Perform, Produce and Prosper M. Scott Hursh, CPA, CCIFP February 23, 2011

Construction Industry - Surviving 2011 Thriving 2012 Presentation

Embed Size (px)

DESCRIPTION

Construction Industry Seminar Presentation

Citation preview

Page 1: Construction Industry - Surviving 2011 Thriving 2012 Presentation

1

Perform, Produce and Prosper

M. Scott Hursh, CPA, CCIFPFebruary 23, 2011

Page 2: Construction Industry - Surviving 2011 Thriving 2012 Presentation

2

Perform, Produce and Prosper

• What we will discuss– State of the Industry– Why focus on productivity? – Bonded work as a niche

Page 3: Construction Industry - Surviving 2011 Thriving 2012 Presentation

11

Perform, Produce and Prosper

• Why Focus on Productivity?– Increased Profitability– Less Rework– Improved Margins– Happy Customers

Page 4: Construction Industry - Surviving 2011 Thriving 2012 Presentation

12

Perform, Produce and Prosper

• Why Focus on Productivity?

– The current competitive environment will continue for some time

– The fat has been squeezed out of overhead

– That’s where the money is!

Page 5: Construction Industry - Surviving 2011 Thriving 2012 Presentation

13

Perform, Produce and Prosper

Page 6: Construction Industry - Surviving 2011 Thriving 2012 Presentation

14

Perform, Produce and Prosper

Percent Improvement

Per 8 HourDay

Increase in Profitability

2% 10 Minutes 20%

5% 24 Minutes 50%

10% 48 Minutes 100%

Page 7: Construction Industry - Surviving 2011 Thriving 2012 Presentation

15

Perform, Produce and Prosper

The difference between average and world class

performance is 48 minutes!

Page 8: Construction Industry - Surviving 2011 Thriving 2012 Presentation

16

Perform, Produce and Prosper

• The secrets to improved productivity– Have a process for everything you do– Document the process– Measure results

Page 9: Construction Industry - Surviving 2011 Thriving 2012 Presentation

17

Perform, Produce and Prosper

© FMI Corporation

Page 10: Construction Industry - Surviving 2011 Thriving 2012 Presentation

18

Perform, Produce and Prosper

• The secrets to improved productivity– Focus daily on improving productivity– Continually look for creative, innovative

construction techniques– Glorify the field– Don’t have profit fade

Page 11: Construction Industry - Surviving 2011 Thriving 2012 Presentation

19

Perform, Produce and Prosper

• The secrets to improved productivity– It starts with project selection

• Know the types of work and customers that are most profitable

– Track estimates and performance on every project

– Examine by type, size, location and customer

– Beware of risk!

Page 12: Construction Industry - Surviving 2011 Thriving 2012 Presentation

20

Perform, Produce and Prosper

• Estimating– Have superior estimating skills and

systems• Written process• Track results

– Know the contract termsScope of work, general conditions payment etc.

– Involve operations people in the estimating

Page 13: Construction Industry - Surviving 2011 Thriving 2012 Presentation

21

Perform, Produce and Prosper

• Project turnover (estimating to production)• Have a written process

• Provide adequate timeBoth hours and calendar

• Involve both estimator and PM

Page 14: Construction Industry - Surviving 2011 Thriving 2012 Presentation

22

Perform, Produce and Prosper

• Production• Daily Huddles

• Weekly job meeting

• Two week look ahead report

• Management dashboard report

Page 15: Construction Industry - Surviving 2011 Thriving 2012 Presentation

23

Perform, Produce and Prosper

• Fundamentals of Productivity Improvement

– Increased productivity = increased margins– Firm-wide best practices = improve efficiency – Proactive processes > reactive individuals– The greatest challenge is changing individual

behaviors

Page 16: Construction Industry - Surviving 2011 Thriving 2012 Presentation

24

Perform, Produce and Prosper

• For Introspection– Do you have these processes in your

organization?– Are they consistently applied? Are they

the same or does each person have their own way of managing?

– As your customer base has changed, have your processes changed?

– How do you ensure they are being followed?

Page 17: Construction Industry - Surviving 2011 Thriving 2012 Presentation

3

Perform, Produce and Prosper

State of the Industry

Page 18: Construction Industry - Surviving 2011 Thriving 2012 Presentation

4

Perform, Produce and Prosper

Page 19: Construction Industry - Surviving 2011 Thriving 2012 Presentation

5

Perform, Produce and Prosper

Page 20: Construction Industry - Surviving 2011 Thriving 2012 Presentation

6

Perform, Produce and Prosper

Page 21: Construction Industry - Surviving 2011 Thriving 2012 Presentation

7

Perform, Produce and Prosper

44.7

34.1 35.6

45 44.8 47.7 48.4754.5

51.3 5346.546.1

52.6

0

50

100

Q4 2007Q1 2008

Q2 2008Q3 2008

Q4 2008Q1 2009

Q2 2009Q3 2009

Q4 2009Q1 2010

Q2 2010Q3 2010

Q4 2010

FMI N

CR

I Sco

re

Page 22: Construction Industry - Surviving 2011 Thriving 2012 Presentation

8

Perform, Produce and Prosper

FMI

Page 23: Construction Industry - Surviving 2011 Thriving 2012 Presentation

9

% 'Clha:ng:e

Illndli·c::atolF :2:009 20--:1 '0' :2:0 1 "I .. :20"10-:20-1 .,

_ Bu"-'_""""'"<".S- CEln

$557

Page 24: Construction Industry - Surviving 2011 Thriving 2012 Presentation

10

Perform, Produce and Prosper

Why Focus on Productivity?

Page 25: Construction Industry - Surviving 2011 Thriving 2012 Presentation

25

Perform, Produce and Prosper

Bonded Construction Work as a Niche

Page 26: Construction Industry - Surviving 2011 Thriving 2012 Presentation

26

Perform, Produce and Prosper

• Why pursue a niche?– 1960s - 800,000 Contractors– 2010 - 2,700,000 Contractors– Adjusted for inflation, the amount of work

put-in-place is about the same– Both competition and customers are more

sophisticated

Page 27: Construction Industry - Surviving 2011 Thriving 2012 Presentation

27

Perform, Produce and Prosper

• What is a Niche?– Focusing on types of work, customers

and locations that reduce your exposure to competition

• Inner-city work• Rural work• Special technologies• Demanding customers, etc

Page 28: Construction Industry - Surviving 2011 Thriving 2012 Presentation

28

Perform, Produce and Prosper

• Why a Niche?– Differentiation– Reduced competition– Expertise improves productivity– Sophisticated customers seek value more

than price

Page 29: Construction Industry - Surviving 2011 Thriving 2012 Presentation

29

Perform, Produce and Prosper

• Why bonded work?– Reduced pool of bidders– Bonded contractors are better competition– Sharing bonding capacity with a new

client shows that your firm • Has financially strength• Understand your costs• Manages risks

Page 30: Construction Industry - Surviving 2011 Thriving 2012 Presentation

30

Perform, Produce and Prosper

• Why bonded work?

During an economic downturn a higher percentage of work tends to be in sectors that normally require a bond

Page 31: Construction Industry - Surviving 2011 Thriving 2012 Presentation

31

% 'Clha:ng:e

Illndli·c::atolF :2:009 20--:1 '0' :2:0 1 "I .. :20"10-:20-1 .,

_ Bu"-'_""""'"<".S- CEln

$557

Page 32: Construction Industry - Surviving 2011 Thriving 2012 Presentation

32

Perform, Produce and Prosper

M. Scott Hursh, CPA, CCIFPStambaugh Ness, PC

2600 Eastern BlvdYork, PA 17402

717-840-6116 [email protected]