348 Sentral Sdn. Bhd.
GFA (w/o car park)
NFA (Shell tower)
NFA (Ascott)
:
:
:
1,015,024 sq ft
557,759 sq ft
134,561 sq ft (156 rooms)
Car parks : 969 bays
GDV : RM908 million
Contractor : MRCB Engineering Sdn Bhd
Completion
Building Standard
:
:
2012
LEED Green Building Certification
for Gold Level
: 100%
Development in Progress
TM
Another wholly-owned
investment asset of the
Group.
% dev comp
@ 31 Mar
2012: 44.9%
Page 21
Temporary
Exhibition Malls
Stesen Sentral
Proposed
Office
Tower &
Retail Mall
YMCA
Lot F has a land area of approx. 5.70 acres
and designated for 3 commercial office
towers with a total GFA of 3.1 million sq ft.
Development is slated to commence in
2013 and completion in 2018. Estimated
GDV of approx. RM3.8 billion.
Site view of Lot F
LOT F – COMMERCIAL DEVELOPMENT
Future Development
TM
: 78.6%
Page 22
PROPOSED INTEGRATED TRANSPORTATION HUB PENANG SENTRAL
• Total development area: 23.94 acres
• Estimated commencement construction of transport hub: 2nd half 2012
• Estimated total cost of transport hub – RM236 million (Turnkey Contract to be completed by 2014)
• Estimated total GDV of mixed commercial & residential development – RM2 billion
• An urban development planned by MRCB with mixed components around the largest integrated
transportation hub in Malaysia’s northern region.
Prospective Development
49% 51%
Page 23
SELBORNE 2 – OFFICE TOWER, SHAH ALAM
Est. Commencement: 2nd half 2012
Est. Completion: 2015
Est. GDV: RM198 million
MRCB
BANK NEGARA HOTEL QUALITY
TOWER A (MENARA
DARUL EHSAN)
DATARAN
SHAH ALAM
PLAZA
ALAM SENTRAL
TOWER B
(MENARA MRCB)
TOWER C
(PROPOSED
OFFICE TOWER)
J A L A N M A J L I S
ROOF GARDEN
OVER NEW RETAIL
PROPOSED
SHOPPING EXTENSION
2 Office Towers with Retail Podium
GFA (w/o car park): 485,875 sq ft
NFA : 357,435 sq ft
No of storeys: 2 x 12 Levels of Office & 3 Levels of Retail
Site area: 2.45 acres
: 100%
Page 24
• Bandar Seri Iskandar is a self-sustained township which is spearheading the socio-economic development of central
Perak by promoting community living and creating value for its stakeholders.
• Spread over 5,000 acres of commercial, residential, industrial and recreational land with full public amenities, Bandar
Seri Iskandar is expected to be fully completed by 2020.
• The biggest township development in central Perak with a GDV of RM5 billion
• Landmark project in the heart of Kinta-Pangkor Corridor
• Comprises of residential properties, commercial centres, industries and public amenities.
• Strategically located in close proximity to technical schools, educational institutions such as UTP and UITM
• The township is accessible through domestic air links via the Sultan Azlan Shah Airport in Ipoh from the Kuala
Lumpur International Airport and a 2 hour drive via the North-South Highway from Kuala Lumpur and Penang. Sri
Iskandar is only a 40 minutes drive to either Ipoh or Lumut Port.
• There are 4,000 acres left planned for development, suitable for education hub and research centre.
• Completed development of 786 units of residential and commercial properties (Phase 1), total GDV of RM62 million.
• Under development in various stages of completion of another 317 units (Phase 1A & 2A), total GDV of RM68 million.
BANDAR SERI ISKANDAR
Single Storey Bungalows
70’x100’ ; 1,800sf – RM375,000
Single Storey Semi-D
50’x90’ ; 1,600sf – RM293,000
Single Storey Terrace House
22’x80’ ; 900sf – RM110,000
: 70%
Page 25
Commercial & Light Industrial Park Concept Completed 1&1/2 Storey Terraced Factory
• Senawang Sentral is one-of-its-kind commercial development offering growth
potential and value appreciation with good connectivity and accessibility.
• Designated for the development of 177 units of 1½ storey terraced factory,
double-storey shop lots and semi-detached factory on 23.4 acres, freehold land.
• Completed Phase 1 = 95 units, and ongoing development in Phase 2 = 70 units
and Phase 3 = 12 units
• Strategically located next to the Tuanku Jaafar Light Industrial area.
• A natural extension of the existing matured light industrial growth area of
Senawang.
• 2 minutes from North-South Highway interchange, 1km from the Senawang Toll
Plaza exit and 10 minutes drive to Giant Hypermarket and Senawang Commercial
Park.
• Designed for multi purpose usage for small to medium enterprises/companies as
service centre, commercial offices, small to medium firms, café, restaurants,
showrooms, etc.
• Potential to attract good rental yield of 8% p.a.
• The development project is part of the state government’s Industry Estate Plan,
on a land area of approximately 116 acres.
SENAWANG SENTRAL
: 100%
GDV
(RM '000)
Phase 1 24,561 Completed
Phase 2 20,437 Est completion: 1Q 2012
Phase 3 11,220
Total GDV 56,218
Completed 2 units in 2010.
Remaining 10 units: exp to
commence in 2011 &
completed in 2015
Page 26
BATU FERRINGHI LAND
Future Property Development
• Land area: 3.34 acres
• Development: Low Density Luxury Residential Condominiums
• Est. GDV: RM185 million
• Est commencement: 2013
• Est completion: 2015
100%
Page 27
HIGH END RESIDENTIAL DEVELOPMENT AT JALAN KIA PENG, KL
• Land: 1.01 acres
• GFA (exclude car park): 359,389 sq ft
• NFA: 283,627 sq ft
• Estimated GDV: RM324 million
• Estimated commencement: 2012
• Estimated completion: 2015
Development Breakdown:-
Condominium: 27 floors
No of Units: 194
Podium Car park: 5 floors
Basement Floors: 4 floors
Car park bays: 469 bays
100%
Page 28
MIXED PROPERTY DEVELOPMENT AT SETAPAK, KUALA LUMPUR
• Land: 27.4 acres
• GFA (exclude car park): 3.8 million sq ft
• Estimated GDV: RM2.5 billion
• Estimated commencement: 2013
• Estimated completion: 2020
100%
Page 29
Development Overview
TOTAL PROPERTY DEVELOPMENT GDV
Lot NFA sf GDV RMm Exp Completion
MRCB's equity
interest
Completed
Platinum Sentral E 533,082 700 2011 100.00%
On-going developments
KL Sentral Development
Nu Sentral Retail Mall G, Parcel A 650,000 1,050 2012 51.00%
Perdana Sentral Office Tower G, Parcel B 440,000 385 2012 -
2 Office Towers G, Parcel C 767,335 706 2012 60.00%
Aloft Hotel G, Parcel D 309,898 217 2012 60.00%
CIMB-Mapletree Office Tower A 620,642 404 2012 -
348 Sentral:
Shell tower Lot 348 542,358 728 2012 100.00%
Ascott Residences Lot 348 134,561 180 2012 100.00%
St Regis:
Hotel C 253,454 624 2014 30.00%
Serviced residences C 390,940 646 2014 30.00%
Q Sentral Office Tower B 1,003,677 1,228 2015 65.70%
Sentral Residences D 1,084,593 1,307 2015 51.00%
Other Developments
Senawang Sentral, N. Sembilan 177 units 53 2015 100.00%
Bandar Seri Iskandar, Perak 4,000 acres 348 NA 70.00%
6,197,458 7,876
New Developments Est Commencement Est Completion
Penang Sentral Development 3,000,000 2,000 2013 2020 49.00%
Office Towers F 2,500,000 3,800 2013 2018 78.6%
Selborn 2, Shah Alam 357,435 198 2013 2015 100.00%
Batu Ferringghi land 3.34 acres 185 2013 2015 100.00%
High end residential development at Jln Kia Peng 1.01 acres 283,627 324 2013 2015 100.00%
Mixed developments at Setapak 27.4 acres 3,783,902 2,500 2013 2020 100.00%
Lot 349 - Privatisation Agreement 4.9 acres 1,000,000 1,150 2013 2017 70.00%
Sub-total 10,924,964 10,157
Total 17,655,504 18,732
Section 3
Engineering & Construction
Page 31
Ongoing Internal & External
Order Book Outstanding as at 31 March 2012
Total Outstanding
Start End (RM million) (RM million)
Environmental Projects
Kuala Sg. Pahang breakwater construction - Phase 2 4Q 2011 1Q 2013 47 39 16.3%
Sg Perai, Penang River Rehabilitation (Phase 3) 4Q 2011 1Q 2013 40 34 16.5%
87 73
Engineering & Construction
Eastern Dispersal Link, Johor 2Q 2008 1Q 2012 716 21 97.1%
Road upgrading works around KL Sentral:
iii) DBKL Package 3 - 5 2Q 2010 1Q 2012 56 - 100.0%
Marlborough College 2Q 2010 2Q 2012 118 32 73.0%
LRT extension - Ampang Line Pack B - main facilities
& segmental box girders 1Q 2012 4Q 2014 1,327 1,327 0.0%
LRT extension - Kelana Jaya Line Pack B - segmental
box girders 1Q 2012 4Q 2013 67 67 0.0%
2,283 1,446
KL Sentral Property Construction
Lot A - CIMB Tower 1Q 2009 3Q 2012 274 68 75.0%
Lot G Retail & Office 4Q 2009 2Q 2013 698 407 41.8%
Lot G - 2 Office Towers:
- Package 2 - office tower 1 & 2 4Q 2010 3Q 2012 243 63 74.0%
1,215 538
3,584 2,057
Key Projects - On Going
Percentage of
Completion
Page 32
Decorative Street Lighting Entrance Archway at Jalan Travers Fountain
LITTLE INDIA, BRICKFIELDS - PRIVATISATION AGREEMENT
Ongoing Construction
• Signed a Privatization Agreement for RM128.7m
• In exchange for 2 parcels of land in Brickfields
measuring approx. 214,000 sq ft or RM601 psf.
• Privatisation of the following construction works:-
i) Little India Project – upgrading and beautification of
Jalan Tun Sambanthan, Brickfields, Kuala Lumpur
beginning from the intersection of Jalan Travers and
Jalan Tun Sambanthan up to the entrance of the
Brickfields Police Station (“Project 1”);
ii) Pines Bazaar – a three-storey building consisting of
office space, 28 units of stalls and 140 car park
bays on Lot 172, Kuala Lumpur (“Project 2”); and
iii) Ang Seng Development – the construction of 212
units of new government Class F quarters near
Jalan Ang Seng to replace the government quarters
at Jalan Rozario, Kuala Lumpur (“Project 3”).
Project 1
completed in
Oct 2010
Page 33
LRT EXTENSION – AMPANG LINE PACKAGE B – MAIN FACILITIES WORKS AND
SEGMENTAL BOX GIRDERS
Ongoing Construction
• The proposed Ampang LRT extension line will commence
from the present Sri Petaling station, passing through
Puchong, Kinrara and ending at the hub in Putra Heights.
The proposed line will consist of 13 new stations and
approximately 17.7km of guideway.
• This section will be divided into 2 main contract packages.
Package A is from Seri Petaling Station to Station No. 5
which is 7.4 km and Package B is from Station No. 5 to Putra
Heights Station which is 10.3 km.
• Main Contractors for Facilities are to be responsible for the
following facilities works:
(i) All guideway sub-structure and main structure works;
(ii) Foundation work for stations and traction power sub-
stations;
(iii) To launch and install Segmental Box Girders (SBG);
(iv) To supply and install parapets and noise barriers;
(v) Construction of stations and traction power sub-stations;
(vi) Supply and Install of escalators and lifts; and
(vii) Construction of Multi-Storey Car Parks
• MRCB’s new contract secured on 15 August 2011:-
• Contract sum: RM1.33 billion - Main contractor for
construction and completion of facilities works including
fabrication and delivery of segmental box girders
(Package B) for the Ampang line extension project.
• Contract sum: RM67.2 million - nominated sub-
contractor to Sunway Construction Sdn Bhd for sub-
contract of the fabrication and delivery of segmental box
girders (Package B) for the Kelana Jaya line extension
project.
Page 34
Completed
PERMAI PSYCHIATRIC HOSPITAL, TAMPOI, JOHOR BAHRU
Design, construction, equipment, commissioning and maintenance
The existing hospital
which was built in 1937
can no longer suitably
provide medical needs
for both patients and
hospital staff in terms
of space for modern
equipment, therapy
and support services.
The proposed
psychiatric hospital in
Tampoi, Johor Bahru is
developed on a 48.55
hectare site and when
ready for operation will
have the latest and
comprehensive
facilities to treat
patients, including
geriatrics and pediatric
specialists. The
hospital is designed to
accommodate 724
beds. There is also
provision for staff
accommodation and
amenities at the site.
Visitors’ Hall
Central OCC Therapy/Rehab
Admission Dept
Total Contract Sum: RM556.5 million
Client: Ministry of Health
Completion date: 30 Dec 2011
No. of beds: 724 beds
Size: 1,800,666 sq ft
Page 35
GAYA BANGSAR CONDOMINIUM, KUALA LUMPUR
Completed
Contract Value : RM95.1 million
GFA : 660,155 sq ft
Commencement Date : March 2009
Completion Date : August 2011
Building Storey : Overall Storey - 34 floor
7 floor – Podium (Car Park)
27 floor - Apartment
Building Owner : UDA Holdings Berhad
Completed in 4Q 2011
Page 36
Completed
UPGRADING OF SABAH MEDICAL CENTER
Job scope:-
- building a 5-storey parking lot
- refurbishment of accident and emergency
department
- development of cardiology and cardiothoracic
centre
- expanding minor operation theaters at the 9th
storey building
Contract sum : RM74 million
Client : Ministry of Health
Completed in 3Q 2011
Page 37
MARLBOROUGH COLLEGE, ISKANDAR MALAYSIA, JOHOR BAHRU
Completed
Marlborough College East occupies 90 acres of land within Iskandar Malaysia Development.
Estimated gross floor area: Approx. 450,300 sq ft (42,000 sq m).
The college constitutes the following buildings:-
- 4 blocks of administration blocks
- 4 blocks of prep schools
- 6 blocks at teaching zone
- 6 blocks of boarding houses
- 1 block of staff apartment
- 11 units of double storey teachers houses
- Other ancillary buildings (bus stops/guard houses/refuse chamber)
Contract sum : RM118 million
% completion as at 31 Mar 2012:- : 73%
Expected Completion : June 2012
Client : Iskandar Investment Berhad
Page 38
Completed
EASTERN DISPERSAL LINK (“EDL”), JOHOR BAHRU
Design, construction, installation, testing & commissioning
ADMINISTRATION BUILDING RAMP C AND D FROM PERMAS JAYA
ABUTMENT B MAINLINE VIADUCT OVEARALL VIEW OF MAINLINE VIADUCT
Page 39
Traffic Dispersal – KL Sentral and Brickfields Cost: RM110 million
Period : 2 years
Client: DBKL
Construction – road
Page 40
ROAD UPGRADING WORKS – DBKL PACKAGE 1 – Design & Build
Completed - road
Package 1 – construction of fly-over at the junction of Jalan Bangsar and Jalan Travers
Contract sum : RM33.6 million
Completion : August 2010
Page 41
Completed Construction - road
ROAD UPGRADING WORKS – DBKL PACKAGE 2 – Design & Build
Construction of fly-over from KL Sentral to
Jalan Damansara and Jalan Mahameru
Contract sum : RM27.35 million
Completed in March 2011
Page 42
ROAD UPGRADING WORKS – DBKL PACKAGE 3, 4 & 5 – Design & Build
Completed Construction - road
Package 3 – upgrading of Jalan Tun Sambanthan and other roads within Brickfields
Package 4 – construction of pedestrian bridges within Brickfields & KL Sentral areas
Package 5 – repair & road upgrading around KL Sentral
Package 5: Completed road resurfacing works
Package 4: Artist impression of pedestrian bridges
Package 3: Jalan Tun Sambanthan
Contract sum : RM55.7 million % completion as at 31 Mar 2012:- : 100%
Page 43
PANTAI SALAK SOUTH TRANSMISSION LINE AND SALAK SOUTH SUBSTATIONS
Completed Construction
Contract sum : RM286.8 million
Completed in 3Q 2011
Client : Tenaga Nasional Bhd
Page 44
275kV Central Area Reinforcement Line – Phase 1.
Power Transmission and Substation Projects
Lenggeng (N Sembilan) – Nuni (Bangi) Transmission Line.
275kV line – Kelemak, Melaka.
275kV 50km line Gelang Patah to Bukit Batu.
Baseline Schedule for Provision of Telecommunication and Teleprotection Equipment for Transmission
Grid System.
33kV Distribution Line from Nyior Tujuh to Tok Dor, Terengganu.
275kV / 132kV Telok Kalong Substation
The construction of 40km of 500kV Double Circuit Transmission Lines from Ayer Tawar to Manjung.
The construction of 33kV Aerial Bundle Conductor (ABC) Transmission Line from Sauk to Chenderoh Power Station.
272km of 275kV and 4km of 132kV from Kasigui to Segaliud, Sabah East-West Transmission Line.
RM1.6 billion 500kV transmission system as backbone of the National Grid in Malaysia – completed in 1998. Total distance 552km and 73km for 275kV transmission line.
Provision of SDH backbone Telecommunication Network – RM27.3 million
132kV and 11kV switchgears, power transformers, ancillary equipment for Rengit 132kV/11kV substation
132kV and 11kV switchgears, power transformers, ancillary equipment for Kluang Industry 132kV/11kV substation
Completed
Page 45
Bakun Dam Switchyard Project
Artist impression
Completed – Power Transmission
Package TR1 - Switchyard project involving design, supply, delivery
to site, erection, testing and commissioning of electrical installation
and civil works for Bakun 275 kV Switchyard and Control Building.
The switchyard sits on a 35,000 sq metre rocky land.
The works comprise a 275kV switchyard with eight 275kV
switchgear bays in 1 breaker arrangement, a control building with
all protection, instrumentation, communication and automation
equipment and approximately 2 km of 275kV transmission lines
connecting the Bakun powerhouse and the switchyard.
Contract sum : RM65.5 million
Client : Sarawak Hidro S/B
Completed in May 2011
Infrastructure -
Environmental Projects
Section 4
Page 47
RIVER OF LIFE (“ROL”)
ECONOMIC TRANSFORMATION PROGRAM
ROL Entry Point Project (EPP) was identified in the Greater KL National
Key Economic Area (NKEA) under the Economic Transformation
Programme (ETP). Aims to transform the Klang & Gombak River into a
vibrant and liveable waterfront with high economic value.
JV between Ekovest (60%) & MRCB (40%)
22 Feb 2011 – Ekovest-MRCB JV (“JV Co”) received a Letter of Intent
from the Government of Malaysia indicating intention to procure JV Co’s
services as Project Delivery Partner (“PDP”).
Scope of Work: i) Beautification - 10.7 km
Est contract sum – RM1 bn
JV Co’s role – PDP & sub-con
ii) Cleaning - 113 km
Est contract sum – RM3 bn
JV Co’s role – PDP
iii) Development
JV Co’s role – PDP
Page 48
CLIMATE CHANGE AND ENVIRONMENT PROJECTS
Ongoing & Completed
Navigational Channel Dredging and
Design & Build of Breakwaters
Phase 1
Contract sum: RM233.82 million
Completed in December 2010
Phase 2
Contract sum: RM46.5 million
% completion @ 31/3/2012: 16.3%
Exp completion: 1Q 2013
Sg. Kuantan River Mouth Improvement Kuala Sg. Pahang River Mouth Improvement
River Rehabilitation, Lower Perai
River, Penang
To dredge the river mouth area of Perai River and its lower tidal reach to ensure safe navigation passage.
Total contract sum: RM30 million
(Phase 1 & 2)
Completed in December 2010
Phase 3 :
Contract Sum: RM40.3 m
% completion @ 31/3/2012: 16.5%
Exp completion: 1Q 2013
Contract sum: RM21.65 million
Completed in October 2010
• Pressure Equalization Module
(PEM) pipes are installed under
the sea bed.
• Beach is then sand nourished with
a layer of graded sand.
• Additional PEM pipes are installed
under new sea bed.
• Completed 2004
Teluk Cempedak – Beach
Rehabilitation Coastal Erosion & River
Conservation – Tioman Island
Contract sum: RM132 million
Completed in 2009
Section 5
Recurring Income Business Divisions:
Toll Concessions
Property Investments
Building Facilities Management
Page 50
Ring Roads
LEGEND
Radial Roads
Duta-Ulu Kelang
Expressway (DUKE)
Inner Ring
Road
Middle Ring Road II (MRR 2)
Middle Ring Road I (MRR 1)
DUKE
Intermediate Ring Road
MRR 2
NKVE
AKLEH MRR 2
Lebuhraya Karak
Kepong
Wangsa Maju
Ampang Sg. Buloh
Damansara
Bangsar
Salak
Selatan
Petaling Jaya
Sg. Besi
-Equity Structure: Kesturi is
a wholly-owned subsidiary
of Nuzen Corporation Bhd,
which is 30% owned by
MRCB and 70% by Wira
Kristal Sdn Bhd.
-To minimize land
acquisition, a large portion
of the expressway is built
on viaduct or bridge
structures. Only 20% of
the land acquisition
involved private land.
Duta Ulu-Kelang Expressway (DUKE)
18km highway which links NKVE at Jalan Duta to the Middle Ring Road II along Jalan
Ulu Kelang. At mid-point, traverses to the North via Sentul Pasar and links to KL-
Karak highway. DUKE has seven interchanges with four directional ramps with
features that include advanced Traffic Information and Management system, Variable
Message Signs, Central Control & Monitoring system and Electronic Tolling.
TOLL CONCESSION
Toll road commenced: May 2009
Page 51
Stretching 8.1km, the EDL
is an open toll system with
dual three-lane
carriageway directly
linking the new Customs,
Immigration and
Quarantine Complex (CIQ)
at Tanjung Puteri and
North-South Expressway
via the Pandan Interchange
in Johor Bahru.
The EDL project also
included providing an
integrated traffic
surveillance and control
system, street lighting and
traffic information system
that would reduce the
journey between the
Pandan Interchange and
CIQ to less than 10
minutes. The project will
improve the traffic flow
within Johor Bahru Central
Business District. The
project will also improve
the transportation link
between Johor Bahru and
Singapore, which is
urgently needed.
Completed
EASTERN DISPERSAL LINK (“EDL”), JOHOR BAHRU
Design, construction, installation, testing & commissioning
Toll Concession Agreement signed on June 26, 2007
Total Cost: RM1.3 billion (Construction and Land
Costs)
Construction commencement: Aug 2008
Completion: 31 March 2012
Road opened to public: 1 April 2012
Page 52
Ongoing Construction
EASTERN DISPERSAL LINK (“EDL”), JOHOR BAHRU
Design, construction, installation, testing & commissioning
Direct and Rapid Route Choice to the CIQ
MBJB ROAD
MAINLINE VIADUCT
RAMP C AND D FROM
PERMAS JAYA
ADMINISTRATION BUILDING
Car lane Bus Lane
Page 53
PROPERTY INVESTMENTS (MRCB: 100%)
Kompleks Sentral is an integrated
facility that combines the advantages of a
factory, warehouse, showroom and
offices all of which are leased at
affordable rental rates. Strategically
located within Kuala Lumpur’s premier
industrial zone, Segambut Industrial
Park. The 6-storey flatted structure with
a flexible modular design has attracted
some of the premier names in the
Malaysian industrial and business
leaders.
NFA:484,689 sq ft
Average rental: RM1.10 psf
Occupancy: 95%
PROPERTY INVESTMENTS
Side view
Plaza Alam Sentral is the largest and
the most crowded shopping mall in Shah
Alam, Selangor. Located in the heart of
the main business centre, surrounded by
landmarks such as Taman Tasik Shah
Alam, Laman Budaya & Masjid Shah
Alam.
NFA : 433,349 sq ft
Average rental: RM2.52 psf
Occupancy: 93%
Sooka Sentral
6-storey retail outlet with approx. total
net lettable area of 100,000 sq ft.
Lifestyle amenities to cater for KL
Sentral’s residents and visitors with al-
fresco dining, food court, fitness
centre, health & beauty center. Winner
of FIABCI Malaysia Property Award
2009 – Purpose Built Category.
NFA: 77,126 sq ft
Average rental: RM3.30 psf
Occupancy: 71%
Plaza Alam Sentral Kompleks Sentral Sooka Sentral
Page 54
PROPERTIES UNDER CONSTRUCTION
PROPERTY INVESTMENTS
LOT G – RETAIL MALL (NU SENTRAL)
MRCB: 51%
NFA: 650,000 sq ft
Completion: 3Q 2012
348 SENTRAL – SHELL TOWER
& ASCOTT RESIDENCES
MRCB:100%
NFA:
Shell Tower – 557,759 sq ft
Ascott Residence – 134,561 sq ft
/ 156 rooms
Completion: 4Q 2012
LOT E – PLATINUM SENTRAL
MRCB: 100%
NFA: 533,082 sq ft
Completed in 4Q 2011
Page 55
Stesen Sentral Kuala Lumpur – Cleaning & Maintenance, Security Services, Business Zoning,
Retail & Commercial Management, Advertising, Passenger & Road Traffic Dispersal System, IT
Network Design & Installation
Building Facilities Management and Car Park Management
BUILDING FACILITIES MANAGEMENT
Location Bays
Existing
Menara Bumiputera Commerce Jalan Raja Laut, Kuala Lumpur 1,122
Plaza Alam Sentral Shah Alam, Selangor 1,400
26 Boulevard Precint 3, Putrajaya 330
The Icon Jalan Tun Razak, Kuala Lumpur 605
Total 3,457
Car Parks outside KL Sentral
managed by MRCB
Car Parks @ KL Sentral Lot Bays Managed by
MRCB
Existing
Stesen Sentral H 833
Plaza Sentral Phase 1 & 2 * M 1,324 a
Suasana Sentral Condominium K 768
Hotels - KL Hilton / Le Meridien I 719
1 Sentral Office Tower N 332 a
Sooka Sentral * J 97 a
Suasana Loft Condominium L 768
MIDA & SSM J 691 a
UEM & Quill J 425
Lot F (Temporary) F 350 a
Total managed by MRCB 2,794
Under construction
To be
managed by
MRCB
Nu Sentral Mall & Perdana Sentral G, (A & B) 1,990 a
2 Office Towers & Aloft Hotel * G, (C & D) 1,044 a
CIMB Tower A 662
Q Sentral * B 1,407 a
St Regis Hotel/Residence C 797
KL Sentral Park * E 680 a
Shell Tower & Ascott Residences * Lot 348 969 a
Future
Sentral Residences D 1,200
Total to be manged by MRCB 6,090
Total 15,056
* Owned by MRCB
THANK YOU
Level 20, 1 Sentral, Jalan Travers,
Kuala Lumpur Sentral,
P.O. Box 12640,
50470 Kuala Lumpur.
Tel: 603 2786 8080
url: www.mrcb.com.my
This presentation contains information believed to be accurate when produced and contains forward-
looking statements or projections based on current expectations. These expectations are not
guarantees of future performances and are subject to risks and uncertainties. Actual results may differ
materially due to: changes in real estate market, cost of building materials and other related costs; the
outcome of legal proceedings; future impact of acquisitions, divestitures or joint ventures, economic,
business and regulatory conditions; and other factors. We disclaim any duty to update forward-looking
statements to reflect new developments.