Corporate Briefing 2012 Resources for Growth MALAYSIAN RESOURCES CORPORATION BERHAD

Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Embed Size (px)

Citation preview

Page 1: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Corporate Briefing

2012

Resources for Growth

MALAYSIAN RESOURCES CORPORATION BERHAD

Page 2: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 2

Contents:

1) MRCB Group of Companies

2) Property Development

3) Engineering & Construction

4) Infrastructure - Environmental Projects

5) Recurring Income Business Divisions: Toll Concessions, Property Investments and Building Facilities Management

Page 3: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 3

Top 3 Shareholders as at 29 June 2012

Top 3 Shareholders No. of shares %

Employees' Provident Fund 585,070,800 42.20%

Public Bank's Fund Management 149,821,000 10.81%

Lembaga Tabung Haji 61,867,273 4.46%

Total paid-up share capital 1,386,467,043 shares

Number of shareholders 36,991

Page 4: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 4

Consensus Revenues & Earnings Forecasts Net Profit 2012 2013 2014

Hwang DBS 78.0 102.0 113

Affin Securities 75.9 110.9 112.0

RHB Securities 87.4 122.7 165.8

OSK Research 85.0 105.3

CIMB Securities 78.9 100.1 122.7

KAF 83.2 78.0 153.0

Kenanga 109.2 116.2

UOB Kay Hian 83.0 187.0 205

CLSA 82.0 99.0 114.0

Hong Leong 69.4 162.2 251.2

AM Research 80.0 88.3 99.0

MIDF 85.0

SJ Securities 80.0

Average 82.8 115.6 148.4

Revenue 2012 2013 2014

Hwang DBS 1,374.0 1,600.0 1,588.0

Affin Securities 1,714.2 1,717.4 1,720.8

RHB Securities 1,507.7 1,905.6 2,748.1

OSK Research 1,213.1 1,522.3 1,660.6

CIMB Securities 1,757.0 2,006.0 2,293.0

KAF 1,489.8 1,385.6 2,009.7

Kenanga 1,305.5 1,281.3

UOB Kay Hian 1,749.0 1,969.0 2,093.0

CLSA 1,552.0 1,671.0 1,759.0

Hong Leong 1,637.5 1,970.0 2,327.0

AM Research 1,363.2 1,405.3 1,413.6

MIDF 1,897.3

SJ Securities 1,470.5

Average 1,540.8 1,675.8 1,961.3

Recommendation Call Target RM Date

Hwang DBS Buy 2.70 7-May-12

Affin Securities Buy 2.71 10-Feb-12

RHB Securities Trading Buy 2.02 18-Jun-12

OSK Research Trading Buy 2.38 23-May-12

CIMB Securities Trading Buy 1.90 23-May-12

KAF Buy 2.36 23-May-12

Kenanga Outperform 2.71 23-May-12

UOB Kay Hian Buy 2.03 18-Jun-12

CLSA Sell 1.80 9-Feb-12

Hong Leong Buy 2.50 25-Jun-12

AM Research Hold 2.30 23-May-12

MIDF Neutral 2.43 10-Feb-12

SJ Securities Neutral 2.45 15-Feb-12

All Calls 9 Buys; 3 Holds; 1 Sell 2.33

Page 5: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Section 1

MRCB Group of Companies

Page 6: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 6

A Focused Property Developer and Infrastructure / Construction

Group of Companies

Engineering &

Construction

Environment &

Infrastructure Property

Development

Buildings and high rise

Civil & Infra works

Residential Development

Energy-Power Network

Transmission

Coastal

engineering

River

rehabilitation

Urban high rise

residential &

commercial

developments

Transport hub

Township

Building Services

IT Services &

Infrastructure

Telecommunications

& Real Estate

Intelligent Systems

Facilities Management

Car Park Services

Industrial shop offices

Toll

concessions

&

expressways

Building Maintenance

Page 7: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Property Development

Section 2

Kuala Lumpur Sentral Development

Bandar Seri Iskandar

Senawang Sentral

Penang Sentral Development

Jalan Kia Peng/Stonor Residential Development

Batu Ferringhi, Penang

Selbourne 2

Setapak

Lot F

Page 8: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 8

Property

Development

Kuala Lumpur Sentral

Bandar Seri Iskandar

Senawang Sentral

Investment

Properties

Penang Sentral Development**

Platinum Sentral

Kompleks Sentral

Sooka Sentral

Plaza Alam Sentral

Lot G - Nu Sentral*

Lot 348 – Shell Tower

& Ascott Residences*

* Under construction

** To be developed

Jalan Kia Peng Residential**

Batu Ferringhi, Penang**

MRCB Land

Selborne 2**

Setapak**

Lot F**

Page 9: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 9

KUALA LUMPUR SENTRAL- An Integrated Development Within A World-Class Transportation Hub

TM

• The exclusive urban centre built around

Malaysia’s largest transit hub, offering global

connectivity, and business convenience.

• 72 acres development - city within a city concept,

at the nucleus is the Stesen Sentral Kuala Lumpur.

• Development phased until 2018, Kuala Lumpur

Sentral is a world-class city valued at a massive

RM15 billion.

• The development comprise of Stesen Sentral,

corporate office towers and business suites,

international hotels, luxury condominiums, a

shopping mall and lifestyle facilities.

• Stesen Sentral’s integrated rail network and city

air terminal facilities provide unparalleled

connectivity.

• The largest commercial development in Kuala

Lumpur today and enjoys close to 100%

occupancy.

• Awarded Malaysia’s first MSC Cybercentre status

in 2006 with tax advantages, full broadband

infrastructure, fiber optics connectivity and an

independent power supply.

• Completed RM4 billion worth of development, RM8

billion development value in progress and RM3 billion

value for future development.

Page 10: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 10

TM

Page 11: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 11

Kuala Lumpur Sentral Development Update

TM

Lot

GFA (sq ft)

(w/o car parks) NFA (sq ft)

Est GDV

RMm Exp Completion

MRCB's equity

interest

% Dev

Completion @

31 MAR 2012

COMPLETED

Investment Properties

Platinum Sentral E 937,891 533,082 700 2011 100.0% 100.0%

UNDER DEVELOPMENT

Investment Properties

Nu Sentral Retail Mall G, Parcel A 1,145,471 650,000 1,050 2012 51.0% 36.2%

348 Sentral:

Shell Tower Lot 348 800,231 542,358 728 2012 100.0% 44.9%

Ascott Residences Lot 348 215,017 134,561 180 2012 100.0% 44.9%

For Sale

2 Office Towers G, Parcel C 840,698 767,335 706 2012 60.0% 69.9%

Aloft Hotel G, Parcel D 348,700 309,898 217 2012 60.0% 69.9%

Q Sentral Office Tower B 1,449,749 1,003,677 1,228 2015 65.7% 14.9%

Sentral Residences D 1,549,418 1,084,593 1,307 2015 51.0% 4.7%

Construction Works

Perdana Sentral Office Tower G, Parcel B 563,574 440,000 385 2012 - 36.2%

CIMB-Mapletree Office Tower A 722,922 620,642 404 2012 - 78.7%

Investment or Sale

St Regis:

Hotel C 513,659 253,454 624 2014 30.0%

Residences C 512,876 390,940 646 2014 30.0%

8,662,315 6,197,458 7,475

FUTURE DEVELOPMENT Est Commencement

Office Towers F 3,147,964 2,500,000 3,800 2013 78.6%

3,147,964 2,500,000 3,800

Total 11,810,279 8,697,458 11,275

Legend:

Investment PropertiesFor Sale

Construction Works

Investment / Sale

Page 12: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 12

LOT A – CIMB MAPLETREE OFFICE TOWER

Development in Progress

TM

Sold to CIMB-Mapletree for CIMB Investment Banking Group HQ

S & P : 27 July 2007

GDV : RM404,193,010 (includes RM100m for

land consideration)

Completion : 2012

Land Area : 1.88 acres

GFA (w/o car park) : 722,922 sq ft

NFA : 620,642 sq ft

Car park bays : 662 bays

Building Particular : 1 Block Office Consist of:-

• 6 Levels of Basement Car Park

• 1 Level of Main Lobby / Office

• 4 Levels of Podium Car Park

• 2 Levels of Auditorium, Club House,

Restaurant and Crèche

• 1 Level Mechanical & Electrical

Room

• 27 Floors of Offices

Main contractor : MRCB Engineering Sdn Bhd

100%

E&C’s contract sum: RM273.6 million

% completion @ 31/3/2012: 75%

Exp completion: 2012

% dev comp

@ 31 March

2012: 78.7%

Page 13: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 13

• 45 storey strata Grade A office suites.

• GFA: 1.4 million sq ft (w/o car park)

• NFA: 1.0 million sq ft

• Estimated GDV of RM1.2 billion

• Completion by 2015

• Car parks: 1,407 bays

• Site area: 1.85 acres

• Features:

- 15 levels of Low Zone Offices (Levels 13A – 29) and 13 levels of High

Zone Offices (Levels 30 – 42). High Zone will present floor plates of up

to 40,000 sq ft.

- Sky Garden on Level 33A, a distinctive “open-to-the-sky” concept,

dining and extensive greenery

- Penthouse with15,000 sq ft private rooftop garden on Level 43

• Main contractor: MRCB Engineering / Quill Construction

• Commencement: 2Q 2011

• To comply with Green Building Index standards

LOT B – Q SENTRAL OFFICE TOWER

65.7% 34.3%

TM

@ 31 Mar 2012

Value sold:

RM722 m (60%)

% dev comp

@ 31 March

2012: 14.9%

Development in Progress

Page 14: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 14

• JV between MRCB and CMY Capital for the

development of St Regis Hotel and Residences.

• Components: 210 hotel rooms & 160 service

apartments under St Regis brand.

• Site area: 2.18 acres

• GFA (w/o car parks): 1.0 million sq ft

• NFA: 644,394 sq ft

• Car parks: 797 bays

• Est. GDV: RM1.3 billion.

• Commencement: 1Q 2011

• Completion: 2014

• To comply with Green Building Index standards

LOT C – ST REGIS HOTEL & RESIDENCES

30%

CMY Capital

Jitra Perkasa

60%

10%

TM

Page 15: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 15

• Total 752 units of luxury serviced residences - GDV of RM1.3 billion

• Facing the National Museum, Lake Garden as well as the KL City

Centre with roof-top sports & club amenities

• GFA: 1.5 million sq ft (w/o car park)

• NFA: 1.2 million sq ft

• Car parks: 2000 bays

• Site area: 2.35 acres

• Commencement: 2nd half 2011

• Estimated completion by 2015

• Main contractor: MRCB Engineering / Quill Construction

• To comply with Green Building Index standards

LOT D – THE SENTRAL RESIDENCES

51% 49%

TM

@ 31 Mar

2012

Value sold:

RM400 m

(30%)

% dev comp

@ 31 March

2012: 4.7%

Page 16: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 16

LOT E – PLATINUM SENTRAL Completed

TM

100%

• A business park with mixed used commercial and retail development set within a tranquil park setting.

• Prime office space with proximity to the transport hub, hotels, shopping complexes, office towers and

condominiums.

• Est. GFA of 937,891 sq ft (w/o car parks) with estimated development value of RM700 million.

• NLA: 533,082 sq ft – 69% secured tenancy. Average gross rent psf per month – (Office:RM8.50, Retail:RM5.50).

First office tenant moved in August 2011.

• Car park bays: 635 bays

• Another wholly-owned investment asset of the Group.

• Complied with Singapore’s BCA Green Mark (Platinum).

Page 17: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 17

TM

Tenants NLA sf

Block D office

area64,789

Blok D office

garden2,497

67,286

Block E office

area67,124

Blok E roof

garden &

terrace

2,497

69,621

Block B office

area137,060

Blok B office

garden 12,701

Block C office

area61,181

Blok C office

garden6,038

216,980

SBM MALAYSIA SDN BHD

SMALL AND MEDIUM

ENTERPRISES

CORPORATION MALAYSIA

SURUHANJAYA

PENGANGKUTAN AWAM

DARAT

KL SENTRAL PARK - OFFICE

Block A office

area91,115

Block A garden3,240

94,355

VACANT

NLA sf

Secured tenant

Prema Bonanza Sdn Bhd G02-G07 15,775

Vacant

Ground floor 55,015

Level 3A 8,560

NLA 79,350

No. of bays

Level 1 - car parks 348 bays

Level 2 - car parks 287 bays

635 bays

KL SENTRAL PARK - RETAIL AREA

KL SENTRAL PARK - PARKING BAYS

NLA sq ft

Office area 421,269

Office roof garden & terrace 26,973

Retail area 79,350

Multi purpose hall 5,490

Total 533,082 sq ft

TENANCY AT PLATINUM SENTRAL

Page 18: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 18

Hotel

Nu Sentral - An integrated mall within a world class

transport hub

GFA: 1,145,471 sf NFA: 650,0000 sf., 270 retail units

51%

49%

Development in Progress

TM

Office tower :

GFA 563,574 sf

NFA 440,000 sf

LOT G (PARCEL A & B) – NU SENTRAL RETAIL MALL AND PERDANA

SENTRAL OFFICE TOWER

• Developer: MRCB Sentral Properties

• JV Co (Retail): Nu Sentral Sdn Bhd (NSSB – a JV

between MRCB & PHB: 51%:49%)

• Car park: 1,990 bays

• Purchaser/owner:

Retail mall – the landowner, PQSB (subsidiary of

PHB) enter into 99 year lease with NSSB

Office tower – retained by PHB

• Main contractor: MRCB Engineering Sdn Bhd

• Est GDV: RM1.4 billion

• To comply with Green Building Index standards

E&C’s contract sum: RM698.48 m

% completion @ 31/3/2012: 41.8%

Exp completion: 3Q 2012

% dev comp

@ 31 Mar

2012: 36.2%

Page 19: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 19 Development in Progress

TM

LOT G (PARCEL C & D) – ALOFT HOTEL AND 2 OFFICE TOWERS

• A scenic 28 storey hotel adjoining two office towers (34 and 45

storey) have commenced construction. The hotel and office

towers cover a total of 2.18 acres of land area.

• NFA:

- Hotel: 300,000 sq ft

- Office Tower 1: 292,136 sq ft

- Office Tower 2: 548,562 sq ft

• Total car parks: 1,044 bays

• GDV of 2 office towers: RM775 million.

• GDV of hotel: RM217 million

• Completion by 2012

• Main contractor: MRCB Engineering (office towers only)

60%

40%

840,698 sq ft

E&C’s contract sum (2 office towers

only): RM243 million

% completion @ 31/3/2012: 74%

Exp completion: Aug 2012

% dev comp

@ 31 Mar

2012: 69.9%

Page 20: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 20

348 SENTRAL – SHELL TOWER & ASCOTT RESIDENCES

Developer : 348 Sentral Sdn. Bhd.

GFA (w/o car park)

NFA (Shell tower)

NFA (Ascott)

:

:

:

1,015,024 sq ft

557,759 sq ft

134,561 sq ft (156 rooms)

Car parks : 969 bays

GDV : RM908 million

Contractor : MRCB Engineering Sdn Bhd

Completion

Building Standard

:

:

2012

LEED Green Building Certification

for Gold Level

: 100%

Development in Progress

TM

Another wholly-owned

investment asset of the

Group.

% dev comp

@ 31 Mar

2012: 44.9%

Page 21: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 21

Temporary

Exhibition Malls

Stesen Sentral

Proposed

Office

Tower &

Retail Mall

YMCA

Lot F has a land area of approx. 5.70 acres

and designated for 3 commercial office

towers with a total GFA of 3.1 million sq ft.

Development is slated to commence in

2013 and completion in 2018. Estimated

GDV of approx. RM3.8 billion.

Site view of Lot F

LOT F – COMMERCIAL DEVELOPMENT

Future Development

TM

: 78.6%

Page 22: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 22

PROPOSED INTEGRATED TRANSPORTATION HUB PENANG SENTRAL

• Total development area: 23.94 acres

• Estimated commencement construction of transport hub: 2nd half 2012

• Estimated total cost of transport hub – RM236 million (Turnkey Contract to be completed by 2014)

• Estimated total GDV of mixed commercial & residential development – RM2 billion

• An urban development planned by MRCB with mixed components around the largest integrated

transportation hub in Malaysia’s northern region.

Prospective Development

49% 51%

Page 23: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 23

SELBORNE 2 – OFFICE TOWER, SHAH ALAM

Est. Commencement: 2nd half 2012

Est. Completion: 2015

Est. GDV: RM198 million

MRCB

BANK NEGARA HOTEL QUALITY

TOWER A (MENARA

DARUL EHSAN)

DATARAN

SHAH ALAM

PLAZA

ALAM SENTRAL

TOWER B

(MENARA MRCB)

TOWER C

(PROPOSED

OFFICE TOWER)

J A L A N M A J L I S

ROOF GARDEN

OVER NEW RETAIL

PROPOSED

SHOPPING EXTENSION

2 Office Towers with Retail Podium

GFA (w/o car park): 485,875 sq ft

NFA : 357,435 sq ft

No of storeys: 2 x 12 Levels of Office & 3 Levels of Retail

Site area: 2.45 acres

: 100%

Page 24: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 24

• Bandar Seri Iskandar is a self-sustained township which is spearheading the socio-economic development of central

Perak by promoting community living and creating value for its stakeholders.

• Spread over 5,000 acres of commercial, residential, industrial and recreational land with full public amenities, Bandar

Seri Iskandar is expected to be fully completed by 2020.

• The biggest township development in central Perak with a GDV of RM5 billion

• Landmark project in the heart of Kinta-Pangkor Corridor

• Comprises of residential properties, commercial centres, industries and public amenities.

• Strategically located in close proximity to technical schools, educational institutions such as UTP and UITM

• The township is accessible through domestic air links via the Sultan Azlan Shah Airport in Ipoh from the Kuala

Lumpur International Airport and a 2 hour drive via the North-South Highway from Kuala Lumpur and Penang. Sri

Iskandar is only a 40 minutes drive to either Ipoh or Lumut Port.

• There are 4,000 acres left planned for development, suitable for education hub and research centre.

• Completed development of 786 units of residential and commercial properties (Phase 1), total GDV of RM62 million.

• Under development in various stages of completion of another 317 units (Phase 1A & 2A), total GDV of RM68 million.

BANDAR SERI ISKANDAR

Single Storey Bungalows

70’x100’ ; 1,800sf – RM375,000

Single Storey Semi-D

50’x90’ ; 1,600sf – RM293,000

Single Storey Terrace House

22’x80’ ; 900sf – RM110,000

: 70%

Page 25: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 25

Commercial & Light Industrial Park Concept Completed 1&1/2 Storey Terraced Factory

• Senawang Sentral is one-of-its-kind commercial development offering growth

potential and value appreciation with good connectivity and accessibility.

• Designated for the development of 177 units of 1½ storey terraced factory,

double-storey shop lots and semi-detached factory on 23.4 acres, freehold land.

• Completed Phase 1 = 95 units, and ongoing development in Phase 2 = 70 units

and Phase 3 = 12 units

• Strategically located next to the Tuanku Jaafar Light Industrial area.

• A natural extension of the existing matured light industrial growth area of

Senawang.

• 2 minutes from North-South Highway interchange, 1km from the Senawang Toll

Plaza exit and 10 minutes drive to Giant Hypermarket and Senawang Commercial

Park.

• Designed for multi purpose usage for small to medium enterprises/companies as

service centre, commercial offices, small to medium firms, café, restaurants,

showrooms, etc.

• Potential to attract good rental yield of 8% p.a.

• The development project is part of the state government’s Industry Estate Plan,

on a land area of approximately 116 acres.

SENAWANG SENTRAL

: 100%

GDV

(RM '000)

Phase 1 24,561 Completed

Phase 2 20,437 Est completion: 1Q 2012

Phase 3 11,220

Total GDV 56,218

Completed 2 units in 2010.

Remaining 10 units: exp to

commence in 2011 &

completed in 2015

Page 26: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 26

BATU FERRINGHI LAND

Future Property Development

• Land area: 3.34 acres

• Development: Low Density Luxury Residential Condominiums

• Est. GDV: RM185 million

• Est commencement: 2013

• Est completion: 2015

100%

Page 27: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 27

HIGH END RESIDENTIAL DEVELOPMENT AT JALAN KIA PENG, KL

• Land: 1.01 acres

• GFA (exclude car park): 359,389 sq ft

• NFA: 283,627 sq ft

• Estimated GDV: RM324 million

• Estimated commencement: 2012

• Estimated completion: 2015

Development Breakdown:-

Condominium: 27 floors

No of Units: 194

Podium Car park: 5 floors

Basement Floors: 4 floors

Car park bays: 469 bays

100%

Page 28: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 28

MIXED PROPERTY DEVELOPMENT AT SETAPAK, KUALA LUMPUR

• Land: 27.4 acres

• GFA (exclude car park): 3.8 million sq ft

• Estimated GDV: RM2.5 billion

• Estimated commencement: 2013

• Estimated completion: 2020

100%

Page 29: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 29

Development Overview

TOTAL PROPERTY DEVELOPMENT GDV

Lot NFA sf GDV RMm Exp Completion

MRCB's equity

interest

Completed

Platinum Sentral E 533,082 700 2011 100.00%

On-going developments

KL Sentral Development

Nu Sentral Retail Mall G, Parcel A 650,000 1,050 2012 51.00%

Perdana Sentral Office Tower G, Parcel B 440,000 385 2012 -

2 Office Towers G, Parcel C 767,335 706 2012 60.00%

Aloft Hotel G, Parcel D 309,898 217 2012 60.00%

CIMB-Mapletree Office Tower A 620,642 404 2012 -

348 Sentral:

Shell tower Lot 348 542,358 728 2012 100.00%

Ascott Residences Lot 348 134,561 180 2012 100.00%

St Regis:

Hotel C 253,454 624 2014 30.00%

Serviced residences C 390,940 646 2014 30.00%

Q Sentral Office Tower B 1,003,677 1,228 2015 65.70%

Sentral Residences D 1,084,593 1,307 2015 51.00%

Other Developments

Senawang Sentral, N. Sembilan 177 units 53 2015 100.00%

Bandar Seri Iskandar, Perak 4,000 acres 348 NA 70.00%

6,197,458 7,876

New Developments Est Commencement Est Completion

Penang Sentral Development 3,000,000 2,000 2013 2020 49.00%

Office Towers F 2,500,000 3,800 2013 2018 78.6%

Selborn 2, Shah Alam 357,435 198 2013 2015 100.00%

Batu Ferringghi land 3.34 acres 185 2013 2015 100.00%

High end residential development at Jln Kia Peng 1.01 acres 283,627 324 2013 2015 100.00%

Mixed developments at Setapak 27.4 acres 3,783,902 2,500 2013 2020 100.00%

Lot 349 - Privatisation Agreement 4.9 acres 1,000,000 1,150 2013 2017 70.00%

Sub-total 10,924,964 10,157

Total 17,655,504 18,732

Page 30: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Section 3

Engineering & Construction

Page 31: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 31

Ongoing Internal & External

Order Book Outstanding as at 31 March 2012

Total Outstanding

Start End (RM million) (RM million)

Environmental Projects

Kuala Sg. Pahang breakwater construction - Phase 2 4Q 2011 1Q 2013 47 39 16.3%

Sg Perai, Penang River Rehabilitation (Phase 3) 4Q 2011 1Q 2013 40 34 16.5%

87 73

Engineering & Construction

Eastern Dispersal Link, Johor 2Q 2008 1Q 2012 716 21 97.1%

Road upgrading works around KL Sentral:

iii) DBKL Package 3 - 5 2Q 2010 1Q 2012 56 - 100.0%

Marlborough College 2Q 2010 2Q 2012 118 32 73.0%

LRT extension - Ampang Line Pack B - main facilities

& segmental box girders 1Q 2012 4Q 2014 1,327 1,327 0.0%

LRT extension - Kelana Jaya Line Pack B - segmental

box girders 1Q 2012 4Q 2013 67 67 0.0%

2,283 1,446

KL Sentral Property Construction

Lot A - CIMB Tower 1Q 2009 3Q 2012 274 68 75.0%

Lot G Retail & Office 4Q 2009 2Q 2013 698 407 41.8%

Lot G - 2 Office Towers:

- Package 2 - office tower 1 & 2 4Q 2010 3Q 2012 243 63 74.0%

1,215 538

3,584 2,057

Key Projects - On Going

Percentage of

Completion

Page 32: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 32

Decorative Street Lighting Entrance Archway at Jalan Travers Fountain

LITTLE INDIA, BRICKFIELDS - PRIVATISATION AGREEMENT

Ongoing Construction

• Signed a Privatization Agreement for RM128.7m

• In exchange for 2 parcels of land in Brickfields

measuring approx. 214,000 sq ft or RM601 psf.

• Privatisation of the following construction works:-

i) Little India Project – upgrading and beautification of

Jalan Tun Sambanthan, Brickfields, Kuala Lumpur

beginning from the intersection of Jalan Travers and

Jalan Tun Sambanthan up to the entrance of the

Brickfields Police Station (“Project 1”);

ii) Pines Bazaar – a three-storey building consisting of

office space, 28 units of stalls and 140 car park

bays on Lot 172, Kuala Lumpur (“Project 2”); and

iii) Ang Seng Development – the construction of 212

units of new government Class F quarters near

Jalan Ang Seng to replace the government quarters

at Jalan Rozario, Kuala Lumpur (“Project 3”).

Project 1

completed in

Oct 2010

Page 33: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 33

LRT EXTENSION – AMPANG LINE PACKAGE B – MAIN FACILITIES WORKS AND

SEGMENTAL BOX GIRDERS

Ongoing Construction

• The proposed Ampang LRT extension line will commence

from the present Sri Petaling station, passing through

Puchong, Kinrara and ending at the hub in Putra Heights.

The proposed line will consist of 13 new stations and

approximately 17.7km of guideway.

• This section will be divided into 2 main contract packages.

Package A is from Seri Petaling Station to Station No. 5

which is 7.4 km and Package B is from Station No. 5 to Putra

Heights Station which is 10.3 km.

• Main Contractors for Facilities are to be responsible for the

following facilities works:

(i) All guideway sub-structure and main structure works;

(ii) Foundation work for stations and traction power sub-

stations;

(iii) To launch and install Segmental Box Girders (SBG);

(iv) To supply and install parapets and noise barriers;

(v) Construction of stations and traction power sub-stations;

(vi) Supply and Install of escalators and lifts; and

(vii) Construction of Multi-Storey Car Parks

• MRCB’s new contract secured on 15 August 2011:-

• Contract sum: RM1.33 billion - Main contractor for

construction and completion of facilities works including

fabrication and delivery of segmental box girders

(Package B) for the Ampang line extension project.

• Contract sum: RM67.2 million - nominated sub-

contractor to Sunway Construction Sdn Bhd for sub-

contract of the fabrication and delivery of segmental box

girders (Package B) for the Kelana Jaya line extension

project.

Page 34: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 34

Completed

PERMAI PSYCHIATRIC HOSPITAL, TAMPOI, JOHOR BAHRU

Design, construction, equipment, commissioning and maintenance

The existing hospital

which was built in 1937

can no longer suitably

provide medical needs

for both patients and

hospital staff in terms

of space for modern

equipment, therapy

and support services.

The proposed

psychiatric hospital in

Tampoi, Johor Bahru is

developed on a 48.55

hectare site and when

ready for operation will

have the latest and

comprehensive

facilities to treat

patients, including

geriatrics and pediatric

specialists. The

hospital is designed to

accommodate 724

beds. There is also

provision for staff

accommodation and

amenities at the site.

Visitors’ Hall

Central OCC Therapy/Rehab

Admission Dept

Total Contract Sum: RM556.5 million

Client: Ministry of Health

Completion date: 30 Dec 2011

No. of beds: 724 beds

Size: 1,800,666 sq ft

Page 35: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 35

GAYA BANGSAR CONDOMINIUM, KUALA LUMPUR

Completed

Contract Value : RM95.1 million

GFA : 660,155 sq ft

Commencement Date : March 2009

Completion Date : August 2011

Building Storey : Overall Storey - 34 floor

7 floor – Podium (Car Park)

27 floor - Apartment

Building Owner : UDA Holdings Berhad

Completed in 4Q 2011

Page 36: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 36

Completed

UPGRADING OF SABAH MEDICAL CENTER

Job scope:-

- building a 5-storey parking lot

- refurbishment of accident and emergency

department

- development of cardiology and cardiothoracic

centre

- expanding minor operation theaters at the 9th

storey building

Contract sum : RM74 million

Client : Ministry of Health

Completed in 3Q 2011

Page 37: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 37

MARLBOROUGH COLLEGE, ISKANDAR MALAYSIA, JOHOR BAHRU

Completed

Marlborough College East occupies 90 acres of land within Iskandar Malaysia Development.

Estimated gross floor area: Approx. 450,300 sq ft (42,000 sq m).

The college constitutes the following buildings:-

- 4 blocks of administration blocks

- 4 blocks of prep schools

- 6 blocks at teaching zone

- 6 blocks of boarding houses

- 1 block of staff apartment

- 11 units of double storey teachers houses

- Other ancillary buildings (bus stops/guard houses/refuse chamber)

Contract sum : RM118 million

% completion as at 31 Mar 2012:- : 73%

Expected Completion : June 2012

Client : Iskandar Investment Berhad

Page 38: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 38

Completed

EASTERN DISPERSAL LINK (“EDL”), JOHOR BAHRU

Design, construction, installation, testing & commissioning

ADMINISTRATION BUILDING RAMP C AND D FROM PERMAS JAYA

ABUTMENT B MAINLINE VIADUCT OVEARALL VIEW OF MAINLINE VIADUCT

Page 39: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 39

Traffic Dispersal – KL Sentral and Brickfields Cost: RM110 million

Period : 2 years

Client: DBKL

Construction – road

Page 40: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 40

ROAD UPGRADING WORKS – DBKL PACKAGE 1 – Design & Build

Completed - road

Package 1 – construction of fly-over at the junction of Jalan Bangsar and Jalan Travers

Contract sum : RM33.6 million

Completion : August 2010

Page 41: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 41

Completed Construction - road

ROAD UPGRADING WORKS – DBKL PACKAGE 2 – Design & Build

Construction of fly-over from KL Sentral to

Jalan Damansara and Jalan Mahameru

Contract sum : RM27.35 million

Completed in March 2011

Page 42: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 42

ROAD UPGRADING WORKS – DBKL PACKAGE 3, 4 & 5 – Design & Build

Completed Construction - road

Package 3 – upgrading of Jalan Tun Sambanthan and other roads within Brickfields

Package 4 – construction of pedestrian bridges within Brickfields & KL Sentral areas

Package 5 – repair & road upgrading around KL Sentral

Package 5: Completed road resurfacing works

Package 4: Artist impression of pedestrian bridges

Package 3: Jalan Tun Sambanthan

Contract sum : RM55.7 million % completion as at 31 Mar 2012:- : 100%

Page 43: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 43

PANTAI SALAK SOUTH TRANSMISSION LINE AND SALAK SOUTH SUBSTATIONS

Completed Construction

Contract sum : RM286.8 million

Completed in 3Q 2011

Client : Tenaga Nasional Bhd

Page 44: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 44

275kV Central Area Reinforcement Line – Phase 1.

Power Transmission and Substation Projects

Lenggeng (N Sembilan) – Nuni (Bangi) Transmission Line.

275kV line – Kelemak, Melaka.

275kV 50km line Gelang Patah to Bukit Batu.

Baseline Schedule for Provision of Telecommunication and Teleprotection Equipment for Transmission

Grid System.

33kV Distribution Line from Nyior Tujuh to Tok Dor, Terengganu.

275kV / 132kV Telok Kalong Substation

The construction of 40km of 500kV Double Circuit Transmission Lines from Ayer Tawar to Manjung.

The construction of 33kV Aerial Bundle Conductor (ABC) Transmission Line from Sauk to Chenderoh Power Station.

272km of 275kV and 4km of 132kV from Kasigui to Segaliud, Sabah East-West Transmission Line.

RM1.6 billion 500kV transmission system as backbone of the National Grid in Malaysia – completed in 1998. Total distance 552km and 73km for 275kV transmission line.

Provision of SDH backbone Telecommunication Network – RM27.3 million

132kV and 11kV switchgears, power transformers, ancillary equipment for Rengit 132kV/11kV substation

132kV and 11kV switchgears, power transformers, ancillary equipment for Kluang Industry 132kV/11kV substation

Completed

Page 45: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 45

Bakun Dam Switchyard Project

Artist impression

Completed – Power Transmission

Package TR1 - Switchyard project involving design, supply, delivery

to site, erection, testing and commissioning of electrical installation

and civil works for Bakun 275 kV Switchyard and Control Building.

The switchyard sits on a 35,000 sq metre rocky land.

The works comprise a 275kV switchyard with eight 275kV

switchgear bays in 1 breaker arrangement, a control building with

all protection, instrumentation, communication and automation

equipment and approximately 2 km of 275kV transmission lines

connecting the Bakun powerhouse and the switchyard.

Contract sum : RM65.5 million

Client : Sarawak Hidro S/B

Completed in May 2011

Page 46: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Infrastructure -

Environmental Projects

Section 4

Page 47: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 47

RIVER OF LIFE (“ROL”)

ECONOMIC TRANSFORMATION PROGRAM

ROL Entry Point Project (EPP) was identified in the Greater KL National

Key Economic Area (NKEA) under the Economic Transformation

Programme (ETP). Aims to transform the Klang & Gombak River into a

vibrant and liveable waterfront with high economic value.

JV between Ekovest (60%) & MRCB (40%)

22 Feb 2011 – Ekovest-MRCB JV (“JV Co”) received a Letter of Intent

from the Government of Malaysia indicating intention to procure JV Co’s

services as Project Delivery Partner (“PDP”).

Scope of Work: i) Beautification - 10.7 km

Est contract sum – RM1 bn

JV Co’s role – PDP & sub-con

ii) Cleaning - 113 km

Est contract sum – RM3 bn

JV Co’s role – PDP

iii) Development

JV Co’s role – PDP

Page 48: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 48

CLIMATE CHANGE AND ENVIRONMENT PROJECTS

Ongoing & Completed

Navigational Channel Dredging and

Design & Build of Breakwaters

Phase 1

Contract sum: RM233.82 million

Completed in December 2010

Phase 2

Contract sum: RM46.5 million

% completion @ 31/3/2012: 16.3%

Exp completion: 1Q 2013

Sg. Kuantan River Mouth Improvement Kuala Sg. Pahang River Mouth Improvement

River Rehabilitation, Lower Perai

River, Penang

To dredge the river mouth area of Perai River and its lower tidal reach to ensure safe navigation passage.

Total contract sum: RM30 million

(Phase 1 & 2)

Completed in December 2010

Phase 3 :

Contract Sum: RM40.3 m

% completion @ 31/3/2012: 16.5%

Exp completion: 1Q 2013

Contract sum: RM21.65 million

Completed in October 2010

• Pressure Equalization Module

(PEM) pipes are installed under

the sea bed.

• Beach is then sand nourished with

a layer of graded sand.

• Additional PEM pipes are installed

under new sea bed.

• Completed 2004

Teluk Cempedak – Beach

Rehabilitation Coastal Erosion & River

Conservation – Tioman Island

Contract sum: RM132 million

Completed in 2009

Page 49: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Section 5

Recurring Income Business Divisions:

Toll Concessions

Property Investments

Building Facilities Management

Page 50: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 50

Ring Roads

LEGEND

Radial Roads

Duta-Ulu Kelang

Expressway (DUKE)

Inner Ring

Road

Middle Ring Road II (MRR 2)

Middle Ring Road I (MRR 1)

DUKE

Intermediate Ring Road

MRR 2

NKVE

AKLEH MRR 2

Lebuhraya Karak

Kepong

Wangsa Maju

Ampang Sg. Buloh

Damansara

Bangsar

Salak

Selatan

Petaling Jaya

Sg. Besi

-Equity Structure: Kesturi is

a wholly-owned subsidiary

of Nuzen Corporation Bhd,

which is 30% owned by

MRCB and 70% by Wira

Kristal Sdn Bhd.

-To minimize land

acquisition, a large portion

of the expressway is built

on viaduct or bridge

structures. Only 20% of

the land acquisition

involved private land.

Duta Ulu-Kelang Expressway (DUKE)

18km highway which links NKVE at Jalan Duta to the Middle Ring Road II along Jalan

Ulu Kelang. At mid-point, traverses to the North via Sentul Pasar and links to KL-

Karak highway. DUKE has seven interchanges with four directional ramps with

features that include advanced Traffic Information and Management system, Variable

Message Signs, Central Control & Monitoring system and Electronic Tolling.

TOLL CONCESSION

Toll road commenced: May 2009

Page 51: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 51

Stretching 8.1km, the EDL

is an open toll system with

dual three-lane

carriageway directly

linking the new Customs,

Immigration and

Quarantine Complex (CIQ)

at Tanjung Puteri and

North-South Expressway

via the Pandan Interchange

in Johor Bahru.

The EDL project also

included providing an

integrated traffic

surveillance and control

system, street lighting and

traffic information system

that would reduce the

journey between the

Pandan Interchange and

CIQ to less than 10

minutes. The project will

improve the traffic flow

within Johor Bahru Central

Business District. The

project will also improve

the transportation link

between Johor Bahru and

Singapore, which is

urgently needed.

Completed

EASTERN DISPERSAL LINK (“EDL”), JOHOR BAHRU

Design, construction, installation, testing & commissioning

Toll Concession Agreement signed on June 26, 2007

Total Cost: RM1.3 billion (Construction and Land

Costs)

Construction commencement: Aug 2008

Completion: 31 March 2012

Road opened to public: 1 April 2012

Page 52: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 52

Ongoing Construction

EASTERN DISPERSAL LINK (“EDL”), JOHOR BAHRU

Design, construction, installation, testing & commissioning

Direct and Rapid Route Choice to the CIQ

MBJB ROAD

MAINLINE VIADUCT

RAMP C AND D FROM

PERMAS JAYA

ADMINISTRATION BUILDING

Car lane Bus Lane

Page 53: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 53

PROPERTY INVESTMENTS (MRCB: 100%)

Kompleks Sentral is an integrated

facility that combines the advantages of a

factory, warehouse, showroom and

offices all of which are leased at

affordable rental rates. Strategically

located within Kuala Lumpur’s premier

industrial zone, Segambut Industrial

Park. The 6-storey flatted structure with

a flexible modular design has attracted

some of the premier names in the

Malaysian industrial and business

leaders.

NFA:484,689 sq ft

Average rental: RM1.10 psf

Occupancy: 95%

PROPERTY INVESTMENTS

Side view

Plaza Alam Sentral is the largest and

the most crowded shopping mall in Shah

Alam, Selangor. Located in the heart of

the main business centre, surrounded by

landmarks such as Taman Tasik Shah

Alam, Laman Budaya & Masjid Shah

Alam.

NFA : 433,349 sq ft

Average rental: RM2.52 psf

Occupancy: 93%

Sooka Sentral

6-storey retail outlet with approx. total

net lettable area of 100,000 sq ft.

Lifestyle amenities to cater for KL

Sentral’s residents and visitors with al-

fresco dining, food court, fitness

centre, health & beauty center. Winner

of FIABCI Malaysia Property Award

2009 – Purpose Built Category.

NFA: 77,126 sq ft

Average rental: RM3.30 psf

Occupancy: 71%

Plaza Alam Sentral Kompleks Sentral Sooka Sentral

Page 54: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 54

PROPERTIES UNDER CONSTRUCTION

PROPERTY INVESTMENTS

LOT G – RETAIL MALL (NU SENTRAL)

MRCB: 51%

NFA: 650,000 sq ft

Completion: 3Q 2012

348 SENTRAL – SHELL TOWER

& ASCOTT RESIDENCES

MRCB:100%

NFA:

Shell Tower – 557,759 sq ft

Ascott Residence – 134,561 sq ft

/ 156 rooms

Completion: 4Q 2012

LOT E – PLATINUM SENTRAL

MRCB: 100%

NFA: 533,082 sq ft

Completed in 4Q 2011

Page 55: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

Page 55

Stesen Sentral Kuala Lumpur – Cleaning & Maintenance, Security Services, Business Zoning,

Retail & Commercial Management, Advertising, Passenger & Road Traffic Dispersal System, IT

Network Design & Installation

Building Facilities Management and Car Park Management

BUILDING FACILITIES MANAGEMENT

Location Bays

Existing

Menara Bumiputera Commerce Jalan Raja Laut, Kuala Lumpur 1,122

Plaza Alam Sentral Shah Alam, Selangor 1,400

26 Boulevard Precint 3, Putrajaya 330

The Icon Jalan Tun Razak, Kuala Lumpur 605

Total 3,457

Car Parks outside KL Sentral

managed by MRCB

Car Parks @ KL Sentral Lot Bays Managed by

MRCB

Existing

Stesen Sentral H 833

Plaza Sentral Phase 1 & 2 * M 1,324 a

Suasana Sentral Condominium K 768

Hotels - KL Hilton / Le Meridien I 719

1 Sentral Office Tower N 332 a

Sooka Sentral * J 97 a

Suasana Loft Condominium L 768

MIDA & SSM J 691 a

UEM & Quill J 425

Lot F (Temporary) F 350 a

Total managed by MRCB 2,794

Under construction

To be

managed by

MRCB

Nu Sentral Mall & Perdana Sentral G, (A & B) 1,990 a

2 Office Towers & Aloft Hotel * G, (C & D) 1,044 a

CIMB Tower A 662

Q Sentral * B 1,407 a

St Regis Hotel/Residence C 797

KL Sentral Park * E 680 a

Shell Tower & Ascott Residences * Lot 348 969 a

Future

Sentral Residences D 1,200

Total to be manged by MRCB 6,090

Total 15,056

* Owned by MRCB

Page 56: Corporate Briefing - ChartNexusir.chartnexus.com/mrcb/docs/note/MRCB - v11.pdf · SBM MALAYSIA SDN BHD SMALL AND MEDIUM ENTERPRISES CORPORATION MALAYSIA SURUHANJAYA PENGANGKUTAN AWAM

THANK YOU

Level 20, 1 Sentral, Jalan Travers,

Kuala Lumpur Sentral,

P.O. Box 12640,

50470 Kuala Lumpur.

Tel: 603 2786 8080

url: www.mrcb.com.my

This presentation contains information believed to be accurate when produced and contains forward-

looking statements or projections based on current expectations. These expectations are not

guarantees of future performances and are subject to risks and uncertainties. Actual results may differ

materially due to: changes in real estate market, cost of building materials and other related costs; the

outcome of legal proceedings; future impact of acquisitions, divestitures or joint ventures, economic,

business and regulatory conditions; and other factors. We disclaim any duty to update forward-looking

statements to reflect new developments.