Copy :

ED (Commercial & RC)/ED (Engg-TL & SS)

Page 3: Copy - POWERGRID encl 19th NR... · 7th Floor, DLF Centre, Parliament Street (Opp. The Park Hotel), Connaught Place, Delhi, India Ph : 9599182552, 9959552185 Email : manojkumar.t@greenkogroup.com

Distribution List: Northern Region

Chief Engineer (PSP&A – I) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066

Member Secretary

Northern Regional Power Committee 18A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi – 110 016

Director (Power System) Solar Energy Corporation of India Ltd. D-3, 1st Floor, A wing, Religare Building, District Centre, Saket, New Delhi-110017

Director Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi-110003

Director (SO)

Power System Operation Corporation Ltd. 9th Floor, IFCI Towers, 61, Nehru Place, New Delhi-110 016

Executive Director

Northern Regional Load Despatch Centre 18-A, Qutab Institutional Area, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi– 110 016

Managing Director

HP Power Transmission Corporation Ltd. Barowalias, Khalini, Shimla-171002

Director(W&P)

UP Power Transmission Company Ltd. Shakti Bhawan Extn, 3rd floor, 14, Ashok Marg, Lucknow-226 001

Director(Technical)

Punjab State Transmission Corporation Ltd. Head Office, The Mall, Patiala 147001, Punjab

Director (Projects)

Power Transmission Corporation of Uttrakhand Ltd. Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun.

Development Commissioner (Power)

Power Development Department

Grid Substation Complex,

Janipur, Jammu

Director (Technical)

Rajasthan Rajya Vidyut Prasaran

Nigam Ltd.

Vidyut Bhawan, Jaipur,

Rajasthan-302005.

Member(Power)

Bhakra Beas Management Board

Sector-19 B, Madhya Marg,

Chandigarh - 160019

Chief Engineer (Operation)

Ministry of Power

UT Secretariat,

Sector-9 D, Chandigarh - 161009

Director (Operations)

Delhi Transco Ltd. Shakti Sadan, Kotla Road, New Delhi-110 002

Director (Technical)

Haryana Vidyut Prasaran Nigam Ltd.

Shakti Bhawan,Sector-6,

Panchkula-134109, Haryana

Page 4: Copy - POWERGRID encl 19th NR... · 7th Floor, DLF Centre, Parliament Street (Opp. The Park Hotel), Connaught Place, Delhi, India Ph : 9599182552, 9959552185 Email : manojkumar.t@greenkogroup.com

Distribution List: Connectivity/Long-term Access Applicants

Shri Sidharth Malik

Senior Manager ACME Solar Holdings Limited Plot No. 152, Sector-44, Gurgaon-122002, Haryana Ph : 9891759725, 9911002391 Email: [email protected]

[email protected]

Shri Manoj Tanwar

Vice President

Greenko Budhil Hydro Power Private Limited

7th Floor, DLF Centre,

Parliament Street (Opp. The Park Hotel),

Connaught Place, Delhi, India

Ph : 9599182552, 9959552185

Email : [email protected]

[email protected]

Page 5: Copy - POWERGRID encl 19th NR... · 7th Floor, DLF Centre, Parliament Street (Opp. The Park Hotel), Connaught Place, Delhi, India Ph : 9599182552, 9959552185 Email : manojkumar.t@greenkogroup.com

1

Agenda for the 19th Northern Region constituents meeting regarding Connectivity/LTA Applications in NR

1.0 Proposal for grant of connectivity to the applications received from Renewable Energy Sources

2 nos. of Stage-II Connectivity have been received online during December, 2018 for Connectivity at Fatehgarh which are in

conformity with CERC Regulations/Detailed Procedure as below:

TABLE 1

Sl. No.

Application No.

Applicant Location Date of Application

Quantum of Stage-I Sought/ Granted (MW)

Stage-II Connectivity

Sought (MW)/date

Quantum won in

SECI/State bids (MW)

Proposed location for Grant of Stage-

II Connectivity

Dedicated Tr. System

1. 1200001722 ACME

Solar

Holdings

Limited

Jaisalmer

05/12/2018 300

(Stage-I :

1200001688)

300

(31/07/2020)

NTPC

600 MW

Fatehgarh-II (new)* (To be

Implemented by

POWERGRID)

Pooling of power from ACME

– V (1200001722)& VI

(1200001723) (Fatehgarh)

Solar Power Plants at

Common Pooling Station of

ACME–V & VI (Fatehgarh)

Solar Power Plants

Common pooling Station of

ACME -V (Fatehgarh) &

ACME –VI (Fatehgarh) Solar

Power Plants - Fatehgarh-II

400kV S/c line (with minimum

capacity of 900 MW at

nominal Voltage)

2. 1200001723 ACME

Solar

Holdings

Limited

Jaisalmer

05/12/2018 300

(Stage-I :

1200001700)

300

(31/07/2020)

* For effecting the Connectivity at Fatehgarh-II(new) S/s, following ISTS elements may be required:

i. Establishment of 3x1500MVA (765/400kV), Fatehgarh-II Pooling station at suitable location near Fatehgarh 400kV S/s in

Jaisalmer Distt.

Page 6: Copy - POWERGRID encl 19th NR... · 7th Floor, DLF Centre, Parliament Street (Opp. The Park Hotel), Connaught Place, Delhi, India Ph : 9599182552, 9959552185 Email : manojkumar.t@greenkogroup.com

Agenda for 19th meeting of NR for Connectivity & LTA Applications

2

ii. LILO of Fatehgarh (TBCB) – Bhadla (PG)$ D/c (765kV line op.at 400kV) line at Fatehgarh-II so as to establish Fatehgarh

(TBCB) – Fatehgarh-II 400kV D/c line (765kV line op. at 400 kV) and Fatehgarh-II - Bhadla 400kV D/c line (765kV line op. at

765 kV)

$ Fatehgarh PS – Bhadla(PG) 765 kV D/c line(to be operated at 400 kV) alongwith Fatehgarh S/s is being implemented through

TBCB by Fatehgarh Bhadla Transmission Limited(FBTL)

Considering Right-of-Way constraints near substation for termination of number of 400kV/220 kV dedicated transmission lines, the

lines may be implemented through multi circuit tower near the substation entry for about 2-3 kms stretches. For this, applicants may

coordinate among themselves.

Stage-II Connectivity grantees are required to the sign the Transmission Agreement within 30 days from the date of intimation of

Grant of Stage-II Connectivity and shall furnish the applicable Connectivity Bank Guarantee (Conn-BG). Further, no extension shall

be granted on any ground and in case of failure to sign the Agreement and / or to furnish the Conn-BG, Grant of Stage-II

Connectivity shall be revoked without any prior notice.

The Stage-II Connectivity grantee shall furnish progress of the monitoring parameters on quarterly basis in the format given at

FORMAT-RCON-II-M by the last day of each quarter. Failure to update progress of the monitoring parameters shall be considered

as adverse progress and in such case CTU shall approach the Commission for appropriate directions. Further, the Stage-II

Connectivity grantees shall be required to complete the dedicated transmission line(s) and pooling sub-station(s) within 24 months

from the date of intimation of bay allocation at existing or new / under-construction ISTS sub-station. If the grantee fails to complete

the dedicated transmission line within the stipulated period, the Conn-BG of the grantee shall be encashed and Stage-II

connectivity shall be revoked.

2.0 Proposal for grant of LTA to the applications

A. Application from Greenko Budhil Hydro Power Pvt. Ltd.

One no. of LTA application, as given below, has been received during Dec’18, details of which are as below:

Page 7: Copy - POWERGRID encl 19th NR... · 7th Floor, DLF Centre, Parliament Street (Opp. The Park Hotel), Connaught Place, Delhi, India Ph : 9599182552, 9959552185 Email : manojkumar.t@greenkogroup.com

Agenda for 19th meeting of NR for Connectivity & LTA Applications

3

TABLE 2

Sl.

No

Application

No./Date

(Online)/

(Physical)

Applicant Connectivity/

Injection

Point

Drawl Point LTA / Start & End

Date sought by the

applicant

Remarks

1. 1200001785

(19/12/2018)/

27/12/2018)

Greenko Budhil

Hydro Power Pvt.

Ltd.

Himachal

Pradesh, NR

Uttarakhand (NR)-61.6 MW

Firm

61.6 MW

(Start :

01/02/19

End :

31/03/26)

PPA signed between Greenko Budhil and Uttarakhand Power Corporation Ltd. (UPCL) and NOC have been submitted along with application.

LTOA had been earlier granted to PTC India Ltd. for transfer of power from Greenko Budhil Hydro Electric Project to Haryana

(PPA signed with Haryana Power Generation Corporation Limited (HPGCL)). Further, as per the directions of Hon’ble CERC in

Petition No. 190/MP/2016 dated 31/05/2018 & based on the request from PTC, LTOA granted for transfer of power from Greenko

Budhil Hydro Electric Project was relinquished w.e.f. 19/06/2018 for 61.6 MW.

The LTA sought under the present proposal is for the same quantum from the same generation project. Accordingly, it is proposed

to grant LTA to M/s Greenko Budhil Hydro Power Pvt. Ltd. for 61.6 MW from Greenko Budhil Hydro Power Pvt. Ltd. to Uttarakhand

with existing ISTS transmission system from 01/02/19 to 31/03/26.

It is understood that PPA signed between PTC India Ltd. and HPGCL is under dispute and the matter is in Hon’ble Supreme Court.

It is proposed to grant LTA to Greenko Budhil Hydro Power Pvt. Ltd., however, the directions of Hon’ble Supreme Court in this

regard shall be applicable.

Page 8: Copy - POWERGRID encl 19th NR... · 7th Floor, DLF Centre, Parliament Street (Opp. The Park Hotel), Connaught Place, Delhi, India Ph : 9599182552, 9959552185 Email : manojkumar.t@greenkogroup.com

Agenda for 19th meeting of NR for Connectivity & LTA Applications

4

B. Application from RE Energy Sources

Several applications at Fatehgarh were discussed and agreed for grant of LTA in 15th & 17th Connectivity & LTA meeting of NR held

on 11/09/2018 & 26/11/2018 respectively with following details:

TABLE 3

Sl.

No

Application

No./Date

(Online)/

(Physical)

Applicant Connectivity/

Injection Point

Drawl Point LTA (MW)/ Start & End Date

(Sought)

1. 1200001664

(27/08/18)/ (29/08/18)

Acme Solar Holdings

Limited

Fatehgarh Rajasthan, NR

Delhi in NR (Target)

300

(Start : 19/10/20

End : 18/10/45)

2. 1200001669

(29/08/18)/ (29/08/18)

Acme Solar Holdings

Limited

Fatehgarh

Rajasthan, NR

Delhi in NR (Target)

300

(Start : 19/10/20

End : 18/10/45)

3. 1200001737

(23/10/18)/ (26/10/18)

ACME Solar Holdings

Limited

Fatehgarh,

Rajasthan, NR

Haryana in NR

(Target)

300

(Start : 26/10/20

End : 25/10/45)

4. 1200001742

(23/10/18)/ (26/10/18)

ACME Solar Holdings

Limited

Fatehgarh,

Rajasthan, NR

Haryana in NR (100MW)

&

Uttar Pradesh in NR (200MW)

(Target)

300

(Start : 26/10/20

End : 25/10/45)

The matter was discussed in 2nd NRSCT meeting held on 13/11/2018 wherein following transmission system required for transfer of

power was technically agreed:

Page 9: Copy - POWERGRID encl 19th NR... · 7th Floor, DLF Centre, Parliament Street (Opp. The Park Hotel), Connaught Place, Delhi, India Ph : 9599182552, 9959552185 Email : manojkumar.t@greenkogroup.com

Agenda for 19th meeting of NR for Connectivity & LTA Applications

5

Transmission system for LTA applications at Fatehgarh S/S 1) Establishment of 765/400kV, 3X1500MVA, pooling station at suitable location near Fatehgarh in Jaisalmer Dist(Fatehgarh-II PS) 2) Establishment of 765/400kV, 2x1500MVA pooling station at suitable location near Phalodi/ Bhadla in Jodhpur (Bhadla-II PS) 3) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri 4) LILO of both circuits of Fatehgarh (TBCB) – Bhadla (PG) 765 kV D/c line (operating at 400kV) at Fatehgarh-II PS so as

establish Fatehgarh (TBCB)-Fatehgarh-II 765kV D/c line (to be op. at 400kV) and Fatehgarh-II- Bhadla (PG) 765kV D/c line 5) Charging of Fatehgarh-II PS–Bhadla section at 765kV level 6) LILO of both ckts of 765kV Ajmer – Bikaner D/c line at Bhadla-II PS 7) Fatehgarh-II PS – Bhadla -II PS 765kV D/c line 8) Bhadla-II PS – Bhadla (PG) 400kV D/c Line (Twin HTLS) 9) Bikaner(PG) – Khetri S/s 765kV D/c line 10) Khetri – Jhatikara 765kV D/c line 11) Khetri – Sikar (PG) 400kV D/c line (twin AL59) 12) Augmentation with 765/400kV, 1x1500MVA transformer (3rd) at Moga S/s 13) Augmentation with 1x1000MVA,765/400kV transformer (3rd) at Bhiwani (PG) 14) Ajmer (PG)– Phagi 765kV D/c line 15) 1x125 MVAr (420kV), 2x240 MVar (765kV) Bus Reactor each at Fatehgarh-II PS, Bhadla-II PS & Khetri Substation 16) 1x240 MVAR Switchable Line reactors for each circuit at Jhatikara end of Khetri – Jhatikara 765kV D/c line 17) 1x240 MVAr Switchable line reactor for each circuit at each end of Bikaner – Khetri 765kV D/c line 18) 1x330 MVAr Switchable line reactor for each circuit at Bhadla-II PS end for Ajmer-Bhadla-II PS 765kV line (after LILO) 19) 1x240 MVAr Switchable line reactor for each circuit at Bhadla-II PS end for Bikaner-Bhadla-II PS 765kV line (after LILO)

Subsequently, the matter was discussed in 2nd NCT meeting held on 04/12/2018 wherein it was decided that time frame of

Fatehgarh-II – Bhadla-II 765kV D/c line shall be decided based on Connectivity/LTA applications. Further, ECT during its 3rd

meeting held on 21/12/2018 concurred the decision of NCT. Accordingly, above transmission system except Fatehgarh-II – Bhadla-

II 765 kV D/c line shall be part of LTA system for above applicants.

Members may note the same.

--------------------- xxxxx -----------------------