39
Custodial Hotels Residential Military Education Healthcare Commercial Retail Total modular expertise

Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Cus

todi

alH

otel

sR

esid

entia

lM

ilita

ryE

duca

tion

Hea

lthca

reC

omm

erci

alR

etai

l

Total modular expertise

A4 Covers artwork 14/2/12 15:23 Page 1

Page 2: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Custodial buildingsA leading principal contractor to the Ministry of Justice, detention service providersand police forces throughout the UK, Caledonian Modular has pioneered thedevelopment of high quality buildings for the custodial sector.

Hotel and leisure buildingsAdvances achieved by Caledonian Modular in design, manufacture and offsiteconstruction make pre-engineered building techniques a fast and economicaloption for hotel construction projects.

Military buildingsCaledonian Modular is a primary provider of permanent buildings for the Ministryof Defence and has specific expertise in the design and construction of highquality single living accommodation for service personnel.

Education buildingsHigh quality offsite modular buildings provide a fast and economical answer to theneed for additional learning space in schools and colleges, whether on apermanent or temporary basis.

Healthcare buildingsThe cost and time saving benefits of offsite construction provide value for moneybuilding solutions for the health estate, from complete hospitals and GP surgeriesto individual wards and operating theatres.

Commercial buildingsCaledonian Modular is a leader in offsite construction for office and commercialbuildings of all types, from multi-storey corporate headquarters to temporary‘decant’ blocks.

Retail buildingsOffsite modular building systems from Caledonian Modular allow you toexpand your retail space in less time, at less cost, and with less disruption toyour customers.

Total modular expertise

Bathroom PodsHigh quality bathroom pods delivered fully finished and tested as part of amodular building solution or ready to install in a traditional site construction. Idealfor fast track construction of hotels, apartments and accommodation buildings.

Cus

todi

alH

otel

sR

esid

entia

lM

ilita

ryE

duca

tion

Hea

lthca

reC

omm

erci

alR

etai

l

Residential buildingsFast-track building combined with accurate project costs and completion dates aremaking offsite construction an increasingly popular solution with social and privatehousebuilders, property developers and contractors in the residential build market.

A4 Covers artwork 14/2/12 15:24 Page 3

Page 3: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Summary

Telephone 01636 821645 | www.caledonianmodular.com

Total modular expertise... With experience across every sector, Caledonian Modular is a leading force in the offsite modular building industry and has the expertise and production capability to deliver high quality, cost-effective buildings that meet the current and future needs of their users. The information contained within this document is designed to give an idea of previous projects that we have worked on and our abilities across the spectrum of construction projects. We have also included some information on the benefits of Offsite Construction, the services that we offer to our clients and indication of our factory and the processes and systems we employ. We do also have additional case studies and more detailed information available on a broad spectrum of offsite construction topics which are available on request. If you would like us to arrange for you to visit one of our existing buildings to see for yourself what Caledonian can do for you or to arrange a meeting to discuss your needs in detail, please contact us on 01636 821645 or e-mail us on [email protected] . Thanks for your interest in our company.

Stephen Wightman Business Development Director Caledonian Group www.caledonianmodular.com Tel: 01636 821645 Fax: 01636 821621 Email: [email protected]

Page 4: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Overview

Telephone 01636 821645 | www.caledonianmodular.com

Caledonian Modular – Uniting Caledonian and ModularUK

With a highly successful history in their specialist sectors, Caledonian and ModularUK have joined forces to create Caledonian Modular, offering a synergy of unique skills and strengths in offsite modular building. Caledonian Modular offers a full design, manufacture and installation service for offsite construction projects from our two manufacturing facilities in Nottinghamshire and East Yorkshire. Our products range from simple single storey structures through to high rise multi million pound buildings. In particular we specialise in offering fully bespoke solutions and high quality designs for clients who require the advantages of offsite construction (program savings, project certainty, quality control and reduced weather dependency) without sacrificing architectural design criteria or site utilisation. We also have the capability to offer hybrid solutions utilising panelised systems and traditional site constructed elements to provide the most efficient and cost effective building solution. Working throughout the United Kingdom and Northern Europe we undertake a range of works from full turnkey packages to simple unit supply to main contractors. We have particular experience in the following sectors

Commercial Offices, Construction Site Facilities, Sports Facilities

Custodial Prisons, Police Cells, Young Offenders Facilities, Courts

Education Complete Schools, Classrooms, Nurseries, Training Centres

Healthcare Wards, Operating Theatres, Offices, Specialist Facilities

Hotels From budget 2 star through to 5 star facilities

Military Barrack Accommodation, Facilities Buildings, Medical Facilities

Residential Student Bedrooms. Flats and Apartments, Individual houses

Retail Supermarkets, Forecourt Shops, Restaurants, Marketing Suites

For specific examples of our experience in these areas please see our sector based case studies in the attached pages.

Page 5: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Benefits of Offsite Construction

Telephone 01636 821645 | www.caledonianmodular.com

Faster There are significant programme savings to be achieved using offsite modular construction. With project start to completion times cut by up to 50%, disruption to clients and the local community is minimised, a particular benefit in the case of a school or hospital, for example. Work in the factory can be scheduled to start at the same time as preparing the site, so the two processes can take place in parallel, resulting in an accelerated build programme. And because a high proportion of the build and fit-out is completed in the factory, from internal and external walls and staircases to fully fitted en-suites, on-site time required for final finishing is reduced.

Cost-effective

Modular buildings, offering the cost and time saving benefits of offsite construction, deliver fast, accurate and value for money space solutions across the industry spectrum. Faster build programmes and less time spent on site brings sizable savings in labour costs and prelims. Completing a building in a shorter time scale also means a faster return on your investment and reduced payback periods.

Sustainable

Offsite construction provides a highly sustainable method of building and completed projects can achieve high standards of energy efficiency. For its part, Caledonian Modular is committed to reducing waste as part of the design process and to recycling up to 96% of waste from our factories and construction sites. Modular building projects also involve fewer traffic movements. In one project, a 2,000 bed development provided a 1,290 tonne reduction in CO2 – that’s the equivalent of planting 5,000 trees.

Flexible

Not simply rectangular boxes, modules can be custom-designed to meet a wide variety of building sizes and shapes. Faceted modules allow for curved buildings; awkward shapes around cores can be accommodated with cutbacks or wedge shaped modules. The module’s welded, hot rolled steel frame can be adapted to suit individual project specifications, including heights in excess of 20 storeys, a range of cladding and glazing solutions, and support for structures such as balconies and walkways.

Page 6: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Our Services

Telephone 01636 821645 | www.caledonianmodular.com

Plan Involving our experienced design teams from the outset of a project will ensure maximum value is achieved as it allows the construction process to be integrated into the building design. This reduces risk and optimises potential savings at each stage of the design and build.

Design

Modules are designed to maximise factory input and minimise deliveries to site. Designs can range from one module incorporating five bedrooms to smaller bespoke modules for plant/ancillary areas. Architectural features are incorporated into the design, including building shape, fenestration and curtain walling as well as any bolt on features such as balconies and walkways

Manufacture offsite

Module frames are erected in the factory in a similar fashion to how they would be set out on site. The modules are then fitted out with partitioning and M&E services, decorated, staircases and lift shafts constructed, windows and doors fitted, all ready for sheeting up before delivery to site.

Transport

Buildings are designed to meet site requirements as well as reducing transport. A recent study by WRAP identified an 83% reduction in transport for a modular project compared to a similar traditional build.

Build on-site

Once a stock of completed modules is ready at the factory deliveries can commence. Around 400m² of accommodation can be craned in each day, so a four-classroom school extension could be delivered in a day or a 100-bed hotel in less than two weeks.

Commission

Around 70% to 80% of modular buildings are completed in the factory, many already with their cladding and roofing, leaving just M&E services to be connected and partitioning and module joints to be finished. Larger buildings will be clad on site with brick/block/render or more contemporary claddings, as well as secondary roofs if required.

Page 7: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Factory Facilities & Process

Telephone 01636 821645 | www.caledonianmodular.com

Facto ry 1Facto ry 1Facto ry 1Facto ry 1

Facto ry 2Facto ry 2Facto ry 2Facto ry 2Factory 3Factory 3Factory 3Factory 3

Site 1

Site 2

Factory 4Factory 4Factory 4Factory 4

Stee lStee lStee lStee lFabricationFabricationFabricationFabrication

OfficesOfficesOfficesOffices

Locations Caledonian Modular operates out of two sites, one in Newark in Nottinghamshire and the other in Driffield in East Yorkshire. Between them these amount to around 600,000 square foot of manufacturing space, in fifty acres of overall site space, providing one of the largest modular manufacturing capacities in Europe.

Capacity

The factories operate on highly process driven principles whilst still being highly flexible and allowing a large variety of module shapes and sizes to be manufactured under the strictly controlled factory conditions. We have the capacity to manufacture up to 50 modules per week, an equivalent building area of 2000m2.

Process

The factory has in place full independent accreditation for both ISO9001 (Quality Assurance) and ISO14001 (Environmental Management) as well as full Health and Safety Management,. We also undertake a high degree of waste management within the facilities, achieving 96% waste to recycle levels within both sites.

Skills

The size of the main factory units allows buildings to be laid out as they will be on site. This allows the maximum content, including large proportions of the Mechanical and Electric services to be factory fitted whilst guaranteeing that the systems will align and operate seamlessly on site. This significantly increases quality and reduces site time.

Bathroom Pods

In addition to our main modular offsite business our subsidiary comma Caledonian Bathroom Pods also offers a bespoke pod service to the construction industry. Utilising high strength steel frames they offer industry leading quality and capability to the very highest standards (5 star plus) for all sectors.

Steelwork

Our in house steel fabrications business, Trent Fabrications, not only produces steel frames for both the bathroom pod and modular manufacturing lines but also fabricates non modular structure, portal frames and other steel fabrications.

Page 8: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Lincoln University

CLIENT / END USERLinpave Building / Lincoln UniversityPROGRAMME19 weeksLOCATIONLincoln, Lincolnshire

Working in conjunction with LinpaveBuilding, the University’s PrincipalContractor, were supplied 80 factoryfinished modules for this four storey officefacility. The building was designed as two wings ofmodules arranged at 90 degrees to eachother, with 12 modules linking the two wingsover the four floors. Offering over 2400 m2 of offices, meetingrooms and including a full 12 personpassenger lift and feature staircase theproject was ready for occupation only 19weeks after possession of the site.

Telephone 01636 821645 | www.caledonianmodular.com

Page 9: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Oxford Airport

CLIENT / END USER

Wates Contractors /

Dawney Day Properties

PROGRAMME

14 weeks

LOCATION

Oxford Airport, Kidlington, Oxford

Working on an operational airport presented

a number of challenges in delivering 880 m2

of highly bespoke modular building.

The client wanted the maximum ceiling

height possible, whilst also retaining the

ability to add a second floor to the building in

the future.

Following detailed design Caledonian

Modular produced 20 modules of varying

sizes up to 4m wide and 14m long, including

three modules with angled ends.

These were delivered to site in line with the

program and then the final interior fit out

completed. Finishes used include marble

floors, specialist internal glass walls and dry

lined wall finishes along with high end M&E

systems.

Telephone 01636 821645 | www.caledonianmodular.com

Page 10: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Power League

CLIENT / END USER

Willian Ltd / Power League

PROGRAMME

10 weeks

LOCATION

Shrewsbury Town Football Club

As one of the fastest growing providers of 5

a side football facilities in the UK, Power

League are keen to expand their facilities

and offer new facilities on green field sites

as quickly as possible.

Caledonian Modular offered a full offsite

solution for the 5 a side facility, which

includes changing rooms, stores, reception

and bar areas. Delivered in less than 10

weeks, the building included a fully dry lined

bar area with a high degree of fit-out.

This building replicates the look of a

traditional building, with a brick-slip exterior

whilst retaining the advantages and speed

of modular construction.

Telephone 01636 821645 | www.caledonianmodular.com

Page 11: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular HMP Whatton

CLIENT / END USERThe Home OfficePROGRAMME30 monthsLOCATIONWhatton, Nottinghamshire

HMP Whatton is one within a long seriesof projects undertaken by Caledonian forHM Prison Service. This developmentincludes all facilities necessary for anindependent prison, including cellaccommodation (420 places), workshop,kitchen, education, gatehouse, visits,sports centre and staff facilities. This project clearly demonstratesCaledonian’s capabilities in design, majorconstruction and overall projectmanagement and delivery of a fullyintegrated multi million pound turnkeypackage. A range of “safer cell” fit outs arealso included in the modular construction.

Telephone 01636 821645 | www.caledonianmodular.com

Page 12: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular HMP Coldingley

CLIENT / END USERThe Home OfficePROGRAMME14 monthsLOCATIONSurrey

The development included a new 128place A8 cell block, multi-functionreception, farms and gardens building,extension of gym, kitchen and segregationblock and the refurbishment of the visits,administration and healthcare facilities.Modular construction techniques wereused to build the A8, minimising theamount of time needed on site. Othertechniques, such as the use of panelisedsystems, were employed for the remainingstructures to speed the constructionprocess even further.

Telephone 01636 821645 | www.caledonianmodular.com

Page 13: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular HMP Preston Kitchen

CLIENT / END USER

The Home Office

PROGRAMME

34 weeks

LOCATION

Preston, Lancashire

Preston kitchen is a pre-arranged

commercial kitchen designed to comply

with the NOMS Kitchen Mandatory Guide.

In order to meet the requirements of the

Ministry of Justice guidelines for kitchens

the building was constructed with concrete

floors fitted in the factory.

This allowed an increased level of fit out

to be completed in the factory facility thus

minimising the number of personnel and

time required on site.

Telephone 01636 821645 | www.caledonianmodular.com

Page 14: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular HMP Preston Visits

CLIENT / END USERThe Home OfficePROGRAMME28 weeksLOCATIONPreston, Lancashire

The new visits building was built close tothe existing visits building, nowdemolished, replacing part of the existingsecure perimeter and creating a newpedestrian entry for visitors. The 2 storey building provides 50 openvisits tables, 12 legal visits rooms, 8closed visits booths and associatedancillary facilities such as staff offices,staff tea room, visitor waiting areas and areception.Particular features include a 5m clearceiling height in the visits area andspecially enhanced security measures,features which demonstrate Caledonian’sunique ability to meet bespoke designrequirements.

Telephone 01636 821645 | www.caledonianmodular.com

Page 15: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Margam Park - EnvironmentalEducation Centre

CLIENT / END USERWRW Construction / Neath Port Talbot CouncilPROGRAMME26 weeksLOCATIONNeath Port Talbot, South Wales

Comprising 84 modules in three main blocksand providing over 2500m² of buildings, thecompany was selected to provide timber-framed modular units for this innovativeproject in South Wales. The modules were maximum height andalso include clerestory roofs in the educationblock, 56 bedrooms in the accommodationblock and a full kitchen and servery facility. The detailing of the project was of particularimportance as this involved the use of manyhighly sustainable and recycled materials.This highly integrated approach was verysuccessful in delivering the project on atight, remote site and to the requiredtimescales.

Telephone 01636 821645 | www.caledonianmodular.com

Page 16: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

caledonian Modular Tolworth children’s centre

projecT ScopeFull turnkey package for a two storeycrèche and dining facility, includingdemolition, asbestos removal and allground works and landscaping.cLIeNT / eND USerroyal Borough of Kingston-Upon-ThamesproGrAMMe26 weeksLocATIoNSchool Lane, Surbiton, Kingston-Upon-Thames

With a very constrained site and a fullyoperational school during the construction itwas essential that the impact of the projecton the pupils and local residents wasminimised. Using 28 bespoke volumetric units arrangedto deliver the maximum clear internalspaces the project also incorporated photo -voltaic cells and a number of other eco-friendly features including clerestory northlighting to the dining facilities.of particular note is an enhanced acoustictreatment between ground and first floor toensure a high level of acoustics isolation forthe crèche facility.

Telephone 01636 821645 | www.caledonianmodular.com

Page 17: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Valley Park School - Children’s Centre

CLIENT / END USERSheffield City CouncilPROGRAMME24 weeksLOCATIONSheffield, South Yorkshire

For Sheffield City Council it was vital that thenew nursery building at Valley Park Schoolblended in with the existing structure.To achieve this Caledonian Modulardelivered 14 bespoke modules which werethen brick clad and had a trussed and tiledroof fitted to ensure that the buildings wereindistinguishable.The project also included ground sourceheat pumps and acoustic passive ventilationsystems to improve building environmentalperformance. Upon testing the finalstructure achieved both the targeted SBEMcalculations and significantly exceeded thetargeted air leakage performance.

Telephone 01636 821645 | www.caledonianmodular.com

Page 18: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Bishop Challenor School

CLIENT / END USERDiocese of Westminster / Tower HamletsPROGRAMME16 weeksLOCATIONShadwell, London

As part of the redevelopment of the BishopChallenor Catholic Collegiate School in EastLondon a building was needed to re-housethe boy’s school whilst a 5 year buildingprogram was undertaken on the main site. The company manufactured and installed athree storey building, including lift, staircasesand curtain walling in a 16 week overallprogram. This included a 15m wide clearspanning assembly / recreation hall,laboratories, classrooms, kitchen andservery and specialist teaching facilities forcrafts, cookery and science, including all thespecialist fit out for these areas.

Telephone 01636 821645 | www.caledonianmodular.com

Page 19: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Hillingdon Hospital - Bevan Ward

CLIENT / END USER

ModuleCo / DOH

PROGRAMME

16 weeks

LOCATION

Hillingdon

ModuleCo were contracted through their

hire division PKL Healthcare, to provide the

first of a new prototype ward for the

Department of Health and they selected

Caledonian Modular to design, manufacture

and deliver the modules.

Incorporating 3 different bedroom designs,

with the emphasis on ensuring the best

patient care and staff utilisation the building

utilises 15m long modules, 4.5m wide, sized

at the maximum height for transportation at

4.135m.

Telephone 01636 821645 | www.caledonianmodular.com

Page 20: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Kingsmill Hospital

CLIENT / END USERSkanska/ Sherwood Forest NHS TrustPROGRAMME24 weeksLOCATIONMansfield, Nottinghamshire

With a site that sloped more than 5m overthe length of the building the design for thisDay Case unit was complex and required acouple of innovative engineering solutions.The finished building was arranged in 27modules on a single floor over a gantry withone module acting as a bridge over the fireaccess road leading to a 2.5 storey bed liftand staircase arrangement. Internally the building includes minoroperations theatre, wards, recovery roomswith full medical gas provision, bed headservices and ventilation. A Chapel andassociated administrative areas were alsoadded within the original contractprogramme.

Telephone 01636 821645 | www.caledonianmodular.com

Page 21: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Southport Hospital

CLIENT / END USERSouthport & Ormskirk NHS Trust /ModuleCoPROGRAMME20 weeksLOCATIONSouthport, Lancashire

Working closely with ModuleCo, thespecialist medical facilities provider, thecompany designed, manufactured,delivered, installed and finished 146modules to create a 2 storey facility forSouthport and Ormskirk NHS Trust.The ground floor area was laid out as officeswith the first floor providing wards, operatingtheatres and all associated facilities.Commencing in the factory in late Spring thebuilding was delivered and completed by themiddle of September.

Telephone 01636 821645 | www.caledonianmodular.com

Page 22: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Premier Inn

CLIENT / END USER

Manchester Airports Developments Ltd

PROGRAMME

44 weeks

LOCATION

Manchester

A full, design and build turnkey contract

providing 195 bedrooms over six-storeys.

The contract was all encompassing,

including piled foundations, utilities

supply/connection and construction of an in-

situ steel framework forming the main in-situ

reception/restaurant area.

Modules formed the meeting rooms at

ground floor level, bedrooms and circulation

areas above and plant rooms at roof level.

Externally the building was finished with a

combination of glazed curtain walling,

composite cladding panels, built-up render

system and cedar weather-boarding.

Details included a raised parapet to conceal

the roof-mounted services and external

plant with the roof formed to fall towards the

central valley gutter.

Telephone 01636 821645 | www.caledonianmodular.com

Page 23: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Premier Inn

CLIENT / END USER

Whitbred

PROGRAMME

32 weeks

LOCATION

Sheffield

This 122 bed hotel shows how a modular

structure can be combined with traditional

construction methods to ensure the benefits

of each system are optimized.

At 13 stories overall, the lower four stories

contain car parking, offices, retail and front

of house with modules providing the

bedroom accommodation from level five to

level 12 and roof modules providing plant

rooms and the head of the staircase.

The modules were designed around the

need to provide open plan meeting rooms,

double rooms, family rooms and fully

accessible rooms. Due to the building

configuration a concrete staircase core was

used to allow for the lateral loads on the

building.

Telephone 01636 821645 | www.caledonianmodular.com

Page 24: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

CLIENT / END USEROxford Hotels / GB Building Solutions LimitedPROGRAMME37 weeks overall contractLOCATIONLuton

The first Hilton hotel in the UK to beconstructed using modular technology, thebuilding comprised an in-situ steel frameforming the ground floor front-of-houseareas, first floor gymnasium and secondfloor Junior Suite bedrooms, with twomodular wings forming the back-of-houseareas and bedrooms over three-storeys. The building design embraced a wholeseries of enhancements to suit theoperator and local Planning conditionsincluding separate heating/chiller plant, 10% renewable energy (provided by meansof a biomass boiler), high performancefloor structure and achieved a ‘Good’rating for BREEAM compliance.

Telephone 01636 821645 | www.caledonianmodular.com

Caledonian Modular Hilton Garden Inn

Page 25: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Tulip Inn Hotel

CLIENT / END USERGolden Tulip (UK) LimitedPROGRAMME32 weeks from order to occupationLOCATIONPortsmouth

This was the first of several new build TulipInn Hotels in the UK and the concept of pre-engineered building enabled Caledonian todedicate a fabrications and assembly line tothe Tulip Inn project.Built over five stories, this 108 bedroomhotel incorporates conference facilities,restaurant and bar and combined modularbedrooms around an in-situ steel framedcore. External cladding was in site appliedrender and panel with the building beingtopped off with a ‘gull-wing’ roof.

Telephone 01636 821645 | www.caledonianmodular.com

Page 26: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Marne Barracks

CLIENT / END USERDebut ServicesPROGRAMME25 weeksLOCATIONCatterick Garrison

Part of the national construction programmesupporting SLAM (single livingaccommodation modernisation) project. Thebuildings at Marne consist of 10, three-storey buildings built across a campus stylesite.The 330 modules (each individual modulecontains 3 bedrooms) took 25 weeks toconstruct in one of Caledonian’s 3manufacturing facilities and were completedon site in around half the time of a similartraditional building.Over the eight years of the SLAM contractCaledonian has delivered more than 10,000bed spaces on the project and deliveredproject benefits year on year.

Telephone 01636 821645 | www.caledonianmodular.com

Page 27: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian ModularNorthwood DevelopmentProject

CLIENT / END USERCarillion ConstructionPROGRAMME18 monthsLOCATIONNorthwood, London

This scheme provides the livingaccommodation element of theredevelopment of the NorthwoodHeadquarters in Middlesex and forms animportant part of the site wide constructionstrategy. The new buildings provide 199senior ranks en-suite bedrooms and 279junior ranks en-suite bedrooms, togetherwith utility and common room areas. Caledonian’s scope of work included allelements of the design, supply andinstallation of the external cladding, roofstructure, coverings and completemechanical and electrical installations. Allbuildings have achieved an ‘Excellent’ ratingas assessed by BREEAM.

Telephone 01636 821645 | www.caledonianmodular.com

Page 28: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular RAF Leconfield HQ

CLIENT / END USERCarillion Building / Defence EstatesPROGRAMME20 weeksLOCATIONLeconfield

Working with the Regional Prime Contractor,Carillion Enterprises, Caledonian Modularwas engaged to provide 40 modulesarranged around a courtyard as the new HQBuilding for the Driver School of Transportat RAF Leconfield. The building provides around 1500m2 ofuseable space with offices, stores, trainingrooms and ancillary spaces. Key featuresinclude a 3.4m structural ceiling height toprovide the appropriate space for theteaching areas and a high load capacityfloor for fork lift use in the stores area. Externally the building is clad in acombination of Trespa, timber and brick andis fully compliant with the MOD CounterTerrorism Measures specification.

Telephone 01636 821645 | www.caledonianmodular.com

Page 29: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular RAF Wittering

CLIENT / END USERDebut ServicesPROGRAMME25 weeksLOCATIONPeterborough

Part of the national construction programmesupporting the SLAM (single livingaccommodation modernisation) project.The two buildings constructed at RAFWittering base are the new evolved ‘T’shape design incorporating 96 bedroomsand associated utility and common rooms,built over four stories.Over the eight years of the SLAM contractCaledonian has delivered more than 10,000bed spaces on the project and deliveredproject benefits year on year. Data from theproject has also proved that themaintenance costs of the modularconstruction SLAM estate is two thirds ofthat of the traditionally built estate.

Telephone 01636 821645 | www.caledonianmodular.com

Page 30: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Paragon Project

CLIENT / END USER

Berkeley First (part of the Berkeley Group)

PROGRAMME

30 months

LOCATION

Brentford, London

This project is the tallest self supporting

modular structure in Europe and comprised

more than 1000 modules to deliver a range

of accommodation across five buildings.

Ranging from four to 17 storeys the project

provided 839 en-suite student rooms and

communal kitchens, 114 en-suite key worker

studio rooms, 44 one bedroom key worker

apartments, 63 two bedroom key worker

apartments.

Caledonian constructed bespoke modular

units for the building structure, tied to

concrete stair and lift cores providing lateral

restraint. Scope of supply included all

modular areas, all internal finishes and

internal furniture.

Telephone 01636 821645 | www.caledonianmodular.com

Page 31: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Surrey Street

CLIENT / END USER

Howard Holdings

PROGRAMME

35 weeks

LOCATION

Croydon, Surrey

The mixed scheme development,

providing private sale, shared ownership

and housing association units, occupies

an L-shaped site in between the main

market street in Croydon and an NCP car

park.

Due to the tight nature of the site a 500

tonne crane was used to lift the modules

into place with deliveries taking place at

night.

One of the unusual aspects of this project

was that stair and lift shaft modules were

extended through the concrete plinth to

level -1, which meant that with an in-situ

staircase, instant access was provided to

the modular structure above modular

construction.

Telephone 01636 821645 | www.caledonianmodular.com

Page 32: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular University of Sheffield

CLIENT / END USER

Sheffield University

PROGRAMME

16 months

LOCATION

Sheffield, South Yorkshire

This large student development near the

centre of town needed to deliver 1,200 study

bedrooms with communal kitchens, studios

& family apartments to a very tight program.

To meet this and minimise costs wider

modules were used, in some cases over 5

metres, allowing five bedrooms with en-

suites to be built in to one unit.

A range of shaped modules containing

staircases and lift cores were designed,

including wedges, to alter the orientation of

longer runs, following site boundaries and

adding interest to the development. As a

way of maximising the offsite build, fully

fitted plant rooms were constructed in the

factory within the modules.

Telephone 01636 821645 | www.caledonianmodular.com

Page 33: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Winton School ResidentialDevelopment

CLIENT / END USERKier London for the Genesis Housing TrustPROGRAMME26 weeksLOCATIONIslington, London

As part of the Local Area RegenerationScheme, this residential developmentproject consisted of 23 dwellings dividedbetween Social Housing and SharedOwnership arranged in a six storeyresidential development using fullyvolumetric construction. The scheme incorporated two bedroomapartments and five bedroom, three storey,townhouses, which also included the keyrequirements of two fully accessibleapartments. Internal works involvedcomplete bathroom and kitchen installationand all M & E works and the buildingachieved NHBC Accreditation.

Telephone 01636 821645 | www.caledonianmodular.com

Page 34: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Kew Riverside

CLIENT / END USERSt James HomesPROGRAMME6 weeksLOCATIONKew, London

For their prestigious Kew Riversidedevelopment alongside the Thames StJames Homes wanted an iconic marketingsuite to emulate the Modernist design ofMies Van Der Rohe.Working closely with the architect and themodular consultant MTech CaledonianModular were able to take the style of theFarnsworth House, built in the 1920’s, andoffer a modular solution. The finished product offered a highly flexiblesales environment for the client,configurable in both single and two storeyformats, whilst also proving that modularstructures do not have to be boring boxes.

Telephone 01636 821645 | www.caledonianmodular.com

Page 35: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Petrol Forecourt Shops

CLIENT / END USERShell, Conoco / Jet, Tesco, SainburyPROGRAMME2-3 weeks on siteLOCATIONUK and Eire

One of the key benefits of offsiteconstruction is the reduced site program,which in a retail environment translates tominimal lost revenue when rebuilding anexisting trading site.Over a period of 5 years the companyproduced over 80 petrol station forecourtshops for a wide range of clients includingShell, Tesco, Conoco, Jet and Sainsbury’s.Varying in size, dependent upon the sitefootprint and the trading requirements of thesite, the buildings were designed as factorycomplete modules, including cladding, paydesks, glazed shop fronts and final roofstructures, with only with jointing and finaltrims and connections being carried out afterinstallation on site.

Telephone 01636 821645 | www.caledonianmodular.com

Page 36: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Norwich Market Stalls

CLIENT / END USERCarter Design Group / Norwich City CouncilPROGRAMME26 weeksLOCATIONNorwich

As part of the £4.6million refurbishment ofNorwich Market the City Council required108 new permanent market stalls. Workingwith LSI Architects, Caledonian Modulardeveloped a fully modular solution whichretained the character of a ‘traditional’market with the brightly painted striped roofsproviding a colourful canopy.The steel-framed modules are fitted withremotely operated steel shutters, ventilationgrilles in the eaves, service ducts andexternal brackets to which the retractablePerspex weather canopies will be affixed.The market site has varying degrees ofsloping across three elevations, meaningthat the steel supporting legs of the modulesall have to be of different lengths tocompensate for the differing ground levels.

Telephone 01636 821645 | www.caledonianmodular.com

Page 37: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Modular Sales Kiosks

CLIENT / END USERVirgin Atlantic / TFLPROGRAMME2-4 weeks on siteLOCATIONHeathrow Airport / North Greenwich Transport Interchange

As offsite construction offers significantlyreduced site programs this can offersignificant benefits where additional retailfacilities Are needed in busy live locations.For London Transport the companydesigned two specialist kiosks for travelinformation services and a driver’s restroomfor the new Jubilee Line transportinterchange. The architects, Foster andPartners, required a very high tech look andthis was achieved by the use of a steelframed unit with proprietary stainless steelcladding panels For Virgin Atlantic First Class check inmodular construction offered the onlypractical way to achieve this installation asthe works were required to be conducted atnight to minimise disruption to the carparking facilities at the airport.

Telephone 01636 821645 | www.caledonianmodular.com

Page 38: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Caledonian Bathroom Pods

BATHROOM POD SPECIALISTS

• High quality modular solution for all

types of building projects

• Time and cost saving benefits of offsite

build and fit-out

• Flexible design and finishing options

• Enhanced quality control from concept to

completion

• Available in a range of sizes with

bespoke design

• Designed to comply with Document M

access legislation where required

Telephone 01636 821645 | www.caledonianmodular.com

Page 39: Construction Index | Construction News | Construction ......Ideal for fast track construction of hotels, apartments and accommodation buildings. Custodial Hotels Residential Military

Head Office and Carlton WorksCarlton-on-TrentNewarkNottinghamshireNG23 6NT

Driffield WorksDriffield Business ParkKelleythorpeDriffieldEast YorkshireYO25 9HD

Caledonian Modular

Carlton WorksCarlton-on-TrentNewarkNottinghamshireNG23 6NT

Caledonian Bathroom Pods

Carlton WorksCarlton-on-TrentNewarkNottinghamshireNG23 6NT

Trent Fabrications

Call us on 01636 821645 to find out more or visit

www.caledonianmodular.com

A4 Covers artwork 14/2/12 15:24 Page 5