18

CONSTRUCTION UPDATE Napa Plant Site Central Unit

Embed Size (px)

Citation preview

CONSTRUCTION UPDATE

Napa Plant Site

Central Unit

Napa Plant Site – Central UnitProject Location

Major Design Elements

Construction Photos

Channel Excavation

Construction Photos

South Perimeter

Levee Lowering

Public Access Features

Construction Photos

Barge Channel Breach

Construction Photos

Construction Photos

MONITORING AND ADAPTIVE MANAGEMENT

Napa Plant Site

Central Unit

Water Quality Monitoring

• Water quality parameters: salinity, turbidity, temperature, pH, and dissolved oxygen (DO).

• Time: Data collected during an ebbing tide Frequency:– Within 3 days prior to breaching– Once during the first 24 hrs after breaching and again

within 5 days after breaching– Weekly for the first month after breaching– Monthly until water quality objectives have been met

for 3 consecutive months

Per California Regional Water Quality Control Board

Sampling Locations• 6 locations for Central Unit

Breach. Shown on map as yellow dots

• NR-3 - Napa River, location 3• CUB-DS-150 - Central Unit Breach

Downstream 150 ft• CUB - Central Unit Breach• CUB-US-150 - Central Unit Breach

Upstream 150 ft• NR-2 - Napa River, location 2• NR-1 - Napa River, location 1

• Additionally sampled at the North Unit Breach (not included on following charts for clarity)

Salinity

20.00

21.00

22.00

23.00

24.00

25.00

9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6

Sa

linit

y (

pp

t)

NR-3 CUB-DS-150 CUB CUB-US-150 NR-2 NR-1

Salinity• Performance Standard – Outflow from site will

increase by no more than 5 ppt during any tide cycle.• Results – Within performance standards

BREACH9/29/09

Turbidity

0

10

20

30

40

50

60

70

80

9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6

Tu

rbid

ity

(N

TU

)

NR-3 CUB-DS-150 CUB CUB-US-150 NR-2 NR-1

Turbidity• Performance Standard – Outflow from site will not increase turbidity by more than 5 NTU

during any tide cycle or by more than 10% if background is > 50 NTU.• Results – Turbidity spikes in the first few days but returned to performance standards after 1

week.

BREACH9/29/09

Temperature

16.00

17.00

18.00

19.00

20.00

21.00

9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6

Te

mp

era

ture

oC

NR-3 CUB-DS-150 CUB CUB-US-150 NR-2 NR-1

Temperature• Performance Standard – Outflow from site will not increase temperature by more

than 2.8o C in the wet season and 5.6o C in the dry season during any tide cycle.• Result – Within performance standards

BREACH9/29/09

pH

7.00

7.10

7.20

7.30

7.40

7.50

7.60

7.70

7.80

7.90

8.00

9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6

pH

NR-3 CUB-DS-150 CUB CUB-US-150 NR-2 NR-1

pH• Performance Standard – Outflow from site will not cause changes

greater than 0.5 units of pH during any tide cycle.• Results – Within performance standards

BREACH9/29/09

Dissolved Oxygen

5.00

6.00

7.00

9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6

Dis

so

lve

d O

xy

ge

n (

mg

/L)

NR-3 CUB-DS-150 CUB CUB-US-150 NR-2 NR-1

Dissolved Oxygen• Performance Standard – Outflow from site will not decrease DO to a

concentration lower than 5.0 mg/L during any tide cycle.• Results – Within performance standards

BREACH9/29/09