ED (Commercial & RC)/ED (Engg-TL & SS)
Distribution List: Northern Region
Chief Engineer (PSP&A – I) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066
Member Secretary
Northern Regional Power Committee 18A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi – 110 016
Director (Power System) Solar Energy Corporation of India Ltd. D-3, 1st Floor, A wing, Religare Building, District Centre, Saket, New Delhi-110017
Director Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003
Director (SO)
Power System Operation Corporation Ltd. 9th Floor, IFCI Towers, 61, Nehru Place, New Delhi-110 016
Executive Director
Northern Regional Load Despatch Centre 18-A, Qutab Institutional Area, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi– 110 016
Managing Director
HP Power Transmission Corporation Ltd. Barowalias, Khalini, Shimla-171002
Director(W&P)
UP Power Transmission Company Ltd. Shakti Bhawan Extn, 3rd floor, 14, Ashok Marg, Lucknow-226 001
Director(Technical)
Punjab State Transmission Corporation Ltd. Head Office, The Mall, Patiala 147001, Punjab
Director (Projects)
Power Transmission Corporation of Uttrakhand Ltd. Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun.
Development Commissioner (Power)
Power Development Department
Grid Substation Complex,
Janipur, Jammu
Director (Technical)
Rajasthan Rajya Vidyut Prasaran
Nigam Ltd.
Vidyut Bhawan, Jaipur,
Rajasthan-302005.
Member(Power)
Bhakra Beas Management Board
Sector-19 B, Madhya Marg,
Chandigarh - 160019
Chief Engineer (Operation)
Ministry of Power
UT Secretariat,
Sector-9 D, Chandigarh - 161009
Director (Operations)
Delhi Transco Ltd. Shakti Sadan, Kotla Road, New Delhi-110 002
Director (Technical)
Haryana Vidyut Prasaran Nigam Ltd.
Shakti Bhawan,Sector-6,
Panchkula-134109, Haryana
Distribution List: Connectivity/Long-term Access Applicants
Shri Sidharth Malik
Senior Manager ACME Solar Holdings Limited Plot No. 152, Sector-44, Gurgaon-122002, Haryana Ph : 9891759725, 9911002391 Email: [email protected]
Shri Manoj Tanwar
Vice President
Greenko Budhil Hydro Power Private Limited
7th Floor, DLF Centre,
Parliament Street (Opp. The Park Hotel),
Connaught Place, Delhi, India
Ph : 9599182552, 9959552185
Email : [email protected]
1
Agenda for the 19th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR
1.0 Proposal for grant of connectivity to the applications received from Renewable Energy Sources
2 nos. of Stage-II Connectivity have been received online during December, 2018 for Connectivity at Fatehgarh which are in
conformity with CERC Regulations/Detailed Procedure as below:
TABLE 1
Sl. No.
Application No.
Applicant Location Date of Application
Quantum of Stage-I Sought/ Granted (MW)
Stage-II Connectivity
Sought (MW)/date
Quantum won in
SECI/State bids (MW)
Proposed location for Grant of Stage-
II Connectivity
Dedicated Tr. System
1. 1200001722 ACME
Solar
Holdings
Limited
Jaisalmer
05/12/2018 300
(Stage-I :
1200001688)
300
(31/07/2020)
NTPC
600 MW
Fatehgarh-II (new)* (To be
Implemented by
POWERGRID)
Pooling of power from ACME
– V (1200001722)& VI
(1200001723) (Fatehgarh)
Solar Power Plants at
Common Pooling Station of
ACME–V & VI (Fatehgarh)
Solar Power Plants
Common pooling Station of
ACME -V (Fatehgarh) &
ACME –VI (Fatehgarh) Solar
Power Plants - Fatehgarh-II
400kV S/c line (with minimum
capacity of 900 MW at
nominal Voltage)
2. 1200001723 ACME
Solar
Holdings
Limited
Jaisalmer
05/12/2018 300
(Stage-I :
1200001700)
300
(31/07/2020)
* For effecting the Connectivity at Fatehgarh-II(new) S/s, following ISTS elements may be required:
i. Establishment of 3x1500MVA (765/400kV), Fatehgarh-II Pooling station at suitable location near Fatehgarh 400kV S/s in
Jaisalmer Distt.
Agenda for 19th meeting of NR for Connectivity & LTA Applications
2
ii. LILO of Fatehgarh (TBCB) – Bhadla (PG)$ D/c (765kV line op.at 400kV) line at Fatehgarh-II so as to establish Fatehgarh
(TBCB) – Fatehgarh-II 400kV D/c line (765kV line op. at 400 kV) and Fatehgarh-II - Bhadla 400kV D/c line (765kV line op. at
765 kV)
$ Fatehgarh PS – Bhadla(PG) 765 kV D/c line(to be operated at 400 kV) alongwith Fatehgarh S/s is being implemented through
TBCB by Fatehgarh Bhadla Transmission Limited(FBTL)
Considering Right-of-Way constraints near substation for termination of number of 400kV/220 kV dedicated transmission lines, the
lines may be implemented through multi circuit tower near the substation entry for about 2-3 kms stretches. For this, applicants may
coordinate among themselves.
Stage-II Connectivity grantees are required to the sign the Transmission Agreement within 30 days from the date of intimation of
Grant of Stage-II Connectivity and shall furnish the applicable Connectivity Bank Guarantee (Conn-BG). Further, no extension shall
be granted on any ground and in case of failure to sign the Agreement and / or to furnish the Conn-BG, Grant of Stage-II
Connectivity shall be revoked without any prior notice.
The Stage-II Connectivity grantee shall furnish progress of the monitoring parameters on quarterly basis in the format given at
FORMAT-RCON-II-M by the last day of each quarter. Failure to update progress of the monitoring parameters shall be considered
as adverse progress and in such case CTU shall approach the Commission for appropriate directions. Further, the Stage-II
Connectivity grantees shall be required to complete the dedicated transmission line(s) and pooling sub-station(s) within 24 months
from the date of intimation of bay allocation at existing or new / under-construction ISTS sub-station. If the grantee fails to complete
the dedicated transmission line within the stipulated period, the Conn-BG of the grantee shall be encashed and Stage-II
connectivity shall be revoked.
2.0 Proposal for grant of LTA to the applications
A. Application from Greenko Budhil Hydro Power Pvt. Ltd.
One no. of LTA application, as given below, has been received during Dec’18, details of which are as below:
Agenda for 19th meeting of NR for Connectivity & LTA Applications
3
TABLE 2
Sl.
No
Application
No./Date
(Online)/
(Physical)
Applicant Connectivity/
Injection
Point
Drawl Point LTA / Start & End
Date sought by the
applicant
Remarks
1. 1200001785
(19/12/2018)/
27/12/2018)
Greenko Budhil
Hydro Power Pvt.
Ltd.
Himachal
Pradesh, NR
Uttarakhand (NR)-61.6 MW
Firm
61.6 MW
(Start :
01/02/19
End :
31/03/26)
PPA signed between Greenko Budhil and Uttarakhand Power Corporation Ltd. (UPCL) and NOC have been submitted along with application.
LTOA had been earlier granted to PTC India Ltd. for transfer of power from Greenko Budhil Hydro Electric Project to Haryana
(PPA signed with Haryana Power Generation Corporation Limited (HPGCL)). Further, as per the directions of Hon’ble CERC in
Petition No. 190/MP/2016 dated 31/05/2018 & based on the request from PTC, LTOA granted for transfer of power from Greenko
Budhil Hydro Electric Project was relinquished w.e.f. 19/06/2018 for 61.6 MW.
The LTA sought under the present proposal is for the same quantum from the same generation project. Accordingly, it is proposed
to grant LTA to M/s Greenko Budhil Hydro Power Pvt. Ltd. for 61.6 MW from Greenko Budhil Hydro Power Pvt. Ltd. to Uttarakhand
with existing ISTS transmission system from 01/02/19 to 31/03/26.
It is understood that PPA signed between PTC India Ltd. and HPGCL is under dispute and the matter is in Hon’ble Supreme Court.
It is proposed to grant LTA to Greenko Budhil Hydro Power Pvt. Ltd., however, the directions of Hon’ble Supreme Court in this
regard shall be applicable.
Agenda for 19th meeting of NR for Connectivity & LTA Applications
4
B. Application from RE Energy Sources
Several applications at Fatehgarh were discussed and agreed for grant of LTA in 15th & 17th Connectivity & LTA meeting of NR held
on 11/09/2018 & 26/11/2018 respectively with following details:
TABLE 3
Sl.
No
Application
No./Date
(Online)/
(Physical)
Applicant Connectivity/
Injection Point
Drawl Point LTA (MW)/ Start & End Date
(Sought)
1. 1200001664
(27/08/18)/ (29/08/18)
Acme Solar Holdings
Limited
Fatehgarh Rajasthan, NR
Delhi in NR (Target)
300
(Start : 19/10/20
End : 18/10/45)
2. 1200001669
(29/08/18)/ (29/08/18)
Acme Solar Holdings
Limited
Fatehgarh
Rajasthan, NR
Delhi in NR (Target)
300
(Start : 19/10/20
End : 18/10/45)
3. 1200001737
(23/10/18)/ (26/10/18)
ACME Solar Holdings
Limited
Fatehgarh,
Rajasthan, NR
Haryana in NR
(Target)
300
(Start : 26/10/20
End : 25/10/45)
4. 1200001742
(23/10/18)/ (26/10/18)
ACME Solar Holdings
Limited
Fatehgarh,
Rajasthan, NR
Haryana in NR (100MW)
&
Uttar Pradesh in NR (200MW)
(Target)
300
(Start : 26/10/20
End : 25/10/45)
The matter was discussed in 2nd NRSCT meeting held on 13/11/2018 wherein following transmission system required for transfer of
power was technically agreed:
Agenda for 19th meeting of NR for Connectivity & LTA Applications
5
Transmission system for LTA applications at Fatehgarh S/S 1) Establishment of 765/400kV, 3X1500MVA, pooling station at suitable location near Fatehgarh in Jaisalmer Dist(Fatehgarh-II PS) 2) Establishment of 765/400kV, 2x1500MVA pooling station at suitable location near Phalodi/ Bhadla in Jodhpur (Bhadla-II PS) 3) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri 4) LILO of both circuits of Fatehgarh (TBCB) – Bhadla (PG) 765 kV D/c line (operating at 400kV) at Fatehgarh-II PS so as
establish Fatehgarh (TBCB)-Fatehgarh-II 765kV D/c line (to be op. at 400kV) and Fatehgarh-II- Bhadla (PG) 765kV D/c line 5) Charging of Fatehgarh-II PS–Bhadla section at 765kV level 6) LILO of both ckts of 765kV Ajmer – Bikaner D/c line at Bhadla-II PS 7) Fatehgarh-II PS – Bhadla -II PS 765kV D/c line 8) Bhadla-II PS – Bhadla (PG) 400kV D/c Line (Twin HTLS) 9) Bikaner(PG) – Khetri S/s 765kV D/c line 10) Khetri – Jhatikara 765kV D/c line 11) Khetri – Sikar (PG) 400kV D/c line (twin AL59) 12) Augmentation with 765/400kV, 1x1500MVA transformer (3rd) at Moga S/s 13) Augmentation with 1x1000MVA,765/400kV transformer (3rd) at Bhiwani (PG) 14) Ajmer (PG)– Phagi 765kV D/c line 15) 1x125 MVAr (420kV), 2x240 MVar (765kV) Bus Reactor each at Fatehgarh-II PS, Bhadla-II PS & Khetri Substation 16) 1x240 MVAR Switchable Line reactors for each circuit at Jhatikara end of Khetri – Jhatikara 765kV D/c line 17) 1x240 MVAr Switchable line reactor for each circuit at each end of Bikaner – Khetri 765kV D/c line 18) 1x330 MVAr Switchable line reactor for each circuit at Bhadla-II PS end for Ajmer-Bhadla-II PS 765kV line (after LILO) 19) 1x240 MVAr Switchable line reactor for each circuit at Bhadla-II PS end for Bikaner-Bhadla-II PS 765kV line (after LILO)
Subsequently, the matter was discussed in 2nd NCT meeting held on 04/12/2018 wherein it was decided that time frame of
Fatehgarh-II – Bhadla-II 765kV D/c line shall be decided based on Connectivity/LTA applications. Further, ECT during its 3rd
meeting held on 21/12/2018 concurred the decision of NCT. Accordingly, above transmission system except Fatehgarh-II – Bhadla-
II 765 kV D/c line shall be part of LTA system for above applicants.
Members may note the same.
--------------------- xxxxx -----------------------