Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
2
TrackExpedition Software & Business Needs
Submittal Reviews
and determine the impact on theSchedule.
Manage Design-Changes and distribute Contract-Drawings-Revisions to Contractors.
Review Change-Orders for financial and technical impact(Cost & Time Impact) and make recommendations to theClient.
Forecast Project Budget (due to different changes).
Communicate up to date Project Details to the Clients.
It is a complete Company Solution based on the concept thatthe Data Stream from the
Expedition Software
Field Personnel on the Site to theTop Executive in the Office
is linked together to form avalidated, comprehensive picture of the Project.
o Expedition accelerates the Review Process.o It keeps everyone informed.o It gets the Answers you need.o It simplifies your Project Schedule.o Expedition enables sending documents from the Job
Site to the Home Office and vice-versa.o Expedition enables to share information with all
Participants.o Received Documents are added to the Project
Database --- reduces data entry.o E-mail Queue sends multiple documents all at once.o Uses current e-mail system.
8/9/2019 Cont Admin Overview
3/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
3
o Creating or using predefinedManaging Project Costs: Cost Codes & Titleso Creating Cost Worksheet grouped by CSI
(Construction Specification Institute) Division or
Category (see later).
.
o Types of Cost Documents: CO: Change Order CON: Contract COR: Change Order Request EST: Estimate INV: Invoice PO: Purchase Order PCO: Proposed Change Order RQS: Requisition . . .
Communicationo Save Time. :o Get the look that you want.o Show Project Status.
Key Benefitso Improve Project Information Flow.:o Provide one Central Location for Project Data.o Reduce Errors.o Controls and Manages Work Flow.
How Do You Benefito
Same Page, Same Time.
?
Everyone can see different views of the samedata.
Consistent data regardless of how it is entered. Data is viewed by the tool each person is
comfortable using.
8/9/2019 Cont Admin Overview
4/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
4
Project Documents & Budget Control
Two Essential Components
1.
:
Track Submittals
o Reviews and Approvals.o Ensures Materials are perfectly to Specifications.
2.Control Changes
a. From Initial Cost Estimate through Approval.b.Identifies impact on Project Costs and Project
Schedule (Time).
Hint:
Contract Changes & Submittals are the two keyelements that can slow down progressConstruction Project.
of a
8/9/2019 Cont Admin Overview
5/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
5
8/9/2019 Cont Admin Overview
6/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
6
Definitions:
The Contract Documents could be classified into four
1.Main Documents (Contracts & Purchase Orders)
major types
as follows:
2.Cost Documents
3.Change Documents
4.Other Documents
8/9/2019 Cont Admin Overview
7/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
7
1.Main Documents
1.1 Contract
A Contract
is a written agreement between two parties inwhich one party agrees to perform specified work for anotherparty for a certain price.
The Contract usually involves Labor only or Labor &Materials.
It includes a Description of the work to be performed. A Contract usually includes a list of the Special Terms
and/or Conditions that apply to the Contract.
It also lists the Start & Finish Dates along with a NegotiatedPrice.
oThe Negotiated Price can be Lump Sum and/or UnitPrice.
Expedition gives you the complete up to date ContractStatus including Pending and Approval Changes.
8/9/2019 Cont Admin Overview
8/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
8
Printed Prime Contract:
8/9/2019 Cont Admin Overview
9/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
9
Printed SubContract:
8/9/2019 Cont Admin Overview
10/34
8/9/2019 Cont Admin Overview
11/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
11
Printed Purchase Order:
8/9/2019 Cont Admin Overview
12/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
12
2 Project Cost Management
2.1 Cost Codes & Cost Worksheet
A Central Location where we can distribute and monitor ourProject Budgeted, Committed, Funding, and Actual Costs.
Use Cost Codes to break down costs in the CostWorksheet. For example, you may have a Contract of LumpSum $50,000.00 for which $25,000.00 is assigned for RoughCarpentry and $25,000.00 is assigned for Finish Carpentry
To track each Carpentrys Cost separately in the CostWorksheet, create 2 Cost Codes (Rough & Finish forexample) and assign $25,000.00 to each of them.
.
Some Companies base their Cost Codes on the Standard CSI(Construction Specification Institute) Codes.
The more meaningful you make the Cost Codes; the easier it isto analyze Cost Details.
8/9/2019 Cont Admin Overview
13/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
13
Example ofDistributing the Budget of the Project in the CostWorksheet using the Cost Codes
:
Cost Code(created)
Title Value
01 01040 OH Coordinate Construction $250,000
01 01300 VN Scheduling Software $7,000
02 02100 SC Excavation $50,000
02 02200 SC Earthwork andLandscaping
$160,000
02 02500 SC Paving $70,000
02 02700 VN Utilities Earthwork andPiping
$20,000
03 03400 VN Pre-cast Concrete $300,000
16 16100 SC Electrical System $113,000
16 16785 SC Security System $30,000
Total $1,000,000
2.2U
InvoicesU
It is a document for recording billing informationfor contracts and purchase order.
2.3U
Request for Payment (Requisition)U
A request for payment Ufrom Uthe contractor UtoU theowner for a portion of work performed, validated byschedule of values for the work performed, ormaterials installed since the last payment.
8/9/2019 Cont Admin Overview
14/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
14
2.4 Cost Categories
oBudgeted Costs represent the target or estimated costs foreach work item. It is usually contractually agreed uponand distributed to the Budget Section of the CostWorksheet.
o UCommitted costsCosts associated with
U
SubcontractsU
and/orU
PurchaseUOrdersU, distributed to the UCommitted SectionU of theUCost WorksheetU.
( )
o UActual CostIt is represented by the Requisition & Invoices received
and issued
o UFunding CostsTrack money from various services (City, State, andGovernment).
8/9/2019 Cont Admin Overview
15/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
15
Bud et
Chan e
Authorized
Funding
(Requisitions)
Cost Worksheet
Budget Committed Actual
Contracts
Chan es Purchase
Orders
Changes
Invoices
Payment
Requests
(Requisitions)
8/9/2019 Cont Admin Overview
16/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
16
You can distribute Contracts (or PO) Costs to the Budgeted,Committed, or Funding Section of the Cost Worksheet
asfollows:
o Use the Budgeted Section
for the total amountavailable to spend on the Project (usually betweenthe Owner & the General Contractor).
o Use the Committed Section
for amounts you haveagreed to pay someone else (usually between theGeneral Contractor & the SubContractors).
o Use the Funding Section
to cost out a Contractfunded by more than one resource.
8/9/2019 Cont Admin Overview
17/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
17
oThe amount of the contract contained when theproject started.
Original Amount
oThe amount due to a change in progress forwhich documents exist and approved.
Approved Amount
oDue to a change in progress for whichdocuments exist but are not approved.
Pending amount
8/9/2019 Cont Admin Overview
18/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
18
3 1BUChange ManagementU:
U
Tracking Contract Change Documents
After Project Parties accept a Contract or Purchase Orderand work begins, any
U
changesU
resulting from changedspecifications, scope of work, site conditions, orprojectscheduleaffect the initial contract costs.
The process of formally changing a contract requires severalsteps, each of which should be fully documented.
U
Expedition helps you to identify changes from initiationthrough resolution and compresses the time frame for theapproval process.
U
Projects Change Process
o UChange in condition (CIC)A Uchange documentU to notify someone of anunexpected change. (usually from SubContractor toGeneral Contractor).
oU
Request for Information (RFI) (Contractinformation)
A URequest for a change document U that asks for
information or clarification on some aspects (parts)of a project.
o UAnswer (ANS)A URequest change documentU to respond to a Requestfor Information (RFI).
8/9/2019 Cont Admin Overview
19/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
19
o Request for Proposal (RFP)A Proposal Change Document that asks a
SubContractor to provide an estimate ofrequirements to complete a change.
(Contract
information)
o Proposed Change Order (PCO)A Proposal Change Document that outlines aSubcontractor's price estimate of the cost tocomplete a proposed change.
(Contract
information)
o Change Order Request (COR)A Request Change Document to request action on arecognized problem.
(Contract
information)
oChange Order (CO)A Change Document to specify a redirection in plansor new work items, as well as any
(Contract information)
approved cost andeffort.
8/9/2019 Cont Admin Overview
20/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
20
CIC
RFI
ANS
RFP
PCO
COR
CO
CO
Subcontractor
Subcontractor
Contractor
Contractor
Contractor
Contractor
Owner
Design Professional
Subcontractor
8/9/2019 Cont Admin Overview
21/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
21
Documenting the Change Process
Page 25 ppts Anas Wahdan
CIC or RFI
REP or ANS
COR or PCOCost WorksheetPending Revision
COCost WorksheetApproved Revision
Add
Generate
Generate
Distribute
Cost
Collect Cost fromCORs or PCOs
Approved CO
CostAutomaticallyTransferred
Add
8/9/2019 Cont Admin Overview
22/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
22
4 Other Documents
o Punch List
A list of items that must be completed before theproject can be finished.
oU
SubmittalU
(Logs)
A Document that tracks items which must beU
reviewed and approvedU
before they can be used in aproject.
:
o UTransmittalU(Communication)A memo or cover letter that accompanies projectdocuments or items such as material samples.
Transmittals accompany items to indicate what,when , and why they were forwarded
o UDunning letterU(Communication)A letter to remind project participants to deliverspecific items or perform certain tasks.
o UCost CodesCodes used in the Cost Worksheet to classifydifferent types of work associated with a project.Once a project is underway, you can compareUbudgetedU, Ucommitted U, UfundingU, and UactualU costs foreach cost code.
8/9/2019 Cont Admin Overview
23/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
23
o(Logs)A term used to identify the company & person
responsible for an action item.
Ball in Court (BIC)
oCompanies & Contacts (Project Participants
This Module identifies each Player or Party to theContract. Use Contacts to track address, role, andphone identification.
)
o Issues (Project Participants)A "folder" that groups different documents relatedto a similar topic so you can access them in one placeinstead of searching for them across differentmodules.
Issues can include a wide range of project concerns,such as problems that must be resolved before a jobis completed, or conditions that can lead to changesor claims. Organizing project information by issueenables you to quickly review each problem thatmay affect the project schedule or costs atcompletion.
8/9/2019 Cont Admin Overview
24/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
24
Contracts & Engineering Drawings (Logs)
The Drawing Log ensures that everyone is building using thelatest Drawings and Specifications.
Expedition helps you to use the Drawings Log to manageyour Drawings, keep on top of the latest revision, and ensurethe distribution to all ProjectParticipants.
Tracking Contract Drawingso Compress the Drawing Approval Cycle.o Maintain an accurate history of revisionso Create and maintain Distribution Lists
Identify Copies Sent and Paper Size
For each Contact who will be receiving andreviewing Drawings, you can enter thepaper size and the number of copies for eachindividual.
o Relate Drawing Changes to Financial Changeso Create Transmittals for each Drawing Set sent for
review or distribution
8/9/2019 Cont Admin Overview
25/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
25
Steps for Managing Drawings1.Establish Drawings Sets
a. Drawings are usually contained in Sets foe easierdistribution, review, and record keeping. Typically,sets correspond to Phases such as Schematic,Issued for Bid, and Issued for Construction.
b. Categorize Standard Drawing Disciplines(AllProjects/Dictionaries/Drawings/Disciplines)
i. For example: Civil, Mechanical, Electrical,Structural, . . . etc
2. Define Distribution Lists (Define/Distribution List)Create Distribution Lists for Project Participantsinvolved in the Transmittal, Submittal, or ContractDrawing Processes
3.Create Multiple Drawings for each Discipline
4.Log Issued Drawings revisions
5.Package a group of Drawings as a Set of Drawingsa. Drawings are usually contained in Sets for easier
distribution, review, and record keeping. Typically,Sets correspond to Phases such as Schematic,Issued for Bid, and Issued for Construction.
b.When to Use?i. Log/Send revisions for:
1.Changes or RFIs2.Drawings for a Design Phase
6.Forward the Drawing Set for Review or Distribution
7.Update Drawings by Reviewers
8/9/2019 Cont Admin Overview
26/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
26
Hint:
Display from the Computer the Drawing Documents& Drawing Sets
8/9/2019 Cont Admin Overview
27/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
27
Linking Expedition to Primavera Schedule
Expedition used an ODBC link to:o Create Data Dictionarieso Define link to Schedule Fileo View current Project Scheduleo Refresh information in Expedition using Update Tools
Linking Submittal Schedule Dateso Use the Schedule tab to link activities defined in P3 or
P3e to Submittals.
o This determines when Submittals are required to beprepared and Approved (Required Start & RequiredFinish) before Construction Activities can begin.
o Enter the Lead Time (duration) and allow Expeditionto calculate the Start & Finish Dates for:
Delivery Time Fabrication Time
Release to Manufacture Approved Period Submittal Preparation
Hint:Show the above discussions on the Computer..
8/9/2019 Cont Admin Overview
28/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
28
Recording Project Events
Expedition enables to record Project Events throughMeetings Minutes and Daily Reports beside PrintingDaily Reports& Meeting Minutes
o Daily Reports (Logs)Expedition provides:
Report of Daily Work Activities,
Record Equipment used at the Site,Maintain Totals of Field-Force Labor,Keep a Daily Log of all Site Visitors,Track Materials Delivered to the Job Site,
8/9/2019 Cont Admin Overview
29/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
29
Printed Daily Report:
8/9/2019 Cont Admin Overview
30/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
30
o Phone Calls, Meeting, Correspondence, RFIs,and Notices (Communication)
We can use these modules for recording
information that may affect both the submittal andchange processes. For example, a change incondition may result in meetings, phone calls, andnotes, then letters and correspondence that lead to aformal contract change.
o Change Orders and Proceed Orders (ContractInformation)
Result from changes in the Scope of work, SiteConditions, or Schedule Delays. we can post costsassociated with these changes to the Cost Worksheetso we have a total financial picture of past eventsand projected future costs.
o Tracking & Statusing Submittals (Logs)Submittals include Contract Drawings, SampleMaterials, etc that need Approval. The Submittalsmodule helps to ensure Contract Compliance bytracking who received what and when they receivedit.
8/9/2019 Cont Admin Overview
31/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
31
oSubmittal Flow
Received Sent
Transmittal
CorrespondenceSent
Returned Forwarded
TransmittalDunning
Letter
Review/Approval
If Days Held> Planned
8/9/2019 Cont Admin Overview
32/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
32
Printed Submittal:
8/9/2019 Cont Admin Overview
33/34
Abdalla ElDaoushy, Institute of National Planning, Cairo, EGYPT
33
Printed Insurance Certificate:
8/9/2019 Cont Admin Overview
34/34
Printed Punch List: